This is Amendment 1 to a federal contract solicitation for water tank painting and maintenance services. The amendment modifies contract drawings (CS-001) and specification section 01 11 00 to shift contractor responsibilities and add new technical requirements.
Key changes include: (1) deletion of the government's responsibility to drain water, remove cathodic protection systems, and water level float systems, with these tasks now assigned to the contractor; (2) addition of contractor obligations to test cathodic protection systems before and after work in accordance with NACE publication SP0193-2016, with responsibility to repair systems if not functioning properly; (3) contractor responsibility to remove remaining water from the tank after government drains it; (4) contractor obligation to replace the roof vent with a clog-resistant vent meeting AWWA D100-11 Section 7.5 specifications; (5) contractor requirement to replace an undersized overflow pipe with a new pipe per AWWA D100-11 Section 7.3; (6) contractor responsibility for storing and protecting anodes during removal, with liability for replacement if damaged; and (7) contractor obligation to perform pit welding and filling on interior surfaces, welding pitting of at least 1/4 steel thickness and filling pitting with rough edges using solventless epoxy seam sealer. These amendments significantly expand contractor scope and responsibility for tank preparation, testing, and restoration activities.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1.
Pit Welding and Pit Filling (interior surfaces): After initial cleaning, all pitting which is found to be at least 1/4 of the thickness of the steel should be welded, and all pitting with rough edges that would make the pitting difficult to coat properly should be filled with a solventless epoxy seam sealer.
Drawings CS-001- Delete note, Summary of Work note 3 “The government will be responsible for draining the water from the tank 558, removing the catholic protection system and the water level float system. After all work is related to the painting contract is complete the government will reinstall the water float system, the catholic protection system and refill the tank.”
Drawing CS-001 Add new note, Summary of Work Note 3. “The contractor shall test the catholic protection system before the water in the tank is drained and before removal of the cathodic protection system to ensure the system is working properly. The test shall be in accordance with NACE publication SP0193-2016. Attachment 1 are the test results from 2019. If the system is not working properly, the contractor shall inform the Government and show the Government the system is not working properly.
When the tank is put back on line the contractor shall test the catholic protection system to ensure the system is working properly. If the system is not working properly the contractor shall fix the catholic protection system.”
Drawing CS-001 Add new note, Summary of Work Note “5. The Government will drain the water from the tank. Any water that remains due to the drain being approximately 4 inches above the bottom of the the floor shall be removed by the contractor.”
Drawing CS-001 Add new note to Summary of Work Note “6. The contractor shall replace the roof vent with a clog-resistant vent that meets the specification of (AWWA D100-11 Sec 7.5.”
Drawing CS-001 Add new note to Summary of Work Note “7. The existing stub overflow pipe from the shell is too small replace the existing overflow pipe with a new pipe in accordance with specification (AWWA D100-11 Sec 7.3).
Drawing CS-001 Add new note to Summary of Work Note “8. The contractor is responsible for storing the anodes while the tank is being painted. If the anodes are damage during the removal, storage or installation of the anodes the contractor will be responsible to replace the anodes.”
Drawing CS-001 Add new note to Summary of Work Note “9. Pit Welding and Pit Filling (interior surfaces): After initial cleaning, all pitting which is found to be at least 1/4 of the thickness of the steel should be welded, and all pitting with rough edges that would make the pitting difficult to coat properly should be filled with a solventless epoxy seam sealer.
Specification section 01 11 00 page 1 paragraph 1.2.1 Project Description: Delete note 3. “The government will be responsible for draining the water from the tank 558, removing the catholic protection system and the water level float system. After all work is related to the painting contract is complete the government will reinstall the water float system, the catholic protection system and refill the tank.”
Specification section 01 11 00 page 1 paragraph 1.2.1 Project Description: Add note 3. “The contractor shall test the catholic protection system before the water in the tank is drained and before removal of the cathodic protection system to ensure the system is working properly. The test shall be in accordance with NACE publication SP0193-2016. Attachment 1 are the test results from 2019. If the system is not working properly, the contractor shall inform the Government and show the Government the system is not working properly. When the tank is put back on line the contractor shall test the catholic protection system to ensure the system is working properly. If the system is not working properly the contractor shall fix the catholic protection system.”
Specification section 01 11 00 page 1 paragraph 1.2.1 Project Description: Add new Note “5. The Government will drain the water from the tank. Any water that remains due to the drain being approximately 4 inches above the bottom of the tank shall be removed by the contractor.”
Specification section 01 11 00 page 1 paragraph 1.2.1 Project Description: Add new Note “6. The contractor shall replace the roof vent with a clog-resistant vent that meets the specification of (AWWA D100-11 Sec 7.5.”
Specification section 01 11 00 page 1 paragraph 1.2.1 Project Description: Add new Note “7. The existing stub overflow pipe from the shell is too small replace the existing overflow pipe with a new pipe in accordance with specification (AWWA D100-11 Sec 7.3).
Specification section 01 11 00 page 1 paragraph 1.2.1 Project Description: Add new Note “8. Pit Welding and Pit Filling (interior surfaces): After initial cleaning, all pitting which is found to be at least 1/4 of the thickness of the steel should be welded, and all pitting with rough edges that would make the pitting difficult to coat properly should be filled with a solventless epoxy seam sealer.