N4008524R2564 Section J-0200000-14 ELINs.xlsx
XLSX spreadsheet 108 KB Posted
- Solicitation number
- N4008524R2564
About this file
This document appears to be an Exhibit Line Item Numbers attachment for a solicitation for Facility Investment Services for the Naval Station Newport Complex Area in Newport, Rhode Island. The solicitation number is N4008524R2564 and is issued by the Department of the Navy Naval Facilities Engineering Command.
The attachment provides detailed pricing line items for recurring and non-recurring services required under the contract, including asbestos removal, mold remediation, vehicle repair, and other maintenance and repair work. The line items are structured for the base period and four option years. Pricing terms are fixed-price and indefinite-quantity. The services are required to maintain the facilities, equipment, and systems at the Naval Station Newport complex.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| CLIN 0001 | $ - 0 | CLIN 0002 | $ - 0 |
| CLIN 0003 | $ - 0 | CLIN 0004 | $ - 0 |
| CLIN 0005 | $ - 0 | CLIN 0006 | $ - 0 |
| CLIN 0007 | $ - 0 | CLIN 0008 | $ - 0 |
| CLIN 0009 | $ - 0 | CLIN 0010 | $ - 0 |
| Total RP | $ - 0 | Total NRP | $ - 0 |
Est. Total $ - 0
Base Period Recurring
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-24-R-2564 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Work - Base Period |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 through A008 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| CNIC | Facility Investment 1502000 | ||||
| Newport, RI | |||||
| A001 | Region Spec Item 3 | ||||
| A001A | Emergency Service Orders - (Spec Item 3.1.1) | 1 | EA | $0.00 | |
| A001B | Urgent Service Orders - (Spec Item 3.1.2) | 3 | EA | $0.00 | |
| A001C | Routine Service Orders - (Spec Item 3.1.3) | 20 | EA | $0.00 | |
| A001CA | Unaccomplished PM Report (Spec Item 3.2.1) | 12 | EA | $0.00 | |
| A001D | Preventive Maintenance -Disabled Doors - (Spec Item 3.3.2) | 3 | EA | $0.00 | |
| A001E | Preventive Maintenance - PlymoVent System - (Spec Item 3.5) | 16 | EA | $0.00 | |
| A001F | Preventive Maintenance - Gas Pump Fire Systems (Spec Item 3.2.4) | 2 | EA | $0.00 | |
| A001G | Preventive Maintenance - Power Doors - (Spec Item 3.3.1) | 9 | EA | $0.00 | |
| A001H | Preventive Maintenance - Kitchen Suppression systems - (Spec Item 3.2.3) | 12 | EA | $0.00 | |
| A001J | Preventive Maintenance - Overhead doors - (Spec Item 3.3) | 68 | EA | $0.00 | |
| A001K | Preventive Maintenance - Dock levelers - Spec Item (3.4) | 5 | ea | $0.00 | |
| A001KA | Gun Range Filters Quarterly Spec Item 3.8 | 31 | ea | $0.00 | |
| A001KAB | Gun Range Filters Semi-Annual Spec Item 3.8.1 | 46 | ea | $0.00 | |
| A001KAC | Gun Range Belts Quartly Spec Item 3.8.2 | 3 | ea | $0.00 | |
| Total Cost For Contract Line Item A001- CNIC |
| A002 | (Training Pool) | |||
| A002A | Chemical Treatement Bldg. 1357 - Spec Item 3.6 | 12 | EA | $0.00 |
| A002B | Chemical Treatment Bldg. 1109 - Spec Item 3.6 | 12 | EA | $0.00 |
| Total Cost For Contract Line Item A002- CNIC |
| A003 | Other Recurring Services Program | ||
| A003A | Recurring Services Program Spec 3.9 | 12 | EA |
| Total Cost For Contract Line Item A003 -CNIC |
| A004 | HAZMAT Sampling, Testing Service Calls CNIC | |||
| A004A | Service Call Asbestos. Spec item 3.7 | 4 | EA | $0.00 |
| A004B | TEM AHERA Asbestos air sampling (TAT 72 Hour) - PCM Asbestos Air NIOSH 7400 A Method (TAT 72 Hour)/ Analytical Reports - Initial Reports - (Spec Item 3.7) | 4 | EA | $0.00 |
| Total Cost For Contract Line Item A004- CNIC |
| A005 | Hazmat Service Calls for Sampling, testing and written results of Lead - CNIC | |||
| A005A | Lead Bulk by EPA - Sampling Lead in accordance with Specification Section 3.7. | 4 | EA | $0.00 |
| Total Cost For Contract Line Item A005- CNIC |
| A006 | Haznmat Routine Service Calls for Sampling, testing and written results of PCB's, Lead, Asbestos, etc | |||
| A006A | Sampling, testing PCB's- Lead, Asbestos, Etc (TAT 48 Hour) - Spec Item 3.7.1 | 4 | EA | $0.00 |
| Total Cost For Contract Line Item A006- CNIC | ||||
| TOTAL CNIC A001-A006 |
| NWC | ||||
| A007 | Facility Investment 1502000 | |||
| A007A | Reserved for Future Use | |||
| A007B | Urgent Service Orders - Spec Item 3.1.2 | 2 | EA | $0.00 |
| A007C | Routine Service Orders - Spec Item 3.1.3 | 4 | EA | $0.00 |
| TOTAL NWC A007 |
| NMRTC | |||
| A008 | Facility Investment 1502000 | ||
| A008A | Reserved for Future Use | 0 | $0.00 |
| A008B | Urgent Service Orders - Spec Item 3.1.2 | 0 | $0.00 |
| A008C | Routine Service Orders - Spec Item 3.1.3 | 0 | $0.00 |
| A008D | Preventive Maintenance (Automatic Doors(7)) (Spec Item 3.3.1) | 0 | $0.00 |
| TOTAL NMRTC A008 | |||
| TOTAL RECURRING LINE ITEMS | $0.00 |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
Base Period-Non-Recurring
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-24-R-2564 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Work - Base Period |
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A755 |
| ELIN | Description | Long Description | Est. Qty | Unit | Unit Price | Total Price | |
| Asbestos Removal | |||||||
| A701 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Material as specified in the Task Order and in accordance with Specification Sections 02 82 00, 01 57 19 and 01 57 19.00 22. | 700 | LF | $0.00 | ||
| A702 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipes. | |||||
| Pipe Size up to 4 inches in diameter | 700 | LF | $0.00 | ||||
| A703 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipes. | |||||
| Pipe Size - 4 inch diameter - up to and including 8 inches in diameter | 700 | LF | $0.00 | ||||
| A704 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of PVC and/or Metal Jacket To Gain Access to Asbestos TSI | 400 | LF | $0.00 | ||
| A705 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Non-Asbestos Pipe TSI | 700 | LF | $0.00 | ||
| A706 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Air Handler Units, Duct Work, Boilers and Tanks | 700 | LF | $0.00 | ||
| A707 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipe in Existing Trenches, Manhole and Steam Pits. | |||||
| Pipe Size up to 4 inches in diameter | 400 | LF | $0.00 | ||||
| A708 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipe in Existing Trenches, Manhole and Steam Pits. | |||||
| Pipe Size - 4 inch diameter - up to and including 8 inches in diameter | 400 | LF | $0.00 | ||||
| A709 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Firebrick, from the Inside and Out Side of the Boiler, Firebrick approximately 4" Thickness | 360 | SF | $0.00 | ||
| A710 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Remaining Asbestos Insulation After Removal of Firebrick in/out side the Boiler Firebox | 360 | SF | $0.00 | ||
| A711 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Loose Fill Insulation That Contains Asbestos or Contaminated with Asbestos | 375 | CF | $0.00 | ||
| A712 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI by Glovebag Technique | 1,150 | LF | $0.00 | ||
| A713 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Single Layer Asbestos Floor Tiles with Mastic. | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 20,000 | SF | $0.00 | ||||
| A714 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of each Additional Layer (Additional to Line Item A701AN) of Asbestos Floor Tiles with Mastic | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 20,000 | SF | $0.00 | ||||
| A715 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Single Layer Asbestos Floor Tiles without Mastic. | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 6,000 | SF | $0.00 | ||||
| A716 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of each Additional Layer (Additional to Line Item A701AP) of Asbestos Floor Tiles without Mastic | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 5,500 | SF | $0.00 | ||||
| A717 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Sheet Flooring | 140 | SF | $0.00 | ||
| A718 | Removal and Disposal of Asbestos Containing Material | Remove and Dispose of 4-inch and/or 6-inch Cove Base or Base Board and Shoe Molding for Access to Asbestos Materials. | 140 | SF | $0.00 | ||
| A719 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Felt Underlay Between Floor Tile and Concrete or Wood Subfloor | 500 | SF | $0.00 | ||
| A720 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Glued Down Carpet, and/or Carpet with Padding to Gain Access To ACM | 6,000 | SF | $0.00 | ||
| A721 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos and Asbestos Contaminated Wallboard (including mud and tape at joints) | 1,500 | SF | $0.00 | ||
| A722 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Non-Asbestos Wallboard for Access to ACM | 2,000 | SF | $0.00 | ||
| A723 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Insulation and Electrical Wiring associated with light fixtures, electrical outlets, and other electrical items. | 70 | EA | $0.00 | ||
| A724 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Acoustical Wall and/or Ceiling tile | 2,000 | SF | $0.00 | ||
| A725 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Suspended Ceiling Tiles Contaminated with or Containing Asbestos | 2,500 | SF | $0.00 | ||
| A726 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Siding. | |||||
| Siding may be Flat Sheet and/or Corrugated | 600 | SF | $0.00 | ||||
| A727 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Built-Up Roofing Material. | |||||
| Roofing Material From 1 Ply and up to 3 Ply | 70 | SQ | $0.00 | ||||
| A728 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Built-Up Roofing Material. | |||||
| Roofing Material From 3 Ply and up to and including 5-Ply | 70 | SQ | $0.00 | ||||
| A729 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Roofing Shingles and all Underlayment | 70 | SQ | $0.00 | ||
| A730 | Removal and Disposal of Asbestos Containing Material | Protection of Roofing Deck For a Period of 5 Days After completion of the Removal Work Completed in Line Items A701BB through A701BD | 70 | SQ | $0.00 | ||
| A731 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of sprayed-on asbestos surfacing material | 2,000 | SF | $0.00 | ||
| A732 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of window glazing containing asbestos | 140 | SF | $0.00 | ||
| A733 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of asbestos paint from a variety of surfaces | 150 | SF | $0.00 | ||
| A734 | Removal and Disposal of Asbestos Containing Material | Remove and Dispose of Asbestos Containing or Contaminated Adhesives and Mastics Encountered on a variety of surfaces. | 150 | SF | $0.00 | ||
| MOLD REMEDIATION SUPPLIES & SERVICES | $0.00 | ||||||
| A735 | Dehumidifier Unit | Supply labor and material for Dehumidifier Unit to area specified | 75 | DA | $0.00 | ||
| A736 | Large Dehumidifier Unit | Supply labor and material for Large Dehumidifier Unit for area specified | 75 | DA | $0.00 | ||
| A737 | X-Large Dehumidifier Unit | Supply labor and material for X-Large Dehumidifier Unit for area specified | 35 | DA | $0.00 | ||
| A738 | Drying Air Movers | Supply labor and material for Drying Air Movers for area specified | 75 | DA | $0.00 | ||
| A739 | Large Drying Air Movers | Supply labor and material for Large Drying Air Movers for area specified | 75 | DA | $0.00 | ||
| A740 | Wall Cavity Drying Unit - Injector Type | Supply labor and material for Wall Cavity Drying Unit - Injector Type for area specified | 10 | DA | $0.00 | ||
| A741 | Wall Cavity Drying Unit - Ducted Type | Supply labor and material for Wall Cavity Drying Unit - Ducted Type for area specified | 10 | DA | $0.00 | ||
| A742 | Wood Floor Drying System - Ducted Type | Supply labor and material for Wood Floor Drying System - Ducted Type for area specified | 8 | DA | $0.00 | ||
| A743 | Wood Floor Drying System - Injector Type | Supply labor and material for Wood Floor Drying System - Injector Type for area specified | 8 | DA | $0.00 | ||
| A744 | Box Van/Large Truck for Delivery and Pick-up of Equipment for Extra Large and Jumbo Mold remediation projects | Supply labor and material for Box Van/Large Truck for Delivery and Pick-up of Equipment for Extra Large and Jumbo Mold remediation projects for area specified | 40 | EA | $0.00 | ||
| A745 | Carpet Cleaning System/Equipment Set-Up and Removal | Supply labor and material for Carpet Cleaning System/Equipment Set-Up and Removal for area | 25 | DA | $0.00 | ||
| A746 | Water Extraction System/Equipment Set-up and Removal | Supply labor and material for Water Extraction System/Equipment Set-up and Removal for area specified | 25 | DA | $0.00 | ||
| Vehicle | $0.00 | ||||||
| A747 | Unit Priced Labor Work - Vehicle Repair- MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place on Government vehicles. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 125 | HR | $0.00 | ||
| A748 | Material Costs- Vehicle Repair - MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work for Government Vehciles per the scope and delivery schedule specified in the order. | 1 | EA | $0.00 | ||
| Misc Work | |||||||
| A749 | Power Washing | Provided all Labor and Material to complete work specified by the customer. | 2,000 | SQFT | $0.00 | ||
| A750 | Blank for future use | ||||||
| A751 | Blank for future use | ||||||
| Non-Priced | |||||||
| A752 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Provide all equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | EA | $0.00 | ||
| A753 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 1 | HR | $0.00 | ||
| A754 | Unit Priced Davis-Bacon -Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 1 | HR | $0.00 | ||
| A755 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | EA | $0.00 | ||
| $0.00 |
1st Opt Period-Recurring
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-24-R-2564 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0003 Recurring Work - Option Year 1 |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 through B008 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| CNIC | Facility Investment 1502000 | ||||
| Newport, RI | |||||
| B001 | Region Spec Item 3 | ||||
| B001A | Emergency Service Orders - (Spec Item 3.1.1) | 1 | EA | $0.00 | |
| B001B | Urgent Service Orders - (Spec Item 3.1.2) | 3 | EA | $0.00 | |
| B001C | Routine Service Orders - (Spec Item 3.1.3) | 20 | EA | $0.00 | |
| B001CA | Unaccomplished PM Report (Spec Item 3.2.1) | 12 | EA | $0.00 | |
| B001D | Preventive Maintenance -Disabled Doors - (Spec Item 3.3.2) | 3 | EA | $0.00 | |
| B001E | Preventive Maintenance - PlymoVent System - (Spec Item 3.5) | 16 | EA | $0.00 | |
| B001F | Preventive Maintenance - Gas Pump Fire Systems (Spec Item 3.2.4) | 2 | EA | $0.00 | |
| B001G | Preventive Maintenance - Power Doors - (Spec Item 3.3.1) | 9 | EA | $0.00 | |
| B001H | Preventive Maintenance - Kitchen Suppression systems - (Spec Item 3.2.3) | 12 | EA | $0.00 | |
| B001J | Preventive Maintenance - Overhead doors - (Spec Item 3.3) | 68 | EA | $0.00 | |
| Preventive Maintenance - Dock levelers - Spec Item (3.4) | 5 | EA | $0.00 | ||
| B001KA | Gun Range Filters Quarterly Spec Item 3.8 | 31 | EA | $0.00 | |
| B001KAB | Gun Range Filters Semi-Annual Spec Item 3.8.1 | 46 | EA | $0.00 | |
| B001KAC | Gun Range Belts Quartly Spec Item 3.8.2 | 3 | EA | $0.00 | |
| Total Cost For Contract Line Item B001- CNIC |
| B002 | (Training Pool) | |||
| B002A | Chemical Treatement Bldg. 1357 - Spec Item 3.6 | 12 | EA | $0.00 |
| B002B | Chemical Treatment Bldg. 1109 - Spec Item 3.6 | 12 | EA | $0.00 |
| Total Cost For Contract Line Item B002- CNIC |
| B003 | Other Recurring Services Program | |||
| B003A | Recurring Services Program Spec 3.9 | 12 | EA | $0.00 |
| Total Cost For Contract Line Item B003 -CNIC |
| B004 | HAZMAT Sampling, Testing Service Calls CNIC | |||
| B004A | Service Call Asbestos. Spec item 3.7 | 4 | EA | $0.00 |
| B004B | TEM AHERA Asbestos air sampling (TAT 72 Hour) - PCM Asbestos Air NIOSH 7400 A Method (TAT 72 Hour)/ Analytical Reports - Initial Reports - (Spec Item 3.7) | 4 | EA | $0.00 |
| Total Cost For Contract Line Item B004- CNIC |
| B005 | Hazmat Service Calls for Sampling, testing and written results of Lead - CNIC | |||
| B005A | Lead Bulk by EPA - Sampling Lead in accordance with Specification Section 3.7 | 4 | EA | $0.00 |
| Total Cost For Contract Line Item B005- CNIC |
| B006 | Haznmat Routine Service Calls for Sampling, testing and written results of PCB's, Lead, Asbestos, etc | |||
| B006A | Sampling, testing PCB's- Lead, Asbestos, Etc (TAT 48 Hour) - Spec Item 3.7.1 | 4 | EA | $0.00 |
| Total Cost For Contract Line Item B006- CNIC | ||||
| TOTAL CNIC B001-B006 |
| NWC | ||||
| B007 | Facility Investment 1502000 | |||
| B007A | Reserved for Future Use | |||
| B007B | Urgent Service Orders - Spec Item 3.1.2 | 2 | EA | $0.00 |
| B007C | Routine Service Orders - Spec Item 3.1.3 | 4 | EA | $0.00 |
| TOTAL NWC B007 |
| NHCNE | |||
| B008 | Facility Investment 1502000 | ||
| B008A | Reserved for Future Use | 0 | $0.00 |
| B008B | Urgent Service Orders - Spec Item 3.1.2 | 0 | $0.00 |
| B008C | Routine Service Orders - Spec Item 3.1.3 | 0 | $0.00 |
| B008D | Preventive Maintenance (Automatic Doors(7)) (Spec Item 3.3.1) | 0 | $0.00 |
| TOTAL NMRTC B008 | |||
| TOTAL RECURRING LINE ITEMS | $0.00 |
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
6' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
1st Opt Non-Recurring
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-24-R-2564 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0004 Non-Recurring Work - Option Year 1 |
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B755 |
| ELIN | Description | Long Description | Est. Qty | Unit | Unit Price | Total Price | |
| Asbestos Removal | |||||||
| B701 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Material as specified in the Task Order and in accordance with Specification Sections 02 82 00, 01 57 19 and 01 57 19.00 22. | 700 | LF | $0.00 | ||
| B702 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipes. | |||||
| Pipe Size up to 4 inches in diameter | 700 | LF | $0.00 | ||||
| B703 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipes. | |||||
| Pipe Size - 4 inch diameter - up to and including 8 inches in diameter | 700 | LF | $0.00 | ||||
| B704 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of PVC and/or Metal Jacket To Gain Access to Asbestos TSI | 400 | LF | $0.00 | ||
| B705 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Non-Asbestos Pipe TSI | 700 | LF | $0.00 | ||
| B706 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Air Handler Units, Duct Work, Boilers and Tanks | 700 | LF | $0.00 | ||
| B707 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipe in Existing Trenches, Manhole and Steam Pits. | |||||
| Pipe Size up to 4 inches in diameter | 400 | LF | $0.00 | ||||
| B708 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipe in Existing Trenches, Manhole and Steam Pits. | |||||
| Pipe Size - 4 inch diameter - up to and including 8 inches in diameter | 400 | LF | $0.00 | ||||
| B709 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Firebrick, from the Inside and Out Side of the Boiler, Firebrick approximately 4" Thickness | 360 | SF | $0.00 | ||
| B710 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Remaining Asbestos Insulation After Removal of Firebrick in/out side the Boiler Firebox | 360 | SF | $0.00 | ||
| B711 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Loose Fill Insulation That Contains Asbestos or Contaminated with Asbestos | 375 | CF | $0.00 | ||
| B712 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI by Glovebag Technique | 1,150 | LF | $0.00 | ||
| B713 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Single Layer Asbestos Floor Tiles with Mastic. | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 20,000 | SF | $0.00 | ||||
| B714 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of each Additional Layer (Additional to Line Item A701AN) of Asbestos Floor Tiles with Mastic | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 20,000 | SF | $0.00 | ||||
| B715 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Single Layer Asbestos Floor Tiles without Mastic. | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 6,000 | SF | $0.00 | ||||
| B716 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of each Additional Layer (Additional to Line Item A701AP) of Asbestos Floor Tiles without Mastic | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 5,500 | SF | $0.00 | ||||
| B717 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Sheet Flooring | 140 | SF | $0.00 | ||
| B718 | Removal and Disposal of Asbestos Containing Material | Remove and Dispose of 4-inch and/or 6-inch Cove Base or Base Board and Shoe Molding for Access to Asbestos Materials. | 140 | SF | $0.00 | ||
| B719 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Felt Underlay Between Floor Tile and Concrete or Wood Subfloor | 500 | SF | $0.00 | ||
| B720 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Glued Down Carpet, and/or Carpet with Padding to Gain Access To ACM | 6,000 | SF | $0.00 | ||
| B721 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos and Asbestos Contaminated Wallboard (including mud and tape at joints) | 1,500 | SF | $0.00 | ||
| B722 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Non-Asbestos Wallboard for Access to ACM | 2,000 | SF | $0.00 | ||
| B723 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Insulation and Electrical Wiring associated with light fixtures, electrical outlets, and other electrical items. | 70 | EA | $0.00 | ||
| B724 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Acoustical Wall and/or Ceiling tile | 2,000 | SF | $0.00 | ||
| B725 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Suspended Ceiling Tiles Contaminated with or Containing Asbestos | 2,500 | SF | $0.00 | ||
| B726 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Siding. | |||||
| Siding may be Flat Sheet and/or Corrugated | 600 | SF | $0.00 | ||||
| B727 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Built-Up Roofing Material. | |||||
| Roofing Material From 1 Ply and up to 3 Ply | 70 | SQ | $0.00 | ||||
| B728 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Built-Up Roofing Material. | |||||
| Roofing Material From 3 Ply and up to and including 5-Ply | 70 | SQ | $0.00 | ||||
| B729 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Roofing Shingles and all Underlayment | 70 | SQ | $0.00 | ||
| B730 | Removal and Disposal of Asbestos Containing Material | Protection of Roofing Deck For a Period of 5 Days After completion of the Removal Work Completed in Line Items A701BB through A701BD | 70 | SQ | $0.00 | ||
| B731 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of sprayed-on asbestos surfacing material | 2,000 | SF | $0.00 | ||
| B732 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of window glazing containing asbestos | 140 | SF | $0.00 | ||
| B733 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of asbestos paint from a variety of surfaces | 150 | SF | $0.00 | ||
| B734 | Removal and Disposal of Asbestos Containing Material | Remove and Dispose of Asbestos Containing or Contaminated Adhesives and Mastics Encountered on a variety of surfaces. | 150 | SF | $0.00 | ||
| MOLD REMEDIATION SUPPLIES & SERVICES | $0.00 | ||||||
| B735 | Dehumidifier Unit | Supply labor and material for Dehumidifier Unit to area specified | 75 | DA | $0.00 | ||
| B736 | Large Dehumidifier Unit | Supply labor and material for Large Dehumidifier Unit for area specified | 75 | DA | $0.00 | ||
| B737 | X-Large Dehumidifier Unit | Supply labor and material for X-Large Dehumidifier Unit for area specified | 35 | DA | $0.00 | ||
| B738 | Drying Air Movers | Supply labor and material for Drying Air Movers for area specified | 75 | DA | $0.00 | ||
| B739 | Large Drying Air Movers | Supply labor and material for Large Drying Air Movers for area specified | 75 | DA | $0.00 | ||
| B740 | Wall Cavity Drying Unit - Injector Type | Supply labor and material for Wall Cavity Drying Unit - Injector Type for area specified | 10 | DA | $0.00 | ||
| B741 | Wall Cavity Drying Unit - Ducted Type | Supply labor and material for Wall Cavity Drying Unit - Ducted Type for area specified | 10 | DA | $0.00 | ||
| B742 | Wood Floor Drying System - Ducted Type | Supply labor and material for Wood Floor Drying System - Ducted Type for area specified | 8 | DA | $0.00 | ||
| B743 | Wood Floor Drying System - Injector Type | Supply labor and material for Wood Floor Drying System - Injector Type for area specified | 8 | DA | $0.00 | ||
| B744 | Box Van/Large Truck for Delivery and Pick-up of Equipment for Extra Large and Jumbo Mold remediation projects | Supply labor and material for Box Van/Large Truck for Delivery and Pick-up of Equipment for Extra Large and Jumbo Mold remediation projects for area specified | 40 | EA | $0.00 | ||
| B745 | Carpet Cleaning System/Equipment Set-Up and Removal | Supply labor and material for Carpet Cleaning System/Equipment Set-Up and Removal for area | 25 | DA | $0.00 | ||
| B746 | Water Extraction System/Equipment Set-up and Removal | Supply labor and material for Water Extraction System/Equipment Set-up and Removal for area specified | 25 | DA | $0.00 | ||
| Vehicle | $0.00 | ||||||
| B747 | Unit Priced Labor Work - Vehicle Repair- MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place on Government vehicles. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 125 | HR | $0.00 | ||
| B748 | Material Costs- Vehicle Repair - MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work for Government Vehciles per the scope and delivery schedule specified in the order. | 1 | EA | $0.00 | ||
| Misc Work | |||||||
| B749 | Power Washing | Provided all Labor and Material to complete work specified by the customer. | 2,000 | SQFT | $0.00 | ||
| B750 | Blank for future use | ||||||
| B751 | Blank for future use | ||||||
| Non-Priced | |||||||
| B752 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Provide all equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | EA | $0.00 | ||
| B753 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 1 | HR | $0.00 | ||
| B754 | Unit Priced Davis-Bacon -Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 1 | HR | $0.00 | ||
| B755 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | EA | $0.00 | ||
| $0.00 |
2nd Opt-Recurring
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-24-R-2564 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0005 Recurring Work - Option Year 2 |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs C001 through C008 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| CNIC | Facility Investment 1502000 | ||||
| Newport, RI | |||||
| C001 | Region Spec Item 3 | ||||
| C001A | Emergency Service Orders - (Spec Item 3.1.1) | 1 | EA | $0.00 | |
| C001B | Urgent Service Orders - (Spec Item 3.1.2) | 3 | EA | $0.00 | |
| C001C | Routine Service Orders - (Spec Item 3.1.3) | 20 | EA | $0.00 | |
| C001CA | Unaccomplished PM Report (Spec Item 3.2.1) | 12 | EA | $0.00 | |
| C001D | Preventive Maintenance -Disabled Doors - (Spec Item 3.3.2) | 3 | EA | $0.00 | |
| C001E | Preventive Maintenance - PlymoVent System - (Spec Item 3.5) | 16 | EA | $0.00 | |
| C001F | Preventive Maintenance - Gas Pump Fire Systems (Spec Item 3.2.4) | 2 | EA | $0.00 | |
| C001G | Preventive Maintenance - Power Doors - (Spec Item 3.3) | 9 | EA | $0.00 | |
| C001H | Preventive Maintenance - Kitchen Suppression systems - (Spec Item 3.2.3) | 12 | EA | $0.00 | |
| C001J | Preventive Maintenance - Overhead doors - (Spec Item 3.2.3) | 68 | EA | $0.00 | |
| C001K | Preventive Maintenance - Dock levelers - Spec Item (3.4) | 5 | EA | $0.00 | |
| C001KA | Gun Range Filters Quarterly Spec Item 3.8 | 31 | EA | $0.00 | |
| C001KAB | Gun Range Filters Semi-Annual Spec Item 3.8.1 | 46 | EA | $0.00 | |
| C001KAC | Gun Range Belts Quartly Spec Item 3.8.2 | 3 | EA | $0.00 | |
| Total Cost For Contract Line Item C001- CNIC |
| C002 | (Training Pool) | $0.00 | ||
| C002A | Chemical Treatement Bldg. 1357 - Spec Item 3.6 | 12 | EA | $0.00 |
| C002B | Chemical Treatment Bldg. 1109 - Spec Item 3.6 | 12 | EA | $0.00 |
| Total Cost For Contract Line Item C002- CNIC |
| C003 | Other Recurring Services Program | |||
| C003A | Recurring Services Program Spec 3.9 | 12 | EA | $0.00 |
| Total Cost For Contract Line Item C003 -CNIC |
| C004 | HAZMAT Sampling, Testing Service Calls CNIC | |||
| C004A | Service Call Asbestos. Spec item 3.7 | 4 | EA | $0.00 |
| C004B | TEM AHERA Asbestos air sampling (TAT 72 Hour) - PCM Asbestos Air NIOSH 7400 A Method (TAT 72 Hour)/ Analytical Reports - Initial Reports - (Spec Item 3.7) | 4 | EA | $0.00 |
| Total Cost For Contract Line Item C004 CNIC |
| C005 | Hazmat Service Calls for Sampling, testing and written results of Lead - CNIC | |||
| C005A | Lead Bulk by EPA - Sampling Lead in accordance with Specification Section 3.7. | 4 | EA | $0.00 |
| Total Cost For Contract Line Item C005- CNIC |
| C006 | Haznmat Routine Service Calls for Sampling, testing and written results of PCB's, Lead, Asbestos, etc | |||
| C006A | Sampling, testing PCB's- Lead, Asbestos, Etc (TAT 48 Hour) - Spec Item 3.7.1 | 4 | EA | $0.00 |
| Total Cost For Contract Line Item C006- CNIC | ||||
| TOTAL CNIC C001-C006 |
| NWC | ||||
| C007 | Facility Investment 1502000 | |||
| C007A | Reserved for Future Use | |||
| C007B | Urgent Service Orders - Spec Item 3.1.2 | 2 | EA | $0.00 |
| C007C | Routine Service Orders - Spec Item 3.1.3 | 4 | EA | $0.00 |
| TOTAL NWC C007 |
| NHCNE | |||
| C008 | Facility Investment 1502000 | ||
| C008A | Reserved for Future Use | 0 | $0.00 |
| C008B | Urgent Service Orders - Spec Item 3.1.2 | 0 | $0.00 |
| C008C | Routine Service Orders - Spec Item 3.1.3 | 0 | $0.00 |
| C008D | Preventive Maintenance (Automatic Doors(7)) (Spec Item 3.3.1) | 0 | $0.00 |
| TOTAL NMRTC C008 | |||
| TOTAL RECURRING LINE ITEMS | $0.00 |
2nd Opt -Non-Recurring
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-24-R-2564 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0006 Non-Recurring Work - Option Year 2 |
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C755 |
| ELIN | Description | Long Description | Est. Qty | Unit | Unit Price | Total Price | |
| Asbestos Removal | |||||||
| C701 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Material as specified in the Task Order and in accordance with Specification Sections 02 82 00, 01 57 19 and 01 57 19.00 22. | 700 | LF | $0.00 | ||
| C702 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipes. | |||||
| Pipe Size up to 4 inches in diameter | 700 | LF | $0.00 | ||||
| C703 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipes. | |||||
| Pipe Size - 4 inch diameter - up to and including 8 inches in diameter | 700 | LF | $0.00 | ||||
| C704 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of PVC and/or Metal Jacket To Gain Access to Asbestos TSI | 400 | LF | $0.00 | ||
| C705 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Non-Asbestos Pipe TSI | 700 | LF | $0.00 | ||
| C706 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Air Handler Units, Duct Work, Boilers and Tanks | 700 | LF | $0.00 | ||
| C707 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipe in Existing Trenches, Manhole and Steam Pits. | |||||
| Pipe Size up to 4 inches in diameter | 400 | LF | $0.00 | ||||
| C708 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI From Pipe in Existing Trenches, Manhole and Steam Pits. | |||||
| Pipe Size - 4 inch diameter - up to and including 8 inches in diameter | 400 | LF | $0.00 | ||||
| C709 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Firebrick, from the Inside and Out Side of the Boiler, Firebrick approximately 4" Thickness | 360 | SF | $0.00 | ||
| C710 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Remaining Asbestos Insulation After Removal of Firebrick in/out side the Boiler Firebox | 360 | SF | $0.00 | ||
| C711 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Loose Fill Insulation That Contains Asbestos or Contaminated with Asbestos | 375 | CF | $0.00 | ||
| C712 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos TSI by Glovebag Technique | 1,150 | LF | $0.00 | ||
| C713 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Single Layer Asbestos Floor Tiles with Mastic. | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 20,000 | SF | $0.00 | ||||
| C714 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of each Additional Layer (Additional to Line Item A701AN) of Asbestos Floor Tiles with Mastic | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 20,000 | SF | $0.00 | ||||
| C715 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Single Layer Asbestos Floor Tiles without Mastic. | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 6,000 | SF | $0.00 | ||||
| C716 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of each Additional Layer (Additional to Line Item A701AP) of Asbestos Floor Tiles without Mastic | |||||
| Tiles will be of various size up to and including 12 inch X 12 inch size | 5,500 | SF | $0.00 | ||||
| C717 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Sheet Flooring | 140 | SF | $0.00 | ||
| C718 | Removal and Disposal of Asbestos Containing Material | Remove and Dispose of 4-inch and/or 6-inch Cove Base or Base Board and Shoe Molding for Access to Asbestos Materials. | 140 | SF | $0.00 | ||
| C719 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Felt Underlay Between Floor Tile and Concrete or Wood Subfloor | 500 | SF | $0.00 | ||
| C720 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Glued Down Carpet, and/or Carpet with Padding to Gain Access To ACM | 6,000 | SF | $0.00 | ||
| C721 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos and Asbestos Contaminated Wallboard (including mud and tape at joints) | 1,500 | SF | $0.00 | ||
| C722 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Non-Asbestos Wallboard for Access to ACM | 2,000 | SF | $0.00 | ||
| C723 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Insulation and Electrical Wiring associated with light fixtures, electrical outlets, and other electrical items. | 70 | EA | $0.00 | ||
| C724 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Acoustical Wall and/or Ceiling tile | 2,000 | SF | $0.00 | ||
| C725 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Suspended Ceiling Tiles Contaminated with or Containing Asbestos | 2,500 | SF | $0.00 | ||
| C726 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Siding. | |||||
| Siding may be Flat Sheet and/or Corrugated | 600 | SF | $0.00 | ||||
| C727 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Built-Up Roofing Material. | |||||
| Roofing Material From 1 Ply and up to 3 Ply | 70 | SQ | $0.00 | ||||
| C728 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Built-Up Roofing Material. | |||||
| Roofing Material From 3 Ply and up to and including 5-Ply | 70 | SQ | $0.00 | ||||
| C729 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of Asbestos Containing Roofing Shingles and all Underlayment | 70 | SQ | $0.00 | ||
| C730 | Removal and Disposal of Asbestos Containing Material | Protection of Roofing Deck For a Period of 5 Days After completion of the Removal Work Completed in Line Items A701BB through A701BD | 70 | SQ | $0.00 | ||
| C731 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of sprayed-on asbestos surfacing material | 2,000 | SF | $0.00 | ||
| C732 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of window glazing containing asbestos | 140 | SF | $0.00 | ||
| C733 | Removal and Disposal of Asbestos Containing Material | Removal and Disposal of asbestos paint from a variety of surfaces | 150 | SF | $0.00 | ||
| C734 | Removal and Disposal of Asbestos Containing Material | Remove and Dispose of Asbestos Containing or Contaminated Adhesives and Mastics Encountered on a variety of surfaces. | 150 | SF | $0.00 | ||
| MOLD REMEDIATION SUPPLIES & SERVICES | $0.00 | ||||||
| C735 | Dehumidifier Unit | Supply labor and material for Dehumidifier Unit to area specified | 75 | DA | $0.00 | ||
| C736 | Large Dehumidifier Unit | Supply labor and material for Large Dehumidifier Unit for area specified | 75 | DA | $0.00 | ||
| C737 | X-Large Dehumidifier Unit | Supply labor and material for X-Large Dehumidifier Unit for area specified | 35 | DA | $0.00 | ||
| C738 | Drying Air Movers | Supply labor and material for Drying Air Movers for area specified | 75 | DA | $0.00 | ||
| C739 | Large Drying Air Movers | Supply labor and material for Large Drying Air Movers for area specified | 75 | DA | $0.00 | ||
| C740 | Wall Cavity Drying Unit - Injector Type | Supply labor and material for Wall Cavity Drying Unit - Injector Type for area specified | 10 | DA | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .