Amend 0001 250002.pdf

PDF 95 KB Posted

Attached to
Repair BEQ AS4211
Solicitation number
N4008526R9007
Issued by

About this file

This document is an Amendment of Solicitation (Standard Form 30) for solicitation N40085-26-R-9007, issued by NAVFAC Mid-Atlantic Resident Officer in Charge of Construction at Camp Lejeune, NC, for a project identified as 25-0002 involving Repair BEQ AS4211. The amendment, labeled as Amendment 0001 and dated 12/18/25, addresses a specific question regarding specification section 28 31 76, clarifying that the standalone file with the RFP replaces the previously dated specification section in the "Spec 250002" file. The time and date for receipt of proposals remains unchanged, and contractors are advised that failure to acknowledge the amendment may constitute grounds for rejection of their proposal.

View the file

Other files

File Type Posted
Amend 0006 250002.pdf PDF
Amend 0005.pdf PDF
Amend 0004 250002.pdf PDF
Amend 0003 250002.pdf PDF
Amend 0002 250002.pdf PDF
Dwgs 250002.pdf PDF
Spec 250002.pdf PDF
Appendix D 250002.pdf PDF
Spec 28 31 76.pdf PDF
RFP 250002.pdf PDF
Paving Detail ELIN 0003.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

AMENDMENT NO. 0001 12/18/25 25-0002

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-26-R-9007

12/17/25

25-0002, Repair BEQ AS4211 Amendment 0001, Answer Requests for information

The time and date for receipt of proposals remains unchanged.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

See Continuation Page(s)

N40085-26-R-9007 Amendment 0001

CONTINUATION SHEET

1. QUESTION: There is already a section 28 31 76 dated July 25, 2025 in the specs but there is also a section 28 31 76 loaded alone. Which one is the correct section, one in the specs already dated July 25, 2025 or the one alone?

ANSWER: Specification section 28 31 76 that is a standalone file with the RFP replaces Specification section 28 31 76 dated July 25, 2025 included in the file named “Spec 250002”

2. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .