Amen06 220046.pdf

PDF 828 KB Posted

Attached to
Structure RTAFC MOUT Repairs
Solicitation number
N4008523R2751
Issued by

View the file

Other files

File Type Posted
Amen05 220046.pdf PDF
Amen04 220046.pdf PDF
Amen 04 Spec 01 35 26 modified.pdf PDF
Amen03 220046.pdf PDF
Amen02 220046.pdf PDF
Amen01 220046.pdf PDF
N4008522B0046 Specs.pdf PDF
RFP 220046.pdf PDF
N4008522B0046 Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE 1 of

PAGE OF PAGES

2. AMENDMENT/MODIFICAITON NO.

AMENDMENT NO. 0006

3. EFFECTIVE DATE

12/13/2023

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

22-0046

6. ISSUED BY CODE

NAVFAC Mid-Atlantic

Resident Officer in Charge of Construction

1107A Birch Street

Camp Lejeune, NC 28547-2521

N40085 7. ADMINISTERED BY (If other than Item 6) CODE

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICIATION NO.

N40085-23-R-2751

9B. DATED (SEE ITEM 11)

6/12/23

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor ✘ is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

22-0046, Structure RTAFC Repairs, Amendment 0006

See Continuation Page(s)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

(Signature of person authorized to sign)

NSN

X

N40085-23-R-2751 Amendment 0006

CONTINUATION SHEET

A. The following RFI responses have been provided:

1. Question: Is it the intent to match the existing construction currently on the project site?

Answer: Yes, match existing.

2. Question: Based on the details on sheet A503 we assume that the window frames and fixed panels on the windows are made of hollow metal frame materials and the operable shutters are made using angle iron and steel deck and fastened into the HM frame. Is our assumption correct or is the entire window assembly constructed of just angle iron with a fixed panel and operable shutters?

Answer: Use 2’ angles to mount to the existing CMU. The shutters are made of angle iron and metal deck.

Details 9 and 10/AS502 depict the shutters.

3. Question: On the door schedule there is a note number 4 which indicates existing door frames but the door schedule shows a head and jamb detail for each frame except the overhead coiling doors. Are there any existing door frames:

Answer: All frames noted on all demolition plans are to receive new frames.

4. Question: Note 8 in the demo legend indicates for the contractor to remove the plywood/Cement board ceilings. Is this to removed and replaced at all ceilings or just damaged areas.

Answer: All ceilings.

B. The date and time for receipt of proposals has been extended to 5 January 2024 at 2pm.

C. All other terms and conditions remain unchanged.