Master PPI Spreadsheet Monaco System.pdf
PDF 153 KB Posted
- Solicitation number
- N4008525R0140
About this file
This document is a Pre-Proposal Information (PPI) Questions and Answers file for a federal contract solicitation to install Monaco Fire Alarm Radio Systems in multiple buildings at Oceana and Dam Neck naval installations. The project involves upgrading fire alarm reporting and monitoring equipment across approximately 40 buildings, including installing new Monaco BT-X transceivers, radio antenna systems, and modifying existing fire alarm control panels to transmit alarm, trouble, and supervisory signals to the Regional Dispatch Center.
Key technical requirements include transmitting up to three distinct signals per building through new Monaco equipment, upgrading head-end receiving stations with new hardware and Windows 11 software, and ensuring compatibility with existing fire alarm system contacts. The project also involves modifications to the Monaco Fire Alarm Radio D21 head-end equipment in Buildings 320 and 525, with the manufacturer required to be involved in hardware replacement, software installation, and database updates. The solicitation number is N4008525R0140, with a Price Proposal (PPI) cut-off date of 01-SEP-2025, indicating this is a current procurement opportunity for a fire protection system upgrade project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25R0140 AMENDMENT_0005.pdf | ||
| 25R0140 AMENDMENT_0004.pdf | ||
| 25R0140 AMENDMENT_0003.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| 25R0140 AMENDMENT_0002.pdf | ||
| Redacted JA ML-25-59 Alarm Reporting Sys NAS Oceana.pdf | ||
| 25R0140 AMENDMENT_0001.pdf | ||
| PPI Spreadsheet.xlsx | XLSX spreadsheet | |
| BLANK SPONSOR VERIFICATION SPREADSHEET.xls | XLS spreadsheet | |
| WD.txt | TXT text file | |
| 1753261 Monaco RFP FIN w 1-7 - Signed.pdf | ||
| SECNAV 5512.pdf | ||
| N4008525R0140 GENERAL REQUIREMENTS .pdf | ||
| PROVISION 52.204-24.pdf | ||
| BASE ACCESS INSTRUCTION.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page Section Para. Dwg #
Who is the existing NASO fire protection maintenance contractor?
All requests for NASO//DN Fire Protection Maintenance should be directed to the project Engineering Technician. Maintenance responsibilities vary depending on bldg. KEK 8/29/25
The RFP instructs that all fire alarms, supervisory alarms, and trouble conditions indicated at the fire alarm control panel must be transmitted to the fire alarm receiving station. Are the 40 existing fire alarm systems capable of transmitting these 8 zones currently or will they require adding relays and programming?
Transmit up to three distinct signals through the new Monaco BT-X transceiver per bldg, FACP Alarm, FACP Trouble, FACP Supervisor condition per RFP. Provide existing FACP auxilary contact monitoring.
KEK 8/29/25
3 What is the make and model of the existing FACP?
Please review the RFP package. BDP 8/28/25
4 1
Section 1.0 Project Description of the scope of work (page 39 of 324) states that the "This project will demolish the existing basewide fire alarm reporting/monitoring equipment and then design and install the interior Monaco Fire Alarm Radio Transmitter...."
Please confirm that it is not the intention of this scope of work to permit the buildings to be without a alarm transmission during the design phase of this project.
Correct, the end of the quoted statement specifies the buildings that this RFP construction will modify. The extent of the existing basewide fire alarm reporting/ monitoring equipment demolition is clarified under Part 3, D5030, Telecommunications Systems, which also requires this demolition to occur after antenna system is installed and accepted at each building. BDP 8/29/25
5 1
Section 1.0 Project Description of the scope of work (page 39 of 324) states that the antennas are for "transmit only".
Please confirm that the new Monaco radio transmission system is not be designed for the distribution of Mass Notification messages.
Correct, this is NOT a Mass Notification System. BDP 8/29/25 Fire Reporting only. KEK 08/29/25
Please confirm that architectural background CADD files will be made available for all building.
CADD files will be made available for the buildings as listed under Attachment #4. BDP 8/29/25
Project Title: INSTALL MONACO SYSTEM IN MULTIPLE
BUILDINGS AT OCEANA AND DAM NECK
Solicitation / RFP#: N4008525R0140 - PPI Cut Off Date: 01-SEP-2025
Amend No.
GOVERNMENT RESPONSE
PPI No.
Offeror Date
Submitted
REFERENCE QUESTION
Section D40, page 84 of 324, states to Provide new or extend existing Automatic Fire Sprinkler systems, Smoke and Heat detection systems, Fire Alarm and Mass Notification systems as required." Please confirm that no modifications to the fire alarm and protection systems are required.
See Page 57 Part 4 , 1.0 General Requirements, second paragraph "Part 4 is a general section. Not all items in Part 4 will be required for this project. See Part 3 for project specific-requirementss. See …"
KEK 08/29/25
Please confirm that all irrelevant specifications (e.g. window coverings, storm sewers, electrical distribution, toilet fixtures, etc.) contained within the RFP, are to be ignored.
Please review the Table Of Contents where Part 3 is the Statement of Work / Project Program, Part 4 contains the minimmum requirements of items specified in Part 3, and Part 5 contains the Prescriptive Specifications, which are not to be ignored.
BDP 8/29/25
9 RFP Part 3 3.0
According to RFP Part 3 §3.0 the project inculdes "a total of 40 (maximum) possible Radio Antenna Systems installed." Will each of the two fire alarm systems in B513 require a separate transmitter/antenna? If so, please confirm maximum overall number of new radio systems.
This confirmation is required by your DOR (Designer Of Record). BDP 08/29/25
10 RFP Part 3 3.1
RFP Part 3 §3.1 refers to FACC (Fire Alarm Control Communicator). Please elaborate on the function/purpose of this equipment.
The FACC (Fire Alarm Control Communicator) is the point of connection between the FACP (Fire Alarm Control Panel) and the TBB (Telephone Backboard) that facilitates the telephone signal. BDP 08/29/25
RFP Part 3
3.1 RFP Part 3 §3.1 refers to FADS. Please
define this term.
The FADS (Fire Alarm Disconnect Switch) is when the FACP is powered by a disconnect switch in lieu of a circuit breaker. BDP 08/29/25
Part 3, D4010, #3 requires antennas to be installed above roof line for single story buildings and line of sight to receiving station for multi-story buildings.
Attached Monaco planning manual states: “A clear line of sight from the BT antenna to the Central RFM is needed.”
There is a thick forest of trees (50-60’) on two sides of Building 320. Are the trees excluded from the “line-of-site” requirement?
Exclude Trees @ bldg 320 in Line of Sight determination. KEK 09/03/25
Who is the existing NASO fire protection maintenance contractor?
All requests for NASO//DN Fire Protection Maintenance should be directed to the project Engineering Technician. Maintenance responsibilities vary depending on bldg. KEK 09/03/25
The RFP instructs that all fire alarms, supervisory alarms, and trouble conditions indicated at the fire alarm control panel must be transmitted to the fire alarm receiving station. Are the 40 existing fire alarm systems capable of transmitting these 8 zones currently or will they require adding relays and programming?
Transmit up to three distinct signals through the new Monaco BT-X transceiver per bldg, FACP Alarm, FACP Trouble, FACP Supervisor condition per RFP. Provide existing FACP auxilary contact monitoring.
KEK 09/03/25
What is the make and model of the existing FACP?
See Attachment 6 for FACP Make and Model by bldg. KEK 09/03/25 Part 6, Attachment #4.
BDP 9/9/25
D40
FIRE
PROTEC
TION
SYSTEM
S System Descripti on
Section states: Modify the existing fire alarm system to be capable of transmitting Alarm, Trouble, and Supervisory conditions to the Regional Dispatch Center (RDC) through a newly provided Monaco BT-XF transceiver system monitoring existing FACP contact closures. Do the existing fire alarm systems already transmit Alarm, Trouble, and Supervisory conditions through the current Monaco or Digitizer systems?
None of the bldgs within the scope of this project transmit alarms through the Monaco system. All bldgs within the scope of this upgrade project communicate to the RDC through phone line connections to the the digitize receiver station in bldg 320. KEK 09/03/25
D4010
FIRE
ALARM
AND
DETECTI
ON
SYSTEM
S IN
EACH
BUILDIN
G
INSTALL
ING AN
ANTENN
A
Section states: All fire alarms, supervisory alarms, and trouble conditions indicated at the fire alarm control panel must be transmitted to the fire alarm receiving station. Transmitter zones must be as follows:
a. Sprinkler Water Flow @ FACP Transmit General Alarm to RDC.
b. Smoke Detector @ FACP Transmit General Alarm to RDC.
c. Manual Pull Station @ FACP Transmit General Alarm to RDC.
d. Supervisory @ FACP Transmit General Supervisory to RDC.
e. Duct Smoke Detector @ FACP Transmit General Supervisory to RDC.
f. Fire Pump Running @ FACP Transmit General Supervisory to RDC.
g. Sleeping Room Smoke Detector @ FACP Transmit General Supervisory to
RDC.
h. Trouble @ FACP Transmit General Trouble to RDC. Are the existing fire alarm systems already programmed to transmit these zones?
Transmit up to three distinct signals through the new Monaco BT-X transceiver per bldg, FACP Alarm, FACP Trouble, FACP Supervisor condition per RFP. Provide existing FACP auxilary contact monitoring.
KEK 09/03/25
D4010
FIRE
ALARM
AND
DETECTI
ON
SYSTEM
S
ADDITIO
NAL
WORK
IN
OCEANA
BLDG
320 /
DNA
BLDG
Section states: Provide modification to the existing Monaco Fire Alarm Radio D- 21 head end equipment programming software at NAS Oceana Building 320 and Dam Neck Annex Building 525, as required. Including, but not limited to, software programming and D-21 Windows 11 operating system upgrade with necessary hardware and software required. (1.)
Can the government clarify programming software "as required. Including, but not limited to, software programming and D- 21 Windows 11 operating system upgrade with necessary hardware and software required" refers to? (2.) Are addtional upgrades needed to the headend software? (3.) Are the upgrades determined by the manufacturer or by the Navy? (4.) What additonal upgrades are being requested?
1) Monaco D-21 Head-end receiving stations require complete hardware and software upgrade in order to maintain secure communications. Manufacturer Monaco will be required to be involved in the hardware replacement, software installation, database review, database transfer, database updating necessary to communicate with the RDC through the LOMAS system. Navy is requesting the installation of two new D-21 Monaco head end windows 11 hardware/software required to provide a fully mission capable fire reporting system at NASO and Dam Neck for all existing reporting bldgs and all new requested bldgs.2)& 3) & 4) Upgrades will be determined by the manufacturer. KEK 09/03/25
MONAC
O
INSTALL
BUILDIN
G
MATRIX
In the table several panels are listed as discontinued. If zones need to be added for the specified reporting zones referenced in question #6 above, parts may not be available. Will the contractor be required to upgrade the fire alarm system?
All existing panels have existing auxilary contacts being monitored by the digitizer system. The monaco system will monitor these same contacts. Existing discontinued FACP programming and hardware additons are not aniticipated. KEK 09/03/25
20 011100 1.0
Please provide a list of the equipment that the contractor will be required to protect during construction at each building.
That list is all government property existing to remain in accordance with the RFP, Part 2, 01 11 00, 1.0 Protection of Governemnt Property.
A more specific list will need to be provided by your DOR (Designer Of Record). BDP 9/08/25
21 011400.05 2 1.1
Please verify that underground work will not be required for this project. If underground work is required, please provide the scope of work.
Review the RFP, Part 3, D5090, Grounding -
IN EACH BUILDING INSTALLING AN
ANTENNA. BDP 9/8/25
22 011400.05 2 1.2 a
As the building are to be occupied, please verify that the contractor will not need to provide temporary partitions at any of the buildings where work is taking place. If temporary partitions are required, please provide as-builts of the building showing the deck heights. If these cannot be provided, please provide a description of work for all building regarding temporary partitions, for bidding purposes.
We do not anticipate partitions to be required due to the limited construction scope at each building unless Hazmat remediation is triggered. BDP 9/8/25
23 011400.05 2 1.3 f
As special badging maybe required to access NAS Oceana Building 3030, please provide a description of how to obtain the special badging for this building.
Review the RFP, Part 6, #4 MONACO INSTALL BUILDING MATRIX, for additional access information. BDP 9/8/25
24 011400.05 2 1.3 f
As special badging maybe required to access NAS Oceana Building 3030, please verify that the contractor will not occur any costs associated with the special badging requirements for this building. If there are additional costs for badging, please provide a pricing schedule, for bidding purposes.
Review the RFP, Part 6, #4 MONACO INSTALL BUILDING MATRIX, for additional access information. No additional badging costs are anticipated. BDP 9/8/25
25 011400.05 2 1.3 f
As escorts are required for work in building 202 and 3030, please verify that the costs of the escorts will be by the government. If not, please provide a cost schedule for the contractor to include for these buildings.
Review the RFP, Part 2, 01 14 00.05 20, 1.3,
h. No additional costs are anticipated for military escorts. BDP 9/8/25
26 013000.05 2 1.1
Please verify that the contractor will need two persons on-site at all times. Per the specifications, the superintendent may serve as SSHO, but not as the QC manager. Further, the SSHO may serve as the QC manager.
Review the RFP, Part 2, 01 30 00.05 20, 1.1 Supervision, for these requirements. BDP 9/8/25
27 015719 1.5 Please provide the hazmat reports for all building.
Hazmat Reports will be made available for the buildings as listed under Attachment #4. BDP 9/8/25
28 015719 1.5 Please provide quantities of asbestos that will need to be removed at each building, for bidding purposes.
Hazmat Reports will be made available for the buildings as listed under Attachment #4. BDP 9/8/25
29 Part 3 1.0
Please provide a list of the existing base wide fire alarm reporting/monitoring equipment that is to be removed, for bidding purposes.
The extent of the existing basewide fire alarm reporting/ monitoring equipment demolition is clarified under Part 3, D5030, Telecommunications Systems. BDP 9/8/25
30 Part 3 1.0
Please verify that the contractor is to assume that all remaining equipment base wide will be compatible with the new Monaco Fire Alarm Radio Transmitter and antenna. If not, please provide a list of equipment that the contractor will be required to replace at each building, for bidding purposes.
"remaining equipment" is interpreted as existing monaco BT-Fx transceivers throughout NASO and Dam Neck not being replaced as part of this project but must still communicate with the newly installed hardware. This equipmnent is compatible with the newly requested D-21 head end operating system, hardware and software.
KEK 09/03/25
31 Part 3 1.0
Please provide a list of the "associated appurtenances" that the contractor will be required to replace, for bidding purposes.
If this cannot be provided, please note that the contractor cannot provide an accurate price for this project and therefore an allowance for associated appurtenances should be provided for each building.
Part 1.0 is a brief project description. That list of the 'associated appurtenances' is in accordance with the RFP, Part 3, such as conduit, conductors, ground rods, etc. that is not listed individually in a brief project description. A more specific list will need to be provided by your DOR (Designer Of Record). BDP 9/08/25
32 Part 3 1.0
Please provide exterior wall type as-builts for each building as the contractor will need to mount an antenna at the exterior of the building.
Review the RFP, Part 3, 3.1 EXISTING SITE CONDITIONS, for exterior wall type description for each building. Exterior wall type as-builts will not be provided. BDP 9/8/25
33 Part 3 1.0
Please verify if the contractor will be required to include framing for the new antennas. If so, please provide a description of the framing at each location, for bidding purposes.
Review the RFP, Part 6, Attachment #5, BUILDING LOCATION MAPS AND DETAIL, for additional antenna installation information.
BDP 9/8/25
34 Part 3 3.1
Please provide a description of the exterior walls at buildings 525 and 3013 if the contractor is to install antennas at these locations.
Review the RFP, Part 3, 1.0 PROJECT DESCRIPTION, where Bldg 525 (DNA) is not listed for an antenna installation. Review the RFP, Part 3, 3.1 EXISTING SITE CONDITIONS, for exterior wall type description for each building. Exterior wall type as-builts will not be provided. Exterior wall information will need to be provided by your DOR (Designer Of Record) where that information is not available in the RFP. BDP 9/8/25
35 C3010
Please provide an approximate square footage at each building that the contractor is to repaint as full as-builds for this project are not provided. This is required for bidding purposes.
As-built floor plans will be provided per Attachment #4 to assist in determining repaint requirements. BDP 9/8/25
36 D4010
For bidding purposes, please verify that the contractor is to assume that the new 120V line to feed the new Monaco BT-FX panel can be extended from the fire alarm control panel and a new circuit breaker will not be required. If this is not the case, please provide an estimated number of occurrences where the contractor will be required to include a new circuit breaker per Part 3.
Review the RFP, Part 3, 3.1 EXISTING SITE CONDITIONS, for the existing power description for each building. BDP 9/8/25
37 D4010
For bidding purposes, please verify that the contractor is to assume that all new Monaco BT-XF panels maybe installed with 15' of the existing FACP. If not, please provide the number of occurrences that the contractor is to assume that will be outside the 15' location and therefore will require a new smoke detector.
For bidding purposes, assume 10 locations.
KEK/BDP 9/9/25
38 D4010
Please verify that the fire alarm control panel will be required to transmit in the eight zones listed in section D4010 on page 13 of part 3.
Transmit up to three distinct signals through the new Monaco BT-X transceiver per bldg, FACP Alarm, FACP Trouble, FACP Supervisor condition per RFP. Provide existing FACP auxilary contact monitoring.
KEK 09/03/25
39 D4010
If the answer to PPI #19 [38] is yes than please verify that the current fire alarm system transmits the eight zones listed in section D4010 on page 13 of part 3.
See PPI #19 [38], KEK 09/03/25
40 D4010
If the current system currently does not transmit the eight zones listed in section D4010 on page 13 of part 3, please verify that the contractor will be required to reprogram the fire alarm in each building to the required eight zones listed in this section.
Transmit up to three distinct signals through the new Monaco BT-X transceiver per bldg, FACP Alarm, FACP Trouble, FACP Supervisor condition per RFP. Provide existing FACP auxilary contact monitoring.
KEK 09/03/25
41 D4010
If the current system currently does not transmit the eight zones listed in section D4010 on page 13 of part 3 and the contractor will be required to reprogram the fire alarm panel in each building, please verify that all components of the existing system are able to transmit the eight zones indicated. If not, please verify that the contractor will be required to replace the components that do not transmit in the eight zones.
All existing panels have existing auxilary contacts being monitored by the digitizer system. The monaco system will monitor these same contacts. KEK 09/03/25
42 D4010
If the answer to PPI #22 [41] is yes than please provide a list of components in each building that do not transmit in the eight zones indicated so the contractor may include replacing them in their bid, for bidding purposes.
All existing panels have existing auxilary contacts being monitored by the digitizer system. The monaco system will monitor these same contacts. KEK 09/03/25
43 D4010
If the answer to PPI #22 [41] is yes than please verify that the project time may be extended to include the removal and replacement of multiple component replacements in multiple buildings.
All existing panels have existing auxilary contacts being monitored by the digitizer system. The monaco system will monitor these same contacts. KEK 09/03/25
44 D4010
Please provide a list of hardware and software that will require upgrades for the head end equipment. As there are a multitude of different upgrades and software's that this new system can use, each upgrade and software has a different costs associated with them.
Monaco D-21 Head-end receiving stations require complete hardware and software upgrade in order to maintain secure communications. Manufacturer Monaco will be required to be involved in the hardware replacement, software installation, database review, database transfer, database updating necessary to communicate with the RDC through the LOMAS system. Navy is requesting the installation of two new D-21 Monaco head end windows 11 hardware/software required to provide a fully mission capable fire reporting system at NASO and Dam Neck for all existing reporting bldgs and all new requested bldgs. KEK 09/03/25
45 D4010
Please provide as-builts that show the location of the existing fire alarm panels in each building. This is required so the contractor may include the proper amount of conduit/wire for the new antenna and controls.
An announcement will be provided when As-builts (& Hazmat reports) are available from our Contract Specialist. BDP 9/8/25
46 D4010
Please verify that the contractor is not to include new lightning protection systems at the building that currently do not have a system in place. If the contractor is to include a new lightning protection system for the 32 buildings that current do not have a lightning protection system, please provide the as-builts for the roof so the contractor may include the new lightning protection as required.
No new lightning protection systems are required in accordance with this RFP, Part 3, D5090, Lightning Protection Systems - IN
EACH BUILDING INSTALLING AN
ANTENNA. BDP 9/8/25
47 D4010
If the contractor is to provide a new lightning protection system for the buildings that currently do not have one, please verify that the contractor will need to provide and install a new grounding loop for each building.
No new lightning protection systems are required in accordance with this RFP, Part 3, D5090, Lightning Protection Systems - IN
EACH BUILDING INSTALLING AN
ANTENNA. BDP 9/8/25
48 D5090
Please provide a specification or detail of the ground test well required.
Review the RFP, Part 3, D5090, Grounding -
IN EACH BUILDING INSTALLING AN
ANTENNA for the ground test well description. More specific information will need to be provided by your DOR (Designer Of Record). BDP 9/8/25
Sheet1