1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.
NO.
PROJECT NO. (If applicable)
0001 03/18/2022
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFACSYSCOM MID-ATLANTIC
PWD NORFOLK
FACILITIES ENGINEERING & ACQ DIV
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-22-R-2632
9B. DATED (SEE ITEM 11)
03/01/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N4008522R2632, NSN, BUILDING LAG-27 RENOVATION, NORFOLK, VIRGINIA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0001
The purpose of this amendment is to provide:
1. Changes to Specifications
2. Revisions to the Submittal Register
3. Changes to Drawings
4. Site Visit Log
5. Responses to Pre-Proposal Inquiries (PPIs)
All PPIs are hereby answered. All other terms and conditions remain unchanged.
1. Changes to Specifications
See Attachment A - 1675989_LAG-27_SPECS_REV1
Changes include the following:
PROJECT TABLE OF CONTENTS
Section 07 05 23, PRESSURE TESTING AND AIR BARRIER SYSTEM FOR AIR TIGHTNESS is added to the Project Table of
Contents and accompanies this design revision.
Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM has been revised and resubmitted and accompanies this design revision.
Section 08 51 13, ALUMINUM WINDOWS is added to the Project Table of Contents and accompanies this design revision.
Section 09 90 00, PAINTS AND COATINGS is added to the Project Table of Contents and accompanies this design revision.
Section 10 14 00.10, EXTERIOR SIGNAGE is added to the Project Table of Contents and accompanies this design revision.
Section 10 14 00.20, INTERIOR SIGNAGE is added to the Project Table of Contents and accompanies this design revision.
Section 10 14 00, EXTERIOR SIGNAGE is added to the Project Table of Contents and accompanies this design revision.
Section 10 21 13, TOILET COMPARTMENTS is added to the Project Table of Contents and accompanies this design revision.
Section 10 26 00, WALL AND DOOR PROTECTION is added to the Project Table of Contents and accompanies this design revision.
Section 10 44 16, FIRE EXTINGUISHERS is added to the Project Table of Contents and accompanies this design revision.
Section 10 51 13, METAL LOCKERS is added to the Project Table of Contents and accompanies this design revision.
Section 11 05 40, COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT is added to the Project Table of Contents and accompanies this design revision.
Section 11 31 13, ELECTRIC KITCHEN EQUIPMENT is added to the Project Table of Contents and accompanies this design revision.
Section 12 48 13, ENTRANCE FLOOR MATS is added to the Project Table of Contents and accompanies this design revision.
Section 32 13 13.06, PORTLANDT CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES has been revised and resubmitted and accompanies this design revision.
2. Revisions to Submittal Register
See Attachment L - LAG27-1675989-REGISTER_REV1
SUBMITTAL REGISTER
Submittal Register has been amended with submittal entries for all specifications sections revised and added to the project as part of this design revision.
3. Changes to Drawings
See Attachment B - 1675989_LAG-27_DWGS_REV1
Changes include the following:
SECTION 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
The following drawings, dated March 18, 2022, are added to the list of drawings and accompany this Design Revision:
NAVFAC Dwg. No. Title
Architectural
12,863,009 (AE302) WALL SECTIONS
12,863,010 (AE303) WALL SECTIONS
12,863,011 (AE304) SECTION DETAILS
12,863,012 (AE502) INTERIOR DETAIL
The following drawings are revised as of March 18, 2022 and accompany this Design Revision:
NAVFAC Dwg. No. Title
General 12,862,932 (GI003) LIST OF SHEETS
Civil
12,862,935 (CD101) CIVIL DEMOLITION PLAN
12,862,936 (CS101) CIVIL SITE PLAN
12,862,937 (CU101) CIVIL UTILITY PLAN
12,862,939 (C-502) WATER & SANITARY SEWER DETAILS
Structural
12,862,941 (S-001) STRUCTURAL NOTES – GENERAL, CONCRETE, REINFORCING
12,862,943 (SD101) DEMOLITION FOUNDATION AND GROUND FLOOR PLAN
12,862,946 (S-101) FOUNDATION AND GROUND FLOOR PLAN
12,862,947 (S-102) ROOF FRAMING PLAN
12,862,950 (S-401) ENLARGED FLOOR PLAN – EQUIPMENT FRAME
12,862,951 (S-501) DETAILS
Architectural
12,862,952 (AE001) ARCHITECTURAL NOTES AND SYMBOLS
12,862,953 (AD101) FIRST FLOOR PLAN – DEMOLITION
12,862,954 (AD102) MEZZANINE PLAN – DEMOLITION
12,862,955 (AD103) REFLECTED CEILING PLAN – DEMOLITION
12,862,956 (AD104) ROOF PLAN – DEMOLITION
12,862,957 (AD201) SOUTH AND WEST EXTERIOR ELEVATIONS – DEMOLITION
12,862,958 (AD202) NORTH AND EAST EXTERIOR ELEVATIONS – DEMOLITION
12,862,963 (AE101) FIRST FLOOR PLAN – NEW WORK
12,862,964 (AE102) FIRST FLOOR REFLECTED CEILING PLAN – NEW WORK
12,862,965 (AE103) ROOF PLAN – NEW WORK
12,862,966 (AE201) SOUTH AND WEST EXTERIOR ELEVATIONS – NEW WORK
12,862,967 (AE202) NORTH AND EAST EXTERIOR ELEVATIONS – NEW WORK
12,862,968 (AE203) INTERIOR ELEVATIONS
12,862,969 (AE204) INTERIOR ELEVATIONS
12,862,970 (AE301) BUILDING SECTIONS
12,862,971 (AE401) ENLARGED PLANS
12,862,972 (AE402) ENLARGED PLANS
12,862,973 (AE501) INTERIOR DETAILS
Interiors
12,862,977 (IN101) FIRST FLOOR FINISH PLAN – NEW WORK
12,862,978 (IN102) FINISH SCHEDULE, SIGNAGE SCHEDULE, AND DETAILS
Mechanical
12,862,991 (M-101) FIRST FLOOR
12,862,995 (M-502) MECHANICAL DETAILS
Electrical
12,862,999 (E-001) ELECTRICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND NOTES
12,863,000 (ED101) FLOOR PLAN – DEMOLITION
12,863,001 (EL101) FLOOR PLAN – LIGHTING
12,863,002 (EL501) LIGHTING DIAGRAMS, DETAILS, AND SCHEDULES
12,863,004 (EP101) FLOOR PLAN – POWER
12,863,000 (EP601) POWER RISER DIAGRAM
Telecommunications
12,863,007 (TT101) FLOOR PLAN – TELECOMMUNICATYIONS & SPECIAL SYSTEMS
12,863,000 (TT501) TELECOMMUNICATIONS DIAGRAMS, DETAILS, AND SCHEDULES
4. Site Visit Log
See Attachment M – Site Visit Log
5. Responses to PPIs #1-36
PPI
Date
Submitted
LEAVE
BLANK
Reference
Question
Page Section Paragraph Response
1 03/07/22 Specifications
Division 09 specifications is missing the spec section for all the painting that is required for this project. Please provide spec section 09 90 00 and/or others as required for all paints and coatings.
Specification section 09 90 00 is provided under Attachment A -
1675989_LAG-27_SPECS_REV1
via Amendment 0001.
2 03/07/22 TT501 A1
Drawing TT501 A1 shows Provide cat
6 telephone cabling to new workstation locations. However Drawing TT101 shows cable tv and data only drops according to icons. I see no telephone drops. Please clarify.
All drops to workstations/displays shall be provided as telecommunications drops with RJ-
45 keystone compatible jacks and
Cat6 cabling. See Attachment B -
1675989_LAG-27_DWGS_REV1
provided via Amendment 0001.
3 03/07/22 IN101 Signage
Signage Schedule indicates sign type
S3 for door # 106 and 107 but does not provide sign text info. Are these signs to be left blank?
See Attachment B - 1675989_LAG-
27_DWGS_REV1. Sign text information for rooms 106 and 107 is provided via Amendment 0001.
4 03/07/22
Specifications
Division 10 specifications do not include a specification section for
Signage. Please provide spec section for Signage.
Specification sections 10 14 00.10
& 10 14 00.20 are provided under
Attachment A - 1675989_LAG-
27_SPECS_REV1 via Amendment
0001.
5 03/07/22
AE102
IN102
#2 work note
& finish sched
New work note #2 on AE102 indicates to apply a stain finish to beams, rafters, and assoc. structure in rms 101, 109, and 116.. Finish schedule indicates there are no ceiling finishes, to exposed or other, for the same rooms.
Are finishes required as per note #2 for these rooms?
Yes, painted finishes will be required for the exposed ceiling and structure in rooms 101, 109, and
116. Refer to Attachment B -
1675989_LAG-27_DWGS_REV1
provided via Amendment 0001.
6 03/14/22 10 76114 2.1.1
Due to the close poximity to the water can aluminum roof panels be considered?
No, only consider coated steel panels per specification 07 61 00.
7 03/14/22 26 51 00 3.3.1 the noted spec section and para states to commission all lighting and lighting control systems IAW Section 01 91
00.15 20 Total Bldg Cx. Section 01 91
00.15 20 Total Bldg Cx. has not been provided with this RFP. Is this specific Cx required? If so please provide Section 01 91 00.15 20
Disregard reference to Section
019100.1520. Contractor shall
solely provide control verification tests for all occupancy/vacancy, timeclock, and lighting/exhaust fan restroom control circuits to ensure proper operation prior to final acceptance.
8 03/14/22 23 05 93 1.5.1.2 the noted spec section and para states the TAB specialist must participate in the Cx process however no Cx specifications have been provided. Is
Cx of Mechanical or Plumbing systems required? If so please provide the appropriate Cx specifications.
Building commissioning is not required for this project.
9 03/14/22
Is Cx of Air Barrier systems or building envelope test required? If so please provide the appropriate
Cx/testing specifications.
Yes, air barrier testing will be required for the envelope of the building. Specification section 07 27
10.00 10 has been revised to reflect this change and specification section
07 05 23 has been added. Refer to
Attachment A - 1675989_LAG-
27_SPECS_REV1 via Amendment
0001.
10 03/14/22
#1
CD101
& #2
CS101
there is a trench drain on the north side of the building. There are two places of concrete removal and new concrete that will segment it, but no details what to do in regards to the trench drain, its not addressed. Is the new concrete to be placed with the trench drain incorporated into it?
Refer to Attachment B -
1675989_LAG-27_DWGS_REV1
drawings sheets CS101 and CU101 are provided via Amendment 0001.
The trench drain is not to modified.
Tunnel under existing trench drain.
11 03/14/22
#6
CD101
& #1
PD101
this note indicates to remove external sanitary & drainage pipe, vents, connections. Please clarify that this if this the same piping, etc as indicated by note #1 on PD101.
Yes these are the same pipes as noted in the plumbing sheets.
12 03/14/22 C3/C50
03 30 00 2.6.6
There is a conflict between the spec and the plan on dowels. Plans call for
2’6” deformed bars, painted. The spec calls for smooth round. Which is required?
Refer to Attachment A -
1675989_LAG-27_SPECS_REV1
via Amendment 0001 (spec has been updated to differentiate between interior and exterior concrete work).
13 03/14/22
#23
M101
C3/M5
23 30 00 note reads to provide pre-insulated ductwork system for exposed duct. C3 detail notes pre-insulated duct by
Thermaduct. The specs do not include a spec reference for Thermaduct, the spec just references double wall ductwork. Is Thermaduct required or are we to provide an equal to the double wall ductwork as specified? If
Thermaduct is required, provide material specifications.
Refer to Revisions provided via
Amendment 0001.
14 03/14/22 #5
SD101
Attachment G -
Bid Sched the note states to refer to CLIN items for additional depth of concrete thickness. The Bid Sched only has 1
CLIN for all work. Please advise if there are additional CLINs for other work and if so provide a revised Bid
Sched.
Refer to Revisions provided via
Amendment 0001.
15 03/14/22
Attach ment A, page
204 &
223 of
Statement of
Special
Inspections, pg following the heading "Designated
Seismic Systems (DSS)" it states that
DSS does not apply to this project due to SDC being less than C. However on pg 223 of 1170 an inspection schedule is provided that indicates all listed inspections are required for Plumbing, Mech, & Elec DSS. Please advise if these inspections are required or not.
Refer to Revisions provided via
Amendment 0001.
16 03/14/22
Attach ment A, page
203 of
Statement of
Special on pg 203 the note sections for
Vertical LFRS and Horizontal LFRS state "see key notes" What specific key notes are being referred to?
Refer to Revisions provided via
Amendment 0001.
17 03/14/22
Attach ment A, page
203 of
Statement of
Special on page 203, following the heading
"Special Inspector of Record (SIOR) it states that an SIOR is not required.
Per GN#11 on S001 last sentence states that the contractor must employ a 3rd party Special Inspector. Please confirm that only a 3rd party inspector is needed to perform the special inspections and does not need to meet any requirements of or fill the supervisory position as the SIOR per
UFGS 01 45 35, Section 1.3.7 or fullfill any requirements as outlined in the RFP spec section 01 45 35 para
3.1.1.
Refer to Revisions provided via
Amendment 0001.
18 03/14/22 site visit sign in sheet will a copy of the site visit sign in sheet be provided to the general contractors?
A copy of the sign in sheet is provided via Amendment 0001 under Attachment M - Site Visit
Sign in Sheet.
19 03/14/22
A4/AE
301 &
B3/C3/
AE601
07 27 10.00 10 2.1
A4 wall section on dwg AE301 doesn’t show any/all contruction details or notes for the exterior wall construction/finishes. As close as the dwgs get to that is on door jamb details
B3 & C3 on dwg AE601. The main concern here is in regards to the air barrier (AB) called out in B3 & C3 details. These details show an air barrier that is not representative in thickness of a self adhering AB. The wall section on dwg AE301 does show an AB on the roof which appears to represent a self adhering AB. Spec 07
27 10.00 10 specifies varying AB types i.e., Self-adhered sheet membranes, fluid applied membranes, spray polyurethane foam, etc. Please clarify which type of AB system is to be provided on the roof, and which type of AB system on the exterior walls. If not self adhering for the exterior walls then please provide the appropriate specification for the material type required.
Wall sections and sections details are provided via Amendment 0001 to address exterior wall construction questions. Refer to Revisions provided via Amendment 0001.
20 03/14/22
A4/AE
Please provide a revised A4 wall section which shows all exterior wall construction details and finishes so accurate pricing can be provided.
Wall sections and sections details are provided via Amendment 0001 to address exterior wall construction questions. Refer to Revisions provided via Amendment 0001.
21 03/14/22
Several dwgs reference to see dwgs
IN601. There was no dwg IN601 provided. Was this reference meant to refer to dwgs IN101 or IN102? If not please provide dwg IN601.
Those notes are meant to reference sheet IN102. Refer to Revisions provided via Amendment 0001.
22 03/14/22
AE401,
notes 3
& 4 note 3 on this dwg references Toilet
Partitions and note 4 references
Lockers. Both notes refer you to
IN601 which does not exist. Toilet
Partitions and Lockers are not addressed in any finish schedule.
Please provide specifications for toilet partitions and lockers.
References to sheet IN601 are meant to reference sheet IN201.
Specifications sections 10 51 13 and
10 21 13 are provided via
Amendment 0001.
23 03/14/22
AD101
note 21 last sentence of this note indicates to assume xxx SF of wood stud framing and sheating boards to be replaced.
Please provide the quantity to be assumed for each item to be replaced.
The quantity is 400 SF. Refer to
Revisions provided via Amendment
0001.
24 03/14/22
AD201
note 22 assume xxx SF of wood stud framing and sheating boards to be replace.
Please provide the quantity to be assumed for each item to be replaced.
The quantity is 400 SF. Refer to
Revisions provided via Amendment
0001.
25 03/14/22
AD202
note 1 remove and replace damaged wood stud framing. For bidding purposes please provide the quantity of wood stud framing to be assumed to be removed and replaced.
The quantity is 400 SF. Refer to
Revisions provided via Amendment
0001.
26 03/14/22
IN101
IN102
IN101 Finish legend shows F2-recessed floor mat. IN102 Interior finish legend shows F2-recessed floor mat. Neither of the schedules provide any material data. Please provide specifications for the recessed floor mat required.
Specification section 12 48 13 is provided via Amendment 0001.
Refer to Revisions provided via
Amendment 0001.
27 03/14/22
AE101
note 1 note 1 indicates see detail "xxxx" for this display case. There is also a similar display case on same dwg in same room but not identified by a work note. Both of these display cases are shown in details C1 & C3 on AE204.
The only dwg with any casework details is dwg AE501 but all of those details pertain to base and wall cabinets not display cases. Please provide detailed dwgs for each of these display cases with sufficient information for construction so pricing can be determined.
Refer to Revisions provided via
Amendment 0001. Sections for both cases provided in sheet AE502.
28 03/14/22
AE101
note 10
AE203
details
A3,B3, C3 several appliances are noted on the drawings. The only work indicated for these appliances is for plumbing or electrical connections. No specifications have been provided for any applicances. Is the contractor to assume these items are Not In Contract or are we to assume they are GFCI?
All appliances except for warming cabinet are in contract as provided in revised sheet AE402 and specifications sections 11 05 40 and
11 31 13. Refer to Revisions provided via Amendment 0001.
29 03/14/22 AE602
this drawing only contains a detail regarding flashing tape. No general notes, new work notes or anything else has been provided. Was other necessary construction details intended to be provided? Please advise.
Window details will be provided on this sheet in a future revision.
30 03/14/22 C-001
Erosion & Sediment Control note #2 states E & S control shall be installed prior to start up and must be reviewed and approved by the Contracting
Officer. Due to the proximity of this project to a waterway will there be any permits or other requirements by any other agency such as or the Virginia
DEQ, Chesapeake Bay Commission, or others?
No other permits are required.
31 03/16/22 AE401 10
AE-401 calls for toilet partitions however, there is no specification for toilet partitions. Will this be provided?
Refer to Revisions provided via
Amendment 0001. Specifications section 10 21 13 is provided via
Amendment 0001.
32 03/16/22 AE401 10
AE-401 calls for lockers howeever, there is not a locker specification. Will this be provided?
Refer to Revisions provided via
Amendment 0001. Specifications section 10 51 13 is provided via
Amendment 0001.
33 03/16/22 AE401 Note 4
AE-401, Note 4 references Drawing, IN601 however, Drawing IN601 has not been included in the project documents. Will this drawing be provided?
References to sheet IN601 are meant to reference sheet IN201. Refer to
Revisions provided via Amendment
0001.
34 03/16/22 AE101 Note 1
AE101 Note 1 shows a display case and references Detail XXXX which does not exist. Will this detail be provided?
Display case section are provided via Amendment 0001 in sheet
AE502 under Attachment B -
1675989_LAG-27_DWGS_REV1.
35 03/16/22
Are current asbestos, lead and PCB reports available for distribution?
Please provide if available.
No, there are no reports available for distribution.
36 03/16/22 Is there water access available onsite?
Yes, water access will be available on site.
(End of Summary of Changes)