ATTACHMENT C - PPI Tazewell-BGI - NAVFAC Responses.pdf
PDF 88 KB Posted
- Solicitation number
- N4008522R2727
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TST Fire Alarm PPIs Building 362 Response.pdf | ||
| 1690856_Misc. Bldg. Renovations_AMENDMENT 1.docx | DOCX document | |
| ATTACHMENT C PPIs Building 362 - NAVFAC Responses.pdf | ||
| 22R2727_AMENDMENT 0001.pdf | ||
| BASE ACCESS INSTRUCTION.pdf | ||
| SecNav 5512.pdf | ||
| 1690856_362 Misc Reno_FINAL DB-RFP PACKAGE_SIGNED.pdf | ||
| ATTACHMENT C PPIs Building 362.xlsx | XLSX spreadsheet | |
| ATTACH. G BLANK Sponsor Verification Spreadsheet.xls | XLS spreadsheet | |
| va62.txt | TXT text file | |
| General Requirements BLDG 362.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFERENCE
Page, Section, Drawing #
Part 3, Pg. 8, Section D2010
Part 3, Section D2010 water closet description says provide mounted water closet. Should this be wall or floor mounted water closet?
Floor mounted.
Part 3, Pg. 9, Section D2030
Part 3 Section D2030 states to provide trap primer for area drain. Are the trap primers existing and reconnect to drain or is design to provide new trap primers and piping from primer to drain?
Remove requirement for trap primer for this floor drain. Replace floor drain, including cover, with new.
Part 4, Pg. 22, Section D2010
Part 4, Section D2010, states faucets provided must be of the same type and manufacturer throughout the facility. Must new lavatory faucet match the existing to remain faucets in other restroom? If so are the manufacturer and model numbers available for the existing faucets?
Match faucets with those from a recent project on the 2nd deck: American Standard Monterrey Two-Handle Centerset Lavatory Faucet with Gooseneck Spout - Model Number 7500.170.
ATTACHMENT A
Project Title: Miscellaneous Building Renovations
Solicitation / RFP#: N40085-22-R-2727 PPI Cut Off Date: 7/12/2022 Proposal Due: 7/22/2022
PPI No.
CONTRACTOR QUESTIONS GOVERNMENT RESPONSES
Table 1