ATTACHMENT A SPECS SECTION 01 35 13.43 10 (Amend).pdf
PDF 20 KB Posted
- Attached to
- CEP AREA GRAVITY SEWER REPAIR/REHAB, W-385 BASIN REPAIRS and PIER 9 SANITARY REPLACEMENT
- Solicitation number
- N4008523R2904
About this file
This document is a technical specification for a federal contract to perform contaminated site remediation and groundwater treatment. The work includes preparing a report on discharges from petroleum contaminated sites in accordance with EPA guidelines. The contractor must apply for and obtain new coverage under Virginia's VPDES General Permit for discharges from petroleum contaminated sites. Drawings must follow the same format used in previous project phases. Quality control procedures must be detailed. The related federal contract opportunity is for gravity sewer repair and rehabilitation work in the Chesapeake Bay area of Virginia under Solicitation Number N4008523R2904 issued by the Naval Facilities Engineering Command.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1749392 NSN CEP Area Gravity Sewer Repair/Rehab, W-385 Basin Repair & Pier 9 Sanitary Sewer Replacement
SECTION 01 35 13.43 10
SPECIAL PROJECT PROCEDURES FOR CONTAMINATED SITES
08/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
FEDERAL REMEDIATION TECHNOLOGIES ROUNDTABLE (FRTR)
USAEC SFIM-AEC-ET-CR-97053 (2007) Federal Remediation Technologies Screening Matrix and Reference Guide, Fourth Edition
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-19 (2001) A Guide to Preparing and Reviewing Remedial Action Reports of Cost and Performance
ER 1110-3-1301 (2016) Engineering and Design -- Environmental Remediation and Removal Programs Cost Engineering
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 542-B-98-007 (1998) Guide to Documenting and Managing Cost and Performance Information for Remediation Projects
1.2 DESCRIPTION OF WORK
Work consists of the preparation of a report for the discharges from petroleum contaminated sites, hydrostatic test and groundwater remediation. NAVFAC has obtained the VPDES Greneral Permit for discharges from petroleum contaminated sites with Virginia DEQ under which the contractor must apply for coverage. Contractor is required to obtain the new coverage with new permit number. The contractor must directly contact Virginia DEQ for permit application:
Loan Pham Virginia Department of Environmental Quality Tidewater Regional Office, VPDES Permits 5636 Southern Blvd.
Virginia Beach, VA 23462 P: (757) 799-8000 loan.pham@deq.virginia.gov
The VPDES General Permit, Registration Statement and expired Permits VAG8350586 & VAG8350590 are included in the Appendix "A" for contractor reference. The new coverage is expected to use identical languages to permits VAG8350586 and VAG8350590.
SECTION 01 35 13.43 10 Page 1
1749392 NSN CEP Area Gravity Sewer Repair/Rehab, W-385 Basin Repair & Pier 9 Sanitary Sewer Replacement
1.2.1 Report Format
Prepare the report in accordance with EPA 542-B-98-007. Present the report as follows: 1) Word processing format: MS Word, 12 point font size, typeface. 2) Page layout: 8-1/2 x 11 inch size paper; 1 inch margins;
portrait or landscape orientation; bold headings, footnotes, page numbering. 3) Tables and charts software: spreadsheets, groundwater modeling. 4) Computer file: also present the document in Hypertext Mark-up Language (HTML 2.0) saved as an ASCII file; link postscript drawings to document text.
1.2.2 Drawing Format
Use the same format for drawings, including software, as that used in the investigative and design phases of the project.
1.2.3 Quality Control
Develop a project-specific quality control program to detail the procedures for preparation of the report and for correction of deficiencies. Arrange for conferences to coordinate the work or to sequence related work for sensitive and complex items as needed and as requested by the Contracting Officer.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-06 Test Reports
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 35 13.43 10 Page 2
File details come from the government source that posted it. Updated .