24R2504 P101 General Requirements.pdf

PDF 173 KB Posted

Attached to
DESIGN-BUILD (DB), G/ATOR SUPPORT FACILITIES, NAS OCEANA, DAM NECK ANNEX, VIRGINIA BEACH, VA
Solicitation number
N4008524R2504
Issued by

About this file

This document is a solicitation for design-build construction services for G/ATOR support facilities at NAS Oceana and Dam Neck Annex in Virginia Beach, Virginia. The Navy seeks a contractor to construct a pre-engineered insulated metal building with concrete foundation and floors, interior walls, doors, roofing system, electrical and communication utilities to provide a radar maintenance bay, storage and supply area, secure room, fire and security systems, and HVAC. The work must comply with antiterrorism standards and is estimated to cost between $10-25 million. Proposals are due December 18, 2023 by 2:00PM with award going to the responsible offeror providing the lowest price. The performance period is 548 calendar days from award. The solicitation is issued under an 8(a) multiple award construction contract and is subject to Davis-Bacon wage rates.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504 NAS OCEANA, Dam Neck Annex, Virignia Beach, Virginia Work Order 1785609

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, MID-ATLANTIC

9324 VIRGINIA AVE, BLDG Z-140

NAVAL STATION NORFOLK, NORFOLK, VA 23511

POC: Angie Clifton angela.j.clifton@navy.mil; (757) 341-0691

DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE

QUANTITY (IDIQ) 8(A) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR

FACILITIES PRIMARILY IN THE HAMPTON ROADS AREA OF RESPONSIBILITY (AOR).

PROPOSED TASK ORDER: N40085-24-R-2504

DESIGN-BUILD (DB), G/ATOR SUPPORT FACILITIES, NAS OCEANA, DAM NECK ANNEX,

VIRGINIA BEACH, VA

DATE OF SOLICITATION: 3 November 2023

8(A) MACC CONTRACT HOLDERS:

N4008523D0030 Argus CJW JV 3 LLC 30 Catoctin Cir SE STE 10 Leesburg, VA 20175-6314 POC: Monika Syal Email: monika@argussi.com; anuj@cjwcontractors.com

CAGE CODE 84ZG3

N4008523D0031 Baron-Rand JV LLC 850 39th St STE 203A Newport News, VA 23607-3171 POC: Lafayette Tatem Email: lafayette@baroncomm.com

CAGE CODE 8ZWP4

N4008523D0032

ERS-CYE JV II, LLC

760 Talleyrand Ave Jacksonville, FL 32202-1031 POC: John Anderson Email: j.anderson@ersfl.com

CAGE CODE 98SY4

N4008523D0033 Fiber Business Solutions Group Inc G Force 3019 W Germantown Pike Norristown, PA 19403-1002 POC: Cindy Gallo Email: cgallo@fbsginc.com

CAGE CODE 523Z5

N4008523D0034 Full Circle ICC JV 740 Springdale Dr STE 125 Exton, PA 19341-2831 POC: Denean Williams Email: drw@thefullcirclegroup.com

CAGE CODE 8MHN3

N4008523D0035 Justin J Reeves LLC 7836 Park Ave Houma, LA 70364-3172 POC: Justin Reeves Email: jreeves@jjrcompany.com

CAGE CODE 6XNR6

N4008523D0036

MIG GOV, LLC

545 S Birdneck Rd STE 202H Virginia Beach, VA 23451-5891 POC: Jose Gutierrez Email: estimating@miggov.com

CAGE CODE 6WSQ7

N4008523D0037 Oakmont Contracting LLC 1100 Wicomico St STE 500 Baltimore, MD 21230-2075 POC: Billy Tose Email: btose@oakmontcontracting.com

CAGE CODE 6MRN1

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

N4008523D0038 Stampede Ventures, Inc 110 Front St STE 300 Nome, AK 99762-0012 POC: Z. Daniel Graham Email: dgraham@beringstraits.com

CAGE CODE 6WK76

General Requirements

All terms and conditions of N4008524D0030/0031/0032/0033/0034/0035/0036/0037/0038 Indefinite Delivery Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. All contract clauses in the Basic Contract by reference or full text remain in effect unless superseded by this task order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issues, please contact Angie Clifton at angela.j.clifton@navy.mil.

Amendments will be posted to PIEE, Sam.gov, and sent directly via email to MACC Holders.

NAVFAC Solicitation No.: N4008524R2504

NAVFAC Specification/Drawings: Work Order No. 1785609

Title: G/ATOR Support Facilities

Location of the Work: NAS Oceana, Dam Neck Annex, Virginia Beach, VA

Description of the Work: This project constructs a steel framed Pre-Engineered Insulated Metal Building (PEMB) with a concrete foundation, reinforced concrete floors with a grounding grid system, and metal stud insulated interior walls, metal doors with hardware, metal insulated roofing system, to provide a special ground mobile radar maintenance bay with electrical and communication utilities for the radar equipment, supply and storage area, a secure room, fire alarm and protection systems, heating, venting and air conditioning systems, electrical systems, communication and electronic security systems.

This project also constructs reinforced concrete pad(s) training area with a concrete foundation, electrical, communication, grounding grid and tie down systems. This project will provide Antiterrorism features and comply with regulations and physical security mitigation in accordance with DoD Minimum Antiterrorism Standards for Buildings.

Estimated Price Range: In accordance with DFAR 236.204 (i) Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $10,000,000 and $25,000,000.

Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the duration of this task order shall be 548 calendar days from date of award (includes 15 calendar days for submission and approval of bonds and insurance).

Wage Determination: Department of Labor (DoL) General Decision Number VA20230167 01/13/2023 applies to this work (Attachment B). The wage determination version in effect at the time of award shall apply to the work performed under this contract.

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,697.21 for each calendar day of delay until the work is completed or accepted.

Utilities: The Contractor shall be responsible for obtaining all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.

Record Shop Drawings: In accordance with FAR 52.236-21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are not required.

Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible Offeror offering the best value to the Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each Offeror on price only.

Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each Offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.

Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.

Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.

Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to Angie Clifton at angela.j.clifton@navy.mil no later than 2:00 pm local time ten (10) days prior to proposal due date.

Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment C).

Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment posted in PIEE and by direct email to MACC holders.

Site Visit:

Date: Wednesday, 15 November 2023 Time: 10:00 am EST Meeting Location: Meet in the HQ parking lot at 1325 S, Birdneck Road, Virginia Beach, VA. A map to the site is provided (see Attachment F).

Site visit departure times will not be adjusted for late arrivals.

*All interested attendees register via email to Angie Clifton at angela.j.clifton@navy.mil. Please provide your name, phone number, and email by 12:00 pm local time, Monday, 13 November 2023.

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

***THE FOLLOWING NEEDS TO BE PROVIDED BY ALL ATTENDEES:

All attendees shall be prepared to show valid Government-issued REAL ID compliant drivers licenses or REAL ID compliant photo ID to enter the facility. The REAL ID Act of 2005 established minimum security standards for licenses and identification cards from states not meeting the Act’s minimum standards.

Non-DoD cardholding visitors with a driver’s license or ID that is not compliant with the REAL ID Act of 2005 will now need to provide an alternate form of acceptable identification to gain entry. In absence of a compliant state issued driver’s license or ID, one of the following federally approved forms of identification must also be provided in addition to the non-compliant driver’s license or ID:

The following forms of identification are approved as alternate forms of identification in the absence of REAL ID compliant driver license or identification cards:

U.S. Passport

U.S. Passport Card

U.S. Coast Guard Merchant Mariner Card

Personal Identity Verification (PIV) Card

Personal Identification Verification-Interoperable (PIV-I) Card

U.S. State Department Driver License

Veterans Health Identification Card (Issued by the U.S. Department of Veterans Affairs)

U.S. Permanent Resident Card (Form I-551)

U.S. Certificate of Naturalization or Certificate of Citizenship (FORM N-550)

Department of Homeland Security Employment Authorization Document (FORM I-766)

Site Visit POCs:

Ryan Coolbaugh, NAVFAC MIDLANT – (email) ryan.d.coolbaugh.civ@us.navy.mil, (Cell) (757) 777-2332 Major Sergio Abreu, MACS24 HQ – (email) sergio.abreu@usmc.mil, (phone) (757) 492-0970 Angie Clifton, NAVFAC MIDLANT – (email) angela.j.clifton@navy.mil; (Cell) (757) 334-3893

Proposal Due Date: Monday, 18 December 2023 at 02:00PM Local Time. LATE PROPOSALS WILL

NOT BE ACCEPTED.

Proposal Delivery Information:

Offerors shall submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file.Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment E. Emailed submissions will not be accepted.

Offerors shall allow adequate time to upload files which may be slow for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504 the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.

The PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS

WILL NOT BE CONSIDERED.

Evaluation Factors for Award

1. The proposed task order will be awarded to the responsible Offeror offering the best value to the

Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each Offeror on price only.

2. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price

i) Solicitation Submittal Requirements:

Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) electronic original copy with the following:

Cover page that includes:

- solicitation number, solicitation title, Offeror name, address, phone number, fax number, EIN, Unique Entity Identifier (UEI) in SAM, CAGE code, Point of Contact (POC), POC phone number, and POC email address;

- All amendments acknowledged;

- Price Proposal Form;

- Copy of Representation and Certifications and proof of registration in System for Award

Management (SAM);

- Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the

2022/2023 filing cycle;

- Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least 20 percent of the proposed price, but shall not exceed $3 million;

The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line items numbers (CLINs). All required proposal documents shall be submitted in accordance with FAR 15.208.

(ii) Basis of Evaluation: The Government will evaluate price based on the total lump sum price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

a. Comparison of proposed prices received in response to the RFP.

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

b. Comparison of proposed prices with the Independent Government Cost Estimate (IGCE).

c. Comparison of proposed prices with available historical information.

d. Comparison of market survey results.

Evaluation

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the Offeror submitting the lowest price proposal.

2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

ATTACHMENTS:

ATTACHMENT A1: P101_1785609_Specifications ATTACHMENT A2: P101_1785609_Drawings ATTACHMENT B: Wage Determination ATTACHMENT C: Pre-Proposal Inquiry (PPI) form ATTACHMENT D: Price Proposal Form ATTACHMENT E: PIEE Vendor Access Instructions ATTACHMENT F – Site Map

ATTACHMENT A

SPECIFICATIONS AND DRAWINGS

See separately attached PDF Files labeled as follows:

ATTACHMENT A1: P101_1785609_Specifications

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

ATTACHMENT A2: P101_1785609_Drawings

ATTACHMENT B

WAGE DETERMINATION

General Decision Number: VA20230167 01/13/2023

Superseded General Decision Number: VA20220167

State: Virginia

Construction Type: Building

County: Virginia Beach* County in Virginia.

*INDEPENDENT CITY OF VIRGINIA BEACH

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the |

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

| | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 01/13/2023

ASBE0024-006 04/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2021

Rates Fringes

BOILERMAKER......................$ 42.62 24.81

BRVA0008-001 05/01/2022

Rates Fringes

BRICKLAYER.......................$ 22.44 10.23

* ELEV0052-005 01/01/2023

Rates Fringes

ELEVATOR MECHANIC................$ 47.72 37.335+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504 for all hours worked.

ENGI0147-019 05/01/2022

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 34.17 15.21 Cranes under 90 tons........$ 33.26 15.12

IRON0079-012 05/01/2022

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 28.87 11%+14.24

IRON0079-013 05/01/2022

Rates Fringes

IRONWORKER, RIGGER...............$ 28.87 11%+14.24

PLUM0110-008 11/01/2022

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 31.77 17.40

PLUMBER..........................$ 31.77 17.40

* SUVA2013-052 01/11/2016

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 17.93 4.41

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 17.13 0.00

ELECTRICIAN, Includes Low Voltage Wiring and Alarm Installation.....................$ 22.94 1.94

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 13.48 ** 3.27

LABORER: Mason Tender - Cement/Concrete..................$ 12.96 ** 3.12

LABORER: Pipelayer..............$ 12.40 ** 1.96

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

LABORER: Common or General, Including Demolition.............$ 12.90 ** 0.96

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 19.25 2.72

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 18.07 3.50

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 18.00 0.00

PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 17.50 2.20

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.24 2.80

SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 ** 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504 is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504 interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

ATTACHMENT C

PRE-PROPOSAL INQUIRY (PPI) FORM

ATTACHMENT C: Pre-Proposal Inquiry Form

ATTACHMENT D

PRICE PROPOSAL FORM

ATTACHMENT D: Price Proposal Form

ATTACHMENT E

PIEE Vendor Access Instructions

ATTACHMENT E: PIEE Vendor Access Instructions

ATTACHMENT F

Site Map

ATTACHMENT F: Site Map

Design-Build G/ATOR SUPPORT FACILITIES Solicitation N4008524R2504

File details come from the government source that posted it. Updated .