About this file

This is a Class Justification and Approval (CJ&A) document from the Naval Facilities Engineering Systems Command, Mid-Atlantic (NAVFAC MIDLANT) authorizing the use of specific brand name programmable building controllers for facilities-related control systems. The document justifies non-competitive procurement for Johnson Controls International's Metasys and Automated Logic Corporation's WebCTRL product lines for the Oceana Building Controls Network (Oceana BCN) from 30 November 2022 to 29 November 2025.

The procurement is focused on network-capable programmable digital controllers for building control systems, including controllers, routers, supervisory controllers, zone controllers, and variable air volume controllers. The justification is based on standardization, interoperability, and cybersecurity requirements, with a business case analysis demonstrating that using these specific manufacturers will minimize costs and potential cyber vulnerabilities. The document indicates the controllers will be used for various projects including a Maritime Surveillance System Facility, Unaccompanied Housing, and several repair and maintenance projects, with some being Military Construction (MILCON) and others being Sustainment, Restoration, and Modernization (SRM) projects.

View the file

Other files

File Type Posted
ATTACHMENT G REV 1 Price Schedule Form.pdf PDF
REVISED MACC ML-C00075 GENERAL REQUIREMENT Cover Page.pdf PDF
ATTACHMENT H_PIEE Vendor Access Instructions.pdf PDF
N4008525R0072 AMENDMENT 0006.pdf PDF
ATTACHMENT B REV Wage Determination.pdf PDF
25R0072 AMENDMENT_0005.pdf PDF
ATTACHMENT G.docx DOCX document
WD VA2260167 1302026.txt TXT text file
25R0072 AMENDMENT_0004.pdf PDF
25R0072 AMENDMENT_0003.pdf PDF
Master PPI Spreadsheet B127.pdf PDF
25R0072 AMENDMENT_0002.pdf PDF
25R0072 AMENDMENT_0001.pdf PDF
1744800 FINAL DB-RFP REVISION.PDF PDF
25R0072 SITE VISIT SHEET.pdf PDF
PROVISION 52.204-24.pdf PDF
BLANK SPONSOR VERIFICATION SPREADSHEET.xls XLS spreadsheet
SECNAV 5512.pdf PDF
1744800 Final DB-RFP.PDF PDF
N4008525R0072 GENERAL REQUIREMENTS .pdf PDF
WAGE DETERMINATION.txt TXT text file
PPI Spreadsheet B127.xlsx XLSX spreadsheet
BASE ACCESS INSTRUCTION.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Class J&A No. ML-23-04

The total estimated value for the use of the Specified Manufacturers and Product Lines equipment through 29 November 2025 is $. The cost of programmable building controllers typically represents approximately 20 percent of the cost of the total controls installation effort, and is a miniscule percentage of the total cost of any building construction effort. A non-exhaustive listing of the projected projects that will utilize this equipment is provided in Appendix A. All required programmable building controllers are authorized under this CJ&A regardless of method of execution or procurement strategy (i.e., contracted, in-house shop forces, base operating support contracts, or materials supply chain contractor).

Estimated Dollar Value of Brand Name Equipment ($K)

FY23-FY26

MILCON

Special Projects

TOTAL

4. Statutory Authority Permitting Other Than Full and Open Competition.

The statutory authority permitting other than full and open competition is Title 10, U.S.C.

3204(a)(l), as implemented by the Federal Acquisition Regulation (FAR) 6.302-1, "Only one responsible source and no other supplies or services will satisfy agency requirements."

5. Rationale Justifying Use of Cited Statutory Authority.

The Installation has a reasonable need for standardization and interoperability of its existing building control systems that will require a connection to the identified installation networked facilities control and monitoring systems commonly referred to as the Oceana BCN. Applicable United States Government Accountability Office (GAO) Comptroller General decisions have acknowledged the authority of a federal agency to use other than competitive procedures when there is a reasonable need for standardization or interoperability with existing agency equipment or software and when it is likely that award to other sources would result in substantial duplication of cost to the government that is not expected to be recovered through competition.

To assess the need for standardization and interoperability, a rigorous business case analysis (BCA) was performed on the existing inventory of building control systems connected to the future Oceana BCN. The BCA evaluated the standardization of building programmable controllers and quantified the annual costs associated with procurement, sustainment of operation and maintenance, and establishment and sustainment of Department of the Navy cybersecurity requirements. The results of the BCA demonstrate that in order to minimize costs and potential cyber vulnerabilities, the use of the indicated Specified Manufacturers and Product Lines programmable building controllers will be required for all projects that require a connection to the Oceana BCN.

Additionally, in support of the future Smart Grid program, all new building control systems, unless identified by exception, shall be required to connect to the Oceana BCN.

Appendix A

List of projected projects using brand name controls from Specified Manufacturers and Product Lines:

PROJECT DESCRIPTION PROGRAM FUNDING CWECOST MILCON Cost of Controllers

NO. YEAR TYPE (000) (YIN)

Pl069 Maritime Surveillance System Facility FY20 MILCON Yes

Pl104 Unaccompanied Housing FY21 MILCON Yes

RM14-1408 DEVGRU Ops B355 Repair HVAC FY20 SRM No

RM20-0771 Repair Hangar 122 FY20 SRM No

RM15-1266 Repair B420, Intelligence Warfare Training FY21 SRM No Center (IWTC)

File details come from the government source that posted it. Updated .