AMENDMENT 0010.pdf

PDF 137 KB Posted

Attached to
REPLACE ELEVATOR, BLDG. 355, DAM NECK ANNEX VIRGINIA BEACH, VA
Solicitation number
N4008525R0084
Issued by

About this file

This is Amendment 0010 to Solicitation N4008525R0084 for elevator replacement services at Building 355, Dam Neck Annex, Virginia Beach, Virginia. The amendment was issued by NAVFAC Mid Atlantic, Facilities Engineering & Acquisition Division on August 18, 2026, with an effective date of August 18, 2026. The receipt of proposals deadline is August 20, 2026, at 2:00 PM EDT.

The primary purpose of this amendment is to update the list of attachments within the General Requirements section. Key changes include updating Attachment B from Wage Determination VA20250167 (dated February 28, 2025) to Wage Determination VA20260167 (dated May 18, 2026), and replacing Attachment H from PROVISION 52.204-24 to PIEE Vendor Access Instructions. All other attachments—Scope of Work (A), Base Access Instruction (C), SECNAV 5512 (D), Sponsor Verification Spreadsheet (E), PPI Spreadsheet (F), Price Schedule Form (G), and DEVGRU Spreadsheet (J)—remain unchanged. Offerors must acknowledge receipt of this amendment prior to proposal submission or risk rejection of their offers.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

18-Aug-2026

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than item 6) CODE

NAVFAC MID ATLANTIC

PWD OCEANA

FACILITIES ENGINEERING & ACQ DIV

953 HORNET DR SUITE 213

VIRGINIA BEACH VA 23460-2190

See Item 6

8. NAME AND ADDRESS OF CONT RACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

N4008525R0084

X 9B. DATED (SEE ITEM 11)

21-Jul-2025

10A. MOD. OF CONT RACT /ORDER NO.

10B. DAT ED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, x is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT

TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SOLICITATION N4008525R0084, REPLACE ELEVATOR, BUILDING 355, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA

The purpose of this amendment is to update the list of attachments within the General Requirements.

***Receipt of Proposal due date is 20 August 2026 at 2:00 PM EDT.***

SEE CONTINUATION PAGE.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONT RACT OR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNIT ED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

18-Aug-2026

EXCEPTION TO SF 30

30-105-04

STANDARD FORM 30 (Rev. 10-83) APPROVED BY OIRM 11-84 Prescribed by GSA

FAR (48 CFR) 53.243

N4008525R0084

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF – BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0010

SOLICITATION N4008525R0084, REPLACE ELEVATOR, BUILDING 355, DAM NECK ANNEX, VIRGINIA

BEACH, VIRGINIA

The purpose of this amendment is to update the list of attachments within the General Requirements.

ATTACHMENTS have been updated

FROM:

ATTACHMENT A Scope of Work

ATTACHMENT B Wage Determination VA20250167 Dated 02/28/2025

ATTACHMENT C Base Access Instruction

ATTACHMENT D SECNAV 5512

ATTACHMENT E BLANK Sponsor Verification Spreadsheet

ATTACHMENT F PPI Spreadsheet

ATTACHMENT G Price Schedule Form

ATTACHMENT H PROVISION 52.204-24

ATTACHMENT J DEVGRU Spreadsheet

To:

ATTACHMENT A Scope of Work

ATTACHMENT B Wage Determination VA20260167 Dated 05/18/2026

ATTACHMENT C Base Access Instruction

ATTACHMENT D SECNAV 5512

ATTACHMENT E BLANK Sponsor Verification Spreadsheet

ATTACHMENT F PPI Spreadsheet

ATTACHMENT G Price Schedule Form

ATTACHMENT H PIEE Vendor Access Instructions

ATTACHMENT J DEVGRU Spreadsheet

Please note ATTACHMENT H PROVISION 52.204-24 has been removed and is no longer required.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .