Amendment 0004.pdf
PDF 415 KB Posted
- Solicitation number
- N4008526R0272
About this file
This is Amendment 0004 to solicitation N4008526R0272, issued by NAVFACSYSCOM Mid-Atlantic ROICC Norfolk on October 22, 2026, for the X-132 Entrance at Northeast Loading Dock project at Naval Station Norfolk, Norfolk, Virginia. The amendment provides responses to one pre-proposal inquiry (PPI #28) regarding construction methodology for a concrete ramp installation. The inquiry addressed concerns about the difficulty of removing concrete forms and infilling a void with stone in a 6-inch gap between existing wall footing and new concrete ramp, as detailed on drawing SB401. The Government's response confirms that if field conditions match those shown on the drawings, contractors may substitute an expansion joint at the junction of the existing concrete platform and new ramp with void infilled with concrete, in lieu of creating the void and filling it with stone. The amendment does not extend the offer receipt deadline. Contractors must acknowledge receipt of this amendment prior to the solicitation deadline by completing and returning the amendment, acknowledging receipt on offer copies, or submitting separate written correspondence referencing the solicitation and amendment numbers. Contact for questions is Erik Cole at (757) 341-0556 or Erik.w.cole2.civ@us.navy.mil.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 2. AMENDMENT/MODIFICATION NO.
0004 10/22/2026
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFACSYSCOM MID-ATLANTIC
ROICC NORFOLK
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N4008526R0272
9B. DATED (SEE ITEM 11)
09/23/2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N4008526R0272; X-132 Entrance at Northeast Loading Dock, Naval Station Norfolk, Norfolk, Virginia
See Continuation Page
Contact POC: Erik Cole (757) 341-0556; Erik.w.cole2.civ@us.navy.mil
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:Erik.w.cole2.civ@us.navy.mil
N4008526R0272
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0004
The purpose of this amendment is to provide the following:
1. Provide responses to Pre-Proposal Inquiries (PPI).
1. PRE-PROPOSAL INQUIRY (PPI) RESPONSES:
PPI # QUESTION RESPONSE
Detail C1 on SB401 shows a 6" gap between the existing wall footing and the new concrete ramp being installed.
The concrete forms that would be used for this will be incredibly difficult to remove from that section once concrete has been poured, and then adding the stone in the void also provides its own difficulty. Would the government accept the use of expansion joint along the wall instead of creating the void and filling with stone?
If the field conditions match those shown on the drawings, the inclusion of an expansion joint at the junction of the existing concrete platform and the new ramp, and having the void infilled with concrete, is acceptable to the Government in lieu of creating the void and filling with stone.