About this file

This document is a Standard Form 30 Amendment of Solicitation for Solicitation N40085-25-R-0072, issued by NAVFAC MID-ATLANTIC for installing a backup generator and Automatic Transfer Switch (ATS) for the NMCI Room in Building 127 at Dam Neck Annex in Virginia Beach, Virginia. The amendment, dated 20 August 2025, serves to issue PPI (Pre-Proposal Information) responses and extends the proposal due date to 29 August 2025 at 2:00 PM EDT. An Adobe PDF Master PPI Spreadsheet for Building 127 is attached to the amendment and has been posted on SAM.gov for potential offerors to review.

View the file

Other files

File Type Posted
ATTACHMENT G REV 1 Price Schedule Form.pdf PDF
ATTACHMENT B REV Wage Determination.pdf PDF
REVISED MACC ML-C00075 GENERAL REQUIREMENT Cover Page.pdf PDF
ATTACHMENT H_PIEE Vendor Access Instructions.pdf PDF
N4008525R0072 AMENDMENT 0006.pdf PDF
25R0072 AMENDMENT_0005.pdf PDF
ATTACHMENT G.docx DOCX document
WD VA2260167 1302026.txt TXT text file
25R0072 AMENDMENT_0004.pdf PDF
25R0072 AMENDMENT_0003.pdf PDF
Master PPI Spreadsheet B127.pdf PDF
25R0072 SITE VISIT SHEET.pdf PDF
25R0072 AMENDMENT_0001.pdf PDF
1744800 JA.pdf PDF
1744800 FINAL DB-RFP REVISION.PDF PDF
PROVISION 52.204-24.pdf PDF
BLANK SPONSOR VERIFICATION SPREADSHEET.xls XLS spreadsheet
SECNAV 5512.pdf PDF
1744800 Final DB-RFP.PDF PDF
N4008525R0072 GENERAL REQUIREMENTS .pdf PDF
PPI Spreadsheet B127.xlsx XLSX spreadsheet
BASE ACCESS INSTRUCTION.pdf PDF
WAGE DETERMINATION.txt TXT text file
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. P ROJECT NO.(If applicable)

6. ISSUED BY CODE N4008 7. ADMINISTERED BY (If other than item 6) CODE

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

X 9B. DATED (SEE ITEM 11)

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORIT Y OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

0002 20-Aug-2025 ACQR 6088409

N40085-25-R-0072

30-Jul-2025

SOLICITATION N40085-25-R-0072, INSTALL BACK UP GENERATOR AND ATS FOR NMCI ROOM BUILDING 127, DAM NECK ANNEX, VIRGINIA

BEACH, VIRGINIA

The purpose of this amendment is to issue the PPI responses.

***Proposal due date is 29 August 2025 at 2:00PM EDT.***

SEE CONTINUATION PAGE.

20-Aug-2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

(End of Summary of Changes)

N40085-25-R-0072

SOLICITATION N40085-25-R-0072, INSTALL BACK UP GENERATOR AND ATS FOR NMCI ROOM,

BUILDING 127, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA

The purpose of this amendment is to issue the PPI responses.

Attachment:

1) Adobe PDF: Master PPI Spreadsheet B127

Attachment is embedded into this Amendment and is posted on SAM.gov.

Page Section Para. Dwg #

1 08/12/25 Part 3

Does the condenser water supply/return piping require pipe insulation?

Yes, provide insulation for the condenser water system, including but not limited to, piping, equipment and accessories provided by this project. Provide insulation as specified in UFGS 23 07 00 THERMAL

INSULATION FOR MECHANICAL

SYSTEMS including TABLE 1 and TABLE 2 which specifies the insulation requirements and allowable insulation types for condenser water piping. Edit UFGS 23 07 00 paragraph

3.2.2 to require the insulating of the provided condenser water piping system.

2 08/12/25

Part 3 C1020

The RFP requires a passage lock be provided for the new double doors to the Server Rm. This lock function does not lock.

Please confirm the specified function is correct.

Yes. Passage lock is correct. No locking required for this door.

3 08/12/25

The site of the new generator location contains an existing electrical disconnect with 2ea 2.5 inch conduits serving it. Can the disconnect equipment be demolished and disposed and the existing conduits be utilized as a pathway for the conductors to the generator if they are properly sized?

No. The entire installation requires new materials and equipment.

4 08/12/25 Part 3 D5010

The RFP requires a new panelboard to replace LC-2 and its circuits relocated to the new panelboard. Is LC-2 to be demolished, completely removed, and disposed or is it to remain in place for future use?

The existing LC-2 is to be demolished after all circuits have been migrated to the new

LC-2.

5 08/12/25 Is a load bank test required upon completion of the generator and ATS equipment installation?

Yes.

6 08/12/25

Is commissioning required for the HVAC portion of the work?

Whole building commission is not specified in Part 3 of this RFP, but specific testing, acceptance testing and performance verification testing (PVT) as required by the applicable UFC and UFGS is required.

7 08/12/25 Are the corridor walls of corridor 1-CR5 a fire rated partition? If so, what is the fire rating of the assembly?

Corridor walls are masonry. One hour rated.

8 08/12/25 Part 3 D30

Part D30 states the psychrometric conditions for the indoor unit. Confirm that for the CRAC unit sequence of operation, the indoor relative humidity setpoint can be a range (40- 50%) to prevent the SCR reheat coil from short cycling.

The CRAC relative humidity design condition per the RFP is 44%. The CRAC controls may allow a space humidity swing between 40 and 50% relative humidity for CRAC unit operation optimization.

9 08/12/25

UFC 3-540-01 2-1.3 requires this type of system to comply with NEC 70, Article 701.

UFC NEC 70, 701.32 requires selective coordination with all supply-side OCPDs.

This most likely will not be possible with the existing fuses and circuit breakers on the supply side of the new generator and ATS.

Please confirm that the contractor is not responsible for selective coordination of existing OCPDs.

Comply with UFC 3-540-01.

10 08/12/25 Are CAD files available for the existing site/floor plan?

CAD files are not available.

11 08/12/25 3 Part 3 3.2

Part 3, 3.2 requires: 1) “The Design-Build Contractor is also required to have all site utilities, both above and below ground, located vertically and horizontally prior to beginning work.” 2) “A detailed topographic and utility survey for the project area” 3) “Physically verify the location of all existing utilities and obtain all additional survey data required to provide quality final existing site plans.” The same paragraph also states:

“The design and relocation of any utility shall be included in the base bid. Existing utilities located within project include but are not limited to sanitary sewer, water, electrical, gas, storm drainage, telecommunications, etc.” Please provide a plan or other information indicating the extent of utilities that will need to be relocated.

The Government expects the Contractor to locate existing utilities in order for the DOR to avoid them in the design.

12 08/12/25 11 Part 3 D5010

Part 3, D5010 requires transfer switch with maintenance bypass/isolation. A bypass/isolation type switch could be 80” tall, 36” wide and 30” deep. Please confirm whether or not bypass/isolation is required for the ATS.

Bypass/isolation is required.

Project Title:INSTALL BACK UP GENERATOR AND ATS FOR

NMCI ROOM, BLDG 127, DAM NECK ANNEX

Solicitation / RFP#: N4008525R0072 - PPI Cut Off Date: 12 AUG 2025

Amend No.

GOVERNMENT RESPONSE

PPI No.

Offeror Date

Submitted

REFERENCE QUESTION

Sheet1

File details come from the government source that posted it. Updated .