N4008524R2508_Amendment_0001.pdf
PDF 122 KB Posted
- Attached to
- IDIQ Contract for Navy Marine Corps Planning Multi-Discipline Architect Engineer Services MIDLANT AOR
- Solicitation number
- N4008524R2508
About this file
This document is an amendment to the synopsis for Solicitation N40085-24-R-2508, an Indefinite Delivery Indefinite Quantity (IDIQ) contract for Navy and Marine Corps planning and multi-discipline Architect-Engineer (A/E) services primarily in the NAVFAC Mid-Atlantic Area of Responsibility (AOR). The amendment updates the due date for submitting SF-330 Architect-Engineer Qualifications forms to April 15, 2024 at 2:00 PM. It also provides responses to 9 Requests for Information, including guidance on submitting hard copy and electronic deliverables, acceptable professional certifications for key personnel, and use of subcontractor project experience. The overall contract will provide planning, architecture, and engineering services as required for master planning at various Navy and Marine Corps installations located primarily in the NAVFAC Mid-Atlantic AOR, with potential for work at any NAVFAC CONUS location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-E Synopsis WON 1789564 Solicitation N40085-24-R-2508
IDIQ A&E Contract Planning & Multi-Discipline Architect & Engineer (A&E) Services – NAVFAC NAVFAC Mid-Atlantic AOR
N40085-24-R-2508 INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT
FOR NAVY & MARINE CORPS PLANNING & MULTI-DISCIPLINE ARCHITECT &
ENGINEER (A&E) SERVICES FOR WORK PREDOMINANTLY LOCATED IN NAVFAC MID-
ATLANTIC AREA OF RESPONSIBILITY. HOWEVER, TASKS ASSOCIATED WITH THIS
CONTRACT MAY BE ASSIGNED ANYWHERE IN THE WORLD.
ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD
FORM SF 330, ARCHITECT ENGINEER QUALIFICATIONS IS CONTAINED HEREIN.
THERE IS NO SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO DOWNLOAD.
THE NOTICES DOES NOT RESTRICT THE GOVERNMENT FROM A PARTICULAR
ACQUISITION APPROACH. THE GOVERNMENT IS NOT OBLIGATED TO, AND WILL NOT
PAY FOR ANY INFORMATION RECEIVED FROM POTENTIAL SOURCES AS A RESULT
OF THIS NOTICE.
Amendment 0001 – 26 March 2024
All changes made to this Synopsis are included as red text in the body of this document.
Summary of the changes:
- 6.0 SF-330 SUBMISSION REQUIREMENTS
o The SF-330 electronic submission (via PIEE) due date is updated to APRIL
15, 2024 AT 2:00 P.M.
- Provide RFI responses #1-9.
RFI Responses
1. Mailing instructions missing for hard copy deliverables. Can you please provide a mailing address for which to ship the one hardcopy and one CDs?
Response: Please provide one (1) Hard copy and one (1) CD-ROM and it shall be labeled
“SF330 N40085-24-R-2508, ATTN: CS GEORGIA SCOTT; DO NOT OPEN IN
MAILROOM”.
ADDRESS:
Naval Facilities Engineering Command, Mid-Atlantic 9324 Virginia Avenue Building Z-140, Room 225 Norfolk, Virginia 23511 Attn: Georgia Scott, CON21
2. Can we add other key positions like master planner and sustainable specialist?
A-E Synopsis WON 1789564 Solicitation N40085-24-R-2508
IDIQ A&E Contract Planning & Multi-Discipline Architect & Engineer (A&E) Services – NAVFAC NAVFAC Mid-Atlantic AOR
Response: Yes, you may add other key positions like master planner and sustainability professional.
3. Is a LEED Accredited Professional accepted as a professional certification for a sustainability specialist? If not, what certification is accepted/acceptable for this solicitation?
Response: Yes, a Leadership in Energy and Environmental Design (LEED) professional certification is acceptable for a sustainability specialist.
4. Is an AICP accredited professional accepted as a professional certification for a cost estimator? If not, what certification is accepted/acceptable for this solicitation?
Response: Yes, an American Institute of Certified Planners (AICP) professional certification is acceptable for a cost estimator.
5. Can projects from non-JV Members be used in the SF330, Section F? If not, can projects from non JV Team Member with the same socio-economic characteristics as the JV Members be included?
Response: Projects cannot be used from non-JV-Members. Projects from non JV Members with the same socio-economic characteristics as JV-Members cannot be included.
6. Can the JV use a Section F project where we were a sub?
Response: Yes
7. Project Managers are not on this table. Should we include Project Managers in our responses for Sections E&G?
Response: Project Managers are included in the table for Required Key Personnel.
8. Are we permitted to have more than one person listed for each Required Key Personnel position? If so, should we submit resumes for those additional personnel?
Response: Yes, submit resumes for all Key Personnel Members.
9. Since DUNS Numbers are no longer being used, should we submit Cage Codes in Part I, Section F, Block 25 with the Firm name?
Response: Yes, submit Cage Codes and Unique Entity ID (UEI)