ATTACHMENT C PPIs Building 362 - NAVFAC Responses.pdf

PDF 96 KB Posted

Attached to
Miscellaneous Building Renovations, Building 362, Dam Neck Annex
Solicitation number
N4008522R2727
Issued by

View the file

Other files

File Type Posted
TST Fire Alarm PPIs Building 362 Response.pdf PDF
1690856_Misc. Bldg. Renovations_AMENDMENT 1.docx DOCX document
ATTACHMENT C - PPI Tazewell-BGI - NAVFAC Responses.pdf PDF
22R2727_AMENDMENT 0001.pdf PDF
BASE ACCESS INSTRUCTION.pdf PDF
SecNav 5512.pdf PDF
1690856_362 Misc Reno_FINAL DB-RFP PACKAGE_SIGNED.pdf PDF
ATTACHMENT C PPIs Building 362.xlsx XLSX spreadsheet
ATTACH. G BLANK Sponsor Verification Spreadsheet.xls XLS spreadsheet
va62.txt TXT text file
General Requirements BLDG 362.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFERENCE

Page, Section, Drawing #

Part 3, Page 8, D2010 Plumbing Fixtures

Water Closets states, "Provide mounted flush valve type water closets in Toilet room 107." The existing water closet is floor mounted and clear chase spase is not available for wall mounting. Is it the intent of the RFP to provide a floor mounted water closet?

Floor mounted.

Part 3, Page 3, 5.0 Room Requirements

Entry (RM 101) - Item 3 states to replace water-damaged gypsum board. At site visit on 7/5 no water-damaged gypsum board was seen in this space. Confirm if this repair is still required.

This item has been repaired and is no longer required in the Scope of Work.

Part 3, Page 4, 5.0 Room Requirements

Shower and Drying Area (RM 111 & 112) - Item 3 states to replace existing grab bars. There are no existing grab bars in this space per site visit on 7/5. Confirm if new grab bars are required.

Provide grab bars at southwest corner shower.

Part 3, Page 4, 5.0 Room Requirements

Stairwell (Rm 106, 206, & 306) - Item 6 states to provide surface mounted LED lighting fixtures. Confirm if the new fixture quantity must meet lighting code calcualitons or to directly replace the existing quantity of 6 existing fixtures.

Per RFP light must meet uniform lighting levels per IES standards throughout the space.The lighting must meet lighting code calculations.

Part 6, Attachments, Drawing A-401

TOILET ROOM 107 - New Work Key Note #13 indicates to prep, prime, and paint metal trim and doors. Existing door 107 is a wood door in a hollow metal frame. Confirm the intent is not to paint the existing wood door.

The intent is not to paint the door.

Part 6, Attachments, Drawing A-401

TOILET ROOM 107 - New Work Key Note #9 indicates to provide grab bars. Confirm the intent for this space is to be an ADA compliant toilet room. The current toilet configuration does not appear to meet ADA requirements.

The intent is to provide an ADA compliant toilet room as much as possible without increasing the size of the bathroom. Please provide the grab bars.

ATTACHMENT A

Project Title: Miscellaneous Building Renovations

Solicitation / RFP#: N40085-22-R-2727 PPI Cut Off Date: 7/12/2022 Proposal Due: 7/22/2022

PPI No.

CONTRACTOR QUESTIONS GOVERNMENT RESPONSES

Part 3 Section D4010

The scope of work asks to replace a conventional fire alarm control panel with an addressable fire alarm control panel and provide compatible smoke detectors, duct smoke detectors, and monitor modules. The existing devices (manual pull stations, etc.) throughout the building are not addressable and will not be compatible with an addressable fire alarm control panel. Please clarify if new monitor modules are to be provided to monitor each existing zone at the new addressable fire alarm control panel, or if new monitor modules are to be provided at each existing device throughout the building to report to the new FACP. Please clarify if all smoke detectors (including elevator recall detectors and all building duct smoke detectors) are to be replaced with new compatible smoke detectors.

Provide new addressable smoke detectors and duct smoke detectors compatible with the new fire alarm control panel throughout. Provide monitor modules for each zone.

Table 1