ATT 3-NUWC 990 HAZMAT Survey.pdf

PDF 5 MB Posted

Attached to
NUWC B-990 HVAC Renovation, Naval Station Newport
Solicitation number
N4008523B2511
Issued by

About this file

This hazardous materials survey report details the findings of inspections conducted at Buildings 990, 1319 and 1351 of the Naval Undersea Warfare Center Division Newport. The inspections assessed suspect asbestos-containing materials, lead-based paint, and polychlorinated biphenyls. Inspections also evaluated mechanical systems and observed pipe insulation, ductwork, and equipment for fiberglass, mold, or other hazardous materials. Samples were collected and tested to confirm the presence of these substances. The report summarizes inspection methods, findings including locations and concentrations of identified hazardous materials, and recommendations.

The related federal contract opportunity is a solicitation for the NUWC B-990 HVAC Renovation project at Naval Station Newport. The solicitation seeks to upgrade HVAC systems in Building 990, including roof and wall penetrations. The Department of the Navy Naval Facilities Engineering Command is the contracting agency. Pricing, response dates, or other contract details are not provided in the opportunity description.

View the file

Other files

File Type Posted
Abstract of Offers OF 1419 1 of 2.pdf PDF
Abstract of Offers OF 1419 2 of 2.pdf PDF
FACP3.JPG JPG image
CB front 1.jpg JPG image
23B2511 Amendment 0008.pdf PDF
FACP1.JPG JPG image
990 Panel.jpg JPG image
FACP2.JPG JPG image
CB back 1.jpg JPG image
CB back 2.jpg JPG image
CB front 2.jpg JPG image
23B2511 Amendment 0007.pdf PDF
Drawing and Specification Updates.pdf PDF
23B2511 Amendment 0006.pdf PDF
23B2511 Amendment 0005.pdf PDF
23B2511 Amendment 0004.pdf PDF
23B2511 Amendment 0003.pdf PDF
Scan from 2023-09-08 09_16_55 AM.pdf PDF
Scan from 2023-09-08 09_13_06 AM.pdf PDF
Scan from 2023-09-08 09_19_47 AM.pdf PDF
Scan from 2023-09-08 09_26_04 AM.pdf PDF
Scan from 2023-09-08 09_19_22 AM.pdf PDF
Scan from 2023-09-08 09_18_35 AM.pdf PDF
Scan from 2023-09-08 09_21_57 AM.pdf PDF
Scan from 2023-09-08 09_18_20 AM.pdf PDF
Scan from 2023-09-08 09_15_08 AM.pdf PDF
Scan from 2023-09-08 09_29_43 AM.pdf PDF
Scan from 2023-09-08 09_19_05 AM.pdf PDF
Scan from 2023-09-08 09_19_05 AM (1).pdf PDF
Scan from 2023-09-08 09_17_58 AM.pdf PDF
Scan from 2023-09-08 09_23_43 AM.pdf PDF
Scan from 2023-09-08 09_23_22 AM.pdf PDF
Scan from 2023-09-08 09_26_33 AM.pdf PDF
23B2511 B990 Site Visit 2 Sign-In Sheet.pdf PDF
Scan from 2023-09-08 09_20_01 AM.pdf PDF
Scan from 2023-09-08 09_25_49 AM.pdf PDF
Scan from 2023-09-08 09_14_05 AM.pdf PDF
Scan from 2023-09-08 09_17_25 AM.pdf PDF
Scan from 2023-09-08 09_22_31 AM.pdf PDF
Scan from 2023-09-08 09_29_16 AM.pdf PDF
Scan from 2023-09-08 09_17_08 AM.pdf PDF
Scan from 2023-09-08 09_15_53 AM.pdf PDF
Attachment 1 - SECNAV FORM 5512-1.pdf PDF
23B2511 Amendment 0002.pdf PDF
ATT 9-Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
ATT 7-NUWC HVAC B990 HAZMAT Summary.pdf PDF
23B2511 Amendment 0001.pdf PDF
ATT 10-VISITOR REQUEST INFO NEEDED 08_2021.pdf PDF
ATT 12-SECNAV FORM 5512-1.pdf PDF
ATT 11-PIEE Vendor Access Instructions.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZARDOUS MATERIALS SUMMARY

Buildings 990, 1319, 1351

Naval Undersea Warfare Center

Naval Station Newport, Newport, RI

Contract No.: N40085-18-D-8703

Prepared by

CDW Consultants, Inc.

6 Huron Drive

Natick, MA 01760

Prepared for

SMMA

1000 Massachusetts Avenue

Cambridge, MA 02138

February 2021

BLDS 990, 1319, 1351

NUWC Navy Base

Newport, RI

CDW CONSULTANTS, INC. ii

TABLE OF CONTENTS

Page

1.0 INTRODUCTION

2.0 PROJECT UNDERSTANDING

3.0 GENERAL SITE CONDITIONS

4.0 REPORTS REVIEW

5.0 ASBESTOS SURVEY

5.1 Methods

5.2 Findings

5.3 Recommendations

6.0 LEAD-BASED PAINT

6.1 Methods

6.2 Findings

6.3 Recommendations

7.0 POLYCHLORATED BIPHENYLS

7.1 Methods

7.2 Findings

8.0 HAZARDOUS MATERIALS SURVEY

8.1 Methods

8.2 Findings

9.3 Recommendations

APPENDICES

Appendix A: Asbestos Laboratory Reports

Appendix B: Lead Laboratory Reports

Appendix C: PCB Laboratory Reports

Appendix D: Photographs

1.0 INTRODUCTION

CDW Consultants, Inc. (CDW) is pleased to present this report summarizing the findings of the preliminary suspect asbestos-containing materials (ACM), lead-based paint (LBP), polychlorinated biphenyls (PCBs), and hazardous materials survey of portions of Buildings 990, 1319 and 1351 at the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) located at Naval Base

Newport, Rhode Island (“Site”). In November and December 2020, Ms. Susan Cahalan (Rhode

Island Asbestos Inspector #AAC-1023) conducted an inspection for suspect materials. An inspection is required by the United States Environmental Protection Agency (USEPA) National Emission

Standards for Hazardous Air Pollutants (NESHAP), prior to scheduled building/structure renovations. Additionally, the Rhode Island Department of Health (RIDOH) and Rhode Island

Department of Environmental Management (RIDEM) regulate ACM associated with renovation, demolition, and asbestos abatement projects. Samples of suspect materials were collected to confirm the presence or absence of ACM, LBP and PCBs. Suspect materials were grouped into homogenous areas. A homogenous area is an area that is similar in color, texture and date of application. Hand tools were used to collect bulk samples which were promptly placed in sealed plastic bags using a unique numbering system. Samples were not collected of non-suspect materials, including wood, fiberglass, plastic, ceramic, concrete, neoprene/rubber, glass, and carpeting.

2.0 PROJECT UNDERSTANDING

The scope of work was to provide a preliminary hazardous materials survey and sampling as required to verify of the presence of hazardous materials such as ACM, LBP, PCBs and other hazardous materials (mercury, oil etc.) that may be impacted by the scope of the work at portions of

Buildings 990, 1319 and 1351. The objective of this work was to evaluate the HVAC systems at each of the three buildings at NUWCDIVNPT and to provide a design for HVAC system repairs, improvements and upgrades. The overall scope of work is to evaluate options for HVAC upgrades in each of the buildings, including roof penetrations and a wall penetration on Building 990. Note that roof access was not allowed at Building 1319 due to equipment emitting radiation. Also, due to security concerns, the laboratories were not assessed.

3.0 GENERAL SITE CONDITIONS

Building 990

Building 990 is 57,000 square foot and was constructed in 1975. It is a 6-story building that contains office space. The building is constructed of structural steel frame supported on concrete spread footings. The floor construction is composite metal deck with concrete fill and the roof construction is metal decking. The roof system is a flat EPDM membrane with rigid insulation overlaying an existing tar and gravel built up roof on rigid insulation. The roof EPDM system was recently repaired/replaced in 2014. The exterior building envelope consists of an exterior brick veneer with reinforced concrete masonry (CMU) back up wall system. The exterior walls have continuous strip windows and punched windows.

The building is served by a roof mounted direct expansion air handling unit which only provides cooling and ventilation air during the summer season and a central station air handling unit in a first-floor mechanical room that provides cooling and heating air during the remaining time of the year.

The distribution at each floor is provided through galvanized sheet metal ductwork to variable volume supply diffusers.

The building is supplied with medium pressure steam from a base wide steam system. The building has a steam to hot water heat exchangers which provides heating hot water. The heating hot water is pumped throughout the building in steel insulated piping. The hot water serves various terminal pieces of equipment including fin tube, unit heaters and provides heating hot water to the air handling unit that provides conditioned air to the office spaces. The cooling system includes water chillers and condensers which provides chilled water which is pumped throughout the building in steel insulated piping. Observed pipe insulation within the mechanical room and above drop ceilings on other floors primarily consist of fiberglass with some suspect ACM fittings. Additionally, mold was observed in the main mechanical room on pipes and equipment.

Building 1319

Building 1319 is 103,000 square feet and was constructed in 1996. It is a 3-story building that includes laboratory and office space. The building is constructed of structural steel frame supported on concrete spread footings. The floor construction is composite metal deck with concrete fill and the roof construction is structural light gage metal decking. The roof system is a flat EPDM roof membrane over tapered rigid insulation. The exterior building envelope consists of an exterior brick veneer with cold-formed light gage metal stud back up wall system. The exterior walls have continuous strip windows, punched windows, and a curtain wall system on the east building elevation. A large mechanical room with various forms of mechanical equipment including switchboards, generators, pumps, hot water boilers, HVAC, and various tanks. There is also a fire suppression system with piping that runs throughout the building. In addition, there is a 295-gallon

AST filled with diesel fuel in the mechanical room. There are also several butane tanks stored throughout the room. The heating, ventilation, and air conditioning is central and contains fiberglass ducting. Pipe runs and elbows were insulated with fiberglass insulation.

The building is supplied with medium pressure steam from a base wide steam system which is directed to a steam to hot water heat exchangers which provides heating hot water. The heating hot water is pumped throughout the building in steel insulated piping. The hot water serves various terminal pieces of equipment including fin tube, unit heaters, lab fan coils and also provides heating hot water to the air handling unit that provides air conditioning to the office spaces. The cooling system includes indoor water chillers and closed-circuit cooling towers which produces chilled water which is pumped throughout the building in steel insulated piping.

The building is served by a central station air handling unit located in the basement which provides heating and cooling air to each floor office area through galvanized sheet metal ductwork to variable volume terminal units. The lab spaces are served by two pipe fan coil units for cooling with a dedicated central station air handler for ventilation located in the basement. CDW visually inspected the VFDs above the drop ceiling panels and did not observe any suspect ACM. Observed pipe and

HVAC insulation within the mechanical room and above drop ceilings on other floors consist of fiberglass. Additionally, mold was observed in the main mechanical room on pipes and equipment.

Building 1351

Building 1351 is a 60,000 square foot building constructed in 2000. It is a 4-story building that includes office space. The building is constructed of structural steel frame supported on concrete spread footings. The floor construction is composite metal deck with concrete fill and the roof construction is structural light gage metal decking. The roof system is a flat EPDM roof membrane over tapered rigid insulation. The exterior building envelope consists of an exterior brick veneer with curtain wall light gage metal stud back up wall system. The exterior walls have continuous aluminum strip windows with tinted double wall glazing.

The building contains one large mechanical room with various forms of mechanical equipment including: air conditioning units, chilling units for water, generators, pumps, hot water boilers, HVAC, and air handling units. There is a concrete pit with piping that drops down approximately 12 feet that is confined space entry. The heating, ventilation, and air conditioning is central and contains fiberglass ducting. Pipe runs, elbows and fittings are insulated with fiberglass.

The building is supplied with medium pressure steam from a base wide steam system which is directed to a steam to hot water heat exchangers which produces heating hot water. The heating hot water is pumped throughout the building in steel insulated piping. The hot water serves various terminal pieces of equipment including fin tube, unit heaters and provides heating hot water to the various air handling units that provide conditioned air to the office spaces. The cooling system includes an air-cooled liquid chiller which produces chilled water that is pumped throughout the building in steel insulated piping. The chilled water serves the air handlers that are located at each floor. The roof mounted chiller was replaced in 2015. Each floor of the building is served by a central station air handling unit which provides heating and cooling air to office area through galvanized sheet metal ductwork to variable volume supply diffusers.

4.0 REPORTS REVIEW

CDW reviewed a report, titled “Asbestos Inspection for Building 990, 1319, 1320 and 1371,” dated

October 25, 2017 and prepared by EnviroMed Services, Inc. of Meridian, Connecticut (EnviroMed).

CDW also reviewed the report “PCB Bulk Sampling for Building 990,” dated March 6, 2008 and

“Lead Paint Sampling for Buildings 990, 1319, 1320 and 1371,” dated April 23, 2018 and prepared by EnviroMed. Though the title of the report includes Buildings 990, 1319, 1320 and 1371, only data for Building 990 was included. Results of the EnviroMed surveys are summarized in the below table.

Field ID Material Location Result %

Asbestos

990-1 Exterior Brick Building 990 Exterior ND

990-2 Exterior Mortar Building 990 Exterior ND

990-3 Exterior Expansion Joint

Caulk

Building 990 Exterior ND

990-4 Black Flashing Behind

Brick

Building 990 Exterior ND

990-5 Black Window Frame

Caulk

Building 990 Exterior ND

990-6 Black Window Glazing

Putty

Building 990 Exterior ND

990-7 Foam Insulation Behind

Brick

Building 990 Exterior ND

990-8 Ceiling Tiles Building 990 Room

ND

990-9 Wallboard Joint Compound Building 990 Room

ND

990-10, 990-11 Wallboard Building 990 Room

ND

990-12 Carpet Glue Building 990 Room

ND

990-13, 990-14 EPDM Roof Seam Cement Building 990 Roof ND

990-15 Pitch Box Cement Building 990 Roof ND

990-16, 990-17 White Flashing Caulk Building 990 Roof ND

S1, S2, S3 Spray Fireproofing Building 990 Interior, Ceiling Mechanical

Room and Above

Ceilings Other Floors

ND

11-04-03902-001 Black Tar-Like;

Black/Brown Fibrous:

Brown Granular

Stair Tower Roof ND

11-04-03902-002 Black Tar-Like;

Black/Brown Fibrous;

Brown Granular

Stair Tower Roof <1%

5.0 ASBESTOS SURVEY

5.1 Methods

The investigative work for the asbestos survey included conducting a visual inspection of accessible areas of the area of mechanical rooms and behind brick façade of building 990 near louver next to mechanical room. The roofing materials were also sampled with the assistance of a contractor to core and repair roofing. Once the visual inspection was completed, the building components were categorized into homogeneous areas. CDW collected bulk samples of different homogeneous suspect materials for asbestos analysis. The bulk samples were delivered under chain of custody to Asbestos

Identification Laboratory, Inc. (AIL) located in Woburn, Massachusetts. AIL is a state licensed

(#AAL-121) and NVLAP-accredited laboratory (lab code #200919-0) for asbestos analysis. Bulk samples were analyzed for asbestos content by polarized light microscopy (PLM) using EPA Method

600/R-93/116. A positive stop method was used – if one sample in a homogeneous group is positive then additional samples of the same material are not analyzed. Samples analyzed to contain greater than 1% asbestos are to be treated as ACM as defined by the USEPA and Rhode Island Department of Environmental Management (RIDEM). The laboratory analytical reports are included in

Appendix A.

5.2 Findings

The results of the laboratory analysis are provided in the below table.

990-1A, 990-1B,990-

1C

Gray Fire Proofing Ceiling, Main

Mechanical Room

990-2A, 990-2B, 990-

2C

Gray Seam Sealant On Fiberglass Pipe

Fitting at Chilled

Water Supply

5%

Chrysotile

990-3A, 990-3B, 990-

3C

Gray Flex Connector Cloth On Large HVAC Unit

– Mechanical Room

990-4A, 990-4B, 990-

4C

Pipe Insulation on Saddle

Blocks

Main Mechanical

Room – Near Chilled

Water Supply

ND

990-5A, 990-5B, 990-

5C

Mudded Pipe Fitting on

Gaskets

HWS #1 & 2 at Pumps

-Mechanical Room

ND

990-6A. 990-6B, 990-

6C

White Insulation on Hot

Water Tank

Main Mechanical

Room

ND

990-7A, 990-7B, 990-

7C

End Cap Sealant on 4”

Diameter Fiberglass Fitting

FG Fitting

1st Floor – Above

Ceiling

3% Chrysotile

990-8A, 990-8B, 990-

8C

Penetration Sealant Main Mechanical

Room

ND

990-9A, 990-9B, 990-

9C

2” Diameter Gray Pipe

Fitting

1st Floor above Ceiling ND

990-10A, 990-10B, 990-10C

4” Diameter Gray Pipe

Fitting

1st Floor above Ceiling ND

990-11A, 990-11B, 990-11C

Pipe Insulation Fitting At Hot Water Tank Y

Connection

ND

990-12A, 990-12B, 990-12C

Gray – White Cloth over

HVAC

Main Mechanical

Room

ND

990-13A, 990-13B Gray Paper Under Duct Pins on

HVAC

ND

990-14A, 990-14B Tan Paper Under Duct Pins HVAC Mechanical

Room

ND

990-Roof-1A Gray Glue under Rubber Roof Core – Near Roof

Top Unit

ND

990-Roof-1B Gray Paper Top & Bottom Roof

Foam

ND

990-Roof-1C Gypsum Board Roof Core – Near Roof

Top Unit

ND

990-Roof-1D Gray Paper Top of Metal Roof

Deck

ND

990-Roof-2A Gray Glue under Rubber Roof Core – Near Roof

Top Unit

990-Roof-2B Gray Paper Top & Bottom

RD of Foam

Roof Core – Near Roof

Top Unit

ND

990-Roof-2C Gypsum Board Roof Core – Near Roof

Top Unit

ND

990-Roof-2D Gray Paper Top of Metal Roof

Deck

ND

990-15A, 990-15B, 990-15C

Gray Mastic on Duct Pins On Roof Top HVAC ND

990-16A, 990-16B, 990-16C

Gray Skim Coat on Smooth

Walls

Main Mechanical

Room

ND

990-17A, 990-17B, 990-17C

Brown Glue under Black

Foam Insulation

HVAC Roof Top Unit ND

990-18A, 990-18B, 990-18C

Black Caulk on HVAC

Door Dividing Insulated

Side to Uninsulated Side

Roof Top Unit ND

990-19 Gray Seam Sealant Roof Top Unit ND

990-20A, 990-20B Black Repair Caulk On Rubber – Roof Top

HVAC Unit

ND

990-21A, 990-21B Gray Mastic on Backup

CMU Behind Black

Flashing

Behind Brick Façade

Near Louver Next to

Main Mechanical

Room Entrance

2% Chrysotile

990-22A, 990-22B Black Flashing Behind Brick Facade ND

1319-1A, 1319-1B, 1319-1C, 1319-1D, 1319-1E

Gray Spray on Fire

Proofing

Ceiling-Mechanical

Room B02

1319-2A, 1319-2B, 1319-2C, 1319-2D, 1319-2E, 1319-2F, 1319-2G

White End Cap Sealant On Fiberglass

Insulated Pipe Fittings-

Mechanical Room B02

Collected From P-3, Steam, Vicarb, Roof

Drain, Horizontal

Steam, HWC Unit, OAHU #1

ND

1319-3A, 1319-3B Tan Duct Pin Mastic On HVAC near

Workshop –

Mechanical Room B02

1319-4A, 1319-4B Tan Duct Pin Mastic On HVAC Unit LAHU

– Mechanical Room

B02

ND

1319-5A, 1319-5B Tan Duct Pin Mastic On HVAC Middle

Rear Wall –

Mechanical Room B02

ND

1319-6A, 1319-6B, 1319-6C

Brown Glue on Foam P4 & P5 Mechanical

Room B02

ND

1319-7A, 1319-7B, 1319-7C

White Cloth over

Fiberglass Insulation

HWC Unit –

Mechanical Room B02

ND

1319-8A, 1319-8B, 1319-8C

Gray Seam Sealant on

OAHU & RAHU Units

OAHU & RAHU

Units Mechanical

Room B02

ND

1319-9A, 1319-9B, 1319-9C

Yellow Glue on Foil over

Fiberglass Insulation

HWC Unit ND

1319-10A, 1319-10B Black Flex Connector LAHU #2 Unit –

Mechanical Room B02

ND

1319-11A, 1319-11B Gray Seam Sealant On LAHU Unit –

Mechanical Room B02

1351-1A, 1351-1B, 1351-1C

White Pipe Penetration

Sealant

Mechanical Room 110 ND

1351-2A, 1351-2B, 1351-2C, 1351-2D, 1351-2E

Joint Compound Walls - Mechanical

Room 110

ND

1351-3A, 1351-3B, 1351-3C, 1351-3D, 1351-3E

Sheetrock Mechanical Room 110 ND

1351-4A, 1351-4B, 1351-4C

White Pipe Insulation Top of Pumps

Mechanical Room 110

ND

1351-5A, 1351-5B, 1351-5C

White End Cap Sealant on

4” Diameter Fiberglass

Pipe Fitting

Mechanical Room 110 ND

1351-6A, 1351-6B, 1351-6C

White End Cap Sealant on

2” Diameter Fiberglass

Pipe Fitting

Mechanical Room 110 ND

1351-7A, 1351-7B Tan Mastic on Duct Pins on HVAC

4th Floor Mechanical

Room

ND

1351-8A, 1351-8B, 1351-8C

Tan Paper under Duct Pins Mechanical Room 110 ND

1351-9A, 1351-9B, 1351-9C

Gray Seam Sealant on

HVAC

Mechanical Room 110 ND

1351-10A, 1351-10B Gray Caulk on HVAC

Seams

4th Floor Mechanical

Room

ND

1351-11A, 1351-11B Red-Gray Penetration

Sealant

4th Floor Mechanical

Room

ND

1351-12A, 1351-12B Black Repair Caulk On Roof Units EF-3 &

EF-4

ND

1351-13A, 1351-13B Gray Caulk on Roof AC

Unit, Thick Wire

Roof ND

1351-14A, 1351-14B Gray Caulk on Metal Pipe

Fittings

Roof ND

1351-Roof-1A Brown-Gray Paper under

Rubber

Roof Core Near Roof

Top Units

ND

1351-Roof-1B Brown Paper Top & and

Bottom Roof Foam

Roof Core Near Roof

Top Units

ND

1351-Roof-1C Brown-Gray Paper on Roof

Deck

Roof Core Near Roof

Top Units

ND

1351-Roof-2A Brown-Gray Paper under

Rubber

Roof Core Near Roof

Top Units

1351-Roof-2B Brown Paper Top &

Bottom Roof Foam

Roof Core Near Roof

Top Units

ND

1351-Roof-2C Brown-Gray Paper on Roof

Deck

Roof Core Near Roof

Top Units

ND

ND = Not Detected

Chrysotile = Asbestos Mineral

5.3 Recommendations

Prior to disturbance, the ACM identified must be abated by a Rhode Island licensed asbestos abatement contractor following all federal, state & local regulations governing asbestos abatement.

A copy of the asbestos waste shipment record must be received within 30 days of removal from the

Site. Asbestos air quality sampling must be conducted under USEPA and RIDOH regulations following asbestos abatement and prior to re-occupancy of the spaces. If additional materials are discovered that have not been sampled, those materials should be considered ACMs until laboratory analysis determines otherwise. Additionally, all abatement programs must follow the requirements outlined in the Unified Facilities Guide Specifications.

6.0 LEAD-BASED PAINT

6.1 Methods

CDW performed a visual inspection of painted surfaces. CDW collected samples from different color paints on various types of building component substrates. Samples were submitted to EMSL

Laboratories in Cinnaminson, New Jersey for analysis via Atomic Absorption Spectrometry (AAS).

6.2 Findings

The laboratory results are listed below. The laboratory analytical reports are included in Appendix B.

Sample ID Location Lead Concentration

(% Weight)

LP-1 White Paint on Concrete Skim in Mechanical

Lounge <0.0080

(% Weight)

LP-2 Vanilla/Gray Paint on CMU Walls Mechanical

Floor <0.0080

LP-3 White Paint on HVAC Metal Mechanical

Room 0.020

LP-4 Black/Red Paint on Duct Frame in Mechanical

Room 4.0

LP-5 Red/Black Paint on Steel Beam Support on

Roof HVAC <0.0080

LP-6 Roof Over Black Paint on Mechanical Roof

Top Unit <0.0080

(% Weight)

LP-1 Gray Paint on Metal Pumps Lower level <0.0080

(% Weight)

LP-1 Black/Brown Paint on Steel Large HVAC Unit <0.0080

LP-2 Black/Brown Paint on Raised Steel Pumps <0.0080

EnviroMed’s “Lead Paint Sampling for Buildings 990, 1319, 1320 and 1371,” dated April 23, 2018 results are listed in the below tables.

(% Weight)

Pb1-990 Wallboard Paint Building 990 Room 613 <0.0098

(% Weight)

Pb2-990 Wallboard Paint Building 990 Room 613 <0.0089

Pb3-990 Lintel Paint Building 990 Exterior 2.6443

Pb4-990 Lintel Paint Building 990 Exterior 2.1022

Pb5-990 Dunnage Paint Building 990 Roof <0.0089

(% Weight)

Pb1-1319 Vinyl Base Building 1319 Room 351 <0.0068

Pb2-1319 Vinyl Base Building 1319 Room 227 <0.0074

Pb3-1319 Lintel Paint Building 1319 Exterior 0.1884

Pb4-1319 Lintel Paint Building 1319 Exterior 0.0592

Pb5-1319 Wallboard Paint Building 1319 Room 351 <0.0091

Pb6-1319 Wallboard Paint 1319 Room 227 <0.0086

The Environmental Protection Agency (EPA) and US Department of Housing and Urban

Development definitions defines LBP as any paint or surface coating that contains lead equal to exceeding one milligram per square centimeter (1.0 mg/cm2) or 0.5% by weight. U.S. Navy defines any percentage of lead above laboratory limits of detection detected as “lead-containing paint.”

Lead containing paint consists of:

• White paint on HVAC metal in Mechanical Room in Building 990

• Lintel paint building 990 exterior

• Lintel paint building 1319 exterior

Lead based paint consists of:

• Black/Red paint on duct frame in mechanical room Building 990

6.3 Recommendations

Based on the conclusions of this testing, the following recommendations are offered:

• In accordance with the EPA Lead Renovation, Repair, and Painting (RRP) Rule 40 CFR 745, workers, visitors, and the public must be protected from lead dust generated during the demolition of LBP or LCP coated surfaces.

• During demolition or renovation, paint materials containing lead should not be sanded, scraped, drilled, or otherwise altered unless proper engineering controls are used to prevent migration of fugitive lead containing dust from the work area. Under OSHA regulations, any demolition or renovation to be performed at a structure where lead in paint and dust is present must be performed in accordance with a worker protection policy, including, but not limited to, appropriate training, medical monitoring, respiratory protection, and other protective equipment. Comply with guidelines outlined in specifications UFGS-028313 and UFGS-

028319.

• In addition to the worker protection requirements stipulated by OSHA and Military, RIDOH and the USEPA regulate the disposal of wastes that are potentially hazardous. Such wastes may include paint chips and residue generated during abatement or repainting work, or whole components, that are coated with LBP and that are disposed of as the result of renovation or demolition work. To determine the required method for disposing of permeable items coated with LBP, the RIDOH and the USEPA require representative sampling of the debris to determine the quantity of lead that would be expected to leach into the environment if the debris were disposed of in a landfill. The representative sample(s) must be analyzed by the Toxicity

Characteristic Leaching Process (TCLP) to determine the proper disposal method.

• Those components/colors not tested, or in locations not inventoried in this report, should be tested for lead content prior to disturbance that may cause airborne release of lead.

7.0 POLYCHLORATED BIPHENYLS

7.1 Methods

CDW conducted a visual inspection for suspect PCB containing building materials at the Site buildings. The samples were submitted to Phoenix Environmental Laboratories in Manchester, Connecticut for analysis via EPA Method 8082 with Soxhlet extraction 3540C. A copy of the PCB laboratory reports are provided in Appendix C.

7.2 Findings

The PCB analytical results are summarized in the below tables.

Concentration

(mg/kg)

PCB-1 Yellow CMU Paint Mechanical Room ND

PCB-2 Black Caulk Roof HVAC ND

PCB-3 White Paint on Steel HVAC ND

PCB-4 Black Repair Caulk - Roof ND

(mg/kg)

PCB-1 Gray Seam Sealant on HVAC ND

PCB-2 Black Foam Insulation ND

PCB-3 Red Caulk ND

PCB-4 White Caulk ND

(mg/kg)

PCB-1 Gray/Brown Paint Mech. Room ND

PCB-2 Gray Caulk HVAC Seams ND

PCB-3 Penetration Caulk Mechanical Room ND

EnviroMed’s “ PCB Bulk Sampling” dated March 6, 2008 results are listed in the below table.

Location Material Sampled PCB Content (mg/kg)

Building 990 Exterior - South

Gray Exterior Sealant Brick to Brick

ND

Building 990 Exterior - South

Black Interior Window Frame Caulk ND

Building 990 Exterior - South

Black Exterior Window Glazing

Putty

ND

Building 990 Exterior - North

Brown Exterior Door Frame Caulk ND

Building 990 Exterior - South

Black Exterior Window Frame Caulk ND

The analytical results are compared to the USEPA standard of 50 milligrams per kilograms (mg/kg), which is the threshold for bulk product waste, as defined by USEPA 40 CFR § 761.3, and regulated under the Toxic Substances Control Act (TSCA). None of the samples contain PCBs greater than 50 mg/kg.

8.0 HAZARDOUS MATERIALS SURVEY

8.1 Methods

CDW visually inspected the Site building for universal, special, and hazardous wastes associated with building materials. These included but were not limited to the following:

• Mercury-containing devices (fluorescent light tubes, thermostats, gauges, etc.);

• Polychlorinated bi-phenyl (PCB)-containing articles, equipment, and devices (light ballasts, electrical switches, etc.);

• Chlorofluorocarbon (CFC)-containing equipment (refrigerants, air conditioners/HVAC equipment, water bubblers, etc.)

• Tritium-containing devices (exit signs);

• Lead-Acid batteries (emergency lights, etc.); and

• Pressurized-cylinders (fire extinguishers, etc.).

8.2 Findings

The visual survey for hazardous materials identified mercury-containing light tubes, electronic ballasts, mercury containing switches and thermostats, oil-filled gauges, lead and tritium batteries, refrigerants and other hazardous materials. No hazardous materials sampling or analysis was conducted as part of this preliminary survey. A list of OHMs identified are included in the table below.

Material Description Location Est.

Quantity

Units

Electronic Ballasts Main Mechanical Room and Small Mechanical

Room M1

40 Each

Mercury Containing Light

Tubes-Compact Fluorescent and Straight Tubes

Mechanical Room 80 Each

Exit Signs (Tritium) Main Mechanical Room 2 Each

Mercury Thermostats and Oil

Filled Gauges

Mechanical Room, and

M1

60 Each

Emergency Lights with

Batteries

Mechanical Room, and

M1

3 Each

Refrigerants HVAC, Roof Unit 1 Unit

Glycol Main Mechanical Room 2 Drums

Acetylene Tanks Main Mechanical Room 8 Each

Units

Electronic Ballasts Mechanical Room 60 Each

Mercury Containing Light

Tubes-Compact Fluorescent and Straight Tubes

Mechanical Room 120 Each

Exit Signs (Tritium) Main Mechanical Room 2 Each

Mercury Thermostats and Oil

Filled Gauges

Mechanical Room 80 Each

Emergency Lights with

Batteries

Mechanical Room 2 Each

Refrigerants (R134a) 2 Chillers in Mechanical

Room, Roof Unit

3 Each

Glycol Mechanical Room 12

Drums (Full)

Drums (Empty)

Acetylene Tanks Mechanical Room 10 Each

Diesel Above Ground Storage

Tank

Mechanical Room 1 295-Gallon

Units

Electronic Ballasts Main Mechanical Room 40 Each

Mercury Containing Light

Tubes-Compact Fluorescent and Straight Tubes

Mechanical Room, Offices, Conference

Room

80 Each

Units

Exit Signs (Tritium) Main Mechanical Room 2 Each

Mercury Thermostats and Oil

Filled Gauges

Mechanical Room 60 Each

Emergency Lights with

Batteries

Mechanical Room, and

M1

2 Each

Refrigerants HVAC, Roof Unit 1 Unit

9.3 Recommendations

Prior to removal, light tubes, ballasts, lead and tritium batteries, thermostats and switches will require proper handling, removal, transportation and off-site recycling/reclamation. Acetylene cylinders and refrigerants must be transported and disposed in accordance with state, federal and military regulations. Additionally, all items identified in the above table shall be collected and properly disposed of prior to renovation activities at the Site and comply with guidelines outlined in the USGS specifications.

Due to visible mold associated with piping and other mechanical components in Buildings 990, 1319 and 1351, a limited mold survey is also recommended.

Limitations

The conclusions are limited to the information available at the time of the field survey and the scope of services, as defined. No subsurface soil or groundwater sampling and analysis was performed.

Where access to portions of the Site or to structures on the site was unavailable or limited, CDW renders no opinion as to the presence of hazardous material or the presence of indirect evidence related to hazardous material in that portion of the site or structure. This report cannot be solely relied upon for renovation or demolition. The sampling performed forms the basis for conclusions expressed and areas inaccessible for testing limits those conclusions. No other conclusions, interpretations or recommendations are contained or implied in this report other than those expressed. While CDW followed industry standards during the inspection, we do not warrant that all suspect hazardous building materials were identified in or on the buildings and shall not be held liable related to future abatement costs related to hazardous materials that are either not discovered or not appropriately characterized. This is due in part to inherent problems with every building inspection, such as, but not limited to:

• Seemingly homogeneous materials that are not in fact homogeneous;

• Seemingly representative locations that are not in fact representative;

• Layered materials that are not uniformly present or are isolated;

• Materials that are present and accessible but were not considered to be hazardous,

• Materials that are present in an isolated and limited quantity; and

• Material that is present in locations that are unsafe or otherwise difficult to access.

Client acknowledges that CDW's inspection is limited, and all hazardous materials may only become apparent during future renovation or demolition. During future renovation/demolition work, it is likely that additional hazardous materials or materials suspected of being hazardous will be identified. Such materials should be assumed to be hazardous unless appropriate evaluation or sampling and analysis demonstrate otherwise. No other use of this report is warranted without the written consent of CDW Consultants, Inc.

APPENDIX A

Batch: 58954

165 New Boston St., Ste 227 Woburn, MA 01801

781-932-9600 Web: www.asbestosidentificationlab.com

Email: mikemanning@asbestosidentificationlab.com

Asbestos Identification Laboratory

Dear Susan Cahalan, Thank you Susan Cahalan for your business.

Michael Manning Owner/Director

Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project.

The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.

December 28, 2020

Susan Cahalan CDW Consultants, Inc.

6 Huron Drive Natick, MA 01760

Project Name: Building 990, NVWC Newport Naval Base, RI

Project Number:

Date Sampled: 2020-11-24

Work Received: 2020-12-21

Work Analyzed: 2020-12-28

Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116

• NVLAP Lab Code: 200919-0

• Massachusetts Certification License: AA000208

• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142

• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)

• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121

• State of Vermont, Department of Health Environmental Health License AL934461

Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, except in full, without the written consent of Asbestos Identification Laboratory.

December 28, 2020

Susan Cahalan CDW Consultants, Inc.

6 Huron Drive Natick, MA 01760

Project Name: Building 990, NVWC Newport Naval Base, RI

Project Number:

Date Sampled: 2020-11-24

Work Received: 2020-12-21

Work Analyzed: 2020-12-28

Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID gray Cellulose 10

Other 5 Non-Fibrous 85655301

990-1A Ceiling, Main Mechanical Room

Gray Fire Proofing None Detected gray Cellulose 10 Other 5 Non-Fibrous 85655302

990-1B Ceiling, Main Mechanical Room

Gray Fire Proofing None Detected gray Cellulose 10 Other 5 Non-Fibrous 85655303

990-1C Ceiling, Main Mechanical Room

Gray Fire Proofing None Detected

Detected Chrysotile 5 gray Non-Fibrous 95

655304

990-2A On Fiberglass Pipe Fitting @ Chilled Water Supply

Gray Seam Sealant

655305

990-2B On Fiberglass Pipe Fitting @ Chilled Water Supply

Gray Seam Sealant Not Analyzed

655306

990-2C On Fiberglass Pipe Fitting @ Chilled Water Supply

Gray Seam Sealant Not Analyzed gray Cellulose 95 Non-Fibrous 5

655307

990-3A On Large HVAC Unit - Mechanical Room

Gray Flex Connector Cloth None Detected gray Cellulose 95 Non-Fibrous 5

655308

990-3B On Large HVAC Unit - Mechanical Room

Gray Flex Connector Cloth None Detected gray Cellulose 95 Non-Fibrous 5

655309

990-3C On Large HVAC Unit - Mechanical Room

Gray Flex Connector Cloth None Detected white Synthetic 10 Non-Fibrous 90

655310

990-4A Main Mechanical RoomPipe Insulation on Saddle Blocks

None Detected white Mineral Wool 10 Synthetic 10 Non-Fibrous 80655311

990-4B Main Mechanical RoomPipe Insulation on Saddle Blocks

None Detected white Synthetic 5 Non-Fibrous 95

655312

990-4C Main Mechanical RoomPipe Insulation on Saddle Blocks

None Detected gray Fiberglass 20 Mineral Wool 30 Cellulose 10 Non-Fibrous 40655313

990-5A HWS #1 & 2 Mechanical Room

Mudded Pipe Fitting on Gaskets

None Detected

Page 1 of 5Monday 28 December

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID gray Fiberglass 20

Mineral Wool 30 Cellulose 10 Non-Fibrous 40655314

990-5B HWS #1 & 2 Mechanical Room

Mudded Pipe Fitting on Gaskets

None Detected gray Fiberglass 20 Mineral Wool 30 Cellulose 10 Non-Fibrous 40655315

990-5C HWS #1 & 2 Mechanical Room

Mudded Pipe Fitting on Gaskets

None Detected white Fiberglass 5 Cellulose 10 Non-Fibrous 85655316

990-6A Main Mechanical RoomWhite TSI on Hot Water Tank

None Detected white Fiberglass 5 Cellulose 10 Non-Fibrous 85655317

990-6B Main Mechanical RoomWhite TSI on Hot Water Tank

None Detected white Fiberglass 5 Cellulose 10 Non-Fibrous 85655318

990-6C Main Mechanical RoomWhite TSI on Hot Water Tank

None Detected

Detected Chrysotile 3 white Non-Fibrous 97

655319

990-7A 1st FloorEnd Cap Sealant on 4" 0 FG Fitting

655320

990-7B 1st FloorEnd Cap Sealant on 4" 0 FG Fitting

Not Analyzed

655321

990-7C 1st FloorEnd Cap Sealant on 4" 0 FG Fitting

Not Analyzed white Non-Fibrous 100

655322

990-8A Main Mechanical RoomPenetration Sealant None Detected white Non-Fibrous 100

655323

990-8B Main Mechanical RoomPenetration Sealant None Detected white Non-Fibrous 100

655324

990-8C Main Mechanical RoomPenetration Sealant None Detected gray Fiberglass 20 Mineral Wool 30 Non-Fibrous 50655325

990-9A 1st Floor above Ceiling2" 0 Gray Pipe Fitting None Detected gray Fiberglass 20 Mineral Wool 30 Non-Fibrous 50655326

990-9B 1st Floor above Ceiling2" 0 Gray Pipe Fitting None Detected gray Fiberglass 20 Mineral Wool 30 Non-Fibrous 50655327

990-9C 1st Floor above Ceiling2" 0 Gray Pipe Fitting None Detected gray Fiberglass 20 Mineral Wool 20 Non-Fibrous 60655328

990-10A 1st Floor above Ceiling4" 0 Gray Pipe Fitting None Detected gray Fiberglass 20 Mineral Wool 20 Non-Fibrous 60655329

990-10B 1st Floor above Ceiling4" 0 Gray Pipe Fitting None Detected gray Fiberglass 20 Mineral Wool 20 Non-Fibrous 60655330

990-10C 1st Floor above Ceiling4" 0 Gray Pipe Fitting None Detected

Page 2 of 5Monday 28 December gray Fiberglass 20

Mineral Wool 20 Non-Fibrous 60655331

990-11A At Hot Water Tank Y Connection

Pipe Insulation Fitting None Detected gray Fiberglass 20 Mineral Wool 20 Non-Fibrous 60655332

990-11B At Hot Water Tank Y Connection

Pipe Insulation Fitting None Detected gray Fiberglass 20 Mineral Wool 20 Non-Fibrous 60655333

990-11C At Hot Water Tank Y Connection

Pipe Insulation Fitting None Detected gray Cellulose 95 Non-Fibrous 5

655334

990-12A Main Mechanical RoomGray - White Cloth over

HVAC

None Detected gray Cellulose 95 Non-Fibrous 5

655335

990-12B Main Mechanical RoomGray - White Cloth over

HVAC

None Detected gray Cellulose 95 Non-Fibrous 5

655336

990-12C Main Mechanical RoomGray - White Cloth over

HVAC

None Detected gray Fiberglass 10 Cellulose 80 Non-Fibrous 10655337

990-13A Under Duct Pins on HVACGray Paper None Detected gray Fiberglass 10 Cellulose 80 Non-Fibrous 10655338

990-13B Under Duct Pins on HVACGray Paper None Detected tan Cellulose 90 Non-Fibrous 10

655339

990-14A HVAC Mechanical RoomTan Paper under Duct Pins

None Detected tan Cellulose 90 Non-Fibrous 10

655340

990-14B HVAC Mechanical RoomTan Paper under Duct Pins

None Detected gray Cellulose 60 Non-Fibrous 40

655341

990-Roof-1A Roof CoreGray Glue under Rubber None Detected gray Fiberglass 10 Cellulose 80 Non-Fibrous 10655342

990-Roof-1B Top & Bottom Roof FoamGray Paper None Detected gray Cellulose 20 Non-Fibrous 80

655343

990-Roof-1C Roof CoreGypsum Board None Detected gray Fiberglass 10 Cellulose 80 Non-Fibrous 10655344

990-Roof-1D Top of Metal Roof DeckGray Paper None Detected gray Cellulose 60 Non-Fibrous 40

655345

990-Roof-2A Roof CoreGray Glue under Rubber None Detected gray Fiberglass 10 Cellulose 80 Non-Fibrous 10655346

990-Roof-2B Roof CoreGray Paper Top & Bottom RD of Foam

None Detected white Cellulose 30 Non-Fibrous 70

655347

990-Roof-2C Roof CoreGypsum Board None Detected gray Fiberglass 10 Hair 80 Non-Fibrous 10655348

990-Roof-2D Top of Metal Roof DeckGray Paper None Detected

Page 3 of 5Monday 28 December black Cellulose 5

Non-Fibrous 95 655349

990-15A On HVACGray Mastic on Duct Pins None Detected black Cellulose 5 Non-Fibrous 95

655350

990-15B On HVACGray Mastic on Duct Pins None Detected black Cellulose 5 Non-Fibrous 95

655351

990-15C On HVACGray Mastic on Duct Pins None Detected gray Non-Fibrous 100

655352

990-16A Main Mechanical RoomGray Skim Coat on Smooth Walls

None Detected gray Non-Fibrous 100

655353

990-16B Main Mechanical RoomGray Skim Coat on Smooth Walls

None Detected gray Non-Fibrous 100

655354

990-16C Main Mechanical RoomGray Skim Coat on Smooth Walls

None Detected brown Non-Fibrous 100

655355

990-17A HVAC Roof UnitGray Skim Coat on Smooth WallsBrown Glue under Balck Foam

None Detected brown Non-Fibrous 100

655356

990-17B HVAC Roof UnitGray Skim Coat on Smooth WallsBrown Glue under Balck Foam

None Detected brown Non-Fibrous 100

655357

990-17C HVAC Roof UnitGray Skim Coat on Smooth WallsBrown Glue under Balck Foam

None Detected black Non-Fibrous 100

655358

990-18A Roof UnitBlack Caulk on HVAC Duct

None Detected black Non-Fibrous 100

655359

990-18B Roof UnitBlack Caulk on HVAC Duct

None Detected black Non-Fibrous 100

655360

990-18C Roof UnitBlack Caulk on HVAC Duct

None Detected gray Non-Fibrous 100

655361

990-19 Roof Top UnitGray Seam Sealant None Detected black Non-Fibrous 100

655362

990-20A On Rubber - Roof Top HVAC Unit

Black Repair Caulk None Detected black Non-Fibrous 100

655363

990-20B On Rubber - Roof Top HVAC Unit

Black Repair Caulk None Detected

Detected Chrysotile 2 gray Non-Fibrous 98

655364

990-21A Behind Brick FacadeGray Mastic on Black Flashing gray

655365

990-21B Behind Brick FacadeGray Mastic on Black Flashing

Not Analyzed black Non-Fibrous 100

655366

990-22A Behind Brick FacadeBlack Flashing None Detected

Page 4 of 5Monday 28 December black Non-Fibrous 100

655367

990-22B Behind Brick FacadeBlack Flashing None Detected

Analyzed by: 58954Batch:

Page 5 of 5Monday 28 December End of Report

APPENDIX B

Client Sample Description ConcentrationLab ID Analyzed Weight Lead

Collected

EMSL Analytical, Inc.

200 Route 130 North, Cinnaminson, NJ 08077 Phone/Fax: (856) 303-2500 / (856) 786-5974 http://www.EMSL.com cinnaminsonleadlab@emsl.com

Attn: Susan Cahalan CDW Consultants 6 Huron Drive Natick, MA 01760

Received: 12/21/20 9:00 AM

Building 990 NUWC Newport Naval Base

Fax:

Phone: (508) 875-2657

Project:

11/24/2020Collected:

Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*

202011549 CustomerID: CDWC26 CustomerPO:

ProjectID:

EMSL Order:

0.2651 Site: white paint on concrete skin mechanical lounge

202011549-0001LP-1 <0.0080 % wt12/28/2020 g11/24/2020

0.2711 Site: vanilla / gray paint on cmu walls mechanical floor

202011549-0002LP-2 <0.0080 % wt12/28/2020 g11/24/2020

0.2523 Site: white paint HVAC mechanical rm

202011549-0003LP-3 0.020 % wt12/28/2020 g11/24/2020

0.2547 Site: black / red paint on duct frame in mechanical room

202011549-0004LP-4 4.0 % wt12/28/2020 g11/24/2020

0.2513 Site: red / black paint on steel beam support on roof HVAC

202011549-0005LP-5 <0.0080 % wt12/28/2020 g11/24/2020

0.2744 Site: roof over black paint on mechanical roof top unit

202011549-0006LP-6 <0.0080 % wt12/28/2020 g11/24/2020

Phillip Worby, Lead Laboratory Manager or other approved signatory

Test Report ChmSnglePrm/nQC-7.32.3 Printed: 12/29/2020 10:24:27 AM

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted.

Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008% wt based on the minimum sample weight per our SOP. "<" (less than) result signifies the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. Definitions of modifications are available upon request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NELAP Certifications: NJ 03036, NY 10872, PA 68-00367, AIHA-LAP, LLC ELLAP 100194, A2LA 2845.01

Initial report from 12/29/2020 10:24:27 http://www.EMSL.com mailto:cinnaminsonleadlab@emsl.com

OrderID: 202011549

OrderID: 202011549

APPENDIX C

CH33086 - CH33089

Tuesday, December 22, 2020

Sample ID#s:

Ms. Susan Cahalan

CDW Consultants, Inc

6 Huron Dr

Natick, MA 01760

SDG ID: GCH33086

Project ID: BUILDING 990 NUWC NAVAL BASE NEWPORT RI

Sincerely yours, Laboratory Director

Phyllis Shiller

If you are the client above and have any questions concerning this testing, please do not hesitate to contact Phoenix Client Services at ext.200. The contents of this report cannot be discussed with anyone other than the client listed above without their written consent.

NELAC - #NY11301

CT Lab Registration #PH-0618

MA Lab Registration #M-CT007

ME Lab Registration #CT-007

NH Lab Registration #213693-A,B

NJ Lab Registration #CT-003

NY Lab Registration #11301

PA Lab Registration #68-03530

RI Lab Registration #63

UT Lab Registration #CT00007

VT Lab Registration #VT11301

This laboratory is in compliance with the NELAC requirements of procedures used except where indicated.

This report contains results for the parameters tested, under the sampling conditions described on the Chain Of Custody, as received by the laboratory. This report is incomplete unless all pages indicated in the pagination at the bottom of the page are included.

A scanned version of the COC form accompanies the analytical report and is an exact duplicate of the original.

All soils, solids and sludges are reported on a dry weight basis unless otherwise noted in the sample comments.

587 East Middle Turnpike, P.O. Box 370, Manchester, CT 06040

Telephone (860) 645-1102 Fax (860) 645-0823

Sample Id Cross Reference December 22, 2020

587 East Middle Turnpike, P.O.Box 370, Manchester, CT 06045 Tel. (860) 645-1102 Fax (860) 645-0823

Environmental Laboratories, Inc.

SDG I.D.: GCH33086

Client Id Lab Id Matrix

Project ID: BUILDING 990 NUWC NAVAL BASE NEWPORT RI

PCB-1 YELLOW CMU PAINT MECH. RO CH33086 BULK

PCB-2 BLACK CAULK ROOF HVAC CH33087 CAULK

PCB-3 WHITE PAINT ON STEEL HVAC CH33088 BULK

PCB-4 BLACK CAULK REPAIR ROOFTO CH33089 CAULK

Sample Information Custody Information

Matrix:

Location Code:

Rush Request:

P.O.#:

Collected by:

Received by:

Analyzed by:

BULK

CDW-PCB

Standard

11/24/20

CP

see "By" below

Laboratory Data

PCB-1 YELLOW CMU PAINT MECH. ROOM

Phoenix ID: CH33086

12/16/20

9:20

15:10

Parameter Result

RL/

PQL Units Date/Time By Reference

FOR: Ms. Susan Cahalan

CDW Consultants, Inc

6 Huron Dr

Natick, MA 01760

Analysis Report December 22, 2020

Date Time

SDG ID: GCH33086

Client ID:

Project ID: BUILDING 990 NUWC NAVAL BASE NEWPORT RI

Dilution

587 East Middle Turnpike, P.O.Box 370, Manchester, CT 06045

Tel. (860) 645-1102 Fax (860) 645-0823

Environmental Laboratories, Inc.

CompletedExtraction for PCB 12/16/20 HH/JJ/KL/CAJSW3540C

PCB (Soxhlet SW3540C) NDPCB-1016 0.98 12/18/20 SC SW8082Amg/Kg 2

NDPCB-1221 0.98 12/18/20 SC SW8082Amg/Kg 2

NDPCB-1232 0.98 12/18/20 SC SW8082Amg/Kg 2

NDPCB-1242 0.98 12/18/20 SC SW8082Amg/Kg 2

NDPCB-1248 0.98 12/18/20 SC SW8082Amg/Kg 2

NDPCB-1254 0.98 12/18/20 SC SW8082Amg/Kg 2

NDPCB-1260 0.98 12/18/20 SC SW8082Amg/Kg 2

NDPCB-1262 0.98 12/18/20 SC SW8082Amg/Kg 2

NDPCB-1268 0.98 12/18/20 SC SW8082Amg/Kg 2

QA/QC Surrogates

70% DCBP 12/18/20 SC 30 - 150 %% 2

68% DCBP (Confirmation) 12/18/20 SC 30 - 150 %% 2

63% TCMX 12/18/20 SC 30 - 150 %% 2

64% TCMX (Confirmation) 12/18/20 SC 30 - 150 %% 2

Ver 1

PCB-1 YELLOW CMU PAINT MECH. ROOM

Phoenix I.D.: CH33086

Client ID:

BUILDING 990 NUWC NAVAL BASE NEWPORT RIProject ID:

Parameter Result

RL/

PQL Units Date/Time ByDilution Reference

Comments:

Results are reported on an ``as received`` basis, and are not corrected for dry weight.

All soils, solids and sludges are reported on a dry weight basis unless otherwise noted in the sample comments.

Phyllis Shiller, Laboratory Director

December 22, 2020

If you are the client above and have any questions concerning this testing, please do not hesitate to contact Phoenix Client Services at ext.200.

The contents of this report cannot be discussed with anyone other than the client listed above without their written consent.

Reviewed and Released by: Rashmi Makol, Project Manager

RL/PQL=Reporting/Practical Quantitation Level ND=Not Detected BRL=Below Reporting Level QA/QC Surrogates: Surrogates are compounds (preceeded with a %) added by the lab to determine analysis efficiency. Surrogate results(%) listed in the report are not "detected" compounds.

Location Code:

Rush Request:

P.O.#:

Collected by:

Received by:

Analyzed by:

CAULK

CDW-PCB

Standard

11/24/20

CP

see "By" below

Laboratory Data

PCB-2 BLACK CAULK ROOF HVAC

Phoenix ID: CH33087

12/16/20

10:30

15:10

Parameter Result

RL/

PQL Units Date/Time By Reference

FOR: Ms. Susan Cahalan

CDW Consultants, Inc

6 Huron Dr

Natick, MA 01760

Analysis Report December 22, 2020

Date Time

SDG ID: GCH33086

Client ID:

Project ID: BUILDING 990 NUWC NAVAL BASE NEWPORT RI

Dilution

587 East Middle Turnpike, P.O.Box 370, Manchester, CT 06045

Tel. (860) 645-1102 Fax (860) 645-0823

Environmental Laboratories, Inc.

CompletedCaulk Extraction for PCB 12/16/20 HH/JJ/KL/CAJSW3540C

PCB (Soxhlet SW3540C) NDPCB-1016 0.72 12/21/20 SC SW8082Amg/Kg 2

NDPCB-1221 0.72 12/21/20 SC SW8082Amg/Kg 2

NDPCB-1232 0.72 12/21/20 SC SW8082Amg/Kg 2

NDPCB-1242 0.72 12/21/20 SC SW8082Amg/Kg 2

NDPCB-1248 0.72 12/21/20 SC SW8082Amg/Kg 2

NDPCB-1254 0.72 12/21/20 SC SW8082Amg/Kg 2

NDPCB-1260 0.72 12/21/20 SC SW8082Amg/Kg 2

NDPCB-1262 0.72 12/21/20 SC SW8082Amg/Kg 2

NDPCB-1268 0.72 12/21/20 SC SW8082Amg/Kg 2

QA/QC Surrogates

65% DCBP 12/21/20 SC 30 - 150 %% 2

59% DCBP (Confirmation) 12/21/20 SC 30 - 150 %% 2

46% TCMX 12/21/20 SC 30 - 150 %% 2

44% TCMX (Confirmation) 12/21/20 SC 30 - 150 %% 2

PCB-2 BLACK CAULK ROOF HVAC

Phoenix I.D.: CH33087

Client ID:

BUILDING 990 NUWC NAVAL BASE NEWPORT RIProject ID:

Parameter Result

RL/

PQL Units Date/Time ByDilution Reference

Comments:

Results are reported on an ``as received`` basis, and are not corrected for dry weight.

PCB Comment:

For PCBs, in order to reach the desired RL, multiple cleanup steps were performed. The extract was cleaned up with a combination of sulfuric acid, potassium permanganate, copper powder and additional florisil.

All soils, solids and sludges are reported on a dry weight basis unless otherwise noted in the sample comments.

Phyllis Shiller, Laboratory Director

December 22, 2020

If you are the client above and have any questions concerning this testing, please do not hesitate to contact Phoenix Client Services at ext.200.

The contents of this report cannot be discussed with anyone other than the client listed above without their written consent.

Reviewed and Released by: Rashmi Makol, Project Manager

RL/PQL=Reporting/Practical Quantitation Level ND=Not Detected BRL=Below Reporting Level QA/QC Surrogates: Surrogates are compounds (preceeded with a %) added by the lab to determine analysis efficiency. Surrogate results(%) listed in the report are not "detected" compounds.

Location Code:

Rush Request:

P.O.#:

Collected by:

Received by:

Analyzed by:

BULK

CDW-PCB

Standard

11/24/20

CP

see "By" below

Laboratory Data

PCB-3 WHITE PAINT ON STEEL HVAC

Phoenix ID: CH33088

12/16/20

11:00

15:10

Parameter Result

RL/

PQL Units Date/Time By Reference

FOR: Ms. Susan Cahalan

CDW Consultants, Inc

6 Huron Dr

Natick, MA 01760

Analysis Report December 22, 2020

Date Time

SDG ID: GCH33086

Client ID:

Project ID: BUILDING 990 NUWC NAVAL BASE NEWPORT RI

Dilution

587 East Middle Turnpike, P.O.Box 370, Manchester, CT 06045

Tel.