ATTACHMENT A SPECS SECTION 01 35 13.43 10 (Amend).pdf

PDF 20 KB Posted

Attached to
CEP AREA GRAVITY SEWER REPAIR/REHAB, W-385 BASIN REPAIRS and PIER 9 SANITARY REPLACEMENT
Solicitation number
N4008523R2904
Issued by

About this file

This document is a technical specification for a federal contract to perform contaminated site remediation and groundwater treatment. The work includes preparing a report on discharges from petroleum contaminated sites in accordance with EPA guidelines. The contractor must apply for and obtain new coverage under Virginia's VPDES General Permit for discharges from petroleum contaminated sites. Drawings must follow the same format used in previous project phases. Quality control procedures must be detailed. The related federal contract opportunity is for gravity sewer repair and rehabilitation work in the Chesapeake Bay area of Virginia under Solicitation Number N4008523R2904 issued by the Naval Facilities Engineering Command.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1749392 NSN CEP Area Gravity Sewer Repair/Rehab, W-385 Basin Repair & Pier 9 Sanitary Sewer Replacement

SECTION 01 35 13.43 10

SPECIAL PROJECT PROCEDURES FOR CONTAMINATED SITES

08/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

FEDERAL REMEDIATION TECHNOLOGIES ROUNDTABLE (FRTR)

USAEC SFIM-AEC-ET-CR-97053 (2007) Federal Remediation Technologies Screening Matrix and Reference Guide, Fourth Edition

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-19 (2001) A Guide to Preparing and Reviewing Remedial Action Reports of Cost and Performance

ER 1110-3-1301 (2016) Engineering and Design -- Environmental Remediation and Removal Programs Cost Engineering

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 542-B-98-007 (1998) Guide to Documenting and Managing Cost and Performance Information for Remediation Projects

1.2 DESCRIPTION OF WORK

Work consists of the preparation of a report for the discharges from petroleum contaminated sites, hydrostatic test and groundwater remediation. NAVFAC has obtained the VPDES Greneral Permit for discharges from petroleum contaminated sites with Virginia DEQ under which the contractor must apply for coverage. Contractor is required to obtain the new coverage with new permit number. The contractor must directly contact Virginia DEQ for permit application:

Loan Pham Virginia Department of Environmental Quality Tidewater Regional Office, VPDES Permits 5636 Southern Blvd.

Virginia Beach, VA 23462 P: (757) 799-8000 loan.pham@deq.virginia.gov

The VPDES General Permit, Registration Statement and expired Permits VAG8350586 & VAG8350590 are included in the Appendix "A" for contractor reference. The new coverage is expected to use identical languages to permits VAG8350586 and VAG8350590.

SECTION 01 35 13.43 10 Page 1

1749392 NSN CEP Area Gravity Sewer Repair/Rehab, W-385 Basin Repair & Pier 9 Sanitary Sewer Replacement

1.2.1 Report Format

Prepare the report in accordance with EPA 542-B-98-007. Present the report as follows: 1) Word processing format: MS Word, 12 point font size, typeface. 2) Page layout: 8-1/2 x 11 inch size paper; 1 inch margins;

portrait or landscape orientation; bold headings, footnotes, page numbering. 3) Tables and charts software: spreadsheets, groundwater modeling. 4) Computer file: also present the document in Hypertext Mark-up Language (HTML 2.0) saved as an ASCII file; link postscript drawings to document text.

1.2.2 Drawing Format

Use the same format for drawings, including software, as that used in the investigative and design phases of the project.

1.2.3 Quality Control

Develop a project-specific quality control program to detail the procedures for preparation of the report and for correction of deficiencies. Arrange for conferences to coordinate the work or to sequence related work for sensitive and complex items as needed and as requested by the Contracting Officer.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-06 Test Reports

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 35 13.43 10 Page 2