REQUEST FOR PROPOSAL FOR LAND EXCHANGE AND WATER/WASTEWATER INFRASTRUCTURE DIVESTITURE NAVAL STATION NEWPORT NEWPORT, RI
Solicitation number
N40085-25-RP-00060
Issued by

About this file

This is an Industry Day presentation from January 2024 outlining NAVFAC's planned land exchange and water/wastewater infrastructure divestiture at Naval Station Newport, Rhode Island. The presentation details a two-phase process where the selected offeror will conduct infrastructure studies including land surveys, condition assessments, and environmental reviews before submitting a Phase 2 proposal covering system characteristics, financing, operations plans, and customer agreements.

The presentation provides extensive details about the current water and wastewater infrastructure, including 60 miles of water distribution pipes serving 1,100 connections with average daily usage of 550,000 gallons, three underground reservoirs totaling 4.4 million gallons capacity, and 785 hydrants. The wastewater system includes 33 miles of gravity lines, 6 miles of force mains, and 15 pump stations handling 1.08 million gallons daily. Key timeline milestones include executing the Exclusivity Agreement by March 2025, completing surveys by January 2026, Phase Two proposal submission in February 2026, and final agreement signing in June 2026.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSTA Newport Land Exchange and Water/Wastewater Divesture Industry Day

1/14/2024

Naval Facilities Engineering Command

UNCLASSIFIED//CUI

Agenda Welcome & Opening Remarks Real Estate Overview Utility Infrastructure Questions & Answers Site Tour (Newport W-WW Utility Infrastructure) Post Tour Debrief Closing Remarks

UNCLASSIFIED//CUI

Real Estate Overview

UNCLASSIFIED//CUI

Phase 2 Overview Exclusivity Agreement and Right of Entry signing Selected Offeror Conducts the “Selected Offeror’s Studies” Land and utility survey to ALTA standards Infrastructure condition assessment Appraisal of the infrastructure and associated easement area Phase 1 Site Assessment (also known as Environmental Condition of the Property Report) Architectural Survey Archeological Survey Historic American Buildings Survey

UNCLASSIFIED//CUI

Phase 2 Overview Continued Using data gathered from the Selected Offeror’s Studies, develop and submit the Phase 2 Proposal containing the following information:

Physical characteristics of the system Financing plan proposed to implement the development Plan proposed to upgrade, operate, and maintain the infrastructure immediately upon transfer of the infrastructure regardless of prior employee availability Schedule proposed for achieving key milestones Plan to enter into agreements with Customers IKC (amount and type) to be provided to the Navy Plan to adhere to federal, state, and local laws and regulations After phase II negotiations, the Parties will execute an Exchange Agreement which shall include:

Relevant characteristics of the development Define all terms and conditions, schedules, and financial arrangements between the parties Mandatory clauses required by federal law

UNCLASSIFIED//CUI

Phase 2 Overview Continued Execution of the Closing Agreements Easement Bill of Sale Utility Service Contract

UNCLASSIFIED//CUI

Tentative Timeline March 2025: Execute Exclusivity Agreement and Right of Access with Selected Offeror January 2026: Selected Offeror’s Surveys complete* February 2026: Selected Offeror submits Phase Two proposal June 2026: Exchange Agreement, Bill of Sale, Easement, and Utility Service Contract signed

*Survey completion date subject to change based on input from selected offeror.

Utility Infrastructure

UNCLASSIFIED//CUI

Potable Water Sources Supplier: Potable water for Naval Station Newport Main Base is supplied by the City of Newport

Treatment plants:

Lawton Valley Treatment Plant Station 1 Treatment Plant

Capacity: Combined capacity of 16 million gallons per day

Distribution: Water enters the installation via 10 metered connections Interconnections with City of Newport System

Meter Pit BLDG A66 Gate 7 Quarters H, Naval Hospital Gate 1 Meter Pit, BLDG 1297 Cloyne Ct Meter Station, BLDG 1188 Meter Station Gate 4 CP Coddington Hwy Meter Pit

Chases Ln Meter Station Greene Lane Meter Station Lawton Valley Meter Station Fort Adams Meter Station

UNCLASSIFIED//CUI

Water Distribution System Inventory Distribution: The potable water system has approximately 60 miles of distribution pipe and 785 hydrants.

Components 1 water pump stations 3 fire pumping stations 3 underground reservoirs 785 fire hydrants 3,000 valves 300 back flow preventers 60 miles of potable water line

UNCLASSIFIED//CUI

All Main base data were pulled from the RFI; All Fort Adams data were pulled from the 2 condition assessments.

Water Storage and Quality Water Storage Tank 31: Capacity 440,000 gallons Tank 50: Capacity 1,710,000 gallons Tank 311: Capacity 2,250,000 gallons Ft Adams Reservoir 1295: Capacity 150,000

Water Quality Testing: Conducted daily, weekly, monthly, quarterly, and annually Maintenance: Routine flushing, valve management, fire hydrants, and pump houses

Average Daily Water Use 550,000 gallons per day through approximately 1,100 service connections

Sanitary Sewer System System Components 33 miles of gravity lines 6 miles of force mains 15 pump stations

Discharge Points: Wastewater from three pump stations (Buildings 48, 68, and 338) is discharged to the City of Newport wastewater treatment plant. Fort Adams sewer system operates independently from the main base, with its own separate discharge point.

Average Flow Daily: 1.08 million gallons per day Annual: 394.19 million gallons

UNCLASSIFIED//CUI

image3.png image2.png image4.png image1.png