This document is a monthly groundwater discharge and air emission monitoring report for the Groundwater Treatment Plant (GWTP) at the Former Naval Weapons Industrial Reserve Plant (NWIRP) in Bethpage, NY, dated November 2025. The report, prepared by KOMAN Government Solutions, LLC (KGS) for the New York State Department of Environmental Conservation, details the compliance status of various chemical constituents in groundwater and air emissions. Key findings include that the plant was offline for approximately 2.0 hours due to backwashing LGAC units, and all SPDES permitted aqueous constituents and stack emissions were within established discharge limits. The report includes detailed tables tracking parameters such as trichloroethene, vinyl chloride, and 1,4-dioxane across different process streams, with measurements compared against regulatory discharge goals.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KOMAN Government Solutions, LLC Phone (610) 363-3000 180 Gordon Drive, Suite 110 Fax (610) 363-3001 Exton, Pennsylvania 19341 www.komangs.com
9 December 2025
Ms. Kristin Granzen New York State Department of Environmental Conservation Division of Solid & Hazardous Materials 625 Broadway Albany, NY 12233-7252
Subject: GROUNDWATER DISCHARGE MONITORING/AIR EMISSION REPORT
GM-38 AREA, NWIRP BETHPAGE, NY; DER SITE # 1-30-003B-OU 2
NOVEMBER 2025 REPORTING PERIOD
Dear Ms. Granzen:
KOMAN Government Solutions, LLC (KGS) is submitting this monthly monitoring report of the groundwater discharge and air emission results for the Groundwater Treatment Plant (GWTP) located at the Former Naval Weapons Industrial Reserve Plant (NWIRP), Bethpage, NY, GM-38 Area. This report was prepared in accordance with GWTP operational requirements for DER Site # 1-30-003B-OU 2, and the SPDES Permit Equivalent # 130003B.
GWTP operational data from 1 November to 30 November 2025 are presented in Attachment A.
The plant was offline for approximately 2.0 hours as a result of backwashing LGAC units #1, #2, and #3.
As indicated in Attachment A, SPDES permitted aqueous constituents are in compliance with the established discharge limits, and all stack emissions are in compliance with established discharge goals during the current reporting period. We are in receipt of your letter dated 29 January 2025 noting updates to the discharge limits for the GWTP. Monitoring data for bis (2-ethylhexyl) phthalate was incorporated into the DMR beginning in March 2025 and will continue to be included in future DMRs.
Please contact me at 610-400-0636 with any questions or concerns you may have regarding this report.
Sincerely, KOMAN Government Solutions, LLC
Robert G. Gregory Project Manager
Attachment A: Groundwater and Air Sampling Results for November 2025
Ms. Kristin Granzen 9 December 2025
KOMAN Government Solutions, LLC Subsidiary of the Natives of Kodiak cc: J. LaClair, NYSDEC S. Johnston, NYSDEC R. O’Mara, NYSDEC Region 1 C. Engelhardt, NYSDEC Region 1 J. Pilewski, NYSDEC – Region 1 Water Engineer J. Sullivan, NYSDOH G. Ennis, Nassau County Department of Public Works T. Licata, Town of Oyster Bay M. Russo, Town of Oyster Bay B. Revell, NAVFAC Mid-Atlantic V. Varricchio, NWIRP Bethpage Facilities Management D. Brayack, Tetra Tech R. Moore, Tetra Tech R. Hoffmaster, KGS
P. Schauble, KGS GM-38 Copy
ATTACHMENT A
GROUNDWATER AND AIR SAMPLING RESULTS
NOVEMBER 2025
GM-38 Area Groundwater Remediation
Groundwater Treatment Plant
Naval Weapons Industrial Reserve Plant - Bethpage, NY
Discharge Monitoring Report
November 2025
SPDES Parameters
Process Stream
Daily
Treated
Effluent
Maximum (1)
Units
Well Depth N/A ft
Screened Interval N/A ft bgs
Sampling Date N/A
Effective Flowrate 1100 GPM 489 0 968 1,005
Total Flow N/A gallons 21,057,450 0 41,699,067 43,307,167 pH 5.5 - 8.5 SU 6.07 NS 5.93 6.27 6.00 6.96
Carbon Tetrachloride 5 mg/L ND (1.0) NS ND (1.0) ND (1.0) ND (1.0) ND (1.0)
Chloroform 5 mg/L ND (1.0) NS ND (1.0) ND (1.0) ND (1.0) ND (1.0)
1,1-Dichloroethane 5 mg/L 0.752 J NS ND (1.0) ND (1.0) 0.38 J ND (1.0)
1,2-Dichloroethane 0.6 mg/L ND (1.0) NS ND (1.0) ND (1.0) ND (1.0) ND (1.0)
1,1-Dichloroethene 5 mg/L 0.323 J NS 0.570 J 2.58 J 0.45 J ND (1.0) cis 1,2-Dichloroethene 5 mg/L 2.06 J NS 0.880 J 1.82 J 1.48 J ND (1.0) trans 1,2-Dichloroethene 5 mg/L ND (1.0) NS ND (1.0) ND (1.0) ND (1.0) ND (1.0)
Tetrachloroethene 5 mg/L 9.82 NS 4.72 J 4.35 J 7.30 J ND (1.0)
1,1,1-Trichloroethane 5 mg/L 0.304 J NS ND (1.0) ND (1.0) 0.15 J ND (1.0)
Trichloroethene 5 mg/L 31.1 NS 218 395 123.6 0.233 J
1,1,2-Trichlorotrifluoroethane 5 mg/L ND (1.0) NS 4.40 J 10.2 J 2.2 J ND (1.0)
Vinyl Chloride 2 mg/L ND (1.0) NS ND (1.0) ND (1.0) ND (1.0) ND (1.0)
1,4-Dioxane - 8270E 0.35 mg/L 1.5 NS 10 12 5.71 0.041 J
Bis(2-ethylhexyl) Phthalate
(2) Monitor mg/L ND (1.0) NS ND (1.0) ND (1.0) ND (1.0) ND (1.0)
Mercury 0.25 mg/L ND (0.10) NS ND (0.10) ND (0.10) ND (0.10) ND (0.10)
Total Suspended Solids (TSS) N/A mg/L ND (1.0) NS ND (1.0) ND (1.0) ND (1.0) ND (1.0)
Notes:
B - Method blank contamination
J - Estimated result between laboratory method detection limit and reporting limit
E - Concentration has exceeded the calibration range.
ND - Not detected above laboratory method detection limit. Limit of Detection (LOD) given in parentheses.
NR - Not Recorded
N/A - Not Applicable
NS - Not Sampled mg/L - micrograms per liter mg/L - milligrams per liter
GPM - gallons per minute
SU - standard units ft - feet ft bgs - feet below ground
(2) Bis(2-ethylhexyl)phthalate to be monitored; if compliance level of 7.5 mg/L exceeded, source identfication to be conducted and reported.
*Indicates that a quality control parameter has exceeded laboratory limits; analysis was performed out of the holding time.
11/3/25
335-395
410-430
392-412
442-504 N/A N/A570-670
(1) Wastewater discharge permit equivalence renewed on February 18, 2025. Discharge limits established for 10 years.
RW-1 RW-3
Combined Influent
(RW-1 + RW-3 +
RW-4 + RE-137)
Treated
Effluent
445 530
RW-4**
675 N/A N/A
RE-137**
630-745
20,641,617
** Effluent from RW-4 and RE-137 routed to the GWTP via a single pipline; separate flowmeters not available. RW-4 and RE-137 were set to operate at 200 gpm and
300 gpm, respectively, from 1 May thorough 23 May 2025. The flowrates were adjusted to operate at 250 gpm for both wells on 23 May 2025.
November 2025
Naval Weapons Industrial Reserve Plant - Bethpage, NY
Air Sampling Results
November 2025
DAR Parameters
Process Stream Units Discharge
Goal (1)
Sampling Date
Average Flowrate(3) CFM N/A NR 1,433
Total Flow ft3 N/A NR 61,727,727
Total Flow m3 N/A NR 1,747,935
1,2-Dichloroethane mg/m3 N/A ND ND cis 1,2-Dichloroethene mg/m3 79 ND trans 1,2-Dichloroethene mg/m3 ND ND
1,2-Dichloroethene (total) mg/m3 ≤ 100,000 79 ND
Toluene mg/m3 N/A ND ND
Total Xylene mg/m3 N/A ND ND
1,1,2-Trichloroethane mg/m3 N/A ND ND
Trichloroethene mg/m3 ≤ 2600 19,000 47
Vinyl Chloride mg/m3 ≤ 560 ND 1.0 J
Tetrachloroethene mg/m3 ≤ 5100 780 ND
Notes:
CFM - cubic feet per minute mg/m
- micrograms per cubic meter ft3 - cubic feet m3 - cubic meters
DAR - Division of Air Resources
J - Estimated result between laboratory method detection limit and reporting limit
N/A - Not Applicable
NR - Not recorded
(1) Discharge goal as approved by NYSDEC's letter dated 31 October 2013.
(2) Discharge goal is for total 1,2-Dichloroethene.
(3) The average flowrate is utilizing the readings from Blower B-1. Blower B-2
November 2025
Influent Effluent was taken offline on 11 May 2023.
Goals based on an assumed air flow rate of 8,000 CFM
11/3/25
≤ 100,000 (2)
Naval Weapons Industrial Reserve Plant - Bethpage, NY
Controlled Stack Emissions
November 2025
DAR Parameters Units Discharge
Goal (1) November 2025
Sampling Date 11/3/25
Average Flowrate CFM N/A 1,433
Total Flow ft 3 N/A 61,727,727
Total Flow m 3 N/A 1,747,935
Trichloroethene lb/hr ≤ 0.09 0.00025
Vinyl Chloride lb/hr ≤ 0.02 0.00000
1,2 Dichloroethene lb/hr ≤ 11 0.00000
1,2-Dichloroethane lb/hr N/A 0.00000
Toluene lb/hr N/A 0.00000
Total Xylene lb/hr N/A 0.00000
1,1,2-Trichloroethane lb/hr N/A 0.00000
Tetrachloroethene lb/hr ≤ 0.18 0.00000
Notes:
CFM - cubic feet per minute
DAR - Division of Air Resources ft3 - cubic feet m3 - cubic meters lb/hr - pounds per hour
N/A - Not Applicable
(1) Discharge goal as approved by NYSDEC's letter dated 31 October 2013.
Goals based on an assumed air flow rate of 8,000 CFM
| NWIRP Bethpage GM-38 GWTP - Discharge Monitoring Report - November 2025 |
| Att A - Groundwater/Air Sampling Results - November 2025 |
| Effluent Discharge |
| Air Sampling |
| Stack Emisisons |
File details come from the government source that posted it. Updated .