This is a fire hydrant flow test report documenting field measurements and hydraulic analysis conducted on June 11, 2026, at Building 530 PoolS, with Bryan Payne as the point of contact. The test evaluated both a static hydrant and a flow hydrant located on the facility's water distribution system, as illustrated in the site map showing the hydrants' positions relative to buildings 524 and 530.

Field measurements recorded a static pressure of 58 psi at the static hydrant with a discharge coefficient of 0.9, a residual pressure of 46 psi, and a pitot flow reading of 750 gpm from the flow hydrant. The calculated flow at 20 psi (Q₂₀) was determined to be 1,398 gpm using the formula Q₂₀ = Q_act × [(Ps - 20)/(Ps - PR)]^0.54. A pressure-flow graph displays the relationship across three data points: 58 psi at 0 gpm, 46 psi at 750 gpm, and 20 psi at 1,398 gpm. These results characterize the hydrant system's capacity and pressure characteristics for the facility's fire protection infrastructure.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Test Date: Area:

Time: POC:

Field Measurements:

Static Hydrant ID:

PS , Static Pressure 58 psi Discharge Coeff 0.9 (Verify)

PR , Residual Pressure: 46 psi Pitot Flow 750 gpm

Q20= 1398 gpm

Graphing Options

Pressure Flow

58 0

46 750

20 1398

Notes:

11-Jun-26 Bldg. 530 PoolS

0900 Bryan Payne

Flow Hydrant ID: #

0.54

0 500 1000 1500 2000

P re ss u re

P S

I

Flow, GPM