About this file

This is a Bid Schedule Excel spreadsheet for the EV32 Bethpage Site 1 GM38 Treatment System contract solicited by the Department of the Navy Naval Facilities Engineering Command. The document details a comprehensive pricing structure for a multi-year contract covering groundwater treatment plant (GWTP) operations and maintenance, with a base year and three optional extension years. The contract includes eight primary work elements: project management, project plans, GWTP operations and maintenance, effluent monitoring, air emission monitoring, groundwater monitoring, an Indefinite Delivery/Quantity (IDQ) schedule, and data submission/reporting.

The IDQ price schedule provides extensive granular pricing for various supplemental services and supplies, including waste management, service calls (minor to major), equipment and supplies, utility services, monitoring services, carbon changeouts, and miscellaneous support items. Each work element and IDQ category is priced consistently across the base year and three option years, suggesting a stable, predictable contract structure. The solicitation number N4008526R0050 indicates this is a specific procurement for environmental treatment system services, with detailed provisions for ongoing maintenance, monitoring, and support activities at the Bethpage Site 1 location.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE Year

TABLE 1 - Price Schedule
COST SUMMARY BY WORK ELEMENTUnitsBreakdown Per YearBase Year QuantityBase Year Price
Work Element 1: Meetings, Project Management, and Administrative Support1 Month15$
Work Element 2: Project Plans1 Month12$
Work Element 3: GWTP Operation and Maintenance1 Month12$
Work Element 4: Effluent Monitoring1 Month12$
Work Element 5: Air Emission Monitoring1 Month12$
Work Element 6: Groundwater Monitoring1 Month12$
Work Element 7: IDQSEE TABLE 2$
Work Element 8: Data Submission and Reports (12 DMR, 3 quarterly and 1 annual report)1 Month12$
Total Base Year Price$
TABLE 2 - IDQ Price Schedule
WORK ELEMENT DESCRIPTIONQUANTITYUNITSBASE YEAR PRICE
Waste Management12MO$
Fence Repairs2EACH$
MINOR SERVICE CALLS (ex. Power outage – No Mat)*12EACH$
MINOR SERVICE CALLS (minor materials)*9EACH$
MODERATE SERVICE CALLS*6EACH$
MAJOR SERVICE CALLS*6EACH$
Sampling Equipment/Supplies1LOT$
AOP UV Light Bulbs50EACH$
Ballast Boards2EACH$
Quartz Sleeves6EACH$
Hydrogen Peroxide Tank Fill6EACH$
Electric Service12MO$
Telephone Service12MO$
Internet Services12MO$
Filtration Unit Bag Filters (5 micron)500EACH$
BWD Water (Carbon Changeout, normal usage)1.2MGALS$
RPZ test1YR$
Security/Fire Alarm Monitoring Service12MO$
Security/Fire Alarm Permit1YR$
Miscellaneous Supplies1LOT$
Liquid Carbon Change Out0EACH$
Vapor Phase Carbon Change Out1EACH$
Characterize Carbon for Disposal/Regeneration1EACH$

Option Year 1

TABLE 1 - Price Schedule
COST SUMMARY BY WORK ELEMENTUnitsBreakdown Per YearOption Year QuantityOption Year Price
Work Element 1: Meetings, Project Management, and Administrative Support1 Month15$
Work Element 2: Project Plans1 Month12$
Work Element 3: GWTP Operation and Maintenance1 Month12$
Work Element 4: Effluent Monitoring1 Month12$
Work Element 5: Air Emission Monitoring1 Month12$
Work Element 6: Groundwater Monitoring1 Month12$
Work Element 7: IDQSEE TABLE 2$
Work Element 8: Data Submission and Reports (12 DMR, 3 quarterly and 1 annual report)1 Month12$
Total Base Year Price$
TABLE 2 - IDQ Price Schedule
WORK ELEMENT DESCRIPTIONQUANTITYUNITSOPTION YEAR PRICE
Waste Management12MO$
Fence Repairs2EACH$
MINOR SERVICE CALLS (ex. Power outage – No Mat)*12EACH$
MINOR SERVICE CALLS (minor materials)*9EACH$
MODERATE SERVICE CALLS*6EACH$
MAJOR SERVICE CALLS*6EACH$
Sampling Equipment/Supplies1LOT$
AOP UV Light Bulbs50EACH$
Ballast Boards2EACH$
Quartz Sleeves6EACH$
Hydrogen Peroxide Tank Fill6EACH$
Electric Service12MO$
Telephone Service12MO$
Internet Services12MO$
Filtration Unit Bag Filters (5 micron)500EACH$
BWD Water (Carbon Changeout, normal usage)1.2MGALS$
RPZ test1YR$
Security/Fire Alarm Monitoring Service12MO$
Security/Fire Alarm Permit1YR$
Miscellaneous Supplies1LOT$
Liquid Carbon Change Out0EACH$
Vapor Phase Carbon Change Out1EACH$
Characterize Carbon for Disposal/Regeneration1EACH$

Option Year 2

TABLE 1 - Price Schedule
COST SUMMARY BY WORK ELEMENTUnitsBreakdown Per YearOption Year QuantityOption Year Price
Work Element 1: Meetings, Project Management, and Administrative Support1 Month15$
Work Element 2: Project Plans1 Month12$
Work Element 3: GWTP Operation and Maintenance1 Month12$
Work Element 4: Effluent Monitoring1 Month12$
Work Element 5: Air Emission Monitoring1 Month12$
Work Element 6: Groundwater Monitoring1 Month12$
Work Element 7: IDQSEE TABLE 2$
Work Element 8: Data Submission and Reports (12 DMR, 3 quarterly and 1 annual report)1 Month12$
Total Base Year Price$
TABLE 2 - IDQ Price Schedule
WORK ELEMENT DESCRIPTIONQUANTITYUNITSOPTION YEAR PRICE
Waste Management12MO$
Fence Repairs2EACH$
MINOR SERVICE CALLS (ex. Power outage – No Mat)*12EACH$
MINOR SERVICE CALLS (minor materials)*9EACH$
MODERATE SERVICE CALLS*6EACH$
MAJOR SERVICE CALLS*6EACH$
Sampling Equipment/Supplies1LOT$
AOP UV Light Bulbs50EACH$
Ballast Boards2EACH$
Quartz Sleeves6EACH$
Hydrogen Peroxide Tank Fill6EACH$
Electric Service12MO$
Telephone Service12MO$
Internet Services12MO$
Filtration Unit Bag Filters (5 micron)500EACH$
BWD Water (Carbon Changeout, normal usage)1.2MGALS$
RPZ test1YR$
Security/Fire Alarm Monitoring Service12MO$
Security/Fire Alarm Permit1YR$
Miscellaneous Supplies1LOT$
Liquid Carbon Change Out0EACH$
Vapor Phase Carbon Change Out1EACH$
Characterize Carbon for Disposal/Regeneration1EACH$

Option Year 3

TABLE 1 - Price Schedule
COST SUMMARY BY WORK ELEMENTUnitsBreakdown Per YearOption Year QuantityOption Year Price
Work Element 1: Meetings, Project Management, and Administrative Support1 Month15$
Work Element 2: Project Plans1 Month12$
Work Element 3: GWTP Operation and Maintenance1 Month12$
Work Element 4: Effluent Monitoring1 Month12$
Work Element 5: Air Emission Monitoring1 Month12$
Work Element 6: Groundwater Monitoring1 Month12$
Work Element 7: IDQSEE TABLE 2$
Work Element 8: Data Submission and Reports (12 DMR, 3 quarterly and 1 annual report)1 Month12$
Total Base Year Price$
TABLE 2 - IDQ Price Schedule
WORK ELEMENT DESCRIPTIONQUANTITYUNITSOPTION YEAR PRICE
Waste Management12MO$
Fence Repairs2EACH$
MINOR SERVICE CALLS (ex. Power outage – No Mat)*12EACH$
MINOR SERVICE CALLS (minor materials)*9EACH$
MODERATE SERVICE CALLS*6EACH$
MAJOR SERVICE CALLS*6EACH$
Sampling Equipment/Supplies1LOT$
AOP UV Light Bulbs50EACH$
Ballast Boards2EACH$
Quartz Sleeves6EACH$
Hydrogen Peroxide Tank Fill6EACH$
Electric Service12MO$
Telephone Service12MO$
Internet Services12MO$
Filtration Unit Bag Filters (5 micron)500EACH$
BWD Water (Carbon Changeout, normal usage)1.2MGALS$
RPZ test1YR$
Security/Fire Alarm Monitoring Service12MO$
Security/Fire Alarm Permit1YR$
Miscellaneous Supplies1LOT$
Liquid Carbon Change Out0EACH$
Vapor Phase Carbon Change Out1EACH$
Characterize Carbon for Disposal/Regeneration1EACH$

File details come from the government source that posted it. Updated .