This is a Pre-Proposal Submission (PPI) Questions and Answers document for federal contract solicitation N4008526R0072, a construction project at Marine Corps Air Station Cherry Point, North Carolina. The PPI contains 21 government responses to contractor inquiries submitted between July 30 and August 5, 2026, addressing technical clarifications and specification interpretations for the CNATT Facilities project.
Key clarifications include: AISC steel certification requirements cannot be waived and remain mandatory; exposed interior ductwork must use premanufactured double-wall construction rather than single-wall with internal liners; all materials, equipment, and personnel must be on-site prior to project commencement; temporary facilities including office trailers, classroom trailers, and a 100-foot by 50-foot insulated fabric equipment shelter must be completely removed at project completion; the foundation design for mobile structures requires North Carolina licensed engineer preparation and Government approval prior to erection; trap seals may be used in lieu of trap primers for floor drains in rooms 121 and 120; and Government-furnished equipment for the High Bay and Armory (including training simulators and armory fit-out) falls outside contractor scope. Additional responses confirm that at least three separate personnel are required to independently fulfill QCM, Superintendent, and SSHO roles, and that electronic proposals must be submitted exclusively through the PIEE Solicitation Module with a maximum file size of 1.9 GB per submission. Outstanding responses regarding environmental data for Operable Unit 14 overlap area and NCDEQ review timelines were noted as forthcoming.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PPI Form 08.12.2026.xlsx | XLSX spreadsheet | |
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| P200 CNATT Solicitation 27Jul26 (002).pdf | ||
| P200 General Requirements.pdf | ||
| P200 General Requirements.pdf | ||
| 1783997dwg01of01.pdf | ||
| Wage Determination.pdf | ||
| 1783997spc01of01.pdf | ||
| JA ML-25-03 Class FRCS Cherry Point - Redacted.pdf | ||
| Attachment F - PIEE Vendor Access Ins..pdf | ||
| 1783997 Blank Price Schedule - CNATT_v1.pdf | ||
| PPI Form.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPI Submittal
| PPI NO. | OFFEROR, | ||||
| DATE SUBMITTED | SECTION | QUESTION | GOVERNMENT RESPONSE | AMEND NO. | |
| 1 | 7/30/26 | 05120-1.3 | ASIC Certification; Could a waiver be issued to allow third party | AISC Certification is requried per the Specifications. MBFA | |
| 2 | inspection of both fabrication and erection and removal of this | ||||
| 3 | requirement. (Limits number of steel bidders if any) | ||||
| 4 | |||||
| 6 | |||||
| 7 | 8/4/26 | M-505, Detail C3 | On drawing M-505, detail C3 shows exposed duct requiring an internal thermosetting resin coasted fiberglass duct liner. On past projects that we have completed on Cherry Point and Camp Lejune double wall ductwork has typically been installed in exposed areas, not single wall ductwork. In the exposed areas inside the building should we be installing double wall duct or single wall with internal liner as shown in detail C3 on drawing M-505? | Provide premanufactured double wall construction for ductwork in exposed areas. [CCE] | |
| 8 | 8/4/26 | M-505 Detail C3 | On drawing M-505, detail C3, it shows exposed duct requiring an internal thermosetting resin coated fiberglass duct liner. On past projects double wall ductwork has typically been installed in exposed areas, not single wall ductwork. In the exposed areas inside the building should double wall or single wall with internal liner be installed? | Provide premanufactured double wall construction for ductwork in exposed areas. [CCE] | |
| 9 | 8/5/26 | 01 14 00, Para. 1.3.a | Paragraph 1.3.a requires materials, equipment, and personnel for certain items of work to be at the site prior to commencement, but the list of applicable work items is not provided in the section. Please identify the specific items of work to which this requirement applies. | This requirement applies to the entire project. | |
| 10 | 8/5/26 | 01 59 00; Sheet SS101 | Sheet SS101 states the foundation shown is approximate and requires the Contractor's North Carolina licensed engineer to prepare final foundation, footing, and strapping design for the mobile structures selected, for Contracting Officer approval prior to erection. Please provide the anticipated Government review and approval duration for this submittal. | Submittal procedures will be conducted in accordance with Section 01 33 00. | |
| 11 | 8/5/26 | 01 59 00; Sheet AS101 | Please confirm whether the temporary CNATT compound (office, classroom, and toilet trailers, and fabric equipment shelter) is to be removed by the Contractor at project completion, or is to remain or be relocated for continued Government use. | Temporary facilites must be removed by the KTR at project complettion. See Civil Drawings for site restoration requirements. | |
| 12 | 8/5/26 | Sheet AS101; 01 59 00; 13 31 33 | Sheet AS101 depicts a 100 foot by 50 foot insulated fabric equipment shelter with a minimum 10 foot eave height and mechanical conditioning requirements. Please identify the specification section governing the material, structural, fire, wind rating, and mechanical requirements for this structure, as Section 01 59 00 addresses only trailers and Section 13 31 33 is written for permanent construction. | Provide the insulated fabric equipment shelter in accordance with Section 13 31 33. | |
| 13 | 8/5/26 | 01 59 00; Sheet CD100 | Section 01 59 00, Temporary Trailers for Displaced Tenants, implies an existing tenant is displaced during construction. Sheet CD100 shows demolition limited to pavement within Area 1 and Area 2, with no building demolition indicated. Please confirm whether any existing building or tenant is displaced or demolished under this contract. | The tenants are relocating from a building that is not included in this project. | |
| 14 | 8/5/26 | 25 05 11.01 | Section 25 05 11.01 states that multiple versions of this section exist for other control systems on the project; however, only the Mechanical/HVAC version is included in the specification package. The drawings include an addressable fire alarm system, an intrusion detection system (Sheet TY101), and an audiovisual control system (Sheets TA101 through TA702). Please confirm which control systems require Cybersecurity/Risk Management Framework specification sections and issue any applicable sections not currently included in the bid package. | Also reference Section 25 08 11.00 20 and Section 25 10 10. | |
| 15 | 8/5/26 | Sheets HS101, HS102 | Sheets HS101 and HS102 identify an 18 square foot overlap between the project site and the Land Use Control boundary for Operable Unit 14. Please provide: (a) available analytical/environmental data for this area, including PFAS results; (b) the anticipated NCDEQ review and approval timeline for the required Geotechnical Work Plan and Land Disturbance Work Plan referenced in Note 6 of Sheet HS101; and (c) confirmation of the specific extent of work, if any, occurring within the overlap area. | a. Response forthcoming |
b. Response forthcoming
c. The Civil Drawings clearly illustrate work in the area of the overlap.
| 16 | 8/5/26 | 01 30 02.00 22 | This section states the AV system may include specialty equipment for which the customer activity is responsible for specifying. Please provide an itemized list of Government furnished or customer specified AV equipment that is excluded from Contractor scope. | Submit proposals in accordance with the RFP, Drawings, Specifications and issued Amendments. |
| 17 | 8/5/26 | Sheet TY101; 08 34 59 | The floor plan identifies a High Bay (Room 110) and an Armory (Room 116). Please confirm whether training simulators, aircraft maintenance trainers, or armory fit out and racking, beyond the vault door specified in Section 08 34 59, are Government furnished and installed and outside Contractor scope. | Confirmed. |
| 18 | 8/5/26 | Specification cover/table of contents pages | The specification package includes two sets of cover and table of contents pages: one dated 08 June 2026 with a completed NAVFAC Mid-Atlantic approval signature, and a second set (Volume 1 and Volume 2 covers) dated 06 June 2026 with a blank, unsigned approval block. Please confirm which issuance represents the official approved specification for bid. | The Project Manual is split into two volumes to facilitate printing and binding. The Volume 1 cover clearly states "Volume 1 of 2" and the Volume 2 cover clearly states "Volume 2 of 2". |
| 19 | 8/5/26 | Please confirm that this project require three personnel: Superintendent, QC, SSHO being all separate rolls. | Confirmed, at least 3 different personnel required to act independently as QCM, Superintendent and SSHO. | |
| 20 | 8/5/26 | General Requirements | Please confirm the Price Proposal is only to be submitted by upload to the PIEE Solicitation Module |
Electronic Copies: Only the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment F. Emailed submissions will not be accepted.
| 21 | 8/5/26 | P-401 | The floor drains located in rooms 121 Fire Riser, and 120 Mechanical are not shown to receive trap primers. Reference drawing P-401. Do the 4 floor drains shown in these two rooms get trap primer valves? If these drains are to receive trap primers, can trap seals be used instead of trap primers in these two rooms? | We take no exception to trap seals being used in lieu of trap primers in these two rooms. |
| 24 | 8/5/26 | P401 | The floor drains located in rooms 121 Fire Riser and 120 Mechanical are not shown to receive trap primers. Do the 4 floor drains shon in the two rooms get trap primer valves? If these drains are to receive trap primers, can trap seals be used instead of trap primers in these two rooms? | We take no exception to trap seals being used in lieu of trap primers in these two rooms. |
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 | ||||
| 37 | ||||
| 38 | ||||
| 39 | ||||
| 40 | ||||
| 41 | ||||
| 42 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 46 | ||||
| 47 | ||||
| 48 | ||||
| 49 | ||||
| 50 | ||||
| 51 | ||||
| 52 | ||||
| 53 | ||||
| 54 | ||||
| 55 | ||||
| 56 | ||||
| 57 | ||||
| 58 | ||||
| 59 | ||||
| 60 | ||||
| 61 | ||||
| 62 | ||||
| 63 | ||||
| 64 | ||||
| 65 | ||||
| 66 | ||||
| 67 | ||||
| 68 | ||||
| 69 | ||||
| 70 | ||||
| 71 | ||||
| 72 | ||||
| 73 | ||||
| 74 | ||||
| 75 | ||||
| 76 | ||||
| 77 | ||||
| 78 | ||||
| 79 | ||||
| 80 | ||||
| 81 | ||||
| 82 | ||||
| 83 | ||||
| 84 | ||||
| 85 | ||||
| 86 | ||||
| 87 | ||||
| 88 | ||||
| 89 | ||||
| 90 | ||||
| 91 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .