About this file
This is a construction drawing and phasing plan for Building CA-7 Secure Room and Restroom Addition at Naval Station Norfolk, Virginia, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic.
The project involves five sequential construction phases to be executed while maintaining continuous operations at Building CA-10 and its adjacent parking lot. Phase 1 encompasses utilities and connections work, including verification of fiber connection points, electrical connections from the main distribution board on Building CA-10 to Building CA-7, erosion and sediment control measures, tree protection, and temporary fencing. Phase 2 involves secured space renovation and utility work within Building CA-7, including interior and exterior improvements, restroom addition, and installation of mechanical, electrical, gas, sanitary sewer, and water utility connections. Phase 3 addresses site work exterior to CA-7, including concrete sidewalk demolition and installation, vegetation removal, and seeding/sodding in the parking lot north of CA-10. Phase 4 covers parking lot improvements encompassing new parking lot addition, milling and overlay of existing pavement, striping, bumper installation, signage, electrical work including barrier arms, vegetation removal, concrete median and retaining curb installation, and stormwater features. Phase 5 involves security and access control installation, including perimeter fence, pedestrian gates, turnstile, double swing gate, motorized and manual barrier arms, bollards, and seeding in disturbed areas. All phases must be completed sequentially with life safety egress pathways maintained throughout construction in accordance with NFPA 101, and existing utilities must remain in continuous service during operational hours with any disruptions coordinated in advance with the Contracting Officer.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
PHASE 4
PHASE 1
PHASE 5
PHASE 5
PHASE 5
CA495
CA10
SHED
CA349
CA348
CA347
CA346
CA345
CA344
CA7
PHASE 2
PHASE 3PHASE 1
PHASE 3PHASE 4
PHASE 1
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
-A
TL
AN
TI
C
MI
DL
AN
T
RO
IC
C
NO
RF
OL
K
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
, V A
NS
A
NO
RO
FL
K
NO
RF
O
LK
, V
IR
G
IN
IA
BL
DG
C A-
SE
CU
RE
R O
O M
A
ND
R
ES
TR
O
O M
A
DD
IT
IO
N
OPTEVFOR
5/28/26
S. GILPIN, R.A.
J. MILLER, P.E.
DAS & DMH
1785959
N/A
GI104
PHASING PLAN
GENERAL SHEET NOTES
GRAPHIC SCALEGRAPHIC SCALE
LEGEND
PHASE 1
PHASE 2
PHASE 3
PHASE 4
A. BUILDING CA-10 AND ADJACENT PARKING LOT WILL REMAIN OPERATIONAL
DURING ALL CONSTRUCTION PHASES.
B. EXISTING UTILITIES MUST MAINTAIN CONTINUOUS, UNINTERRUPTED SERVICE
DURING OPERATIONAL HOURS. COORDINATE ANY TEMPORARY SERVICE
DISRUPTIONS IN ADVANCE WITH THE CONTRACTING OFFICER.
C. ENSURE BUILDING OCCUPANT LIFE SAFETY IN ACCORDANCE WITH NFPA 101
AT ALL TIMES. PROVIDE CODE-COMPLIANT LIFE SAFETY EGRESS PATHWAYS,
WHICH MUST REMAIN FREE AND CLEAR OF DEBRIS THROUGHOUT
CONSTRUCTION.
D. ALL WORK ASSOCIATED WITH A SPECIFIC PHASE MUST BE FULLY
COMPLETED BEFORE BEGINNING WORK ON THE NEXT PHASE.
E. REFER TO PLANS FOR DETAILED WORK TO BE DONE IN EACH PHASE.
PHASING NOTES
***ALL OF PHASE 1 WORK IS TO BE COMPLETED BY OTHERS***
1. PHASE 1 – UTILITIES / CONNECTIONS
1.1. CONTRACTOR MUST VERIFY AND CONFIRM ALL FIBER CONNECTION
POINTS WITHIN OUR LIMITS OF WORK. EXPECTED LOCATIONS OF
CONDUIT TO BUILDING CA-495 AND TO NSA FIBER SYSTEM IS SHOWN.
1.2. ONLY AFTER FIBER CONNECTION POINTS HAVE BEEN VERIFIED,
PROVIDE ALL WORK ASSOCIATED WITH ELECTRICAL CONNECTION
FROM THE MAIN DISTRIBUTION BOARD ON BUILDING CA-10 TO BUILDING
CA-7.
1.3. PROVIDE ALL EROSION AND SEDIMENT CONTROL MEASURES AND TREE
PROTECTION DEVICES AS SHOWN ON CD-SERIES SHEETS.
1.4. PROVIDE ALL TEMPORARY FENCE AND GATES AS SHOWN ON SHEET
GI103.
2. PHASE 2 – SECURED SPACE RENOVATION AND UTILITY WORK.
PERFORM ALL WORK ASSOCIATED WITH THE SECURED SPACE (BUILDING
CA-7) RENOVATION, INCLUDING (BUT NOT LIMITED TO) INTERIOR AND
EXTERIOR IMPROVEMENTS SUCH AS THE RESTROOM ADDITION; ALL UTILITY
CONNECTIONS SUCH AS GAS, SANITARY SEWER, WATER LINE WORK,
ELECTRICAL CONNECTION FROM EQUIPMENT PADS TO BUILDING; AND
INSTALLATION OF REQUIRED MECHANICAL AND ELECTRICAL EQUIPMENT AND
CONCRETE PADS.
***ALL OF PHASES 3, 4, AND 5 WORK IS TO BE COMPLETED BY OTHERS***
3. PHASE 3 - SITE WORK OUTSIDE OF CA-7 EXCLUDING WORK MENTIONED
UNDER PHASE 2.
3.1. PERFORM ALL WORK ASSOCIATED WITH CONCRETE SIDEWALK
DEMOLITION AND INSTALLATION; VEGETATION REMOVAL
(BUSHES/SHRUBS/TREES); SEEDING/SODDING/MULCH; HANDICAP
STRIPPING AND SIGNAGE INSTALLATION IN EXISTING PARKING LOT
NORTH OF CA-10.
4. PHASE 4 – PARKING LOT IMPROVEMENTS
4.1. PERFORM ALL WORK ASSOCIATED WITH THE NEW PARKING LOT
ADDITION AND MILLING/OVERLAY OF THE EXISTING PARKING LOT
NORTH OF CA-7, INCLUDING (BUT NOT LIMITED TO) PAVEMENT
MARKING/STRIPING; PARKING BUMPER INSTALLATION; SIGNAGE;
ELECTRICAL WORK (INCLUDING BARRIER ARMS OFF DIVEN STREET);
VEGETATION REMOVAL (BUSHES/SHRUBS/TREES); CONCRETE MEDIAN
INSTALLATION; RETAINING CURB AND RAILING INSTALLATION;
SEEDING/SODDING; AND ALL ASSOCIATED STORMWATER FEATURES
AND RELATED UTILITY WORK.
5. PHASE 5 – SECURITY / ACCESS CONTROL
5.1. INSTALL THE PERIMETER FENCE AND ACCESS CONTROL FEATURES,
INCLUDING PEDESTRIAN GATES, TURNSTILE, DOUBLE SWING GATE,
MOTORIZED BARRIER ARMS OFF DIVEN STREET, MANUAL DROP ARMS,
AND BOLLARDS OFF DIVEN ARCH AND SEEDING WITHIN AREAS
DISTURBED BY FENCE INSTALLATION AND WITHIN AREAS DISTURBED
BY OTHERS DURING PHASE 2. INSTALL BOLLARDS AROUND EQUIPMENT
PADS THAT ARE TO BE CONSTRUCTED BY OTHERS DURING PHASE 2.
PHASE 5
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text D
AutoCAD SHX Text Xref ..\08_ARCH\CA7-1785959-A-R21 - Floor Plan.dwg
AutoCAD SHX Text
DIVEN ARCH
AutoCAD SHX Text
DIVEN STREET
AutoCAD SHX Text
NORFOLK CROSSING AVE
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text
LSRL
AutoCAD SHX Text
LSRL
AutoCAD SHX Text
WHW
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text 12948327
AutoCAD SHX Text
AutoCAD SHX Text
W. WITHAM, P.E.
AutoCAD SHX Text
SCALE: 1" = 30'-0"
AutoCAD SHX Text 60'
AutoCAD SHX Text 0'
AutoCAD SHX Text 1"=30'
AutoCAD SHX Text 30' virginia.perry Text Box
MAC CONTRACT
virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line
| Sheets and Views |
| GI104 |
File details come from the government source that posted it. Updated .