1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.

NO.

PROJECT NO. (If applicable)

0001 03/18/2022

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFACSYSCOM MID-ATLANTIC

PWD NORFOLK

FACILITIES ENGINEERING & ACQ DIV

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-22-R-2632

9B. DATED (SEE ITEM 11)

03/01/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N4008522R2632, NSN, BUILDING LAG-27 RENOVATION, NORFOLK, VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0001

The purpose of this amendment is to provide:

1. Changes to Specifications

2. Revisions to the Submittal Register

3. Changes to Drawings

4. Site Visit Log

5. Responses to Pre-Proposal Inquiries (PPIs)

All PPIs are hereby answered. All other terms and conditions remain unchanged.

1. Changes to Specifications

See Attachment A - 1675989_LAG-27_SPECS_REV1

Changes include the following:

PROJECT TABLE OF CONTENTS

Section 07 05 23, PRESSURE TESTING AND AIR BARRIER SYSTEM FOR AIR TIGHTNESS is added to the Project Table of

Contents and accompanies this design revision.

Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM has been revised and resubmitted and accompanies this design revision.

Section 08 51 13, ALUMINUM WINDOWS is added to the Project Table of Contents and accompanies this design revision.

Section 09 90 00, PAINTS AND COATINGS is added to the Project Table of Contents and accompanies this design revision.

Section 10 14 00.10, EXTERIOR SIGNAGE is added to the Project Table of Contents and accompanies this design revision.

Section 10 14 00.20, INTERIOR SIGNAGE is added to the Project Table of Contents and accompanies this design revision.

Section 10 14 00, EXTERIOR SIGNAGE is added to the Project Table of Contents and accompanies this design revision.

Section 10 21 13, TOILET COMPARTMENTS is added to the Project Table of Contents and accompanies this design revision.

Section 10 26 00, WALL AND DOOR PROTECTION is added to the Project Table of Contents and accompanies this design revision.

Section 10 44 16, FIRE EXTINGUISHERS is added to the Project Table of Contents and accompanies this design revision.

Section 10 51 13, METAL LOCKERS is added to the Project Table of Contents and accompanies this design revision.

Section 11 05 40, COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT is added to the Project Table of Contents and accompanies this design revision.

Section 11 31 13, ELECTRIC KITCHEN EQUIPMENT is added to the Project Table of Contents and accompanies this design revision.

Section 12 48 13, ENTRANCE FLOOR MATS is added to the Project Table of Contents and accompanies this design revision.

Section 32 13 13.06, PORTLANDT CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES has been revised and resubmitted and accompanies this design revision.

2. Revisions to Submittal Register

See Attachment L - LAG27-1675989-REGISTER_REV1

SUBMITTAL REGISTER

Submittal Register has been amended with submittal entries for all specifications sections revised and added to the project as part of this design revision.

3. Changes to Drawings

See Attachment B - 1675989_LAG-27_DWGS_REV1

Changes include the following:

SECTION 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

The following drawings, dated March 18, 2022, are added to the list of drawings and accompany this Design Revision:

NAVFAC Dwg. No. Title

Architectural

12,863,009 (AE302) WALL SECTIONS

12,863,010 (AE303) WALL SECTIONS

12,863,011 (AE304) SECTION DETAILS

12,863,012 (AE502) INTERIOR DETAIL

The following drawings are revised as of March 18, 2022 and accompany this Design Revision:

NAVFAC Dwg. No. Title

General 12,862,932 (GI003) LIST OF SHEETS

Civil

12,862,935 (CD101) CIVIL DEMOLITION PLAN

12,862,936 (CS101) CIVIL SITE PLAN

12,862,937 (CU101) CIVIL UTILITY PLAN

12,862,939 (C-502) WATER & SANITARY SEWER DETAILS

Structural

12,862,941 (S-001) STRUCTURAL NOTES – GENERAL, CONCRETE, REINFORCING

12,862,943 (SD101) DEMOLITION FOUNDATION AND GROUND FLOOR PLAN

12,862,946 (S-101) FOUNDATION AND GROUND FLOOR PLAN

12,862,947 (S-102) ROOF FRAMING PLAN

12,862,950 (S-401) ENLARGED FLOOR PLAN – EQUIPMENT FRAME

12,862,951 (S-501) DETAILS

Architectural

12,862,952 (AE001) ARCHITECTURAL NOTES AND SYMBOLS

12,862,953 (AD101) FIRST FLOOR PLAN – DEMOLITION

12,862,954 (AD102) MEZZANINE PLAN – DEMOLITION

12,862,955 (AD103) REFLECTED CEILING PLAN – DEMOLITION

12,862,956 (AD104) ROOF PLAN – DEMOLITION

12,862,957 (AD201) SOUTH AND WEST EXTERIOR ELEVATIONS – DEMOLITION

12,862,958 (AD202) NORTH AND EAST EXTERIOR ELEVATIONS – DEMOLITION

12,862,963 (AE101) FIRST FLOOR PLAN – NEW WORK

12,862,964 (AE102) FIRST FLOOR REFLECTED CEILING PLAN – NEW WORK

12,862,965 (AE103) ROOF PLAN – NEW WORK

12,862,966 (AE201) SOUTH AND WEST EXTERIOR ELEVATIONS – NEW WORK

12,862,967 (AE202) NORTH AND EAST EXTERIOR ELEVATIONS – NEW WORK

12,862,968 (AE203) INTERIOR ELEVATIONS

12,862,969 (AE204) INTERIOR ELEVATIONS

12,862,970 (AE301) BUILDING SECTIONS

12,862,971 (AE401) ENLARGED PLANS

12,862,972 (AE402) ENLARGED PLANS

12,862,973 (AE501) INTERIOR DETAILS

Interiors

12,862,977 (IN101) FIRST FLOOR FINISH PLAN – NEW WORK

12,862,978 (IN102) FINISH SCHEDULE, SIGNAGE SCHEDULE, AND DETAILS

Mechanical

12,862,991 (M-101) FIRST FLOOR

12,862,995 (M-502) MECHANICAL DETAILS

Electrical

12,862,999 (E-001) ELECTRICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND NOTES

12,863,000 (ED101) FLOOR PLAN – DEMOLITION

12,863,001 (EL101) FLOOR PLAN – LIGHTING

12,863,002 (EL501) LIGHTING DIAGRAMS, DETAILS, AND SCHEDULES

12,863,004 (EP101) FLOOR PLAN – POWER

12,863,000 (EP601) POWER RISER DIAGRAM

Telecommunications

12,863,007 (TT101) FLOOR PLAN – TELECOMMUNICATYIONS & SPECIAL SYSTEMS

12,863,000 (TT501) TELECOMMUNICATIONS DIAGRAMS, DETAILS, AND SCHEDULES

4. Site Visit Log

See Attachment M – Site Visit Log

5. Responses to PPIs #1-36

PPI

Date

Submitted

LEAVE

BLANK

Reference

Question

Page Section Paragraph Response

1 03/07/22 Specifications

Division 09 specifications is missing the spec section for all the painting that is required for this project. Please provide spec section 09 90 00 and/or others as required for all paints and coatings.

Specification section 09 90 00 is provided under Attachment A -

1675989_LAG-27_SPECS_REV1

via Amendment 0001.

2 03/07/22 TT501 A1

Drawing TT501 A1 shows Provide cat

6 telephone cabling to new workstation locations. However Drawing TT101 shows cable tv and data only drops according to icons. I see no telephone drops. Please clarify.

All drops to workstations/displays shall be provided as telecommunications drops with RJ-

45 keystone compatible jacks and

Cat6 cabling. See Attachment B -

1675989_LAG-27_DWGS_REV1

provided via Amendment 0001.

3 03/07/22 IN101 Signage

Signage Schedule indicates sign type

S3 for door # 106 and 107 but does not provide sign text info. Are these signs to be left blank?

See Attachment B - 1675989_LAG-

27_DWGS_REV1. Sign text information for rooms 106 and 107 is provided via Amendment 0001.

4 03/07/22

Specifications

Division 10 specifications do not include a specification section for

Signage. Please provide spec section for Signage.

Specification sections 10 14 00.10

& 10 14 00.20 are provided under

Attachment A - 1675989_LAG-

27_SPECS_REV1 via Amendment

0001.

5 03/07/22

AE102

IN102

#2 work note

& finish sched

New work note #2 on AE102 indicates to apply a stain finish to beams, rafters, and assoc. structure in rms 101, 109, and 116.. Finish schedule indicates there are no ceiling finishes, to exposed or other, for the same rooms.

Are finishes required as per note #2 for these rooms?

Yes, painted finishes will be required for the exposed ceiling and structure in rooms 101, 109, and

116. Refer to Attachment B -

1675989_LAG-27_DWGS_REV1

provided via Amendment 0001.

6 03/14/22 10 76114 2.1.1

Due to the close poximity to the water can aluminum roof panels be considered?

No, only consider coated steel panels per specification 07 61 00.

7 03/14/22 26 51 00 3.3.1 the noted spec section and para states to commission all lighting and lighting control systems IAW Section 01 91

00.15 20 Total Bldg Cx. Section 01 91

00.15 20 Total Bldg Cx. has not been provided with this RFP. Is this specific Cx required? If so please provide Section 01 91 00.15 20

Disregard reference to Section

019100.1520. Contractor shall

solely provide control verification tests for all occupancy/vacancy, timeclock, and lighting/exhaust fan restroom control circuits to ensure proper operation prior to final acceptance.

8 03/14/22 23 05 93 1.5.1.2 the noted spec section and para states the TAB specialist must participate in the Cx process however no Cx specifications have been provided. Is

Cx of Mechanical or Plumbing systems required? If so please provide the appropriate Cx specifications.

Building commissioning is not required for this project.

9 03/14/22

Is Cx of Air Barrier systems or building envelope test required? If so please provide the appropriate

Cx/testing specifications.

Yes, air barrier testing will be required for the envelope of the building. Specification section 07 27

10.00 10 has been revised to reflect this change and specification section

07 05 23 has been added. Refer to

Attachment A - 1675989_LAG-

27_SPECS_REV1 via Amendment

0001.

10 03/14/22

#1

CD101

& #2

CS101

there is a trench drain on the north side of the building. There are two places of concrete removal and new concrete that will segment it, but no details what to do in regards to the trench drain, its not addressed. Is the new concrete to be placed with the trench drain incorporated into it?

Refer to Attachment B -

1675989_LAG-27_DWGS_REV1

drawings sheets CS101 and CU101 are provided via Amendment 0001.

The trench drain is not to modified.

Tunnel under existing trench drain.

11 03/14/22

#6

CD101

& #1

PD101

this note indicates to remove external sanitary & drainage pipe, vents, connections. Please clarify that this if this the same piping, etc as indicated by note #1 on PD101.

Yes these are the same pipes as noted in the plumbing sheets.

12 03/14/22 C3/C50

03 30 00 2.6.6

There is a conflict between the spec and the plan on dowels. Plans call for

2’6” deformed bars, painted. The spec calls for smooth round. Which is required?

Refer to Attachment A -

1675989_LAG-27_SPECS_REV1

via Amendment 0001 (spec has been updated to differentiate between interior and exterior concrete work).

13 03/14/22

#23

M101

C3/M5

23 30 00 note reads to provide pre-insulated ductwork system for exposed duct. C3 detail notes pre-insulated duct by

Thermaduct. The specs do not include a spec reference for Thermaduct, the spec just references double wall ductwork. Is Thermaduct required or are we to provide an equal to the double wall ductwork as specified? If

Thermaduct is required, provide material specifications.

Refer to Revisions provided via

Amendment 0001.

14 03/14/22 #5

SD101

Attachment G -

Bid Sched the note states to refer to CLIN items for additional depth of concrete thickness. The Bid Sched only has 1

CLIN for all work. Please advise if there are additional CLINs for other work and if so provide a revised Bid

Sched.

Refer to Revisions provided via

Amendment 0001.

15 03/14/22

Attach ment A, page

204 &

223 of

Statement of

Special

Inspections, pg following the heading "Designated

Seismic Systems (DSS)" it states that

DSS does not apply to this project due to SDC being less than C. However on pg 223 of 1170 an inspection schedule is provided that indicates all listed inspections are required for Plumbing, Mech, & Elec DSS. Please advise if these inspections are required or not.

Refer to Revisions provided via

Amendment 0001.

16 03/14/22

Attach ment A, page

203 of

Statement of

Special on pg 203 the note sections for

Vertical LFRS and Horizontal LFRS state "see key notes" What specific key notes are being referred to?

Refer to Revisions provided via

Amendment 0001.

17 03/14/22

Attach ment A, page

203 of

Statement of

Special on page 203, following the heading

"Special Inspector of Record (SIOR) it states that an SIOR is not required.

Per GN#11 on S001 last sentence states that the contractor must employ a 3rd party Special Inspector. Please confirm that only a 3rd party inspector is needed to perform the special inspections and does not need to meet any requirements of or fill the supervisory position as the SIOR per

UFGS 01 45 35, Section 1.3.7 or fullfill any requirements as outlined in the RFP spec section 01 45 35 para

3.1.1.

Refer to Revisions provided via

Amendment 0001.

18 03/14/22 site visit sign in sheet will a copy of the site visit sign in sheet be provided to the general contractors?

A copy of the sign in sheet is provided via Amendment 0001 under Attachment M - Site Visit

Sign in Sheet.

19 03/14/22

A4/AE

301 &

B3/C3/

AE601

07 27 10.00 10 2.1

A4 wall section on dwg AE301 doesn’t show any/all contruction details or notes for the exterior wall construction/finishes. As close as the dwgs get to that is on door jamb details

B3 & C3 on dwg AE601. The main concern here is in regards to the air barrier (AB) called out in B3 & C3 details. These details show an air barrier that is not representative in thickness of a self adhering AB. The wall section on dwg AE301 does show an AB on the roof which appears to represent a self adhering AB. Spec 07

27 10.00 10 specifies varying AB types i.e., Self-adhered sheet membranes, fluid applied membranes, spray polyurethane foam, etc. Please clarify which type of AB system is to be provided on the roof, and which type of AB system on the exterior walls. If not self adhering for the exterior walls then please provide the appropriate specification for the material type required.

Wall sections and sections details are provided via Amendment 0001 to address exterior wall construction questions. Refer to Revisions provided via Amendment 0001.

20 03/14/22

A4/AE

Please provide a revised A4 wall section which shows all exterior wall construction details and finishes so accurate pricing can be provided.

Wall sections and sections details are provided via Amendment 0001 to address exterior wall construction questions. Refer to Revisions provided via Amendment 0001.

21 03/14/22

Several dwgs reference to see dwgs

IN601. There was no dwg IN601 provided. Was this reference meant to refer to dwgs IN101 or IN102? If not please provide dwg IN601.

Those notes are meant to reference sheet IN102. Refer to Revisions provided via Amendment 0001.

22 03/14/22

AE401,

notes 3

& 4 note 3 on this dwg references Toilet

Partitions and note 4 references

Lockers. Both notes refer you to

IN601 which does not exist. Toilet

Partitions and Lockers are not addressed in any finish schedule.

Please provide specifications for toilet partitions and lockers.

References to sheet IN601 are meant to reference sheet IN201.

Specifications sections 10 51 13 and

10 21 13 are provided via

Amendment 0001.

23 03/14/22

AD101

note 21 last sentence of this note indicates to assume xxx SF of wood stud framing and sheating boards to be replaced.

Please provide the quantity to be assumed for each item to be replaced.

The quantity is 400 SF. Refer to

Revisions provided via Amendment

0001.

24 03/14/22

AD201

note 22 assume xxx SF of wood stud framing and sheating boards to be replace.

Please provide the quantity to be assumed for each item to be replaced.

The quantity is 400 SF. Refer to

Revisions provided via Amendment

0001.

25 03/14/22

AD202

note 1 remove and replace damaged wood stud framing. For bidding purposes please provide the quantity of wood stud framing to be assumed to be removed and replaced.

The quantity is 400 SF. Refer to

Revisions provided via Amendment

0001.

26 03/14/22

IN101

IN102

IN101 Finish legend shows F2-recessed floor mat. IN102 Interior finish legend shows F2-recessed floor mat. Neither of the schedules provide any material data. Please provide specifications for the recessed floor mat required.

Specification section 12 48 13 is provided via Amendment 0001.

Refer to Revisions provided via

Amendment 0001.

27 03/14/22

AE101

note 1 note 1 indicates see detail "xxxx" for this display case. There is also a similar display case on same dwg in same room but not identified by a work note. Both of these display cases are shown in details C1 & C3 on AE204.

The only dwg with any casework details is dwg AE501 but all of those details pertain to base and wall cabinets not display cases. Please provide detailed dwgs for each of these display cases with sufficient information for construction so pricing can be determined.

Refer to Revisions provided via

Amendment 0001. Sections for both cases provided in sheet AE502.

28 03/14/22

AE101

note 10

AE203

details

A3,B3, C3 several appliances are noted on the drawings. The only work indicated for these appliances is for plumbing or electrical connections. No specifications have been provided for any applicances. Is the contractor to assume these items are Not In Contract or are we to assume they are GFCI?

All appliances except for warming cabinet are in contract as provided in revised sheet AE402 and specifications sections 11 05 40 and

11 31 13. Refer to Revisions provided via Amendment 0001.

29 03/14/22 AE602

this drawing only contains a detail regarding flashing tape. No general notes, new work notes or anything else has been provided. Was other necessary construction details intended to be provided? Please advise.

Window details will be provided on this sheet in a future revision.

30 03/14/22 C-001

Erosion & Sediment Control note #2 states E & S control shall be installed prior to start up and must be reviewed and approved by the Contracting

Officer. Due to the proximity of this project to a waterway will there be any permits or other requirements by any other agency such as or the Virginia

DEQ, Chesapeake Bay Commission, or others?

No other permits are required.

31 03/16/22 AE401 10

AE-401 calls for toilet partitions however, there is no specification for toilet partitions. Will this be provided?

Refer to Revisions provided via

Amendment 0001. Specifications section 10 21 13 is provided via

Amendment 0001.

32 03/16/22 AE401 10

AE-401 calls for lockers howeever, there is not a locker specification. Will this be provided?

Refer to Revisions provided via

Amendment 0001. Specifications section 10 51 13 is provided via

Amendment 0001.

33 03/16/22 AE401 Note 4

AE-401, Note 4 references Drawing, IN601 however, Drawing IN601 has not been included in the project documents. Will this drawing be provided?

References to sheet IN601 are meant to reference sheet IN201. Refer to

Revisions provided via Amendment

0001.

34 03/16/22 AE101 Note 1

AE101 Note 1 shows a display case and references Detail XXXX which does not exist. Will this detail be provided?

Display case section are provided via Amendment 0001 in sheet

AE502 under Attachment B -

1675989_LAG-27_DWGS_REV1.

35 03/16/22

Are current asbestos, lead and PCB reports available for distribution?

Please provide if available.

No, there are no reports available for distribution.

36 03/16/22 Is there water access available onsite?

Yes, water access will be available on site.