N4008522B0046 Dwgs.pdf
PDF 28 MB Posted
- Attached to
- Structure RTAFC MOUT Repairs
- Solicitation number
- N4008523R2751
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amen06 220046.pdf | ||
| Amen05 220046.pdf | ||
| Amen04 220046.pdf | ||
| Amen 04 Spec 01 35 26 modified.pdf | ||
| Amen03 220046.pdf | ||
| Amen02 220046.pdf | ||
| Amen01 220046.pdf | ||
| N4008522B0046 Specs.pdf | ||
| RFP 220046.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WAKE
DURHAM
PERSON
GRANVILLE
FRANKLIN
WARREN
COLUMBUS
BLADEN
HARNETT
WAYNE
JOHNSTON
WILSON
NASH
EDGECOMBE
SAMPSON
DUPLIN
JONES
GREENE
LENOIR
PITT
HERTFORD
GATES
CARTERET
CRAVEN
ONSLOW
PENDER
NEW
HANOVER
BRUNSWICK
PAMLICO
BEAUFORT
HYDE
DARE
C A M
D E N
PA
SQ
U O
TAN K
TYRRELL
PER
Q
UI M
ANS
C H O W
A N
MARTIN WASHINGTON
NORTHAMPTON
CUR
I
U K
T R
C
BERTIE
VANCE
CUMBERLAND
HALIFAX
ATLANTIC OCEAN
CAMP LEJEUNE
BASE MAP
FC332
NEW RIVER
HADNOT
POINT
MAR
IN
ES
R
OAD
COURTHOUSE
BAY
HO
LO
CO
M
B
BLVD
U S
R O
U
TE
NC ROUTE 24
N.C. HIGHWAY 172
STONE
BAY
N.C. HIGHWAY 172
N.
C.
H
IG
HW
AY
N .C
. H
IG
H W
AY
MOUT FACILITY
ATLANTIC
OCEAN
MOUT FACILITY
NOT TO SCALE1 LOCATION MAP
NORTH
1" = 200 FEET1" = 600 FEET2 ENLARGED BASE MAP
NORTH
3BASE MAP
NORTH
CAMP LEJEUNE
HOME OF
EXPEDITIONARY
FORCES IN READINESS
FINAL
STRUCTURE RTAFC REPAIRS 220046
G-001
COVER SHEET
05-01-2023
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO
ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO
THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH
THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
60038648
OL
D
BE
AR
C
RE
EK
R
OA
D
G-002
SHEET INDEX, GENERAL INFO AND
PRIORITY WORK ORDER
INDEX OF DRAWINGS
GENERAL
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
G-001 60038648 1 COVER SHEET
G-002 60038649 2 SHEET INDEX, GENERAL INFO AND PRIORITY WORK ORDER
EXISTING CONDITIONS
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
VF100 60038650 3 CIVIL EXISTING CONDITIONS
CIVIL
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
C-001 60038651 4 CIVIL GENERAL NOTES, LEGENDS AND ABBREVIATIONS
CD100 60038652 5 CIVIL DEMOLITION PLAN
CS100 60038653 6 CIVIL SITE PLAN
CG100 60038654 7 CIVIL GRADING PLAN
C-500 60038655 8 CIVIL DETAILS
STRUCTURAL
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
S-001 60038656 9 GENERAL NOTES
S-101 60038657 10 PARTIAL FIRST AND SECOND FLOOR PLANS- BUILDINGS 3 AND 4
S-102 60038658 11 FOUNDATION PLAN - BUILDING 12
S-103 60038659 12 FOUNDATION PLAN - BUILDING 13
S-104 60038660 13 FOUNDATION PLAN - BUILDING 14
S-105 60038661 14 FIRST AND SECOND FLOOR PLANS - BUILDING 15
S-106 60038662 15 FIRST FLOOR PLAN - BUILDING 16
S-501 60038663 16 TYPICAL DETAILS
S-701 60038664 17 EXISTING CONDITION PHOTOS
ARCHITECTURAL
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
A-001 60038665 18 NOTES, LEGENDS & ABBREVIATIONS
A-002 60038666 19 REFERENCE BUILDING LOCATIONS PLAN
A-101 60038667 20 FLOOR PLANS, BLDG 1 - HOTEL
A-102 60038668 21 FLOOR PLANS, BLDG 2 - CITY HALL, BLDG 7 - CHURCH
A-103 60038669 22 FLOOR PLANS, BLDG 3 -4 APARTMENTS
A-104 60038670 23 FLOOR PLANS, BLDG 5 - OFFICE, BLDG 6 - OFFICE
A-105 60038671 24 FLOOR PLANS, BLDG 8 & 9 - BUS/RES
A-106 60038672 25 FLOOR PLANS, BLDG 10 - BUS/RES, HOUSE 21 RES,
HOUSE 22 RES
A-107 60038673 26 FLOOR PLANS, BLDG 11 & 12 TOWNHOUSES
A-108 60038674 27 FLOOR PLANS, BLDG 13 & 14 TOWNHOUSES
A-109 60038675 28 FLOOR PLANS, BLDG 15 - SCHOOL, BLDG 16 - GYMNASIUM
A-110 60038676 29 FLOOR PLANS, BLDG 17 - BANK, 19 - WAREHOUSE, BLDG 18
SERV., BLDG 31 SERV.
A-111 60038677 30 FLOOR PLAN, BLDGS 23, 24, 25, 26, 27, 28 - HOUSES
A-150 60038678 31 ROOF PLANS, BLDGS 1, 2, 3 & 4
A-151 60038679 32 ROOF PLANS, BLDGS 5, 6, 8, 9 & 15
A-152 60038680 33 ROOF PLANS, BLDGS 16,17,18 & 31
A-201 60038681 34 ELEVATIONS, BLDG 1
A-202 60038682 35 ELEVATIONS, BLDG 2
A-203 60038683 36 ELEVATIONS, BLDG 3 & 4
A-204 60038684 37 ELEVATIONS, BLDG 5
A-205 60038685 38 ELEVATIONS, BLDG 6
A-206 60038686 39 ELEVATIONS, BLDG 7
A-207 60038687 40 ELEVATIONS, BLDG 8 & 9
A-208 60038688 41 ELEVATIONS, BLDG 10
A-209 60038689 42 ELEVATIONS, BLDG 11
A-210 60038690 43 ELEVATIONS, BLDG 12
A-211 60038691 44 ELEVATIONS, BLDG 13, 14
A-212 60038692 45 ELEVATIONS, BLDG 15
A-213 60038693 46 ELEVATIONS, BLDG 16
A-214 60038694 47 ELEVATIONS, BLDG 17
A-215 60038695 48 ELEVATIONS, BLDG 19
A-216 60038696 49 ELEVATIONS, BLDG 18 & 31
A-217 60038697 50 ELEVATIONS, BLDG 21 & 22
A-218 60038698 51 ELEVATIONS, BLDG 23, 24, 25
A-219 60038699 52 ELEVATIONS, BLDG 26, 27, 28
A-501 60038700 53 REPLACEMENT STAIR PLANS & TYP. SECTIONS
A-502 60038701 54 TYP. CONDITIONS PHOTOS
A-503 60038702 55 DETAILS - 1
A-504 60038703 56 DETAILS - 2
A-601 60038704 57 WINDOWS/DOORS
GENERAL PROJECT NOTES:
1. ANY REFERENCES TO STATE GOVERNMENT, FEDERAL GOVERNMENT, OR
INDUSTRY STANDARDS OR SPECIFICATION MADE HEREIN SHALL FORM A
PART OF THE WORK TO THE EXTENT REFERENCED THERETO AND ALL
MATERIALS AND WORKMANSHIP UNDER THIS CONTRACT SHALL COMPLY
WITH OR EXCEED THESE STANDARDS AND REFERENCE. ALL REFERENCED
STANDARDS SHALL BE THE LATEST EDITION.
2. ALL MANUFACTURED EQUIPMENT AND PRODUCTS SHALL BE NEW
MATERIALS IN UNDAMAGED CONDITION AND INSTALLED AS PER
MANUFACTURER'S LATEST PRINTED INSTRUCTIONS, UNLESS SPECIFIED
OTHERWISE HEREIN.
3. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF EXISTING
FACILITIES EQUIPMENT FROM DAMAGE DURING INSTALLATION AND TESTING
OPERATIONS.
4. CONTRACTOR SHALL TAKE INTO ACCOUNT THE SPECIAL TREATMENT OF
HAZARDOUS WASTE, AS WELL AS THE ENVIRONMENTAL IMPLICATIONS
RELATED TO BUILDING DEMOLITION MANAGEMENT (I.E. FLUORESCENT
LIGHTING TUBES, T-STATS, ETC.) EVERY EFFORT SHALL BE MADE TO
RECYCLE ELIGIBLE MATERIALS, AND THOSE NOT SUITABLE, SHALL BE
DISPOSED OF OFF BASE IN ACCORDANCE WITH THE REQUIREMENTS OF
THE (NCDEQ) NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL
QUALITY.
5. ENSURE THAT ANY DEMOLITION, UTILITY CUT AND CAPPING, AND DEBRIS
REMOVAL SERVICE PERFORMED AT THE BASE IS COMPLETED IN SUCH A
MANNER THAT WILL RESTORE A NEAT AND PROFESSIONAL APPEARANCE OF
BASE AREAS.
6. THE FACILITY/AREA SHALL BE CLEANED IN ITS ENTIRETY, INCLUDING
EXTERIOR AREAS, BEFORE BEING RETURNED TO THE GOVERNMENT.
WARRANTY:
1. CONTRACTOR SHALL FURNISH A MINIMUM ONE YEAR WARRANTY AGAINST
DEFECTS IN MATERIAL AND WORKMANSHIP STARTING ON THE BENEFICIAL
OCCUPANCY DATE.
WORKING CONDITIONS:
1. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO ENSURE THAT
OPERATIONS ARE CONDUCTED IN A MANNER AS TO MINIMALLY INTERFERE
WITH THE NORMAL OPERATIONS OF THE BASE AND THE SAFETY AND
CONVENIENCE OF THE BASE PERSONNEL. THE CONTRACTOR SHALL
COORDINATE UTILITY OUTAGES WITH THE APPROPRIATE BASE UTILITY
SERVICE OFFICE AND THE USER.
GENERAL INFORMATION:
1. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES,
EQUIPMENT, LABOR, AND APPLICABLE LICENSES AND PERMITS NECESSARY
TO COMPLETE REQUIREMENTS WITHIN. ALL WORK SHALL BE DONE IN
STRICT ACCORDANCE WITH THE STATEMENT OF WORK AND SUBJECT TO
THE TERMS AND CONDITIONS OF THE CONTRACT AND IN ACCORDANCE
WITH (UFC) UNITED FACILITIES CRITERIA, UNIFIED FACILITIES GUIDE
SPECIFICATIONS (UFGS), THE INTERNATIONAL BUILDING CODE (IBC),
INTERNATIONAL PLUMBING CODE (IPC), NATIONAL ELECTRICAL CODE (NEC),
NATIONAL ELECTRICAL SAFETY CODE (NESC), NATIONAL FIRE PROTECTION
ASSOCIATION (NFPA), EPA 402-K-01-001 (2008), NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION (NCDOT), NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ), BASE DESIGN AND
CONSTRUCTION STANDARDS INCLUDING BASE EXTERIOR ARCHITECTURAL
PLAN (BEAP), AND ALL OTHER APPLICABLE CODES.
2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS,
QUANTITIES AND SQUARE FOOTAGES. ALL DIMENSIONS, QUANTITIES AND
SQUARE FOOTAGES INCLUDED ARE APPROXIMATIONS. CONSTRUCTION
AND DEMOLITION SHALL BE IN STRICT ACCORDANCE WITH THE BASE
DESIGN AND CONSTRUCTION STANDARDS. THE INFORMATION PROVIDED IN
THE STATEMENT OF WORK (SOW), THE PROVIDED DRAWINGS, AND THE
REQUIREMENTS OF THE BASE DESIGN AND CONSTRUCTION STANDARDS
SHALL BE DETERMINED TO BE THE MINIMUM STANDARDS REQUIRED IN THIS
PROJECT.
3. THE CONTRACTOR SHALL VIDEO ALL AREAS IN WHICH WORK SHALL OCCUR
PRIOR TO STARTING WORK TO INCLUDE INTERIOR AND EXTERIOR JOB SITE
AND SURROUNDING AREA. UFC'S TAKE PRECEDENCE OVER ALL
STANDARDS, CODES AND BASE DESIGN STANDARDS AND REQUIREMENTS
THAT PERTAIN TO THE WORK WITHIN THIS SOW.p
4. DURING CONSTRUCTION, THE CONTRACTOR SHALL TAKE CARE NOT TO
DAMAGE EXISTING STRUCTURES, ETC. THAT WILL NOT BE REPLACED AS
PART OF THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
TEMPORARY SUPPORT OF ALL DEVICES AS REQUIRED TO PERFORM WORK.
ANY DEMOLITION WORK THAT NEEDS TO BE ACCOMPLISHED TO COMPLETE
THE CONTRACT IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL
MATERIAL SHALL BE INSTALLED PER MANUFACTURERS'
RECOMMENDATIONS. ALL ITEMS LISTED IN THE SOW ARE TO BE SUPPLIED
AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE NOTED.
5. A PRE-CONSTRUCTION MEETING WILL BE HELD AT THE BASE TO INCLUDE
THE CONTRACTOR AND GOVERNMENT REPRESENTATIVES. THE
GOVERNMENT SHALL SET UP THIS MEETING WITH THE CONTRACTOR AND
GOVERNMENT REPRESENTATIVES, TO DISCUSS ALL PERTINENT PROJECT
REQUIREMENTS, AS WELL AS ANY OTHER CONSTRUCTION ISSUES THE
CONTRACTOR MAY HAVE. ALL FINISHES SHALL BE PRESENTED TO THE
CONTRACTING OFFICER AS ONE SUBMITTAL FOR SELECTION AND
APPROVAL PRIOR TO INSTALLATION. ALL MATERIAL THAT COULD BE
DISCONTINUED SHALL BE ON-SITE, I.E. CARPET AND TILE PRIOR TO
STARTING PROJECT SO THERE WILL BE NO DIFFERENCE IN COLOR.
6. WHERE SPECIFIC PART NUMBERS OR MANUFACTURER'S ARE REFERENCED,
IT SHALL BE UNDERSTOOD THAT THE CONTRACTOR MAY SUBMIT A
PROPOSED EQUAL.
7. THE TERMS "OWNER" & "GOVERNMENT" WILL BE CONSIDERED TO BE THE
SAME/ INTERCHANGEABLE FOR THIS PROJECT.
8. THE TERM "SHALL" WHERE USED IS EQUIVALENT TO "MUST". ALL WORK AND
MATERIALS NOTED ARE NEW UNLESS NOTED OTHERWISE.
9. THE TERM "INSTALL" WHERE USED IS EQUIVALENT TO "PROVIDE", (FURNISH
AND INSTALL COMPLETE).
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
INDEX OF DRAWINGS
PLUMBING
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
P-001 60038705 58 PLUMBING NOTES & LEGEND
PD101 60038706 59 BLDG NO.1 HOTEL & NO.21 HOUSE - PLUMBING DEMOLITION
P-101 60038707 60 BLDG NO.1 HOTEL & NO.21 HOUSE - PLUMBING
P-501 60038708 61 PLUMBING DETAILS
ELECTRICAL
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
E-001 60038709 62 ELECTRICAL NOTES & LEGEND
ES101 60038710 63 SITE PLAN - ELECTRICAL
ES102 60038711 64 TLZ RAVEN - ELECTRICAL
ED101 60038712 65 BLDG NO.1 HOTEL - ELECTRICAL DEMOLITION
ED102 60038713 66 BLDG NO.1 HOTEL - ELECTRICAL DEMOLITION
ED103 60038714 67 BLDG NO.3/NO.4 APARTMENTS - ELECTRICAL DEMOLITION
ED104 60038715 68 BLDG NO.5 OFFICE - ELECTRICAL DEMOLITION
ED105 60038716 69 BLDG NO.7 CHAPEL - ELECTRICAL DEMOLITION
ED106 60038717 70 BLDG NO.16 GYM - ELECTRICAL DEMOLITION
ED107 60038718 71 BLDG NO.18 VSS - ELECTRICAL DEMOLITION
ED108 60038719 72 BLDG NO.19 WAREHOUSE - ELECTRICAL DEMOLITION
ED109 60038720 73 BLDG NO.20 WAREHOUSE - ELECTRICAL DEMOLITION
ED110 60038721 74 BLDG NO.21 HOUSE - ELECTRICAL DEMOLITION
E-101 60038722 75 BLDG NO.1 HOTEL - ELECTRICAL
E-102 60038723 76 BLDG NO.1 HOTEL - ELECTRICAL
E-103 60038724 77 BLDG NO.3/NO.4 APARTMENTS - ELECTRICAL
E-104 60038725 78 BLDG NO.5 OFFICE - ELECTRICAL
E-105 60038726 79 BLDG NO.7 CHAPEL - ELECTRICAL
E-106 60038727 80 BLDG NO.16 GYM - ELECTRICAL
E-107 60038728 81 BLDG NO.18 VSS - ELECTRICAL
E-108 60038729 82 BLDG NO.19 WAREHOUSE - ELECTRICAL
E-109 60038730 83 BLDG NO.20 WAREHOUSE - ELECTRICAL
E-110 60038731 84 BLDG NO.21 HOUSE - ELECTRICAL
E-501 60038732 85 ELECTRICAL DETAILS
E-502 60038733 86 ELECTRICAL DETAILS
E-601 60038734 87 ELECTRICAL SCHEDULES
PROJECT WORK DIVISIONS:
1. ALL WORK ON THIS PROJECT IS DIVIDED BY INDIVIDUAL BUILDINGS AND
EXTERIOR SITE WORK FOR PRICING AND EXECUTION. ALL WORK INDICATED
IN THE DRAWINGS FOR EACH BUILDING IN THE PRIORITY LIST MUST BE
INCLUDED COMPLETE FOR THAT NUMBERED ITEM. WORK FOR EACH
BUILDING INCLUDES BUT IS NOT LIMITED TO RE-ROOFING, EXTERIOR
PAINTING, STRUCTURAL REPAIR, STAIR REPLACEMENT, STAIR REPAIR, DOOR
REPLACEMENT, DOOR FRAME REPLACEMENT, WINDOW SHUTTERS,
ELECTRICAL AND MISCELLANEOUS CONSTRUCTION ITEMS.
2. ALL WORK FOR EACH BUILDING IS SHOWN ON RESPECTIVE ARCHITECTURAL,
STRUCTURAL, PLUMBING & ELECTRICAL FLOOR PLANS, ROOF PLANS,
ELEVATIONS, STAIR DRAWINGS, SCHEDULES AND SPECIFICATIONS.
3. CONTRACTOR RESPONSIBLE FOR ALL SCOPE INDICATED ON THE DRAWINGS.
4. CONTRACTOR TO NOTIFY CONTRACTING OFFICER IF ANY WORK REQUIRED
AFFECTS ANY BUILDING(S) THAT ARE NOT PART OF THE BASE CONTRACT OR
SUBSEQUENT CLINs.
PRIORITY WORK ORDER:
NUMBERED PRIORITY LIST OF PROJECT SCOPE
1. BUILDING 20
2. BUILDING 19
3. BUILDING 1
4. BUILDING 3
5. BUILDING 4
6. BUILDING 12
7. BUILDING 13
8. BUILDING 14
9. BUILDING 15
10. BUILDING 16
11. BUILDING 18
12. BUILDING 7
13. BUILDING 8
14. BUILDING 9
15. BUILDING 17
16. BUILDING 2
17. BUILDING 31
18. BUILDING 10
19. BUILDING 5
20. BUILDING 6
21. BUILDING 11
22. EXTERIOR LIGHTING
23. CURB REPLACEMENT
24. REPLACEMENT OF TIMBER TIE RETAINING WALLS (SHEET CS100 & C-500)
25. BUILDING 25
26. BUILDING 26
27. BUILDING 22
28. BUILDING 24
29. BUILDING 27
30. BUILDING 23
31. BUILDING 21
32. BUILDING 28
33. SITE WORK AT TLZ RAVEN (GRADING, LIGHTING & REFINISHING MASONRY SITE
WALLS)
34. CLEARING DRAINAGE SWALE, (SHEET CG100 KEYNOTE 5).
35. SITE WALL REFINISHING AND REPAIR, & SITE TRELLIS REPAIR/REFINISHING
GENERAL INFO:
60038649
TLZ
RAVEN
BLEACHERS
BLDG. NO. 16
GYMNASIUM
BLDG. NO. 15
SCHOOL
BL
D
G
G
H O
ST
BLDG 28
HOUSE
BL
DG
N O
.1
G
HO
ST
BLDG 30
GHOST
BLD
G . N
O . 31
VEH
. SER
BLDG 24HOUSE
BLDG 27
HOUSE
BLDG 22HOUSE
BLDG 26HOUSE
BLDG 25HOUSE
BLDG. NO. 2
CITY HALL
BLD
G
. N O
. 10
BU
S R
ES
BLDG 21
HOUSE
BLDG 23
HOUSE
BLDG. NO. 5
OFFICE BLDG. 6
OFFICE
BLDG. NO. 14
TOWNHOUSES
BLDG. NO. 20
WAREHOUSE
BLD
G. N
O. 1
TOWNHOUSES
BLDG. NO. 4
APARTMENTS
BLDG. NO. 3
APARTMENTS
BL
D
G . N
O . 1
TO
W N
H O
U
SE
S
BLD
G.
NO.17
BANK
BLDG. NO. 1
HOTEL
BLDG. 9
BUS/RES
BLDG. 8
BUS/RES
BLDG. NO. 7
CHURCH
BLDG.NO. 1
VEH. S
ER.
BL
D
G . N
O . 1
W
AR
EH
O U
SE
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
BLDG. NO. 32
MOSQUE
1. SEE SHEET C-001 FOR GENERAL NOTES, LEGEND, AND
ABBREVIATIONS.
SURVEY CONTROL DATA
1. EXISTING CONDITIONS SHOWN PER MCB CAMP
LEJEUNE GIS AND DIGITIZED AERIAL PHOTOGRAPHY
2. NO SURVEY HAS BEEN PERFORMED BY CAPE FEAR
ENGINEERING, INC.
VF100
CIVIL EXISTING CONDITIONS1 CIVIL EXISTING CONDITIONS
1" = 40'
PLAN
NORTH
1"=40'-0"SCALE:
20' 40' 80' 120'0
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
GENERAL SHEET NOTES
60038650
CIVIL GENERAL NOTES:
1. REFER TO THE PROJECT SPECIFICATIONS IN ALL
SITUATIONS. BRING CONFLICTS BETWEEN PROJECT
SPECIFICATIONS AND PLANS TO THE ATTENTION OF THE
CONTRACTING OFFICER AND/OR ENGINEER FOR
RESOLUTION. ALL MATERIALS AND WORKMANSHIP MUST
CONFORM TO THE PROJECT SPECIFICATIONS.
2. EXISTING UTILITY INFORMATION IS NOT TO BE RELIED ON AS
BEING EXACT OR COMPLETE. LOCATION, VERIFICATION,
SUPPORT AND PROTECTION OF ALL ABOVE GROUND AND
UNDERGROUND UTILITIES TO REMAIN IN PLACE, INCLUDING
ANY UTILITIES NOT INDICATED ON CONTRACT DRAWINGS IS
REQUIRED. ANY CONFLICTS OR DISCREPANCIES MUST BE
BROUGHT TO THE CONTRACTING OFFICER'S AND/OR
ENGINEER'S ATTENTION IMMEDIATELY. CAPE FEAR
ENGINEERING HAS NOT PHYSICALLY LOCATED ANY
UNDERGROUND UTILITIES.
3. PRIOR TO ANY EXCAVATION, CONTRACTOR MUST HAVE THE
EXISTING UNDERGROUND LINES MARKED ON THE GROUND
SURFACE IN THE AREAS OF CONSTRUCTION. POTHOLE AND
PHYSICALLY VERIFY DEPTH AND LOCATION OF ALL UTILITY
LINES IN THE WORK AREA THAT REQUIRE COORDINATION
WITH WORK ITEMS. POTHOLE VERIFICATION MUST BE DONE
WELL IN ADVANCE OF ACTUAL WORK SO THAT POTENTIAL
UTILITY CONFLICTS CAN BE VERIFIED AND RESOLVED
WITHOUT CAUSING SCHEDULE DELAYS.
4. PROTECT ALL EXISTING STRUCTURES, TREES, PAVEMENT,
UTILITIES, AND OTHER PROPERTY UNLESS THEY ARE TO BE
DEMOLISHED. ANY PROPERTY NOT AUTHORIZED FOR
REMOVAL, BUT DAMAGED BY THE CONTRACTOR MUST BE
RESTORED BY THE CONTRACTOR TO THEIR
PRE-CONSTRUCTION CONDITION OR BETTER AT NO
ADDITIONAL EXPENSE TO THE OWNER.
5. MAKE EVERY EFFORT TO SAVE PROPERTY IRONS,
MONUMENTS, OTHER PERMANENT POINTS AND LINES OF
REFERENCE AND CONSTRUCTION STAKES. PROPERTY
IRONS, MONUMENTS, AND OTHER PERMANENT POINTS OF
REFERENCE DESTROYED BY THE CONTRACTOR MUST BE
REPLACED AT THE CONTRACTOR'S EXPENSE.
6. WORK PERFORMED UNDER THIS CONTRACT MUST NOT
IMPACT THE OPERATION OF ANY ADJACENT PROPERTIES
UNLESS A UTILITY OUTAGE HAS BEEN APPROVED IN
ADVANCE.
7. SEQUENCE WORK AS NECESSARY TO ENSURE THAT ALL
UTILITY SERVICES, INCLUDING FIRE HYDRANTS, REMAIN
OPERATIONAL DURING CONSTRUCTION.
8. RESTORE ANY ACCESS ROADS AND STAGING AREAS USED
BACK TO THEIR PRE-CONSTRUCTION CONDITION OR BETTER.
VEGETATE ALL DISTURBED AREAS IN ACCORDANCE WITH
THE PROJECT SPECIFICATIONS.
9. TAKE ADEQUATE PROTECTIVE MEASURES TO ENSURE THAT
EXISTING PAVEMENT SURFACES ARE NOT DAMAGED FROM
TRACKED CONSTRUCTION EQUIPMENT OR ANY OTHER
POSSIBLE SOURCE WHEN EQUIPMENT IS BEING MOVED.
REPAIR ANY PAVED AREAS DAMAGED DURING
CONSTRUCTION TO THEIR PRE-CONSTRUCTION CONDITION
OR BETTER.
10. EXISTING PAVEMENTS AND ALL OTHER AREAS ADJACENT TO
THE SITE MUST BE KEPT CLEAN AT ALL TIMES. DO NOT
ALLOW BUILD UP OF SOIL, MUD, DUST OR OTHER DEBRIS.
11. CONTRACTOR IS RESPONSIBLE FOR ALL SURVEYING AND
STAKING TO COMPLETE THE WORK.
12. ANY AND ALL MATERIAL QUANTITIES INDICATED ON THIS
PLAN SET ARE FOR REFERENCE ONLY. CONTRACTOR MUST
VERIFY ALL MATERIAL QUANTITIES SHOWN.
13. KEEP REDLINE MARK-UPS OF ANY CHANGES MADE FROM
THE APPROVED PLAN AND PROVIDE COPY OF REDLINES TO
ENGINEER UPON PROJECT COMPLETION.
EXISTING CONDITION NOTES:
1. SEE SHEET VF100 FOR EXISTING CONDITIONS AND SURVEY
INFORMATION.
OFFSITE BORROW AREA NOTES
1. CONTRACTOR IS RESPONSIBLE FOR ENSURING OFFSITE
BORROW AREA HAS AN APPROVED EROSION CONTROL
PERMIT AND APPROPRIATE MEASURES IN PLACE PRIOR TO
LAND DISTURBING ACTIVITY.
2. NO BORROW MATERIALS ARE AVAILABLE ON GOVERNMENT
PROPERTY.
DEMOLITION PLAN NOTES:
1. LOCATE UNDERGROUND UTILITIES AND COORDINATE
DEMOLITION AND / OR RELOCATION WORK. SPECIFICALLY
TAKE EXTRA CAUTIONARY MEASURES TO PREVENT
DISRUPTION OF ANY TELECOM FIBER IN THE PROJECT AREA.
ONCE LOCATED IN THE FIELD, POSITIVE VERIFICATION BY
POTHOLING IS REQUIRED. REPORT ANY CONFLICTS OR
DISCREPANCIES TO ENGINEER.
2. LIMITS OF DEMOLITION AND DIMENSIONS ARE SHOWN FOR
GENERAL REFERENCE. CONTRACTOR MUST BE
RESPONSIBLE FOR REMOVAL OF ALL ITEMS, INCLUDING ALL
EXCAVATED MATERIALS NECESSARY TO COMPLETE WORK
WITHIN THIS CONTRACT.
3. WHERE ASPHALT/CONCRETE DEMOLITION IS REQUIRED, USE
A SAW CUT AT THE LIMITS OF DEMOLITION OR NEAREST
JOINT TO OBTAIN A CLEAN VERTICAL EDGE.
4. DEDICATED DEMOLITION AND OTHER WASTE
AREAS/EARTHEN MATERIAL STOCKPILES MUST BE LOCATED
AT LEAST 50' FROM STORMDRAINS OR STREAMS.
5. REPORT ANY UNSUITABLE SOILS, CONTAMINATED SOILS,
AND BURIED CONCRETE AND DEBRIS TO THE CONTRACTING
OFFICER IMMEDIATELY.
6. UNDERGROUND UTILITIES SHOWN ON THE DEMOLITION
PLANS MAY EXTEND FURTHER THAN SHOWN. CONTRACTOR
IS RESPONSIBLE FOR COMPLETE REMOVAL OF UTILITIES
WITHIN THE ENTIRE PROJECT SITE UNLESS OTHERWISE
NOTED.
SIGNAGE, STRIPING, AND MARKING NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL PEDESTRIAN
AND VEHICULAR TRAFFIC DETOURS AND MUST USE
APPROPRIATE SIGNAGE AND BARRICADES IN ACCORDANCE
WITH ALL BASE, STATE, AND FEDERAL REQUIREMENTS.
2. ALL ROAD AND LANE CLOSURES MUST BE REQUESTED AND
APPROVED BY THE CONTRACTING OFFICER PRIOR TO
CLOSING OF ANY ROADWAYS.
3. ALL ROAD CLOSURES MUST BE SUBMITTED TO THE
CONTRACTING OFFICER A MINIMUM OF 15 DAYS PRIOR TO
THE REQUIRED DATE OF CLOSURE AND MUST INCLUDE A
TRAFFIC CONTROL PLAN IN ACCORDANCE WITH MUTCD AND
EM 385-1-1.
4. ALL TRAFFIC CONTROL METHODS AND DEVICES, BOTH
TEMPORARY AND PERMANENT, MUST BE IN ACCORDANCE
WITH THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL
HIGHWAY ADMINISTRATION'S "MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES" (MUTCD), MOST RECENT
EDITION AND THE NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION (NCDOT).
5. ANY EXISTING PAVEMENT MARKINGS IN THE VICINITY OF THE
PROJECT LIMITS THAT ARE DAMAGED DURING
CONSTRUCTION MUST BE REPAIRED OR REPLACED TO THE
CONTRACTING OFFICER'S SATISFACTION.
STORMWATER AND GRADING NOTES:
1. ALL CUT OR FILL SLOPES MUST BE 3:1 OR FLATTER UNLESS
OTHERWISE NOTED.
2. DURING CONSTRUCTION, PERFORM GRADING IN A MANNER
AND SEQUENCE THAT WILL PROVIDE PROPER DRAINAGE AT
ALL TIMES.
3. ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY
TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE.
4. UPON THE COMPLETION OF CONSTRUCTION AND SITE
STABILIZATION, ALL NEW PIPES AND EXISTING PIPES
IMPACTED BY CONSTRUCTION MUST BE CLEANED TO
REMOVE ALL ACCUMULATED SILT, SEDIMENT AND DEBRIS.
EROSION CONTROL NOTES:
1. TOTAL DISTURBED AREA IS LESS THAN 1.0 ACRES. A LAND
DISTURBANCE PERMIT IS NOT REQUIRED.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE
IN ACCORDANCE WITH THE NORTH CAROLINA
SEDIMENTATION AND EROSION CONTROL DESIGN MANUAL
(LATEST EDITION).
3. DIMENSIONS AND GRADES SHOWN ON THE PLANS MUST BE
FIELD VERIFIED BY THE CONTRACTOR PRIOR TO
CONSTRUCTION. NOTIFY THE ENGINEER IN WRITING IF
DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH
CONSTRUCTION FOR NECESSARY PLAN OR GRADE
CHANGES.
4. PROVIDE POSITIVE DRAINAGE AWAY FROM THE SITE AT ALL
TIMES.
5. IF UNFORESEEN EROSIVE CONDITIONS DEVELOP DURING
CONSTRUCTION AS THE RESULT OF INCREASED RUNOFF OR
SEDIMENT DISPLACEMENT, THE CONTRACTOR SHALL TAKE
ACTION TO REMEDY SUCH CONDITIONS AND PREVENT
DAMAGE TO ADJACENT PROPERTIES.
6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
MAINTAINED CONTINUOUSLY, RELOCATED WHEN
NECESSARY, AND SHALL BE CHECKED FOR STABILITY AND
PROPER FUNCTIONING AFTER EVERY RAINFALL EVENT.
SEQUENCE OF LAND DISTURBANCE:
1. PRECONSTRUCTION CONFERENCE TO BE HELD PRIOR TO
THE BEGINNING OF WORK.
2. PROVIDE STORMDRAIN INLET PROTECTION AT EXISTING
INLETS.
3. INSTALL NEW STORM DRAIN STRUCTURES, OUTLET
STRUCTURES AND PIPES, PROVIDE INLET PROTECTION AT
NEW STORM DRAIN INLETS.
4. INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES
EVERY 7 DAYS AND AFTER EACH SIGNIFICANT RAINFALL
EVENT (1.0" OR GREATER).
5. PLACE TEMPORARY SEEDING, INCLUDING MULCHING AND
CRIMPING, IN ALL AREAS THAT ARE TO BE LEFT IDLE FOR
MORE THAN 14 DAYS.
6. PERMANENT GRASS MUST BE INSTALLED PER PROJECT
SPECIFICATIONS FOR ALL AREAS AT FINAL GRADE AND IN
SEASON. FERTILIZE, WATER AND REPLACE TO ESTABLISH A
VIGOROUS STAND OF GRASS. TEMPORARY IRRIGATION MAY
BE REQUIRED UNTIL GRASS IS FULLY ESTABLISHED.
7. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS
STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM
SILT FENCE AND OTHER EROSION CONTROL MEASURES.
GRASS THESE AREAS IMMEDIATELY AND REMOVE ALL
EROSION CONTROL MEASURES.
8. CONTRACTOR IS RESPONSIBLE FOR SPREADING EXCAVATED
SPOILS ON SITE AND GRADE WITH SMOOTH TRANSITIONS TO
MATCH EXISTING GRADE. CONTRACTOR TO MAINTAIN
POSITIVE DRAINAGE AT ALL AREAS. ALL IN ACCORDANCE
WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS.
SYMBOL LEGEND:
DETAIL
REFERENCE
SECTION
DETAIL TITLE
NOT TO SCALE1
VIEW TITLE
DETAIL TITLE
IDENTIFICATION NUMBER
SHEET # FOR
SECTION/DETAIL
SCALE
IDENTIFICATION
NUMBER
IDENTIFICATION NUMBER
SHEET # FOR
SECTION/DETAIL
C-500
A1
C-500
SCALE
1 VIEW TITLE
1" = 20'
PLAN
NORTH
LEGEND: EXISTING
FEATURES:
DEMOLISHED
FEATURES:
BUILDING
CONCRETE PAVEMENT
CONCRETE SIDEWALK
GRAVEL ROAD
SAFETY CHAIN
RETAINING WALL
CONCRETE CURB
RETAINING WALL
PROPOSED
FEATURES:
SOD
CONCRETE CURB
RETAINING WALL
FINISH GRADE AREA
ABBREVIATIONS
A/C AIR CONDITIONER
ATFP ANTI TERRORISM FORCE PROTECTION
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BMP BEST MANAGEMENT PRACTICE
BW BARBED WIRE
C&G CURB AND GUTTER
CB CATCH BASIN
CC CONCRETE CURB
CI CURB DROP INLET
CJ CONTRACTION JOINT
CLF CHAIN LINK FENCE
CMH COMMUNICATION MANHOLE
CONC CONCRETE
D/B DESIGN/BUILD
DCJ DOWELED CONSTRUCTION JOINT
DI DROP INLET
DPW DEPARTMENT OF PUBLIC WORKS
DUMP DUMPSTER
E EAST
EHH ELECTRICAL HANDHOLE
EG EXISTING GAS
EJ EXPANSION JOINT
ELEC ELECTRIC
EMH ELECTRICAL MANHOLE
EL ELEVATION
FDC FIRE DEPARTMENT CONNECTION
FES FLARED END SECTION
FFE FINISH FLOOR ELEVATION
FL FLOW LINE
GFGI GOVERNMENT FURNISHED, GOVERNMENT INSTALLED
HW HEAD WALL
IE INVERT ELEVATION
LP LIGHT POLE
LSA LANDSCAPE STONE
MAT MATERIAL
MH MANHOLE
MOF METAL ORNAMENTAL FENCE
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
N NORTH
NCDEQ NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY
NCDOT NORTH CAROLINA DIVISION OF TRANSPORTATION
NE NORTHEAST
NIC NOT IN CONTRACT
NOAA NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
NW NORTHWEST
PNG PIEDMONT NATURAL GAS
PP POWER POLE
PT PHYSICAL TRAINING
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
S SOUTH
SCM STORMWATER CONTROL MEASURE
SDMH STORM DRAIN MANHOLE
SE SOUTHEAST
SEP SEPARATION
SMH SANITARY SEWER MANHOLE
STA STATION
STY STORY
SW SOUTHWEST
TC TOP OF CURB
TD TRENCH DRAIN
TE THICKENED EDGE
TEJ THICKENED EDGE EXPANSION JOINT
THH TELECOMMUNICATION HANDHOLE
TMH TELECOMMUNICATION MANHOLE
TRANS TRANSFORMER
TSB TEMPORARY SEDIMENT BASIN
TYP TYPICAL
UG UNDERGROUND
UNK UNKNOWN
W WEST
W/BW WITH BARBED WIRE
WV WATER VALVE
WW WING WALL
CIVIL GENERAL NOTES, LEGENDS
AND ABBREVIATIONS
C-001
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
60038651
BLEACHERS
BLDG. NO. 16
GYMNASIUM
BLDG. NO. 15
SCHOOL
BL
D
G
G
H O
ST
BLDG 28
HOUSE
BL
DG
N O
.1
G
HO
ST
BLDG 30
GHOST
BLD
G . N
O . 31
VEH
. SER
BLDG 24HOUSE
BLDG 27
HOUSE
BLDG 22HOUSE
BLDG 26HOUSE
BLDG 25HOUSE
BLDG. NO. 2
CITY HALL
BLD
G
. N O
. 10
BU
S R
ES
BLDG 21
HOUSE
BLDG 23
HOUSE
BLDG. NO. 5
OFFICE BLDG. 6
OFFICE
BLDG. NO. 14
TOWNHOUSES
BLDG. NO. 20
WAREHOUSE
BLD
G. N
O. 1
TOWNHOUSES
BLDG. NO. 4
APARTMENTS
BLDG. NO. 3
APARTMENTS
BL
D
G . N
O . 1
TO
W N
H O
U
SE
S
BLD
G.
NO.17
BANK
BLDG. NO. 1
HOTEL
BLDG. 9
BUS/RES
BLDG. 8
BUS/RES
BLDG. NO. 7
CHURCH
BLDG.NO. 1
VEH. S
ER.
BL
D
G . N
O . 1
W
AR
EH
O U
SE
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
BLDG. NO. 32
MOSQUE
1. SEE SHEET C-001 FOR GENERAL NOTES, LEGENDS, AND
ABBREVIATIONS.
2. SEE SHEET VF100 FOR EXISTING CONDITIONS.
1. REMOVE CONCRETE CURB.
2. REMOVE TIMBER RAILROAD TIE RETAINING WALLS AND
STEPS.
3. VEGETATION REMOVAL EXTENTS ARE FROM ENDS OF SWALE
AS SHOWN AND APPROXIMATELY 30' IN WIDTH. REMOVE ALL
TREES, BUSHES, UNDERGROWTH AND DEAD BRANCHES IN
HATCHED ARE AS SHOWN. GRIND STUMPS TO JUST BELOW
EXISTING GRADE.
CD100
CIVIL DEMOLITION PLAN1 CIVIL DEMOLITION PLAN
1" = 40'
PLAN
NORTH
1"=40'-0"SCALE:
20' 40' 80' 120'0
TYP
TYP
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
GENERAL SHEET NOTES
SHEET KEYNOTES
60038652
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
30'
30'
30'
1. SEE SHEET C-001 FOR GENERAL NOTES, LEGENDS, AND
ABBREVIATIONS.
2. SEE SHEET VF100 FOR EXISTING CONDITIONS.
1. REPLACE CONCRETE CURB
2. REPLACE RAILROAD TIE WALLS/STEPS WITH NEW SEGMENTAL CONCRETE
BLOCK WALLS/STEPS
3. SOD TLZ RAVEN
TLZ
RAVEN
BLEACHERS
BLDG. NO. 16
GYMNASIUM
BLDG. NO. 15
SCHOOL
BL
D
G
G
H O
ST
BLDG 28
HOUSE
BL
DG
N O
.1
G
HO
ST
BLDG 30
GHOST
BLD
G . N
O . 31
VEH
. SER
BLDG 24HOUSE
BLDG 27
HOUSE
BLDG 22HOUSE
BLDG 26HOUSE
BLDG 25HOUSE
BLDG. NO. 2
CITY HALL
BLD
G
. N O
. 10
BU
S R
ES
BLDG 21
HOUSE
BLDG 23
HOUSE
BLDG. NO. 5
OFFICE BLDG. 6
OFFICE
BLDG. NO. 14
TOWNHOUSES
BLDG. NO. 20
WAREHOUSE
BLD
G. N
O. 1
TOWNHOUSES
BLDG. NO. 4
APARTMENTS
BLDG. NO. 3
APARTMENTS
BL
D
G . N
O . 1
TO
W N
H O
U
SE
S
BLD
G.
NO.17
BANK
BLDG. NO. 1
HOTEL
BLDG. 9
BUS/RES
BLDG. 8
BUS/RES
BLDG. NO. 7
CHURCH
BLDG.NO. 1
VEH. S
ER.
BL
D
G . N
O . 1
W
AR
EH
O U
SE
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
BLDG. NO. 32
MOSQUE
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
GENERAL SHEET NOTES
SHEET KEYNOTES
CS100
CIVIL SITE PLAN1 CIVIL SITE PLAN
1" = 40'
PLAN
NORTH
1"=40'-0"SCALE:
20' 40' 80' 120'0
TYP
TYP
C-500
C-500
TYP
C-500
TYP
C-500
C-500
TYPC-500
TYP
C-500
TYP
C-500
TYP
C-500
TYP
C-500
TYP
C-500
TYP
C-500
60038653
TYP
C-500
TYP
C-500
TYP
C-500
TYP
C-500
TYP
C-500
TYP
C-500
TYP
C-500
TYPC-500
TYPC-500
BLEACHERS
BLDG. NO. 16
GYMNASIUM
BLDG. NO. 15
SCHOOL
BL
D
G
G
H O
ST
BLDG 28
HOUSE
BL
DG
N O
.1
G
HO
ST
BLDG 30
GHOST
BLD
G . N
O . 31
VEH
. SER
BLDG 24HOUSE
BLDG 27
HOUSE
BLDG 22HOUSE
BLDG 26HOUSE
BLDG 25HOUSE
BLDG. NO. 2
CITY HALL
BLD
G
. N O
. 10
BU
S R
ES
BLDG 21
HOUSE
BLDG 23
HOUSE
BLDG. NO. 5
OFFICE BLDG. 6
OFFICE
BLDG. NO. 14
TOWNHOUSES
BLDG. NO. 20
WAREHOUSE
BLD
G. N
O. 1
TOWNHOUSES
BLDG. NO. 4
APARTMENTS
BLDG. NO. 3
APARTMENTS
BL
D
G . N
O . 1
TO
W N
H O
U
SE
S
BLD
G.
NO.17
BANK
BLDG. NO. 1
HOTEL
BLDG. 9
BUS/RES
BLDG. 8
BUS/RES
BLDG. NO. 7
CHURCH
BLDG.NO. 1
VEH. S
ER.
BL
D
G . N
O . 1
W
AR
EH
O U
SE
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
BLDG. NO. 32
MOSQUE
1. SEE SHEET C-001 FOR GENERAL NOTES, LEGENDS,
ABBREVIATIONS.
1. ELEVATION OF NEW WALLS TO MATCH EXISTING
2. ELEVATIONS OF NEW CURB TO MATCH EXISTING
3. PRIOR TO SODDING. CONTRACTOR SHALL GRADE TLZ TO PROVIDE
POSITIVE DRAINAGE. MIN 1% ADDITIONAL TOPSOIL FILL MATERIAL MAY
BE REQUIRED.
4. BACKFILL/COMPACT ERODED/SUNKEN AREAS AGAINST EXISTING
FRONT AND EACH SIDE OF STOOPS TO PROVIDE POSITIVE DRAINAGE,
WITH COMPACTED ABC AND FINES. EXTEND OUT & BLEND INTO
EXISTING GRADES AT MAX 4:1 SLOPE
5. VEGETATION REMOVAL EXTENTS ARE FROM ENDS OF SWALE AS
SHOWN AND APPROXIMATELY 30' IN WIDTH. REMOVE ALL TREES,
BUSHES, UNDERGROWTH AND DEAD BRANCHES IN HATCHED ARE AS
SHOWN. GRIND STUMPS TO BELOW EXISTING GRADE
CG100
CIVIL DRAINAGE PLAN1 CIVIL GRADING PLAN
1" = 40'
PLAN
NORTH
TYP
TYP
TYP
TYP
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
GENERAL SHEET NOTES
SHEET KEYNOTES
60038654
LEGEND
FINISH GRADE AREA, BACKFILL/ COMPACT AGAINST EXISTING STOOPS
TO PROVIDE DRAINAGE WITH COMPACTED ABC AND FINES.
TYP
TYP
TYP
TYP
TYP
TYP
EXISTING
CONCRETE
STOOP
EXISTING GRAVEL PAVEMENT
FOUNDATION SOIL
FOUNDATION SOIL
COMPACTED
GRANULAR BASE
7.1°
7.1°
4H:1V SLOPE
12" FREE DRAINING
AGGREGATE
CAP BLOCK
CAP BLOCK
COMPACTED ABC AND FINES
COMPACTED ABC
AND FILLS
±1 '-1
R2
EXISTING
SIDEWALK
EXISTING
PAVEMENT
4"
6"
1" 5"
6"
COMPACTED
GRANULAR BASE
7.1°
4H:1V SLOPE
12" FREE DRAINING
AGGREGATE
CAP BLOCK
EXISTING
CONCRETE
STOOP
FOUNDATION SOIL
EXISTING CONCRETE
CURB & GRAVEL
PAVEMENT
EXISTING CONCRETE
SIDEWALK
COMPACTED ABC AND FINES
CIVIL DETAILS
C-500
SEGMENTAL BLOCK RETAINING WALL (TWO TIER)
NOT TO SCALE1
NOTES:
1. BACKFILL MATERIALS AND COMPACTION REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE
EXCAVATION AND FILL SPECIFICATION AND THE PROJECT GEO-TECHNICAL REPORT.
2. RETAINING WALL SECTION IS SHOWN FOR GENERAL REFERENCE/COORDINATION ONLY.
3. CONTRACTOR TO PROVIDE WALL GEOMETRY (LENGTH AND HEIGHT) TO MATCH EXISTING AND PROVIDE
POSITIVE DRAINAGE.
4. MAX. SLOPE 4H:1V
5. MODULAR PRECAST CONCRETE BLOCK RETAINING WALL SYSTEM. PAVESTONE OR UNILOCK BASIS OF
DESIGN
CONCRETE CURB
NOT TO SCALE2
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
NOTES:
1. CURB SECTION SHOWS FOR GENERAL REFERENCE/COORDINATION ONLY, ADJUST SECTION/HEIGHT TO
MATCH EXISTING CONDITIONS.
2. EXPANSION AND CONTRACTION JOINTS TO BE PROVIDED PER PROJECT SPECIFICATIONS.
SITE AREA DESCRIPTION
PERIMETER DIKES, SWALES, DITCHES
AND SLOPES
HIGH QUALITY WATER (HQW) ZONES
SLOPES STEEPER THAN 3:1
SLOPES 3:1 OR FLATTER
ALL OTHER AREAS WITH SLOPES
FLATTER THAN 4:1
STABILIZATION
7 DAYS
7 DAYS
7 DAYS
14 DAYS
14 DAYS
NONE
NONE
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED
7 DAYS FOR SLOPES GREATER
THAN 50' IN LENGTH.
NONE, EXCEPT FOR PERIMETERS AND HQW
ZONES
TIMEFRAME EXCEPTIONS
NEW STABILIZATION TIMEFRAMES
STABILIZATION SCHEDULE
NOT TO SCALE
PROVIDE SAND-BASED CENTIPEDE SOD (EREMOCHLOA OPHIUROIDES) FOR ALL TURF AREAS. SODDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.12 OF THE NCDEQ EROSION
CONTROL PLANNING AND DESIGN MANUAL AND PROJECT SPECIFICATIONS.
TEMPORARY STABILIZATION
PERMANENT STABILIZATION
MAINTENANCE
NA
NOTES
FERTILIZATION/ FERTILIZATION/ACRE
UNWEATHERED; AVOID WEEDS
QUALITY
DRY, UNCHOPPED,
750 LBS. 10-10-10
SPREAD BY HAND OR MACHINE, MUST
BE TACKED DOWN.
SHOULD COME FROM WHEAT OR OATS
2 TONS
AMOUNT/
ACRE
MATERIAL
STRAW
GRASS TYPE
RATE PER ACRE
ACRE
NADEC 1 - APR 15
SEEDING
TIME OF
GERMAN MILLET 40 LBS.
NA1,000 LBS. 10-10-10120 LBS.RYE (GRAIN) NAAUG 15-DEC 30
750 LBS. 10-10-10 NA NA
RYE (GRAIN) &
LESPEDEZA, KOBE
120 LBS. &
50 LBS.
APRIL 15-AUG 15
TEMPORARY SEEDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.10 AND PERMANENT SEEDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.11 OF THE
NCDEQ EROSION CONTROL PLANNING AND DESIGN MANUAL. SODDING SHALL BE INSTALLED AND
MAINTAINED IN ACCORDANCE WITH SECTION 6.12 OF THE NCDEQ EROSION CONTROL PLANNING AND
DESIGN MANUAL AND PROJECT SPECIFICATIONS.
MULCHING MATERIALS AND APPLICATION RATES
TEMPORARY SEEDING
EXPANSION JOINTS
60038655
SEGMENTAL BLOCK RETAINING WALL (SINGLE TIER)
NOT TO SCALE4
NOTES:
1. BACKFILL MATERIALS AND COMPACTION REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE
EXCAVATION AND FILL SPECIFICATION AND THE PROJECT GEO-TECHNICAL REPORT.
2. RETAINING WALL SECTION IS SHOWN FOR GENERAL REFERENCE/COORDINATION ONLY.
3. CONTRACTOR TO PROVIDE WALL GEOMETRY (LENGTH AND HEIGHT) TO MATCH EXISTING AND PROVIDE
POSITIVE DRAINAGE.
4. MAX. SLOPE 4H:1V
5. RETURN WALL TO FORM STEP/STOOPS AT LOCATIONS WHERE TIMBER TIES RETURN TO FORM STEPS.
6. MODULAR PRECAST CONCRETE BLOCK RETAINING WALL SYSTEM. PAVESTONE OR UNILOCK BASIS OF
DESIGN
A-001
NOTES, LEGENDS & ABBREVIATIONS
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
NUMBERING SYSTEM:
A-100
DISCIPLINE:
G - GENERAL
A - ARCHITECTURAL
P -PLUMBING
M - MECHANICAL
E - ELECTRICAL
SHEET NUMBER
WITHIN SERIES
FA - FIRE ALARM
T - TELECOMMUNICATIONS
C - CIVIL
DRAWING SYMBOLS:
A101
A101
1 SIM
SHEET NUMBER WHERE
SECTION/DETAIL IS DRAWN
Ref
EXTERIOR ELEVATION
SHEET NUMBER WHERE
SECTION/DETAIL IS DRAWN
SECTION
A-101
1 SIM
PLAN, BLOW-UP DETAIL
SHEET NUMBER WHERE
SECTION/DETAIL IS DRAWN
SPOT ELEVATION
# DEMOLITION SHEET KEYNOTE
FLOOR LEVEL & NAMENAME
ELEVATION
# SHEET KEYNOTE
101 ROOM NAME / NUMBER
ROOM NAME
NORTH ARROW
1 REVISION TAG
MATCH LINE
STANDARD SYMBOLOGY:
A ---------------------
AB ANCHOR BOLT
ALUM ALUMINUM
ANOD ANODIZE
APPROX APPROXIMATE
AVG AVERAGE
B ---------------------
BD BOARD
BLDG BUILDING
BOT BOTTOM
BRG BEARING
C ---------------------
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CDR CARD READER
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CTR CENTER
D ---------------------
DBL DOUBLE
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DR DOOR
DS DOWNSPOUT
E ---------------------
EA EACH
EJ EXPANSION JOINT
EL, ELEV ELEVATION
ELEC
EQ EQUAL
EXP EXPOSED
EXT EXTERIOR
FD FLOOR DRAIN
FND FOUNDATION
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN FLR FINISH FLOOR
FLASH'G FLASHING
FLR FLOOR
FRTW FIRE RETARDANT TREATED WOOD
FSTNR FASTENER
FT FEET
FTG FOOTING
---------------------G
GALV GALVANIZED
GHM GALVANIZED HOLLOW METAL
H ---------------------
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
J ---------------------
S --------------------
SF SQUARE FOOT (FEET)
SHTHG SHEATHING
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SS STAINLESS STEEL
STD STANDARD
STL JST STEEL JOIST
STOR STORAGE
T --------------------
TEMP TEMPORARY
THK THICKNESS
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOS TOP OF SLAB
TRTD TREATED
V --------------------
VERT VERTICAL
W --------------------
L ---------------------
LLV LONG LEG VERTICAL
LT LIGHT
M ---------------------
MATL MATERIAL
MAX MAXIMUM
ME MATCH EXISTING
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MILS MIL THICKNESS
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTG MOUNTING
MTL METAL
N ---------------------
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
ORIG ORIGINAL
P --------------------
PAR PARAPET
PCC PRECAST CONCRETE
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
Q --------------------
QTY QUANTITY
R --------------------
RD ROOF DRAIN
REF REFERENCE
REQD REQUIRED
RFG ROOFING
REINF REINFORCEMENT
RM ROOM
RO ROUGH OPENING
HD GALV HOT DIPPED GALVANIZING
U --------------------
UL UNDERWRITERS LABORATORY
TYP TYPICAL
RCP REFLECTED CEILING PLAN
INFO INFORMATION
HDW HARDWARE
ELECTRICAL
JT JOINT
GC GENERAL CONTRACTOR
UNO UNLESS NOTED OTHERWISE
SPAC'G SPACING
SYP SOUTHERN YELLOW PINE
H HEIGHT
W WIDTH
DIM DIMENSION
GA GAUGE
SCHED SCHEDULE
GIHM GALVANIZED INSUL HOLLOW METAL
PT, PTD PAINT, PAINTED
STL STEEL
DEMO'ED DEMOLISHED
ABBREVIATIONS
U.S. UNDERSIDE
SOW SCOPE OF WORK
---------------------F
O --------------------
GENERAL ARCHITECTURAL NOTES
1. THE EXISTING OVERALL EXTERIOR BUILDINGS WITH THEIR INTERIOR GENERAL
ARRANGEMENT FLOOR PLAN REPRESENTS A SCHEMATIC RECORD DOCUMENT,
PROVIDING THE BUILDING OWNER AND GENERAL CONTRACTOR AN ELECTRONIC
DIGITAL MEDIA, DEPICTING THE EXISTING INTERIOR AND EXTERIOR GEOMETRIC
OVERALL LAYOUTS OF ITS BUILDING ELEMENTS. PROVIDING ACTUAL DETAILED
WORKING DRAWINGS OF EXISTING ELECTRICAL AND MECHANICAL SYSTEMS ARE NOT
PART OF THE SCOPE OF THIS PROJECT.
2. ARCHITECTURAL CONTRACT DOCUMENTS (WORKING DRAWINGS) DEPICTED
GENERAL ARRANGEMENT SPACES WERE DIMENSIONALLY MEASURED FROM
EXISTING FACE TO FACE OF FINISHED INTERIOR WALL SURFACES; UNLESS NOTED
OTHERWISE.
3. FOR FULL ACTUAL CONSTRUCTION MEASUREMENTS, GENERAL CONTRACTOR SHALL
BE RESPONSIBLE FOR CHECKING ALL EXISTING DIMENSIONS AND SITE VERIFYING
EXISTING CONDITIONS (ABOVE AND BELOW FINISHED FLOORS & CEILINGS), FOR ALL
THEIR ACCURACIES, BEFORE RENOVATION, ALTERATIONS OR RETROFITTING
PROCEEDS AS TO NEW CONSTRUCTION.
4. THE USE OF THE WORD 'TYPICAL' MEANS FOR ALL SIMILAR CONDITIONS UNLESS
OTHERWISE NOTED.
5. DO NOT SCALE DRAWINGS, GOVERN DIMENSIONS: LARGE SCALE DETAILS GOVERN
OVER SMALL SCALE DETAILS. THE WORK SHALL BE LAID OUT FROM DIMENSIONS
SHOWN ON THE WORKING DRAWINGS ONLY. ALL CONTRACTORS SHALL WORK FROM
MOST RECENT DRAWINGS SUPPLIED.
6. DETAILS ARE USUALLY KEYED ONLY ONCE ON THE PLANS (OR ELEVATIONS WHEN
THEY FIRST OCCUR) AND ARE TYPICAL FOR SIMILAR CONDITIONS THROUGHOUT
CONSTRUCTION DOCUMENT SET UNLESS OTHERWISE NOTED.
7. THE GENERAL CONTRACTOR SHALL LAYOUT WALL LOCATIONS AND CENTER LINE
PLUMBING FIXTURE LOCATIONS AND REVIEW THIS LAYOUT WITH THE ARCHITECT AS
NECESSARY.
8. ALL PENETRATIONS THROUGH PARTITIONS & CEILINGS SHALL BE SEALED.
SEALANTS SHALL BE MANUFACTURED SYSTEMS AND SHALL BE INSTALLED IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
9. CONTRACTOR TO NOTIFY GOVERNMENT OF ANY DEFECTIVE DEVICE PRIOR TO
REMOVAL.
10. ANY DEVICE DAMAGED BY CONTRACTOR IS TO BE REPLACED BY THE CONTRACTOR.
11. NOTE THERE IS NO INTERIOR PAINTING EXCEPT AS NOTED IN DRAWINGS.
12. WHERE KEYNOTES ARE SHOWN ON DRAWINGS AND NOTED AS "TYP.", THEY ARE
APPLICABLE TO ALL CONDITIONS, WORK, AND MATERIALS OCCURRING THROUGHOUT
EACH BUILDING.
1. DEMOLITION AND ALTERATION NOTES SHALL NOT BE CONSIDERED TO BE ALL
INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS
EACH AREA AND TO FULFILL THE INTENT OF THE DESIGN INDICATED BY THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL REVIEW ALL ITEMS TO BE DEMOLISHED WITH OWNER TO
IDENTIFY ANY ITEMS TO BE SALVAGED PRIOR TO START OF DEMOLITION.
3. EVERY PRECAUTION SHALL BE TAKEN TO MINIMIZE THE TRAVEL OF DUST AND DIRT
FROM THE CONSTRUCTION AREA TO ADJACENT SPACES. TEMPORARY DUST
PROTECTION SHALL BE COORDINATED WITH THE OWNER'S REQUIREMENTS.
4. THE CONTRACTOR SHALL STOP WORK AND INFORM OWNER IMMEDIATELY IN
WRITING OF ANY HAZARDOUS MATERIAL ENCOUNTERED OR MATERIAL THOUGHT TO
BE HAZARDOUS MATERIAL. THE OWNER, AFTER RECEIVING WRITTEN NOTICE SHALL
INSTRUCT THE CONTRACTOR ON HOW TO PROCEED.
5. PRIOR TO ANY DEMOLITION, THE CONTRACTOR SHALL COORDINATE BRACING AND
MAINTAIN THE STRUCTURAL INTEGRITY OF THE REMAINING ELEMENTS OF THE
BUILDING AND ITS SYSTEMS AS REQUIRED. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE SUPPORT OF ADJACENT COMPONENTS OF THE BUILDING
DURING DEMOLITION AND NEW CONSTRUCTION WORK. THE CONTRACTOR SHALL
PROVIDE ALL TEMPORARY SHORING, SCAFFOLDING, ETC., WHICH ARE NECESSARY
TO PREVENT COLLAPSE, SUBSIDENCE, DEFLECTION OR ANY OTHER TYPE OF
DAMAGE.
6. UNINTERRUPTED POWER SHALL BE PROVIDED TO RECEPTACLES AND LIGHTING
FIXTURES IN OCCUPIED AREAS ADJACENT TO WORK AREAS DURING ALL PHASES OF
DEMOLITION AND CONSTRUCTION.
7. TEMPORARY LIGHTING SHALL BE PROVIDED THROUGHOUT THE SPACE UNDER
DEMOLITION AND CONSTRUCTION TO MINIMUM LIGHT LEVEL AS REQUIRED BY ALL
TRADES TO PERFORM WORK.
8. ALL ABANDONED PIPING, AND CONDUITS THAT ARE INDICATED TO BE REMOVED OR
NO LONGER IN SERVICE WITHIN THE AREA OF THE SCOPE OF WORK SHALL BE
CAPPED AND RECESSED BEHIND FINISHED SURFACES.
9. FOR ALL SURFACES SCHEDULED TO REMAIN, PATCH AND MATCH SURFACES
DISTURBED BY DEMOLITION OR REMOVAL OF EQUIPMENT OR UTILITIES. INSTALL
PATCHING TO MATCH ADJACENT WORK IN FINISH, STRUCTURAL QUALITIES,
COURSING OF MASONRY, SURFACE TEXTURE, COLOR AND OTHER
CHARACTERISTICS. PATCH SURFACES TO COMPLY WITH FIRE RATINGS,
SMOKE-TIGHT RATINGS, ACOUSTICAL CRITERIA AND OTHER PERFORMANCE
CRITERIA INDICATED.
10. UPON COMPLETION OF DEMOLITION WORK, LEAVE ALL AFFECTED AREAS IN BROOM
CLEAN CONDITION.
GENERAL DEMOLITION NOTES
D DIAMETER
TS TUBE STEEL
60038665
TLZ RAVEN
(SOCCER FIELD)
BLEACHERS
BLDG. NO. 16
GYMNASIUM
BLDG. NO. 15
SCHOOL
BL
D
G
G
H O
ST
BLDG 28
HOUSE
BL
DG
N O
.1
G
HO
ST
BLDG 30
GHOST
BLD
G . N
O . 31
VEH
. SER
BLDG 24HOUSE
BLDG 27
HOUSE
BLDG 22HOUSE
BLDG 26HOUSE
BLDG 25HOUSE
BLDG. NO. 2
CITY HALL
BLD
G
. N O
. 10
BU
S R
ES
BLDG 21
HOUSE
BLDG 23
HOUSE
BLDG. NO. 5
OFFICE BLDG. 6
OFFICE
BLDG. NO. 14
TOWNHOUSES
BLDG. NO. 20
WAREHOUSE
BLD
G. N
O. 1
TOWNHOUSES
BLDG. NO. 4
APARTMENTS
BLDG. NO. 3
APARTMENTS
BL
D
G . N
O . 1
TO
W N
H O
U
SE
S
BLD
G.
NO.17
BANK
BLDG. NO. 1
HOTEL
BLDG. 9
BUS/RES
BLDG. 8
BUS/RES
BLDG. NO. 7
CHURCH
BLDG.NO. 1
VEH. S
ER.
BL
D
G . N
O . 1
W
AR
EH
O U
SE
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
BLDG. NO. 32
MOSQUE
TYP
TYP
TYP
TYP
TYP
NO WORK IN
THIS AREA
LIMITS OF
CONSTRUCTION
TYP
TYP
TYP
TYP
TYP
TYP
TYP
BUILDING NO. 1 HOTEL SHEETS A101, A150, A201,
BUILDING NO. 2 CITY HALL SHEETS A102, A150, A202,
BUILDING NO. 3 APARTMENTS SHEETS A103, A150, A203,
BUILDING NO. 4 APARTMENTS SHEETS A103, A150, A203,
BUILDING NO. 5 OFFICE SHEETS A104, A151, A204,
BUILDING NO. 6 OFFICE SHEETS A104, A151, A205,
BUILDING NO. 7 CHURCH SHEETS A102, A206,
BUILDING NO. 8 BUS/RES SHEETS A105, A151, A207,
BUILDING NO. 9 BUS/RES SHEETS A105, A151, A207,
BUILDING NO. 10 BUS/RES SHEETS A106, A208,
BUILDING NO. 11 GHOST SHEETS A107, A209,
BUILDING NO. 12 TOWNHOUSES SHEETS A107, A210,
BUILDING NO. 13 TOWNHOUSES SHEETS A108, A211,
BUILDING NO. 14 TOWNHOUSES SHEETS A108, A211,
BUILDING NO. 15 SCHOOL SHEETS A109, A151, A212,
BUILDING NO. 16 GYMNASIUM SHEETS A109, A152, A213,
BUILDING NO. 17 BANK SHEETS A110, A152, A214,
BUILDING NO. 18 VEHICLE SERVICE SHEETS A110, A152, A216,
BUILDING NO. 19 WAREHOUSE SHEETS A110, A215,
BUILDING NO. 20 WAREHOUSE (NIC) NO ARCHITECTURAL SCOPE
BUILDING NO. 21 HOUSE SHEETS A106, A217,
BUILDING NO. 22 HOUSE SHEETS A106, A217,
BUILDING NO. 23 HOUSE SHEETS A111, A218,
BUILDING NO. 24 HOUSE SHEETS A111, A218,
BUILDING NO. 25 HOUSE SHEETS A111, A218,
BUILDING NO. 26 HOUSE SHEETS A111, A219,
BUILDING NO. 27 HOUSE SHEETS A111, A219,
BUILDING NO. 28 HOUSE SHEETS A111, A219,
BUILDING NO. 29 GHOST (NIC) NO SCOPE
BUILDING NO. 30 GHOST (NIC) NO SCOPE
BUILDING NO. 31 VEHICLE SERVICE SHEETS A110, A152, A216,
BUILDING NO. 32 MOSQUE (NIC) NO SCOPE
1. CLEAN AND RECOAT/ PAINT SITE WALLS
2. CLEAN, PREPARE, AND REPAINT RAILINGS AND GUARD RAILS
3. REPAIR WOOD SCREENS/ TRELLIS CLEAN AND RECOAT. REPLICATE EXISTING
CONFIGURATIONS AND PAINT ALL. FENCE / LATTICE REPAIR INCLUDES REMOVAL
AND REPLACEMENT OF ROTTED BOARDS, RESECURING BOARD ENDS WHERE
LOOSE OR DETACHED. USE STAINLESS STEEL ANNULAR THREADED RING NAILS.
PREPARE ALL SURFACES AND REPAINT.
A-002
REFERENCE BUILDING LOCATIONS
PLAN
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
05-01-2023
DIRECTORY / LIST OF BUILDINGS
1 REFERENCE BUILDING LOCATIONS PLAN
1" = 40'-0"
KEYNOTES
FOR ARCHITECTURAL SCOPE
60038666
1/8" = 1'-0"
FIRST FLOOR PLAN HOTEL BLDG 11
A-101 0 4' 8' 16'
PLAN NORTH
W19 W19 W19 W19 W19 W19 W19 W19
W19
W19W19
W19W19W19 W19 W19
W19W19
W31 W31
99R 9 9R
9 9 9
10 10 10
1010101010
12 12 12 12
1212 12 12
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
2A
TYP
1. REMOVE WOOD FRAME & PLYWOOD SHUTTERS
2. REMOVE GROUTED DOOR FRAME. REMOVE & CUT GROUT & ANCHORS
FLUSH TO FACE OF CMU.
3. REMOVE EXISTING COILING DOOR AND ASSEMBLY.
4. REMOVE EXISTING OVERHEAD DOOR AND ASSEMBLY.
5. REMOVE COMPLETE STAIR ASSEMBLY WITH ALL MISCELLANEOUS
STEEL SUPPORTS & INTEGRAL RAILS & HANDRAILS. PREPARE ALL
SURFACES FOR NEW STAIR ASSEMBLIES.
6. REMOVE RUBBLE. RECORD APPROXIMATE PLACEMENT FOR PLACING
RUBBLE BACK IN PLACE AFTER STAIR WORK IS COMPLETE.
7. REMOVE STEEL STAIR SUPPORT LEDGER ANGLES BELOW STAIR
LANDINGS.
8. REMOVE EXISTING CEILING CEMENT BOARD / PLYWOOD CEILING
PANELS; REMOVE & SAVE 1X CEILING PERIMETER TRIM.
9. PREPARE STEEL RAILINGS AND STAIRS FOR REFINISHING.
10. PREPARE STEEL RAILINGS FOR REFINISHING.
11. PREPARE STEEL LADDERS FOR REFINISHING.
12. PREPARE STEEL ROOF / WALL ANCHOR RAILS / HOOKS / CHAINS /
STANCHIONS / BOLLARDS FOR REFINISHING.
13. PREPARE STEEL DOWNSPOUTS AND SCUPPERS FOR REFINISHING.
14. PREPARE EXTERIOR MASONRY, PRECAST LINTELS & PREVIOUSLY
FINISHED SURFACES FOR REFINISHING.
15. REMOVE EIFS SYSTEM, INSULATION AND SHEATHING FROM PARAPET
AND SOFFIT.
16. REMOVE METAL WALL CAP AND PRESERVE FOR RE-INSTALLATION.
17. PREPARE CONCRETE/CONCRETE TOPPING DECK SURFACE FOR
COATING.
1. FRAME & SHUTTERS ASSEMBLY
2. DOOR & FRAME; SEE LEGEND BELOW.
2A. CASED FRAME; SEE LEGEND BELOW.
3. COILING DOOR ASSEMBLY.
4. OVERHEAD DOOR ASSEMBLY.
5. STAIR ASSEMBLY WITH ALL MISCELLANEOUS STEEL SUPPORTS, RAILS AND
HANDRAILS.
6. RE-PLACE EXISTING RUBBLE.
7. STEEL SUPPORT LEDGER ANGLES BELOW STAIR LANDINGS. SIZE SAME AS
ORIGINAL DEMOLISHED LEDGER ANGLES.
8. CEMENT BOARD CEILING PANELS. REINSTALL 1X PERIMETER TRIM. REPLACE
ANY BROKEN / MISSING PIECES.
9. PAINT STEEL RAILINGS AND STAIRS.
10. PAINT STEEL RAILINGS.
11. PAINT STEEL LADDERS. RE-SECURE LOOSE BOLTS/ANCHORS.
12. PAINT STEEL ROOF / WALL ANCHOR RAILS / HOOKS / CHAINS & STANCHIONS &
BOLLARDS.
13. PAINT STEEL DOWNSPOUTS AND SCUPPERS.
14. PAINT EXTERIOR MASONRY & PRECAST LINTELS INCLUDING TRIM & ADJACENT
SURFACES.
15. WOOD TRELLIS/FRAME. MATCH ADJACENT FRAMING SIZE, SPACING AND
ELEVATION. PREPARE AND PAINT.
16. REPAIR WOOD FENCE/LATTICE. PREPARE AND PAINT.
17. BIRD/BAT SCREENING
18. CEMENT BOARD SIDING PANELS, REPLACE 1X PERIMETER TRIM TO MATCH.
19. RE-INSTALL METAL CAP FLASHING
20. CONCRETE DECK SURFACE COATING; CONTINUE COATING 16" INSIDE BLDG
DOORWAYS
WINDOW ASSEMBLIES - SEE DEMO KEYNOTE 1 AND NEW WORK KEYNOTE 1 THIS
SHEET. SEE SHEET A-601 FOR ELEVATIONS, & A-503 FOR DETAILS.
CASED METAL DOOR FRAME (NO DOOR OR HARDWARE PREPS). SEE DEMO
KEYNOTE 2 AND NEW WORK KEYNOTE 2A THIS SHEET. SEE A-503 FOR FRAME
DETAILS, A-601 FOR DOOR & FRAME SCHEDULE.
METAL DOOR FRAME. SEE DEMO KEYNOTE 2 AND NEW WORK KEYNOTE 2 THIS
SHEET. SEE A-503 FOR FRAME DETAILS, A-601 FOR DOOR & FRAME SCHEDULE.
WHERE RATED DOOR IS INDICATED BY DOOR #R, FRAME MUST BE RATED.
METAL DOOR. SEE A-601 FOR DOOR & FRAME SCHEDULE.
METAL DOOR AND/OR FRAME. SEE DOOR & FRAME SCHEDULE ON SHEET A-601.
"R" INDICATES RATED FRAME & DOOR ASSEMBLY.# #R
1/8" = 1'-0"
SECOND FLOOR PLAN HOTEL BLDG 12
A-101 0 4' 8' 16'
PLAN NORTH
W19 W19 W19 W19 W19 W19 W19 W19
W19
W19
W19
W19
W19
W19W19W19W19W19
W34
W34
W34
W34
W32 W32W33W33
1R 1 11
1 1 1
1 1 1R 2 2
224 444
4 4 4 4 4 4
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
2A
TYP
W19
1/8" = 1'-0"
THIRD FLOOR PLAN HOTEL BLDG 13
A-101 0 4' 8' 16'
PLAN NORTH
W19 W19 W19 W19 W19 W19 W19 W19
W19 W19 W19 W19 W19 W19 W19 W19 W19
W19W19
W19
1R
1 1
1 1
1 1
2 2 2 2 2 2
2 2 2 2 2
44444444
4 4 4 4 4 4 4
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
2A
TYP
1/8" = 1'-0"
BASEMENT PLAN HOTEL BLDG 14
A-101 0 4' 8' 16'
PLAN NORTH
TYP
SEE SHEETS
PD101 & P-101
SEE DISCLOSURE OF INFORMATION STATEMENT ON SHEET G-001
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com | N.C. LICENSE # C-1621
DEMOLITION KEY NOTES
NEW WORK KEYNOTES
05-01-2023
GENERAL SHEET NOTES
A-101
FLOOR PLAN, BLDG 1 - HOTEL
1. SEE SHEET A-001 FOR ARCHITECTURAL ABBREVIATIONS, SYMBOLS, NOTES AND LEGENDS. ALL
KEYNOTES MAY NOT BE USED ON ALL SHEETS.
2. SEE SHEET G-002 FOR ADDITIONAL GENERAL NOTES INCLUDING LIST OF PROJECT PRIORITY WORK ORDER. REFER TO CIVIL, STRUCTURAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL NOTES AND
INFORMATION.
3. ALL WORK NOTED IS NEW UNLESS SPECIFICALLY REFERRED TO AS EXISTING.
4. REMOVE AND DEMOLISH ALL DOORS AND HARDWARE.SEE SHEET A-601 FOR DOOR SCHEDULE.
FRAMES WHICH MUST BE REPLACED ARE INDICATED BY SYMBOL; SEE LEGEND BELOW.
5. PROVIDE CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUT LOCATIONS.
60038667
NOTES RE DOORS AND FRAMES, ALL BUILDINGS, SHEETS
A-101 THRU A-111:
FRAMES WHICH MUST BE REPLACED ARE INDICATED BY
TRIANGLE SYMBOLS, WITH TYPE OF FRAME AS DESCRIBED IN
LEGEND.
NOT ALL FRAMES ARE REPLACED. ALL EXISTING FRAMES
MUST BE PREPARED AND PAINTED.
DOOR REPLACEMENT IS INDICATED BY DOOR SYMBOL &
NUMBER AS DESCRIBED IN LEGEND.
LEGEND
FIRST FLOOR PLAN CITY HALL BLDG 21
A-102 0 4' 8' 16'
PLAN NORTH
W6 W6 W5
W6
W6
W6
W6
W6
W6
W6
W6
W6 W6 W6 W6 W6
W6
W6
W6
W6
W6
1R
1R
1 1
2 2 2
TYP
TYP
TYP
TYP
A-501
A-501
5 5
SIM.
SIM.
2A
TYP
1. REMOVE WOOD FRAME & PLYWOOD SHUTTERS
2. REMOVE GROUTED DOOR FRAME. REMOVE & CUT GROUT & ANCHORS
FLUSH TO FACE OF CMU.
3. REMOVE EXISTING COILING DOOR AND ASSEMBLY.
4. REMOVE EXISTING OVERHEAD DOOR AND ASSEMBLY.
5. REMOVE COMPLETE STAIR ASSEMBLY WITH ALL MISCELLANEOUS
STEEL SUPPORTS & INTEGRAL RAILS & HANDRAILS. PREPARE ALL
SURFACES FOR NEW STAIR ASSEMBLIES.
6. REMOVE RUBBLE. RECORD APPROXIMATE PLACEMENT FOR PLACING
RUBBLE BACK IN PLACE AFTER STAIR WORK IS COMPLETE.
7. REMOVE STEEL STAIR SUPPORT LEDGER ANGLES BELOW STAIR
LANDINGS.
8. REMOVE EXISTING CEILING CEMENT BOARD / PLYWOOD CEILING
PANELS; REMOVE & SAVE 1X CEILING PERIMETER TRIM.
9. PREPARE STEEL RAILINGS AND STAIRS FOR REFINISHING.
10. PREPARE STEEL RAILINGS FOR REFINISHING.
11. PREPARE STEEL LADDERS FOR REFINISHING.
12. PREPARE STEEL ROOF / WALL ANCHOR RAILS / HOOKS / CHAINS /
STANCHIONS / BOLLARDS FOR REFINISHING.
13. PREPARE STEEL DOWNSPOUTS AND SCUPPERS FOR REFINISHING.
14. PREPARE EXTERIOR MASONRY, PRECAST LINTELS & PREVIOUSLY
FINISHED SURFACES FOR REFINISHING.
15. REMOVE EIFS SYSTEM, INSULATION AND SHEATHING FROM PARAPET
AND SOFFIT.
16. REMOVE METAL WALL CAP AND PRESERVE FOR RE-INSTALLATION.
17. PREPARE CONCRETE/CONCRETE TOPPING DECK SURFACE FOR
COATING.
1. FRAME & SHUTTERS ASSEMBLY
2. DOOR & FRAME; SEE LEGEND BELOW.
2A. CASED FRAME;…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .