This is a construction drawing and phasing plan for Building CA-7 Secure Room and Restroom Addition at Naval Station Norfolk, Virginia, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic.

The project involves five sequential construction phases to be executed while maintaining continuous operations at Building CA-10 and its adjacent parking lot. Phase 1 encompasses utilities and connections work, including verification of fiber connection points, electrical connections from the main distribution board on Building CA-10 to Building CA-7, erosion and sediment control measures, tree protection, and temporary fencing. Phase 2 involves secured space renovation and utility work within Building CA-7, including interior and exterior improvements, restroom addition, and installation of mechanical, electrical, gas, sanitary sewer, and water utility connections. Phase 3 addresses site work exterior to CA-7, including concrete sidewalk demolition and installation, vegetation removal, and seeding/sodding in the parking lot north of CA-10. Phase 4 covers parking lot improvements encompassing new parking lot addition, milling and overlay of existing pavement, striping, bumper installation, signage, electrical work including barrier arms, vegetation removal, concrete median and retaining curb installation, and stormwater features. Phase 5 involves security and access control installation, including perimeter fence, pedestrian gates, turnstile, double swing gate, motorized and manual barrier arms, bollards, and seeding in disturbed areas. All phases must be completed sequentially with life safety egress pathways maintained throughout construction in accordance with NFPA 101, and existing utilities must remain in continuous service during operational hours with any disruptions coordinated in advance with the Contracting Officer.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

PHASE 4

PHASE 1

PHASE 5

PHASE 5

PHASE 5

CA495

CA10

SHED

CA349

CA348

CA347

CA346

CA345

CA344

CA7

PHASE 2

PHASE 3PHASE 1

PHASE 3PHASE 4

PHASE 1

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

RO

IC

C

NO

RF

OL

K

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

, V A

NS

A

NO

RO

FL

K

NO

RF

O

LK

, V

IR

G

IN

IA

BL

DG

C A-

SE

CU

RE

R O

O M

A

ND

R

ES

TR

O

O M

A

DD

IT

IO

N

OPTEVFOR

5/28/26

S. GILPIN, R.A.

J. MILLER, P.E.

DAS & DMH

1785959

N/A

GI104

PHASING PLAN

GENERAL SHEET NOTES

GRAPHIC SCALEGRAPHIC SCALE

LEGEND

PHASE 1

PHASE 2

PHASE 3

PHASE 4

A. BUILDING CA-10 AND ADJACENT PARKING LOT WILL REMAIN OPERATIONAL

DURING ALL CONSTRUCTION PHASES.

B. EXISTING UTILITIES MUST MAINTAIN CONTINUOUS, UNINTERRUPTED SERVICE

DURING OPERATIONAL HOURS. COORDINATE ANY TEMPORARY SERVICE

DISRUPTIONS IN ADVANCE WITH THE CONTRACTING OFFICER.

C. ENSURE BUILDING OCCUPANT LIFE SAFETY IN ACCORDANCE WITH NFPA 101

AT ALL TIMES. PROVIDE CODE-COMPLIANT LIFE SAFETY EGRESS PATHWAYS,

WHICH MUST REMAIN FREE AND CLEAR OF DEBRIS THROUGHOUT

CONSTRUCTION.

D. ALL WORK ASSOCIATED WITH A SPECIFIC PHASE MUST BE FULLY

COMPLETED BEFORE BEGINNING WORK ON THE NEXT PHASE.

E. REFER TO PLANS FOR DETAILED WORK TO BE DONE IN EACH PHASE.

PHASING NOTES

***ALL OF PHASE 1 WORK IS TO BE COMPLETED BY OTHERS***

1. PHASE 1 – UTILITIES / CONNECTIONS

1.1. CONTRACTOR MUST VERIFY AND CONFIRM ALL FIBER CONNECTION

POINTS WITHIN OUR LIMITS OF WORK. EXPECTED LOCATIONS OF

CONDUIT TO BUILDING CA-495 AND TO NSA FIBER SYSTEM IS SHOWN.

1.2. ONLY AFTER FIBER CONNECTION POINTS HAVE BEEN VERIFIED,

PROVIDE ALL WORK ASSOCIATED WITH ELECTRICAL CONNECTION

FROM THE MAIN DISTRIBUTION BOARD ON BUILDING CA-10 TO BUILDING

CA-7.

1.3. PROVIDE ALL EROSION AND SEDIMENT CONTROL MEASURES AND TREE

PROTECTION DEVICES AS SHOWN ON CD-SERIES SHEETS.

1.4. PROVIDE ALL TEMPORARY FENCE AND GATES AS SHOWN ON SHEET

GI103.

2. PHASE 2 – SECURED SPACE RENOVATION AND UTILITY WORK.

PERFORM ALL WORK ASSOCIATED WITH THE SECURED SPACE (BUILDING

CA-7) RENOVATION, INCLUDING (BUT NOT LIMITED TO) INTERIOR AND

EXTERIOR IMPROVEMENTS SUCH AS THE RESTROOM ADDITION; ALL UTILITY

CONNECTIONS SUCH AS GAS, SANITARY SEWER, WATER LINE WORK,

ELECTRICAL CONNECTION FROM EQUIPMENT PADS TO BUILDING; AND

INSTALLATION OF REQUIRED MECHANICAL AND ELECTRICAL EQUIPMENT AND

CONCRETE PADS.

***ALL OF PHASES 3, 4, AND 5 WORK IS TO BE COMPLETED BY OTHERS***

3. PHASE 3 - SITE WORK OUTSIDE OF CA-7 EXCLUDING WORK MENTIONED

UNDER PHASE 2.

3.1. PERFORM ALL WORK ASSOCIATED WITH CONCRETE SIDEWALK

DEMOLITION AND INSTALLATION; VEGETATION REMOVAL

(BUSHES/SHRUBS/TREES); SEEDING/SODDING/MULCH; HANDICAP

STRIPPING AND SIGNAGE INSTALLATION IN EXISTING PARKING LOT

NORTH OF CA-10.

4. PHASE 4 – PARKING LOT IMPROVEMENTS

4.1. PERFORM ALL WORK ASSOCIATED WITH THE NEW PARKING LOT

ADDITION AND MILLING/OVERLAY OF THE EXISTING PARKING LOT

NORTH OF CA-7, INCLUDING (BUT NOT LIMITED TO) PAVEMENT

MARKING/STRIPING; PARKING BUMPER INSTALLATION; SIGNAGE;

ELECTRICAL WORK (INCLUDING BARRIER ARMS OFF DIVEN STREET);

VEGETATION REMOVAL (BUSHES/SHRUBS/TREES); CONCRETE MEDIAN

INSTALLATION; RETAINING CURB AND RAILING INSTALLATION;

SEEDING/SODDING; AND ALL ASSOCIATED STORMWATER FEATURES

AND RELATED UTILITY WORK.

5. PHASE 5 – SECURITY / ACCESS CONTROL

5.1. INSTALL THE PERIMETER FENCE AND ACCESS CONTROL FEATURES,

INCLUDING PEDESTRIAN GATES, TURNSTILE, DOUBLE SWING GATE,

MOTORIZED BARRIER ARMS OFF DIVEN STREET, MANUAL DROP ARMS,

AND BOLLARDS OFF DIVEN ARCH AND SEEDING WITHIN AREAS

DISTURBED BY FENCE INSTALLATION AND WITHIN AREAS DISTURBED

BY OTHERS DURING PHASE 2. INSTALL BOLLARDS AROUND EQUIPMENT

PADS THAT ARE TO BE CONSTRUCTED BY OTHERS DURING PHASE 2.

PHASE 5

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text Xref ..\08_ARCH\CA7-1785959-A-R21 - Floor Plan.dwg

AutoCAD SHX Text

DIVEN ARCH

AutoCAD SHX Text

DIVEN STREET

AutoCAD SHX Text

NORFOLK CROSSING AVE

AutoCAD SHX Text

PHASING PLAN

AutoCAD SHX Text

LSRL

AutoCAD SHX Text

LSRL

AutoCAD SHX Text

WHW

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 12948327

AutoCAD SHX Text

AutoCAD SHX Text

W. WITHAM, P.E.

AutoCAD SHX Text

SCALE: 1" = 30'-0"

AutoCAD SHX Text 60'

AutoCAD SHX Text 0'

AutoCAD SHX Text 1"=30'

AutoCAD SHX Text 30' virginia.perry Text Box

MAC CONTRACT

virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line virginia.perry Line

Sheets and Views
GI104

File details come from the government source that posted it. Updated .