Amen02 220046.pdf
PDF 133 KB Posted
- Attached to
- Structure RTAFC MOUT Repairs
- Solicitation number
- N4008523R2751
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amen06 220046.pdf | ||
| Amen05 220046.pdf | ||
| Amen04 220046.pdf | ||
| Amen 04 Spec 01 35 26 modified.pdf | ||
| Amen03 220046.pdf | ||
| Amen01 220046.pdf | ||
| N4008522B0046 Specs.pdf | ||
| RFP 220046.pdf | ||
| N4008522B0046 Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0002 07/05/23
5. PROJECT NO. (If applicable) 22-0046
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-23-R-2751
6/12/23
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
22-0046, Structure RTAFC Repairs, Amendment 0002, Provide RFI response
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
N40085-23-R-2751 Amendment 0002
CONTINUATION SHEET
A. The following RFI responses have been provided:
1. QUESTION: Are all interior & exterior door frames and doors to be painted new and old A- 101 through A-111?
ANSWER: Yes.
2. QUESTION: Are any doors and door frames interior and exterior to be painted on the rest of the buildings?
ANSWER: Only buildings shown on drawings are applicable.
3. QUESTION: Are all new Interior and exterior Stairs and railings Galvanized and are they painted?
ANSWER: New stairs – all galvanized and not painted. All existing stairs, prepped and painted per specs/drawings.
4. QUESTION: Are plywood windows that remain to be painted?
ANSWER: There should not be any remaining. All are demolished and replaced with metal shutter detail.
5. QUESTION: Are all flower boxes and knee walls to be painted?
ANSWER: Yes.
6. QUESTION: Are street signs to be painted?
ANSWER: No.
N40085-23-R-2751 Amendment 0002
7. QUESTION: Do metal trusses in the hotel get painted?
ANSWER: If referring to the existing steel structure at area where roof stair is to be replaced, yes existing steel is to be prepped and painted.
8. QUESTION: Can the time for this job be extended taking into account submittals, fabrication of new items, repairs, installation of new items and length of time for preparation and painting?
ANSWER: The Government agrees to an extension for project completion to 510 days.
9. QUESTION: Are the retaining walls at ponds painted? They are marked A-502 to be repainted.
ANSWER: Yes
10. QUESTION: Are any parts of new window replacement to be painted?
ANSWER: Frames shop painted; shutter panels galvanized, not painted. See 9 & 10 on A-502.
11. QUESTION: No washing or painting on Bldg. 20, 29, 30, 32?
ANSWER: No.
B. All other terms and conditions remain unchanged.
| Amend 0004 |
| Continuation sheet |
File details come from the government source that posted it. Updated .