This document is the Section F - Deliverables for a solicitation (Solicitation Number N4008524R2564) for Facility Investment Services for the Naval Station Newport Complex Area, facilities, and installed equipment and systems at Naval Station Newport, Rhode Island.
The document outlines the various deliverables the contractor will be required to provide, including request to work outside regular hours, meeting minutes, permits and licenses, insurance documentation, cybersecurity incident reports, work scheduling and status updates, quality management plans, personnel qualification documents, safety plans and inspections, environmental management plans, and recurring and non-recurring work proposals. The deliverables have specific due dates, distribution requirements, and submission frequencies. The contract is being issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008524R2564_Site Visit Log.pdf | ||
| N4008524R2564_Amendment0003.pdf | ||
| N4008524R2564_Amendment0002.pdf | ||
| Base Access Spreadsheet.xlsx | XLSX spreadsheet | |
| N4008524R2564_Amendment0001.pdf | ||
| N4008524R2564 Section J-0200000-10 - CHARACTERISTIC METER READING INFORMATION.xlsx | XLSX spreadsheet | |
| Attachment H PIEE Solicitations - PIEE Vendor Access Instructions.pdf | ||
| N4008524R2564 - Section J Annexes.pdf | ||
| N4008524R2564 Section J-0200000-14 ELINs.xlsx | XLSX spreadsheet | |
| N4008524R2564 Section J-0200000-08- ASSET INFORMATION.xlsx | XLSX spreadsheet | |
| N4008524R2564 - C Annexes.pdf | ||
| N4008524R2564 Section J-0200000-07 - SERVICE PROVIDER INFORMATION.xlsx | XLSX spreadsheet | |
| N4008524R2564_Solicitation.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000
Management and Administration
Section F 0200000
Deliveries or Performance
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.2.1.2 N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes Final
Revision
Within two working days
KO, COR
and all attendees
1 As
Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.5 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by
0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command
Security
Manager
1 As required
2.6.4 N/A Scheduling and
Work Status
Updates
Weekly, within
30 minutes of the inquiry during regular working hours, and by
08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As
Specified
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.4 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
2.6.5 N/A Notification of any
Difficulty in
Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.8.2 N/A Pipe Delimited
Flat-File
By the end of each workday
KO or a representat ive designated by the KO
1 Daily
2.6.8.2 N/A Sample Pipe
Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representat ive designated by the KO
1 As required to demonstrat e the ability to properly format the flat-file
2.6.8.2 N/A Asset and
Specification Data
When an asset is repaired, replaced, installed, or otherwise affected
KO or a representat ive designated by the KO
1 As required
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.8.3 N/A List of personnel
requiring access to
Government’s
Maximo
Within 30 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.9.3 N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
1 Monthly
2.6.10 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and
Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.2.6 N/A Proof of United
States of America
Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.3 N/A Service Contract
Reporting (SCR)
No later than 31
October
KO and
COR
1 Annually for labor executed during the period of performanc e during each
Governmen t fiscal year
(FY)
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
required
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.8.8 N/A OF-306
Declaration for
Federal
Employment and
Digital
Fingerprints
Prior to commencement of work
KO, COR,
and
Security
Manager
1 As required
2.8.9 N/A List of personnel
requiring access to and the justification for their access to
Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security
Manager
1 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4 N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4.7 N/A Control of
Hazardous Energy
(lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
2.9.6 J-0200000-05 NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
2.9.9 N/A OSHA Citations
and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
COR
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.9.10 N/A Safety Inspection
and Monitoring
Report
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.10 N/A EMS Goals and
Policy
Measurement
Information
Upon request. KO and
COR
1 As required
2.10.1.1 N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
1 As specified
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.2.1 N/A Sampling Plan Prior to Sampling KO and
COR
1 As required
2.10.2.1 N/A Laboratory
Analysis
Upon Request KO and
COR
1 As specified
2.10.2.2 N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
1 As required
2.10.2.3 J-0200000-05 Solid Waste
Management and
Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
2.10.2.5 N/A Waste Stream
Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.2.7 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.8 N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.8 J-0200000-05 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.12 N/A Asbestos
Containing
Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written
Notification within 24 hours
KO and
COR
1 As specified
2.10.2.13 N/A Hazardous Air
Pollutants Monthly
Data
First workday of each month.
KO, COR,
Installation
Environme ntal
Division
1 Monthly
2.10.3 N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
2.10.3.2 N/A Recovered
Material
Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.11 N/A Mission Essential
Contractor
Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As
Required
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.14.1 Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
2.14.2 N/A Notification to the
Government for
Work Above the
Recurring Work
Limitations and
Rough Order of
Magnitude
Within two hours of identification
KO and
COR
1 As required
2.15.1.1 N/A Non-Recurring
Work Quantities
Ordered via
FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
NAVSTA CONSOLIDATED CONTRACT
1502000 – Facility Investment
SECTION F: DELIVERIES OR PERFORMANCE
Annex/
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
1502000/
2.2.1
N/A
Certification and
Licenses
Within 15 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested
1502000/
3.1
J-1502000-04 Service Order
Summary Report
First work day of each month
KO 2 Monthly
1502000/
3.2
N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO 1 Monthly
1502000/
3.9
N/A
Other Recurring
Services Program
Summary Report
First work day of each month
KO 2 Monthly
Non-recurring
A-701 through
A746
N/A All Hazmat Services must contain a written Plan and
Specifications on removal services
As required per occurrence
KO/PAR 1 AS Needed
NAVSTA CONSOLIDATED CONTRACT
Deliverables Form Preparation Instructions
Deliverable Title: All Mandated Government Report
Form Attachment No.: J-1502000-04
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
The Service Order Summary Report shall be a compilation of the previous months service order reports with the following information:
a. Detailed description of work actually completed, problems encountered and recommended follow-up actions required.
b. Brief description of material and parts used, including quantities and cost.
c. Date and time work began.
d. Date and time work was completed.
e. Total hours of labor (by craft) expended, including travel time.
f. Name of person accepting the work and any comments written on the service order ticket.
g. Last name and first initial of the Contractor employee(s) performing the work.
Submit a copy of the summary report via email to KO for Government review and comment.