This is a Pre-Proposal Inquiry (PPI) Submission Form containing 167 questions and answers related to the CA-7 Secure Space & Restroom Addition project at Naval Station Norfolk, Virginia, solicitation number N4008526R0232. The document clarifies ambiguities in the bid documents, specifications, and drawings to assist contractors in developing accurate proposals.

The project involves demolition and renovation of Building CA-7 to create a secure space with restroom addition, requiring Phase 2 construction work only with specific interface points for utilities, telecommunications, water, sewer, and natural gas provided by others. Key scope includes hazardous material abatement (asbestos, lead paint, creosote-treated wood), RF shielding and security modifications, HVAC and mechanical systems, fire protection and alarm systems, distributed antenna system (ERCES), and fixture/equipment installation. Three separate individuals must fill the superintendent, site safety and health officer (SSHO), and quality control manager roles. The contractor must provide temporary field office trailer, temporary security storage using connex boxes with high-security locks within the perimeter fence, and maintain already-erected security measures during construction. The government will provide security personnel (CST/SSM staff) during normal working hours (0700-1700 M-F) with 72-hour advance notice required for overtime, weekends, and holidays. Proposal submission deadline is August 31, 2026; the project number is 1785959. CLINs 0002 and 0003 cover separately funded FF&E and A/V equipment options with government-estimated values and contractor-proposed handling and assembly costs. The contractor bears responsibility for utility costs, third-party testing agencies for various systems, RF shielding specialist qualifications, and detailed quality control planning including submittals review and air barrier certification through ABAA-approved installers.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPI Submission Form

Pre-Proposal Inquiry Submission Form N4008526R0232 CA-7 Secure Space & Restroom Addition, NSA, Norfolk, VA
Submitted By
Date SubmittedLEAVE BLANKReference
PageSectionParagraphQuestionAnswerAnswered by
407/22/26Price proposal form includes a CLIN 0002 and CLIN 0003 for FF&E and A/V Equipment, however it does not include the Government Estimated Price for either of these. Will this information be provided to contractors or is it up to the contractor to determine the estimated cost of these CLINs?See revised Price Proposal Form - Refer to Revision 2MABP
507/22/26Both CLINs 0002 and 0003 are listed on the Price Proposal Form as deductive modifications. How would these to be deductive modifications if they are options to be added to the price of the total contract?See revised Price Proposal Form - Refer to Revision 2MABP
607/22/26401 32 17.00 201.9Can the designated project scheduler be employed by the prime contractor or does this position need to be a performed by a third party?Project scheduler can be employeed by prime contractorALP
707/22/26Section 01 35 26, paragraph 1.8.3 states that the SSHO may not serve as the Quality Control Manager, however Section 01 45 00, paragraph 1.6.1.1 states the QC manager is to serve as the Level two SSHO. How many individuals from the prime contractor are required to fill the Superintendent, SSHO, and QC manager roles?Must be 3 separate individuals.ALP
807/22/26Is the prime contractor required to provide a temporary field office trailer on site for the duration of the project?yes, a temporary trailer must be on site for the duration.ALP
907/22/26The General Requirements state: “Proposal Due Date: Wednesday, 21 August 2026.” August 21, 2026 falls on a Friday. Please confirm the controlling proposal due date and day of the week.The due date for bid submission has been extended to August 31st, 2026. August 31st, 2026 falls on a Monday.SLG
1007/22/26The General Requirements identify Work Order No. 1785989, while the specifications and price schedule reference eProject No. 1785959 and, in some locations, 1785959/1710350.
Please confirm the correct project number, work order number, and eProject number that offerors must use on proposals, bonds, subcontractor documents, and post-award submittals.The correct number is 1785959ALP
1107/22/26The price schedule totals CLINs 0001, 0002, and 0003, while the evaluation language states that total price consists of the “basic requirements.” CLINs 0002 and 0003 are separately funded bid options containing Government-estimated FF&E and AV values plus the Contractor’s proposed HAR.

Please confirm:

Whether low-price evaluation will be based on CLIN 0001 only or the combined total of CLINs 0001, 0002, and 0003.

Whether the Government-estimated FF&E and AV amounts are included in the evaluated price.

Whether the bid bond is calculated from CLIN 0001 or from the total of CLINs 0001 through 0003.See revised Price Proposal Form - Refer to Revision 2MABP
1207/22/26The price schedule directs offerors to extend the stated quantities for CLINs 0001AC through 0001AO and include those extensions in the total for CLIN 0001.

Please confirm:

The stated quantities must be extended and included in the evaluated CLIN 0001 price.

CLINs 0001AA and 0001AB must exclude costs covered by 0001AC through 0001AO to prevent duplication.

Post-award payment will be adjusted to actual measured quantities using the accepted unit prices.

Whether the stated quantities are guaranteed minimum quantities or estimated quantities only.CLINs 0001AC - 0001AO are above what is included in the base price.ABP
1307/22/26Updated Sheet GI104 states that all Phase 1 and Phases 3, 4, and 5 work will be completed by others. However, the Phase 1 notes still direct the “Contractor” to verify fiber connections and provide electrical connections, erosion controls, tree protection, and temporary fencing.

Please confirm that this task order includes Phase 2 work only, except for the specific utility and equipment-pad work expressly listed under Phase 2. Please identify all required Phase 2 interface points with work by others, including:

Electrical service Telecommunications/fiber Domestic water Sanitary sewer Natural gas Site access and temporary controls Permanent fencing and access-control work

Please also provide the anticipated completion and turnover date for Phase 1 infrastructure and confirm that delays in making those interfaces available will result in appropriate time and cost adjustments.The Contractor for this bidding package is responsible for Phase 2 work only excepting specific items listed.WHW
1407/22/26Updated Sheet GI104 assigns Phase 1 temporary fencing and gates to work by others. However, Construction Security Plan Section 15 assigns the GC responsibility for the Secure Construction Site and Secure Storage Area fences, perimeter lighting, Access Control Facility, sally port, utilities, maintenance, and removal.

Please confirm which party must furnish, install, maintain, operate, and remove each of the following:

FE-6 Secure Construction Site perimeter fence Secure Storage Area enclosure Personnel gates Vehicle gates and sally port Perimeter and vehicle-search lighting Access Control Facility Power, water, sanitary service, and communications serving these facilities

If included in this task order, please provide the Government’s proposed site-security outline, approximate fence length, locations, utility connection points, and anticipated duration.The phase 1 site work will establish a temporary security fence including gates, lighting and turnstiles. The permanent fence will be completed by the site contractor upon completion of the building work. The building contractor is responsible for maintaining the already erected security measures during the building construction phase of the work.WHW
1507/22/26The Construction Security Plan defines the SSA in one location as substantial slab-to-slab construction with a solid-core or steel-clad door. Section 13 subsequently describes the SSA as a fenced area located within the Secure Construction Site.

Please clarify the required SSA construction. Specifically, confirm whether the SSA must be:

A weatherproof enclosed building;

A chain-link fenced compound;

Both an enclosed building and fenced compound; or Another Government-approved configuration.

Please provide the minimum required area, height, environmental controls, lighting, power, fire protection, and weather-protection requirements.GC is to provide connex boxes with added high security locks that meet the security requirements in the CSP. Connex boxes must be inside the perimeter fence and no closer than 6 feet to the FE-6 fence. Connex boxes need to stay locked when GC is not loading or unloading material. Box is to be weather protected. Size and number of boxes are at the discretion of the GC and are dependent on how much building material they plan to store at once. Materials may not be stored off site once they are received. Storage plan must be approved by the activity and contracting officer prior to installation.SLG
1607/22/26Construction Security Plan Section 15 states that SSM staff and Construction Surveillance Technician requirements are addressed under a separate security-contractor PWS.

Please confirm:

The Government will furnish and pay for the SSM, CSTs, access-control workers, and other security personnel required to inspect and continuously surveil the work.

The normal hours during which Government security coverage will be available.

The advance notice required for overtime, weekends, holidays, deliveries, and multiple-shift work.

Whether the Contractor will incur any direct charge for Government security coverage outside normal working hours.YES OPTEVFOR (the Government) will be providing all the CST/SSM Services Support work throughout demolition and construction (Working hours to be 0700 to 1700 M-F).The government will provide a manned ACF during the hours that the GC is On Site at CA-07. The SCS will be provided 24/7 video surveillance by the government during the CA-07 project. Overtime: A minimum of a 72-hour notification and/or In accordance with the Awarded Contract (if specified) or on a Case-by-Case basis under urgent or compelling situations with OPTEVFOR SSO approval. Weekends: A minimum of a 72-hour notification and/or In accordance with the Awarded Contract (if specified) or on a Case-by-Case basis under urgent or compelling situations with OPTEVFOR SSO approval. Holidays: A minimum of a 72-hour notification and/or In accordance with the Awarded Contract (if specified) or on a Case-by-Case basis under urgent or compelling situations with OPTEVFOR SSO approval. Deliveries: (IAW the signed CSP) The GC shall provide the SSM 24 hours' notice of material delivery to this project to all for proper staffing of SSM Staff personnel. Additionally, Three Week Look Ahead Schedule. The GC shall provide the SSM a Three (3) Week work look ahead schedule on a weekly basis. The SSM will use the Three Week look ahead schedule for planning of SSM Staff and resources. The three week look ahead shall include, but not be limited to: the number of workers expected per day over the following 3 weeks; the general working locations of all workers/trades and their activities; the hours of operation/site access on a daily basis; and any special activities, operations, visits, or other information the SSM should be notified about. Multiple-Shift Work: Activity is not provisioned to support Shift Work (not including those days that need to incorporate overtime as prescribed within the awarded contract. The Contractor will not incur any direct charge for Government security coverage outside of working hours.SLG
1707/22/26Specification Section 01 10 00, paragraph 1.3, states that the building will be occupied during construction. The Construction Security Plan, Section 12, states: “There will be no operations in building CA-7 during this renovation project.”
Please confirm that Building CA-7 will be fully vacated and unavailable to Government occupants throughout demolition and construction. If any portion will remain occupied or operational, please identify the occupied areas, required access routes, utility services that must remain operational, and required temporary separations.Building will not be occupied.ALP
1807/22/26Specification Section 02 85 00 states that an initial Microbial Assessment Survey is included at the end of the section; however, no project-specific survey appears to be included. The specifications also direct the Contractor to obtain facility ACM/LBP surveys from the Contracting Officer.

Please provide all available project-specific surveys and laboratory results for:

Asbestos-containing materials Presumed asbestos-containing materials Paint containing lead, cadmium, or chromium Mold or microbial contamination PCBs and mercury-containing equipment Gym-floor wood ties, adhesive, mastics, and underlying materials

Please identify the locations and estimated quantities of all known abatement included in the base bid.Refer to HM101 note A, "hazardous material testing was not contducted during design, but prior field observation has indicted probable presence of hazardous materials. Conduct sample testing before construction or demolition begins." Assumed quantities for bid purposes can be found on sheet HM101. Contractor is responsible for testing.ALP
1907/22/26Specification Section 02 82 00 states that asbestos work includes demolition and removal of creosote-treated wood ties, but the sentence does not identify their location or quantity. The specification also appears to apply asbestos handling and negative-pressure requirements to this removal.

Please clarify:

The existing gym-floor assembly, including the thickness and number of layers of wood, sleepers/ties, felt or tar paper, mastics, and other materials.

Which components are confirmed or presumed to contain asbestos.

Whether all creosote-treated wood ties and underlying materials must be removed as regulated abatement under Section 02 82 00.

The estimated square footage, volume, or weight to be carried in the base bid.

The required disposal classification for each material.Refer to HM101 note A, "hazardous material testing was not contducted during design, but prior field observation has indicted probable presence of hazardous materials. Conduct sample testing before construction or demolition begins." Assumed quantities for bid purposes can be found on sheet HM101. Contractor is responsible for testing.ALP
2007/22/26The solicitation incorporates DFARS 252.204-7012, and the Construction Security Plan identifies project information as Controlled Unclassified Information. However, the solicitation does not identify a required CMMC level or assessment status.

Please confirm:

Whether CMMC certification or assessment is required for the prime contractor.

The applicable CMMC level.

Whether the requirement flows down to subcontractors, designers, consultants, suppliers, or others receiving project documents.

Whether subcontractors must meet the requirement before bidding, before receiving documents, or before beginning post-award performance.

The approved systems and methods for transmitting and storing project CUI.CMMC level oneALP
2108/10/26Is the contractor responsible for removing existing FF&E from the space prior to the start of construction? If so, should the contractor plan to store existing FF&E or dispose?Customer will remove all building contents prior to the start of construction with the exception of 3 large wall monitors/screens and one small computer rack that are located in the classroom space. Due to computer security requirements, these items must remain in place and must be protected by the contractor while above ceiling work is being performed at this location.SLG
2208/10/26Please confirm that demolition beyond limits shown in the bid documents is acceptable to facilitate equipment access for interior LGMF framing and concrete work.Yes.ALP
2308/10/26Does this project remove/abate existing paint at interior gym walls?Yes, see HM101, note #1.ALP
2408/10/26It appears 25 05 11 Cybersecurity for Facility-Related Control Systems was not included with the project specifications. Please confirm that contractor provided cybersecurity commissioning/specialist is not required to support his project.Specification Section 25 05 11 has been added. Refer to Revision 02MJAT
2508/10/26It appears 01 91 00.15 Building Commissioning was not included with the project specifications. Please confirm that contractor provide, third-party commissioning is not required to support his project.Building Commissioning is not Required for this project.SLG
2608/10/26MI501Detail A4 on Sheet MI501 shows a security grill and grounding for duct penetrations at the secure area boundary for ICD 705/TEMPEST compliance. Please confirm that waveguides are not required for duct penetrations at the secure area boundary. Please also confirm that waveguides are not required for pipe penetrations at the secure area boundary: sprinkler, hydronic, refrigerant, etc.Waveguides are not required on this project.ALP
2708/10/26Does this project clean and repoint existing brick veneer at Building CA-7?No.ALP
2808/10/26Should the contractor assume surficial soil exposed after removal of existing gym floor rests is contaminated with creosote? If so, please provide an assumed removal depth for bidding purposes?Refer to Revision 02M which indicates to change keyonte 2 on sheet HM101 to read "REMOVE CREOSOTE TREATED (4x4) WOOD TIES BENEATH WOOD FLOOR COMPLETE. IF IT IS SUSPECTED THAT ADJACENT SOIL IS CONTAMINATED, TEST SOIL WITH TCLP SAMPLING METHOD. REMOVE CONTAMINATED SOIL AS REQUIRED." Though exact quantity of contaminated soil required for removal will be unknown until it is uncovered during demolition - assume that 1'-0" depth of soil will have to be removed and disposed of according to governing regulations for bidding purposes.SLG
2908/10/26It appears that intumescent coating is required for wood roof sheathing and trusses in the existing classroom area. Please confirm that roof sheathing and trusses in the existing gym area are not wood construction and don’t require intumescent coating.Refer to plans. AE104, AE302 and AE303. Intumescent Paint will be required at underside of barrel vault roof (in area that is currenty the gym) - to existing wood joists and wood roof sheathing. Additionally, intumescent paint will be required above ceiling at existing classroom space to wood joists and wood roof sheathing. Assembly must achieve 1 hour fire rating.ALP
3008/10/26Bid ScheduleDescriptions for CLINs 0002 and 0003 note each as a deductive modification. Should this read as planned modification instead? If deductive, should the contractor plan to include all FF&E and A/V related cost in CLIN 0001AA. Also, will a government estimate be provided for FF&E and A/V packages.See revised Price Proposal Form - Refer to Revision 2MABP
3108/10/26CS105Is the contractor responsible for site restoration after completion of ground disturbing activities as part of this project? For example, Keynote 9 on Sheet CS105 calling out topsoil/seed in the area of new mechanical and generator pads is redlined.Site Restoration will be expect only in areas that the MAC contractor has disturbed the site. This will include a 5'0" perimeter around the new restroom addition and mechanical equipment pads. Additionally any areas where excavation is required for utility work, site restoration will be an expectation.SLG
3208/10/26CS105Marker for Keynote 8 is redlined on Sheet CS105, but the description is not. Please confirm this note applies to the project.Note 8 is located on the far east of the site of the plan - mid page. This note refers to patching pavement related to installation of water meter.SLG
3308/10/26Bid SchedulePlease elaborate on scope associated CLINs 0001AK through 0001AO. Are these in reference to direct scope associated with the project or surplus unit price quantities similar to CLINs 0001C through 0001J? If direct scope, please provide a brief summary/diagram highlighting each CLIN.Surplus unit price quantities.JAT
3408/10/26Please confirm this project does not provide permanent security fencing/gates/turnstiles around the perimeter of CA-7 and new bathroom addition.Confirming it does not, as provided by others.ALP
3508/10/26Please confirm this project does not require temporary fencing/gates/turnstiles around the perimeter of CA-7 and new bathroom addition during construction.Confirming it does not, provided by others.ALP
3608/10/26Bid ScheduleDoes the total amount of CLIN 0001AA through CLIN 0001AO serve as the basis for award or are specific CLINs excluded? We were unable to find clarifying language in the provided bid schedule.See revised Price Proposal Form - Refer to Revision 2MABP
3708/10/26Are pathways for SIPR cabling required to be in Rigid Steel conduit with epoxied/welded joints and exposed for inspection on the building interior?No, horizontal copper for SIPR is only ran inside the secure boundary.JAT
3808/10/26Are data boxes supporting SIPR required to be surface-mounted, lockable type?No, horizontal copper for SIPR is only ran inside the secure boundary.JAT
3908/11/26Note 13 on drawing sheet CS105, which states to provide bollards to protect mechanical equipment, however this note is redlined. Are these bollards not required or was the redline on that note an error?Bollards are to be provided by others in a separate contract and are not be be included in this project.SLG
4008/11/26
Review of the project specs reveals that several sections (01, 27, 28) reference cybersecurity requirements and one directly references (spec pdf page 1563/1860) what seems to be a missing Section 25 05 11. We believe sections 23 and 26 should also have requirements, but they currently don’t. Please provide the missing division 25 specification section.Specification Section 25 05 11 has been added. Refer to Revision 02MJAT
4108/12/26GeneralPlease verify that all patching and repairs are shown on the drawings. If there are existing hole, cracks, chips, etc. that need to be repaired and are not shown on the drawings, please provide locations, sizes and counts of each item that the contractor will be required to repair. If this cannot be provided, please provide an allowance that the contractor shall carry in order to account for all patching or repairs.Confirming all patching and repairs are shown.ALP
4208/12/26GeneralPlease verify that the contractor will not be required to remove/relocate/protect any equipment/furniture other than what is shown on the drawings. If this is required, please provide a list of equipment and location(s) of the equipment/furniture that the contractor is to protect/relocate/remove. If the equipment/furniture is to be relocated, please provide the temporary location of the equipment/furniture. If the contractor is required to store any equipment/furniture, please provide the location that the contractor may place the temporary storage containers.Customer will remove all building contents prior to the start of construction with the exception of 3 large wall monitors/screens and one small computer rack that are located in the classroom space. Due to computer security requirements, these items must remain in place and must be protected by the contractor while above ceiling work is being performed at this location.SLG
4308/12/26GeneralPlease verify that all mechanical and electrical testing can be completed by the MEP contractors and a 3rd party testing agency will not be required. If the contractor is required to hire a 3rd party testing agency for testing, please provide the type of test and frequency of all tests required to be completed by a 3rd party.Refer to Specification Section 23 05 93 for Mechanical third party testing requirements. Refer to Specification Section 26 08 00 for third party apparatus and inspection testing requirements. Third party testing is required.SLG
4408/12/26GeneralPlease verify that the contractor will be required to provide 3rd party utility locates for this project.Yes this is contractor responsibilitySLG
4508/12/26GeneralPlease specify what anti-malware software the government would want us to have.Section 01 50 00 - Subpart 1.6.1.2 indicates: The [Contractor} computer must run anti-malware software from a reputable software

manufacturer. Anti-malware software must be a version currently supported by the software manufacturer, must be current on all patches and updates, and must use the latest definitions file. All computers used on this project must be scanned using the installed software at least once per

day. A specific software has not been indicated - but must meet the performance characteristics described above. For bidding purposes - assume $20.00 per month for malware software.SLG
4608/12/26GeneralPlease verify that the contractor will not be required to remove, relocate and/or protect any equipment/furniture. If this is required, please provide a list of equipment and location(s) of the equipment and/or furniture that the contractor is to protect/relocate/remove. If the equipment/furniture is to be relocated, please provide the temporary location of the equipment/furniture. If the contractor is required to store any equipment/furniture, please provide the location that the contractor may place the temporary storage containers.Customer will remove all building contents prior to the start of construction with the exception of 3 large wall monitors/screens and one small computer rack that are located in the classroom space. Due to computer security requirements, these items must remain in place and must be protected by the contractor while above ceiling work is being performed at this location.SLG
4708/12/263Please reference page 3 of the price schedule. Line item 0002 is noted as a deductive modification. Please verify if the contractor is not to include FF&E supply and installation in their base bid. If the contractor is not to include FF&E supply and installation in their base bid, please verify that line item 0002 is an additive modification in lieu of a deductive modification.See revised Price Proposal Form - Refer to Revision 2MABP
4808/12/263Please provide the government estimated price for the FF&E scope so the contractor may include this in their bid.See revised Price Proposal Form - Refer to Revision 2MABP
4908/12/263Please verify that the contractor must include FF&E design in their base bid.See Spec section 12 00 01.00 20 paragraph 3.1.1ABP
5008/12/266Please reference page 6 of the price schedule. Line item 0003 is noted as a deductive modification. Please verify if the contractor is not to include A/V supply and installation in their base bid. If the contractor is not to include A/V supply and installation in their base bid, please verify that line item 0003 is an additive modification in lieu of a deductive modification.See revised Price Proposal Form - Refer to Revision 2MABP
5108/12/266Please provide the government estimated price for the A/V scope so the contractor may include this in their bid.See revised Price Proposal Form - Refer to Revision 2MABP
5208/12/266Please verify that the contractor must include A/V design in their base bid.See Spec section 01 30 02.00 22 paragraph 1.3ABP
5308/12/2610114001.2Please verify that the security specialist for this project will be provided by the government. If the contractor is to include the security specialist, please provide a specification including all requirements and staff required.The activity is providing the security specialist, please refer to the CSP.ALP
5408/12/2640114001.3.4As the contractor is required to work in an existing building which is occupied, please provide the locations of all temporary partitions required for this project.Building will not be occupied, no partition will be required.ALP
5508/12/2640114001.3.4As this is a secured space, please provide a detail and location of any temporary partitions required to ensure the space is secured.No temporary partitions required.ALP
5608/12/2640130001.9.1 cPlease verify that the initial partnering session can be an online teams meeting.Initial Parterning Meeting is Required and must be in-person.SLG
5708/12/2640130001.9.1 cIf the initial partnering session cannot be an online teams meeting or located at the contractor's office located in Norfolk, VA, please provide the required location of the initial partnering session, for bidding purposes.Partnering meeting is required and must be within 15 miles of Naval Station, Norfolk at a mutually agreed upon off-base location. Initial partnering meeting is required to be one day.SLG
5808/12/2640130001.9.1 dPlease verify that the 3rd party facilitator requirement for the partnering session maybe waived for this project.Third party facilitator is required.SLG
5908/12/261013201.00 101.3Please verify that the designated project scheduler may also serve as the project manager as long as they meet the required per section 013201.00 10 1.3.Yes - it is possible for the designated project scheduler to serve as the project manager as long as they meet the requirements of both positions.SLG
6008/12/2630133291.5.1Please provide the high performance sustainable building checklist that was developed during design for this project as this is typically completed by the DOR.There is no checklist requirement for this project.
6108/12/2690145001.6.4Please verify that a QC specialist will be required to perform quality control activities regarding the RF shielding and meet the qualification of the experience matrix as required per section 014500 1.6.4.A third party RF sheilding specialist is requred to be provided by the Contractor in addition to overall project QC. Refer to specification section 13.49.20.00 10 for requirements specificlly related to qualifications of RF sheilding specialist and third party testing requirements Section 3.5 indicates that the Contractor must provide a Field Quality Control Plan. Section 3.7 indicates that the Contractor is to "Integrate the Contractors' organizational structure for sheilding quality control into jobsite management".SLG
6208/12/2690145001.6.4Please verify that the submittal clerk required per the experience matrix will not need to be onsite.QC Clerk

Provide a Quality Control Clerk at the work site until the work has been accepted. The primary duty is to assist the QC Manager in processing and maintaining files for submittals, preparing and publishing reports and meeting minutes. After primary duties are accomplished, other duties may

be assigned provided the duties do not interfere with primary duties.SLG
6308/12/2690145001.6.4Please verify that a QC specialist will be required to perform quality control activities regarding the concrete scope and meet the qualification of the experience matrix as required per section 014500 1.6.4.Yes - additionally a third party special inspector is also required per specification section 01 45 35SLG
6408/12/26120145001.6.4.4.1Please verify that the contractor's QC manager will perform the periodic inspections required for the secure space perimeter construction as required per section 014500 1.6.4.4.1. If not, please verify that the inspections will be performed by the SSM for the project.A third party RF sheilding specialist is requred to be provided by the Contractor in addition to overall project QC. Refer to specification section 13.49.20.00 10 for requirements specificlly related to qualifications of RF sheilding specialist and third party testing requirements (Testing requirment by independent tesing firm is indicated in Section 3.7). Section 3.5 indicates that the Contractor must provide a Field Quality Control Plan. Section 3.7 indicates that the Contractor is to "Integrate the Contractors' organizational structure for sheilding quality control into jobsite management. Perform testing by an independent testing firm."SLG
6508/12/26120145001.6.4.4.1If the QC manager or SSM will not perform the periodic inspections required for the secure space perimeter, please verify that a 3rd party inspector will need to be hired by the contractor. If so, please provide the qualifications of the secure perimeter inspector, for bidding purposes.A third party RF sheilding specialist is requred to be provided by the Contractor in addition to overall project QC. Refer to specification section 13.49.20.00 10 for requirements specificlly related to qualifications of RF sheilding specialist and third party testing requirements (Testing requirment by independent tesing firm is indicated in Section 3.7). Section 3.5 indicates that the Contractor must provide a Field Quality Control Plan. Section 3.7 indicates that the Contractor is to "Integrate the Contractors' organizational structure for sheilding quality control into jobsite management. Perform testing by an independent testing firm."SLG
6608/12/26120145001.6.4.4.3Please verify that the contractor will be required to perform sound attenuation testing for the sound rated doors and partitions. If so, please verify that the testing can be completed by a subcontractor.Third party agency that is not the subcontractor must perform sound attenuation testing.SLG
6708/12/26120145001.6.4.4.4Please verify that the testing required for the electronic security systems can be performed by the ESS subcontractor. If not, please provide the qualifications required for the contractor to perform the security system testing.ESS will be provided by others. Testing is not the responsibility of the contractor.SLG
6808/12/26120145001.6.4.4.4Please verify that the electrotonic security system testing is included in the A/V scope of work regarding line item 0003. If not, please verify that the testing required for the electronic security system will need to be included in the base bid.Testing will be part of line item 003.SLG
6908/12/26130145001.6.6Please verify that the submittal reviewer required per section 014500 1.6.6 may also serve as the submittal clerk.QC Clerk

Provide a Quality Control Clerk at the work site until the work has been accepted. The primary duty is to assist the QC Manager in processing and maintaining files for submittals, preparing and publishing reports and meeting minutes. After primary duties are accomplished, other duties may

be assigned provided the duties do not interfere with primary duties. Must be 2 people.SLG
7008/12/26130145001.6.6Please verify that the submittal reviewer, that is to be separate from the QC, will not need to be onsite full time.QC Clerk

Provide a Quality Control Clerk at the work site until the work has been accepted. The primary duty is to assist the QC Manager in processing and maintaining files for submittals, preparing and publishing reports and meeting minutes. After primary duties are accomplished, other duties may

be assigned provided the duties do not interfere with primary duties. Must be 2 people.SLG
7108/12/26130145001.6.6Please verify that the contractor will be required to have a registered structural engineer review the submittals for the cold-formed metal framing.Yes - confirming that a registered engineer must review submittals for cold formed metal framingBS
7208/12/26130145001.6.6Please verify that the certified industrial hygienist that is to review all submittals maybe hired by the abatement subcontractor.Yes - this is acceptableSLG
7308/12/2670150003.2.2Please verify that the contractor may utilize existing power/water/sanitary sewer at no cost. If the contractor will be required to pay for usages of utilities, please provide the utility service rates as required per section 015000 3.2.2 b.Contractor is responsible for costs associated with power, water and sewer. Utilities will be available at the prevailing rate.SLG
7408/12/26110150003.6.2Please verify that the contractor will need to provide a separate quality control manager records and field office as required per section 015000 3.6.2.Yes.SLG
7508/12/26110150003.6.3Please provide the location and size of the laydown area as the contractor will be required to provide a fence with plastic strip inserts as required per section 015000 3.6.3.As discussed at the pre bid conference the location of the laydown area is yet to be determined and will be decided at the kickoff meeting.SLG
7608/12/26160157191.6.4Please verify that the superintendent may also serve as the environmental manger for this project. If not, please verify that either the QC manager or the SSHO may serve as the environmental manager.The superintendent, QC or SSHO may serve as the environmental manager as long as they meet qualifications of the environmental manager.SLG
7708/12/26120282001.5.1Please verify that the PQP will need to be a 1st tier subcontractor directly hired by the general contractor for this project.No - it is acceptable for the PQP to be something other than 1st tier subcontractor. In other words, can be hired by subcontractor.SLG
7808/12/2660282001.2.27Please verify the only role that the qualified person will need to perform regarding the asbestos remediation scope is the review of submittals as required per section 014500 1.6.6.refer to HM101SLG
7908/12/2640283001.2.8Please verify that the certified industrial hygienist required to be the competent person is to be hired/employed by the general contractor as a 1st tier subcontractor and cannot be hired by the abatement Subcontractor.No - it is acceptable for the PQP to be something other than 1st tier subcontractor. In other words, can be hired by subcontractor.SLG
8008/12/2640283001.2.8Please verify that the certified industrial hygienist will be required to be on-site as the competent person for the air and wipe sampling.Certified Industrial Hygenist will only be required as part of a remdiation plan if mold is discovered during demolition. At this time, there is no known mold. Spec provided in event that mold is dicovered during demolition. For bid purposes - assume that this spec section is for information only.SLG
8108/12/2680283001.5.1.1Please verify that the competent person will need to have 3 years experience implementing OSHA lead in construction standard and is licensed and trained as required, as is the same for the competent person required for asbestos. If so, please verify that this person will not be required to be a certified industrial hygienist.Confirmed as indicated in 028300 - Section 1.5.1.1SLG
8208/12/2640284161.8.1Please verify that the only scope of work for the CIH as required per section 028416 1.8.1 is to review the submittals and work plans. If not, please provide the paragraph "Certified Industrial Hygienist" as section 1.3.1 does not give the specific scope of work and there is no other paragraph in section 028416 named "certified Industrial Hygienist".Certified Industrial Hygenist will only be required as part of a remdiation plan if mold is discovered during demolition. At this time, there is no known mold. Spec provided in event that mold is dicovered during demolition. For bid purposes - assume that this spec section is for information only.SLG
8308/12/26110285001.4.1.2Please verify that the only scope of work for mold remediation regarding CIH is to review the submittals and supervision of the IH as required.Correct. Spec section was added in event that mold is discovered during demolition. At this time, there is no evidence of mold.SLG
8408/12/26110330001.6.6.1Please verify that extraordinary proven experience is defined as experience of 5 projects of similar scope and/or dollar value. If not, please provide a definition of extraordinary proven experience.The quality manager must hold a current license as a professional engineer in the U.S. state or territory with expereince in at least 5 similar projects. To be considered to have evidence of extroridnary proven expereince and act as Quality Manager - they must have expereince with projects of similar scale, cost and complexity. It is at the discresion of the Contracting Officer to determine if evidence provided to prove "extrodinary expereince" is acceptable. Quality Manager must be approved by the Contracting OfficerSLG
8508/12/26430330003.10.2Please verify if the floor flatness specified per section 033000 3.10.2 maybe waived.Floor Flatness requirements will not be waived.SLG
8608/12/26290420003.6.1.4Please verify that the contractor will be required to perform water penetration testing required per section 042000 3.6.1.4 on the masonry.Requirement to perform water penetration testing has been removed. Refer to Revision 02M which calls for removal of section 3.6.1.4SLG
8708/12/260145001.6.6Please verify that the general contractor will need to hire a professional engineer to review the submittals for the cold-formed metal framing as the cold-formed metal framing contractor will be required to submit professional engineered signed calculation as required per section 054000 1.6.2.See PPI response no. 71BS
8808/12/2670714003.4.2Please verify that the contractor will be required to include film testing for the thickness of the fluid-applied waterproofing as required if this section is required.Contractor will be reqired to include film test. Fluid applied waterproofing will be used at all roof penetrations. Spec section is required. See detail A1/AE502SLG
8908/12/26071400Please provide the locations of all fluid-applied waterproofing as they do not appear on the drawings.Fluid applied waterproofing will be used at all roof penetrations. See detail A1/AE502SLG
9008/12/264072719.011.7.3Please verify that the field peel adhesion testing required for the self-adhering air barriers maybe performed by the air barrier subcontractor as the testing will need to be performed by an ABAA approved testing agency,Yes - this is acceptableSLG
9108/12/264072719.011.7.1Please verify that all air barrier work will need to be performed by ABAA approved installers,Yes - Air barrier must meet by currently certifiied in accordance with the ABAA QAP Quality Assurance ProgramSLG
9208/12/2640727261.6Please verify that the field peel adhesion testing and capillary moisture testing required for the fluid-applied membrane air barriers maybe performed by the air barrier subcontractor as the testing will need to be performed by an ABAA approved testing agency,Yes - this is acceptableSLG
9308/12/2640727261.9.1Please verify that all air barrier work will need to be performed by ABAA approved installers,Yes - Air barrier must meet by currently certifiied in accordance with the ABAA QAP Quality Assurance ProgramSLG
9408/12/2650752001.4.3Please verify that this section maybe waived as this project is already designed and will not need the qualification of engineer of record.Engineer of record is required - bid as shownSLG
9508/12/2670792003.1Please verify that the field adhesion testing required maybe waived for this project.Field Adhesion Testing is not waived for this project. Bid as ShownSLG
9608/12/26110834733.3Please verify that 3rd party field sound testing will be required per ASTM E336 for all sound rated partitions and doors.Third party testing will be required.SLG
9708/12/26120990002.3Please provide all locations that require intumescent painting.Refer to plans. AE104, AE302 and AE303. Intumescent Paint will be required at underside of barrel vault roof (in area that is currenty the gym) - to existing wood joists and wood roof sheathing. Additionally, intumescent paint will be required above ceiling at existing classroom space to wood joists and wood roof sheathing. Assembly must achieve 1 hour fire rating.SLG
9808/12/26102600Please provide the locations of all wall and door protection as required per 102600 as they are not shown on the drawings.To be provided on all outside corners, refer to IN501 and IN 601 note G.
9908/12/2628134920.00 103.7.2Please verify that all RF shielded field testing required, including but not limited to the SELDS and Effectiveness testing, maybe performed by the RF shielded subcontractor, as this is typical.A third party RF sheilding specialist is requred to be provided by the Contractor in addition to overall project QC. Refer to specification section 13.49.20.00 10 for requirements specificlly related to qualifications of RF sheilding specialist and third party testing requirements (Testing requirment by independent tesing firm is indicated in Section 3.7). Section 3.5 indicates that the Contractor must provide a Field Quality Control Plan. Section 3.7 indicates that the Contractor is to "Integrate the Contractors' organizational structure for sheilding quality control into jobsite management. Perform testing by an independent testing firm."SLG
10008/12/2633134920.00 103.8Please provide a grounding plan required for the RF shielding.Slab rebar is used to achieve equipotential ground plane, see sheets EP401 (Note 12) and S-501 (Detail C1)JAT
10108/12/2692632151.4.7Please verify that the engine-generator manufacturer will be required to include a field engineer to supervise the complete installation and testing of the generator.CorrectJAT
10208/12/26482632153.6Please verify that all fuel/oil required for testing the generator will be provided by the government.see PPI #73; generator uses natural gas line. Contractor will be responsible for cost of natural gas associated with testing.JAT
10308/12/264275319.131.6.1Please provide the locations of where the DAS system is to transmit.Per Sheet TN001, Note 1, the ERCES coverage is for the building. All spaces.DS
10408/12/264275319.131.6.1Please provide the make/model of the receiver that the DAS system will transmit to.Due to the sensitivity of this question, actual frequencies are only provided to the successful bidder. There are 7 transmitting and 7 receiving frequencies that are all in the range of 380 to 400 MHz.DS
10508/12/264275319.131.6.1Please provide a list of the current software that is in use for the receivers.There is no existing software. This software mentioned in this paragraph is for the software provided the successful bidder.DS
10608/12/2643100001.2.14Please verify that the contractor will not be required to include rock removal in their bid. If the contractor is to include rock removal, please provide the estimated quantities, for bidding purposes.There are not expected to be any rocks encountered on site.WHW
10708/12/2643100001.2.14Please provide a soils report.there will be no soils report provided.WHW
10808/12/26GI102Please provide the size of the fire extinguishers required as they are not included on GI102.4-A:80-BCDS
10908/12/26HM101As a hazmat report was not conducted during design, please verify that the contractor is to assume that all items listed under the keynotes are to be included as hazardous material removal and included in the base bid.Yes.SLG
11008/12/26HM101Please verify that the contractor is only required to scrape loose and flaky lead paint off the walls and pilasters as required per note 1 on HM101. If not, please verify the contractor will be required to remove the paint to the substrate.Scrape all loose and flaky paint. Removal all the way to substrate is not required.SLG
11108/12/26028500Please provide the areas that are assumed to need mold remediation as required per section 028500, for bidding purposes.No mold is pressumed to be present.SLG
11208/12/26028416Please provide the locations of all lighting ballasts and lamps containing PCBs and mercury required to be removed as indicated in section 028416, for bidding purposes as quantities are not provided.Assume all lights to be demolished on sheet ED101 qualify.JAT
11308/12/26HM101Please provide the number of creosote treated wood ties required to be removed per keynote 2 on HM101, for bidding purposes.Exact number of ties is unknown. However, for bidding purposes - assume 8,000 LF of 2x4 sleepers.SLG
11408/12/26HM101Please provide the approximate size of the ductwork insulation that is assumed to contain asbestos as required per keynote 4 on HM101.Assume 2" insulation.RSK
11508/12/26HM101Please provide the approximate size of the gas pipe insulation that is assumed to contain asbestos as required per keynote 5 on HM101.Assume 2" insulation on HW piping. Note: There is no gas piping.RSK
11608/12/26CD105Please provide a detail or description of the thickness of the existing mechanical pads that are to be removed per note 16 on CD105. Please include a detail of any thickened edges.Concrete pads are 6" thickRSK
11708/12/26Bid FormPlease verify that all sitework is to be included in CLIN 0001AB.YesSLG
11808/12/26CD105Please refer to drawing CD105. NoteQuestion IncompleteSLG
11908/12/26CU105Please verify that the contractor will be required to remove and reinstall the high-security fence at the new utilities that are to be installed.yes.SLG
12008/12/26CU105Please provide the size of the existing gas line that the contractor is tying into for the new 2" line per note 13 on CU105.Note 13 on CU105 is revised to read "Proposed tie in connection to gas line main. Contractor to coordinate work provided by Virginia Natural Gas (VNG). Refer to Revision 02M.WW
12108/12/26S-101Please provide the finished floor elevation along with the existing elevation below the gym floor, so the contractor can determine if any soils will need to be removed inside the existing building.Reference top of concrete slab as 0'0" for finish floor elevation. It is believed that sleepers for wood floor is resting directly on earthBS
12208/12/26AE501Please clarify if the air barrier is to be installed under the roof and on the inside wall of the parapet to ensure compliance with the documents.Yes - please install air barrier as shown in detail providedSLG
12308/12/26AE501Please provide a description of the work required for the bold dashed line for detail A1/AE501 that is to be wrapped around the footing and installed under the slab.Provide continuous vapor-retarding membrane air barrierSLG
12408/12/26S-504Please provide the size of the continuous steel angle required per B3/S-504.Required continuous steel angle size is L3x3x1/4 in B3/S-504.BS
12508/12/26AD101Please provide the location of all damaged masonry that will need to be repaired per general note G on AD101, for bidding purposes.For bidding purpose - assume 100 LF of hairline cracks (1/8" thick or less) that will need to be filled with masonry crack filler.SLG
12608/12/26AD101Please provide the location of all damaged concrete that will need to be repaired per general note G on AD101, for bidding purposes.For bidding purpose - assume 40 SF of concrete will have to be patched 1/4" or less deep.SLG
12708/12/26AD101Please provide a detail of all masonry and concrete repairs required per note G on AD101.For bidding purpose - assume 100 LF of hairline cracks (1/8" thick or less) that will need to be filled with masonry crack filler.SLG