TST Fire Alarm PPIs Building 362 Response.pdf
PDF 6 MB Posted
- Solicitation number
- N4008522R2727
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1690856_Misc. Bldg. Renovations_AMENDMENT 1.docx | DOCX document | |
| ATTACHMENT C PPIs Building 362 - NAVFAC Responses.pdf | ||
| ATTACHMENT C - PPI Tazewell-BGI - NAVFAC Responses.pdf | ||
| 22R2727_AMENDMENT 0001.pdf | ||
| BASE ACCESS INSTRUCTION.pdf | ||
| SecNav 5512.pdf | ||
| 1690856_362 Misc Reno_FINAL DB-RFP PACKAGE_SIGNED.pdf | ||
| ATTACHMENT C PPIs Building 362.xlsx | XLSX spreadsheet | |
| ATTACH. G BLANK Sponsor Verification Spreadsheet.xls | XLS spreadsheet | |
| va62.txt | TXT text file | |
| General Requirements BLDG 362.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFERENCE
Page, Section, Drawing #
D4010; PPI Answers
PPI Answer states to provide new addressable devices and then states to provide monitor modules for each zone. If we are to use monitor modules, the existing devices can be used. If we are to provide new devices, monitor modules are not required. Please advise which direction we should take.
Provide monitor modules for zones not containing any type of smoke detector.
D4010 How many AHU's in the building are rated above 2,000 CFM? These will require duct detectors. Only replace existing duct smoke detectors.
D4010 How many zones are existing on the current Fire Alarm Panel? See Attached Plans
D4010 Could you provide pictures of the existing Fire Alarm Panel? See Attached Plans
D4010 What are the labels on the zones idnetifying each zone's function on the existing fire alarm panel? See Attached Plans
D4010 Please provide a list of Fire Alarm devices to be replaced. See Attached Plans
D4010 Please provide As-Built Drawings of the existing fire alarm system. See Attached Plans
ATTACHMENT A
Project Title: Miscellaneous Building Renovations
Solicitation / RFP#: N40085-22-R-2727 PPI Cut Off Date: 7/12/2022 Proposal Due: 7/22/2022
PPI No.
CONTRACTOR QUESTIONS GOVERNMENT RESPONSES