DOOR NUMBER

(REFER TO DOOR SCHEDULE)

DOOR TAG

ARCHITECTURAL SYMBOLS

WINDOW TYPE LETTER

WINDOW TYPE TAG

SPECIALITY ITEM NUMBER

SPECIALITY ITEM TAG

PARTITION TYPE DESIGNATION

(REFER TO PARTITION SCHEDULE)

PARTITION TYPE TAG

PARTITION IN PLAN

ROOM

A1 A-301

ROOM TAG

DETAIL NUMBER

SHEET WHERE DRAWN

DETAIL TAG

ROOM NAME

ROOM NUMBER

A-401 INTERIOR ELEVATION

TAG

INTERIOR ELEVATION NUMBER

SHEET WHERE DRAWN

EXTERIOR ELEVATION

TAG

ELEVATION NUMBER

DIRECTION OF VIEW

SHEET WHERE DRAWN

A1 A-301

WALL / PARTIAL

BUILDING SECTION

TAG

SECTION NUMBER

SHEET WHERE DRAWN

A1 A-301

BUILDING SECTION

TAG

SECTION NUMBER

SHEET WHERE DRAWN

A1 A-301

BUILDING

NEW WORK

KEYNOTE TAG

KEYNOTE NUMBER

DEMO

KEYNOTE TAG

KEYNOTE NUMBER

A-901 PHOTOGRAPH TAG

PHOTOGRAPH NUMBER

SHEET WHERE SHOWN

A1

A-501

A1

A1

A1

B

A1

MATERIALS LEGEND

CAST-IN-PLACE CONCRETE

STEEL

BATT/LOOSE FILL INSULATION

RIGID INSULATION

WOOD - ROUGH

WOOD BLOCKING

SECTION ELEVATION

GLAZING

CONCRETE FOUNDATION

EARTH / COMPACT FILL

POROUS FILL / GRAVEL

ALUMINUM

GYPSUM BOARD

PLYWOOD

SAND / MORTAR / PLASTER

ACOUSTICAL TILE CEILING

CERAMIC TILE

FINISHED WOOD

LAG-27

LAG-88

LAG-109

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:5

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AE001

BU

IL

DI

NG

L

AG

-2

AR

CH

IT

EC

TU

RA

L

NO

TE

S

AN

D

SY

M

BO

LS

ALP

12,862,952

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AE

1 MANUFACTURER'S TRADE NAMES LISTED ARE NOT INTENDED TO BE

PROPRIETARY. PRODUCTS OF OTHER MANUFACTURERS ARE ACCEPTABLE

PROVIDED THEY MEET THE TECHNICAL REQUIREMENTS INDICATED, AS WELL

AS, MATCH THE COLOR, FINISH, TEXTURE, AND/OR PATTERN OF THE

MANUFACTURER LISTED.

2 ALL WOOD BLOCKING AND MISCELLANEOUS STEEL SHOWN IN DETAILS AND

SECTIONS MUST BE CONTINUOUS UNLESS SPECIFICALLY NOTED OTHERWISE.

3 DEMOLITION OF PLUMBING, MECHANICAL AND ELECTRICAL ITEMS INDICATED

ON THE ARCHITECTURAL DRAWINGS IS NOT INTENDED TO INCLUDE ALL

NECESSARY DEMOLITION WORK FOR THESE ITEMS. REFER TO PLUMBING,

MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS FOR ADDITIONAL

INFORMATION.

4 DIMENSIONS INDICATED FOR NEW WORK ARE TO FACE OF STUD, FACE OF

MASONRY OR FACE OF EXISTING SURFACES UNLESS OTHERWISE NOTED.

5 REFER TO SHEET GI002 FOR ADDITIONAL GENERAL PROJECT NOTES.

SIM SIMILAR

SPC SUSPENDED PLASTER CEILING

SPEC SPECIFICATION

SQ SQUARE

STD STANDARD

STOR STORAGE

STR STRAIGHT STRIKE / STRINGERS

SUSP SUSPENDED

T&B TOP AND BOTTOM

TEL TELEPHONE

THRES THRESHOLD

THRU THROUGH

TOS TOP OF SLAB / STEEL

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

V VOLT

VAR VARIATION

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VENT VENTILATION / VENTILATOR

VERT VERTICAL

VEST VESTIBULE

VS VENT STACK

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WASTE / WATT / WEST / WIDE

W/ WITH

W/O WITHOUT

WC WATER CLOSET / WALL COVERING

WD WOOD

WH WATER HEATER

WP WATERPROOFING / WEATHERPROOF / WORKING

POINT

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

XRMR TRANSFORMER

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPT OPTIONAL

PCT PERCENT

PEJ PREMOLDED EXPANSION JOINT

PL PROPERTY LINE

PLAS PLASTER / PLASTIC

PLYWD PLYWOOD

PNL PANEL

PRELIM PRELIMINARY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT

QT QUARRY TILE

R RADUIS / RISER

RA RETURN AIR

RAD RETURN AIR DUCT

RB RESILIENT BASE

RD ROOF DRAIN / ROAD

REFL REFLECT

REFR REFRIGERATION

REINF REINFORCE

REQD REQUIRED

REV REVISION

RF RESILIENT FLOORING

RL ROOF LEADER

RM ROOM

RND ROUND

RO ROUGH OPENING

RS ROUGH SAWN

RT RIGHT

S SOUTH

SAPC SUSPENDED ACOUSTICAL PANEL CEILING

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT

SH SHINGLES / SINGLE HUNG

GA GAUGE

GALV GALVANIZED

GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GL GLASS / GROUND LEVEL

GR GROSS

GSU GLAZED STRUCTURAL UNIT

GYP GYPSUM

H HIGH

HB HOSE BIB

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HT HEIGHT

HVY HEAVY

ID INSIDE DIAMETER

INSUL INSULATION / INSULATED

INT INTERIOR

J-BOX JUNCTION BOX

JAN JANITOR CLOSET

LAV LAVATORY

LB POUND

LT LIGHT

MACH MACHINE

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFG MANUFACTURING

MIN MINIMUM / MINUTE

MISC MISCELLANEOUS

ML MATCH LINE

MO MASONRY OPENING / MOTOR OPERATED

MTD MOUNTED

MTG MOUNTING / MEETING

MTL METAL

MWP MEMBRANE WATERPROOFING

N NORTH

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OUTSIDE AIR

CPT CARPET / COMMON PATH OF TRAVEL

CT CERAMIC TILE

CTR CENTER

D DEPTH / DEEP

DEG DEGREE

DEMO DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DR DRAIN

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

EA EACH

EIFS EXTERIOR INSULATION & FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC / ELECTRICAL

EPDM ETHLENE PROPYLENE DIEN MONOMER

EQ EQUAL

EQUIP EQUIPMENT

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION / EXPOSED / EXPAND

EXT EXTERIOR

FD FLOOR DRAIN

FDTN FOUNDATION

FF FINISH FACE

FG FIGURE

FHC FIRE HOUSE CABINET

FIN FLR FINISHED FLOOR

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUB / FACE OF SLAB

FR FRAME / FIRE RATING / FIRE RESISTANT

FT FOOT, FEET

FTG FOOTING

AB ANCHOR BOLT

ACS PNL ACCESS PANEL

ADJ ADJUST

ALT ALTERNATE, ALTITUDE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECT

ASPH ASPHALT

ATC ACOUSTICAL TILE CEILING

BD BOARD

BLDG BUILDING

BLW BELOW

BM BEAM

BOS BOTTOM OF SLAB / STEEL

BOT BOTTOM

BRG BEARING

BSMT BASEMENT

BTWN BETWEEN

C TO C CENTER TO CENTER

CAB CABINET

CEM CEMENT

CER CERAMIC

CI CAST IRON

CIP CAST IRON PIPE

CJ CONTROL / CONSTRUCTION JOINT

CLG CEILING

CLG REG CEILING REGISTER

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CND CONDUIT

CNDS CONDENSATE

CNSTR CONSTRUCTION

CNTR CNTR

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONN CONNECT

CONT CONTINUE / CONTINUOUS

CORR CORRIDOR

ARCHITECTURAL ABBREVIATIONS

GENERAL ARCHITECTURAL NOTES

REFERENCE SITE PLAN

SITE PLAN KEYNOTES#

1 SCOPE OF CIVIL SITE WORK. REFER TO CIVIL DRAWINGS.

2 COMPOSITE BOARD DECKING AND CANOPY STRUCTURE TO REMAIN. REMOVE

AND SALVAGE CANOPY AND DECKING COMPONENTS AS REQUIRED TO

COMPLETE THE CONTRACTED WORK. AT WORK COMPLETION, REINSTALL AND

RESTORE DECKING AND CANOPY COMPONENTS TO THEIR ORIGINAL STATE.

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

DW

REF.

A

B

C

D

E

2 3 4 5 6 7 8 9

93'-2 1/4" ±

8 1/2" ± 11'-0 1/2" ± 10'-10 1/4" ± 11'-1 1/2" ± 10'-11" ± 11'-3" ± 10'-10 1/2" ± 11'-2" ± 15'-11 1/2" ± 9 1/4" ±

'-3 1/

4"

3/4

5'- 0 1

/4"

'-1

3/ 4"

'-1 3/

4"

4'-

1/ 2"

± 4'-8" ±

8'- 0"

5" ± 4'-8" ±

8'- 0"

21'-9 1/4" ± 23'-4 3/4" ± 21'-0" ± 11'-0 1/2" ± 16'-8 1/4" ±

5'- 3 3

/4"

9'- 6 7

/8"

'-4

7/ 8"

7'-

3"

11" ±

3'- 7"

4'- 6 3

/8"

1'- 1 1

/2"

'-0

3/ 4"

1'-

0 1 /4"

'-1 1"

5'-

5/ 8"

1'-2 3/8" ± 9'-11" ± 11'-9 1/4" ± 40'-0 3/4" ± 7'-11 3/8" ± 2'-3 1/2" ± 4'-5 3/4" ± 11'-7" ± 4'-11" ±

2'-9 5/8" ± 10'-11 7/8" ± 1'-7 1/2" ±

5'-4 1/2" ± 6'-2 1/2" ± 4'-11" ±

1'-

1/ 4"

5'-

4"

3'-

3/ 4"

1'-

1 1 /2"

4'-

6 3 /8"

'-4

1/ 2"

1'-

4 5 /8"

3'-

8 1 /2"

6'- 8 1

/2"

5'- 0 3

/8"

6"

3'-6" ± 7'-10 1/8" ± 3'-4 1/2" ±

9'-8 1/4" ±

2'- 1"

4'-

4" ±5'- 3 3

/4"

C1

AD201

B1

AD201

C1

AD202

B1

AD202

1 1

2 2

6 6 6

88 8 8 8 8

8 8 8

9 9 9

13 12 1415

16 16 16 16

161616 16

RE

MO

VE

AS

R

EQ

UI

RE

D

47'-0" ±

23 23

23 23 C1

AE301

C1

AE301

'-1

1/ 2"

2626 26

272727

27272727

29 29

29 29 29 29

31 31 31 31

31313131

4'-0"

6'- 0"34

SYMBOL DESCRIPTION

EXISTING WOOD STUD FRAMING AND SHEATHING

BOARDS TO REMAIN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:2

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD101

BU

IL

DI

NG

L

AG

-2

FI

RS

T

FL

O O

R

PL

AN

DE

M

O

LI

TI

O

N

ALP

12,862,953

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

DEMOLITION KEYNOTESGENERAL SHEET NOTES #

0 2' 4' 8'

PLAN

NORTH

SCALE: 1/4" = 1'-0" (AD201)

FIRST FLOOR PLAN - DEMOLITION

8 AT EXISTING METAL FASTENERS, BRACKETS, PLATES AND OTHER

COMPONENTS ASSOCIATED WITH THE TIMBER STRUCTURAL SYSTEM,

STRIP PAINT COMPLETE DOWN TO METAL SURFACE WITHOUT

COMPROMISING THE INTEGRITY OF THE STRUCTURAL CONNECTIONS AND

TIMBER STRUCTURE. REFER TO HAZARDOUS MATERIALS DRAWINGS FOR

LEAD PAINT REMEDIATION INFORMATION AND REFER TO STRUCTURAL

DRAWINGS FOR ADDITIONAL TIMBER STRUCTURAL COMPONENTS REPAIR

INFORMATION.

9 AT EXISTING TIMBER STRUCTURAL COMPONENTS AND SHEATHING

BOARDS, REMOVE PAINT AS DIRECTED IN SHEET HM101. REPAIRS TO

DAMAGED OR ROTTED WOOD SURFACES TO REMAIN TO BE

ACCOMPLISHED WITH REPLACEMENT IN-KIND OF WOOD COMPONENTS OR

REPAIR WITH EPOXY WOOD REPLACEMENT MATERIALS. WHEN USING

EPOXY MATERIALS, AFTER REMOVAL OF PAINT, REMOVE DAMAGED WOOD

AND TREAT THE EXPOSED WOOD WITH A DEEP PENETRATING WOOD

CONSOLIDANT. AFTER TREATMENT, FILL VOIDS WITH EPOXY MATERIALS.

BUILD-UP SHAPE TO THICKNESS REQUIRED AND SAND TO MATCH

PREVIOUS PROFILE. EPOXY SYSTEM BY ABATRON, INC. OR EQUAL. REFER

TO HAZARDOUS MATERIALS DRAWINGS FOR LEAD PAINT REMEDIATION

INFORMATION AND REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL

TIMBER STRUCTURAL COMPONENTS REPAIR INFORMATION. PREPARE

SURFACES AS REQUIRED FOR APPLICATION OF NEW FINISHES.

10 REFER TO STRUCTURAL DRAWINGS FOR LOCATION OF CONCRETE CURB

DEMOLITION AND REPAIR ALONG BUILDING PERIMETER. PLEASE REFER TO

DETAIL XXX ON SHEET XXXX FOR EXTERIOR WOOD WALL SILL REMOVAL

AND REPLACEMENT RELATED TO CONCRETE CURB REPAIRS.

1 REFER TO GI002 FOR ADDITIONAL GENERAL PROJECT NOTES.

2 REFER TO HAZARDOUS MATERIALS, PLUMBING, MECHANICAL, ELECTRICAL

DRAWINGS AND OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

3 IT IS THE GENERAL INTENT OF THE DEMOLITION WORK TO COMPLETELY

REMOVE ALL ITEMS OF EXISTING CONSTRUCTION, WHERE NOTED OR

INDICATED ON THE DRAWINGS, INCLUDING BUT NOT LIMITED TO:

ANCHORS, FASTENERS, BRACKETS, CLIPS, RODS, HANGERS, AND

SUPPORTS COMPLETE.

4 EXISTING DIMENSIONS ARE BASED ON EXISTING DRAWINGS AND FIELD

WORK. VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

PERFORMING ANY WORK. BRING ANY DISCREPANCIES TO THE ATTENTION

OF THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.

5 EXISTING TIMBER STRUCTURE AND ASSOCIATED METAL FASTENERS AND

COMPONENTS, AND EXISTING ROOF SHEATHING BOARDS TO REMAIN.

6 EXISTING SPACE WILL CONTAIN ABANDONED FURNITURE, FILING

CABINETS, AND DEBRIS LEFT BY THE CURRENT TENANT. UNLESS

OTHERWISE NOTED, CONTRACTOR MUST REMOVE AND DISPOSE OF ALL

REMAINING ITEMS IN THE SPACE AS PART OF THE CONTRACT.

7 REMOVE EXISTING CONDUITS, RECEPTACLES, HANGERS, AND ALL OTHER

NON-STRUCTURAL ELEMENTS ATTACHED TO EXISTING TIMBER

STRUCTURAL ELEMENTS COMPLETE.

25 REMOVE EXISTING HOT WATER TANK AND ASSOCIATED COMPONENTS

COMPLETE. REFER TO PLUMBING DRAWINGS.

26 REMOVE ASBESTOS TILE FLOORING COMPLETE. REFER TO HAZARDOUS

MATERIALS DRAWINGS.

27 REMOVE EXISTING INTERIOR GWB OR PLYWOOD SUBSTRATE COMPLETE.

28 REMOVE EXISTING EXTERIOR WALL ASSEMBLY AND ASSOCIATED

COMPONENTS COMPLETE. THE EXTERIOR WALL ASSEMBLY IS COMPOSED

OF WOOD STUD FRAMING, GWB, OR PLYWOOD FINISH ON THE INTERIOR,

PLYWOOD SHEATHING ON THE EXTERIOR, AIR BARRIER, AND VINYL SIDING.

29 REMOVE NON-STRUCTURAL 6 x 10 TIMBER COLUMNS COMPLETE.

31 REMOVE EXISTING WOOD STUD WALL FRAMING AND SHEATHING BOARD

CONSTRUCTION TO EXTENTS SHOWN AND PREPARE ROUGH OPENING FOR

DOOR OR WINDOW AS SHOWN ON SHEET AE101.

32 LINE OF ROOF OVERHANG ABOVE.

33 REMOVE 2'-0" HIGH SECTION OF EXTERIOR WOOD STUD WALL

CONSTRUCTION AND EXISTING CONCRETE CURB FROM GROUND FLOOR

LEVEL TO EXTENTS SHOWN. BRACE EXTERIOR WALL AS REQUIRED

THROUGHOUT THE DURATION OF THE WORK. PREPARE EXTERIOR WALL

PERIMETER SURFACE FOR THE INSTALLATION OF NEW CONCRETE CURB.

REFER TO STRUCTURAL DRAWINGS.

34 REMOVE PORTION OF SLAB TO 3/4" DEEP TO EXTENTS SHOWN TO

ACCOMODATE RECESSED ENTRANCE MAT. REFER TO SHEET IN101.

17 INFILL EXISTING RAMP AREA. REFER TO STRUCTURAL DRAWINGS FOR INFILL

WORK INFORMATION.

18 REMOVE EXISTING EPOXY FINISH DOWN TO BARE CONCRETE SLAB.

PREPARE SLAB TO RECEIVE FINISHES AS SCHEDULED - REFER TO SHEET

AE101.

19 REMOVE EXISTING RAISED SLAB DOWN TO GROUND FLOOR LEVEL.

PREPARE SLAB TO RECEIVE FINISHES AS SCHEDULED - REFER TO SHEET

AE101. REFER TO STRUCTURAL DRAWINGS FOR SLAB DEMOLITION WORK.

20 REMOVE EXISTING PAINT FINISH DOWN TO BARE CONCRETE SLAB.

PREPARE SLAB TO RECEIVE FINISHES AS SCHEDULED. REFER TO SHEET

AE101.

21 REMOVE EXISTING BOARD AND BATTEN VINYL SIDING AND AIR BARRIER

COMPLETE. EXISTING WOOD STUD WALL FRAMING AND SHEATHING BOARDS

TO REMAIN. REMOVE AND REPLACE DAMAGED WOOD STUD FRAMING AND

SHEATHING BOARDS AS REQUIRED. FOR BIDDING PURPOSES, ASSUME A

TOTAL OF XXX SF OF WOOD STUD FRAMING AND SHEATHING BOARDS TO BE

REPLACED.

22 EXISTING WOOD DECK TO REMAIN. REMOVE AND SALVAGE WOOD DECK

CONSTRUCTION AS REQUIRED TO ALLOW THE COMPLETION OF THE

DEMOLITION AND RENOVATION WORK. STORE SALVAGED WOOD DECKING

MATERIAL THROUGHOUT THE DURATION OF THE WORK AND REINSTALL

AFTER THE RENOVATION WORK HAS BEEN COMPLETED.

23 EXISTING CANOPY STRUCTURE TO REMAIN. PROTECT THROUGHOUT THE

DURATION OF THE WORK.

24 REMOVE EXISTING ELECTRICAL PANELS AND ASSOCIATED EQUIPMENT

COMPLETE. REFER TO ELECTRICAL DRAWINGS.

1 REMOVE EXISTING WOOD STUD AND PLYWOOD PARTITION COMPLETE.

2 REMOVE EXISTING WOOD STUD AND GWB PARTITION COMPLETE.

3 REMOVE PARTIALLY FRAMED EXISTING WOOD STUD PARTITION COMPLETE.

4 REMOVE EXISTING DOOR, FRAME, AND HARDWARE COMPLETE.

5 REMOVE EXISTING WOOD STAIRS AND ASSOCIATED COMPONENTS

COMPLETE.

6 REMOVE EXISTING 3' W x 6' H DOUBLE CASEMENT WINDOWS AND SALVAGE

FOR REINSTALLATION.

7 REMOVE EXISTING OVERHEAD WOOD DOOR, FRAME, AND HARDWARE

COMPLETE.

8 EXISTING TIMBER COLUMN TO REMAIN. REFER TO GENERAL NOTES AND

HAZARDOUS MATERIALS DRAWINGS FOR PAINT REMOVAL AND

REMEDIATION INFORMATION. REFER TO STRUCTURAL DRAWINGS FOR

COLUMN STRUCTURAL REPAIRS. TYPICAL OF 20.

9 REMOVE EXISTING WOOD STUD AND WOOD PANEL PARTITION COMPLETE.

10 REMOVE EXISTING PAD COMPLETE. REFER TO STRUCTURAL DRAWINGS.

11 REMOVE EXISTING EYE WASH STATION. REFER TO PLUMBING DRAWINGS.

12 REMOVE EXISTING DOUBLE SINK AND ASSOCIATED COMPONENTS

COMPLETE. REFER TO PLUMBING DRAWINGS.

13 REMOVE EXISTING CASEWORK AND ASSOCIATED COMPONENTS COMPLETE.

14 REMOVE EXISTING DISHWASHER.

15 REMOVE EXISTING REFRIGERATOR.

16 REMOVE DOWNSPOUT AND ASSOCIATED COMPONENTS COMPLETE.

LEGEND

SY

M

DE

S C

RI

PT

I O N

DA

TE

A

B

C

D

E

2 3 4 5 6 7 8 9

45 5

7 7

NOTE: REMOVE ALL MEZZANINE LEVEL PARTITIONS AND

ELEMENTS BEFORE REMOVING ANY PARTITIONS AT THE

GROUND FLOOR LEVEL. REFER TO STRUCTURAL

DRAWINGS FOR MORE INFORMATION.

C1

AE301

C1

AE301

SYMBOL DESCRIPTION

EXISTING WOOD STUD FRAMING AND SHEATHING

BOARDS TO REMAIN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:5

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD102

BU

IL

DI

NG

L

AG

-2

M

EZ

ZA

NI

NE

P

LA

N

-D

EM

O

LI

TI

O

N

ALP

12,862,954

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

0 2' 4' 8'

PLAN

NORTH

SCALE: 1/4" = 1'-0" (AD201)

MEZZANINE PLAN - DEMOLITION

8 AT EXISTING METAL FASTENERS, BRACKETS, PLATES AND OTHER

COMPONENTS ASSOCIATED WITH THE TIMBER STRUCTURAL SYSTEM,

STRIP PAINT COMPLETE DOWN TO METAL SURFACE WITHOUT

COMPROMISING THE INTEGRITY OF THE STRUCTURAL CONNECTIONS AND

TIMBER STRUCTURE. REFER TO HAZARDOUS MATERIALS DRAWINGS FOR

LEAD PAINT REMEDIATION INFORMATION AND REFER TO STRUCTURAL

DRAWINGS FOR ADDITIONAL TIMBER STRUCTURAL COMPONENTS REPAIR

INFORMATION.

9 AT EXISTING TIMBER STRUCTURAL COMPONENTS AND SHEATHING

BOARDS, REMOVE PAINT AS DIRECTED IN SHEET HM101. REPAIRS TO

DAMAGED OR ROTTED WOOD SURFACES TO REMAIN TO BE

ACCOMPLISHED WITH REPLACEMENT IN-KIND OF WOOD COMPONENTS OR

REPAIR WITH EPOXY WOOD REPLACEMENT MATERIALS. WHEN USING

EPOXY MATERIALS, AFTER REMOVAL OF PAINT, REMOVE DAMAGED WOOD

AND TREAT THE EXPOSED WOOD WITH A DEEP PENETRATING WOOD

CONSOLIDANT. AFTER TREATMENT, FILL VOIDS WITH EPOXY MATERIALS.

BUILD-UP SHAPE TO THICKNESS REQUIRED AND SAND TO MATCH

PREVIOUS PROFILE. EPOXY SYSTEM BY ABATRON, INC. OR EQUAL. REFER

TO HAZARDOUS MATERIALS DRAWINGS FOR LEAD PAINT REMEDIATION

INFORMATION AND REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL

TIMBER STRUCTURAL COMPONENTS REPAIR INFORMATION. PREPARE

SURFACES AS REQUIRED FOR APPLICATION OF NEW FINISHES.

10 REFER TO STRUCTURAL DRAWINGS FOR LOCATION OF CONCRETE CURB

DEMOLITION AND REPAIR ALONG BUILDING PERIMETER. PLEASE REFER TO

DETAIL XXX ON SHEET XXXX FOR EXTERIOR WOOD WALL SILL REMOVAL

AND REPLACEMENT RELATED TO CONCRETE CURB REPAIRS.

1 REFER TO GI002 FOR ADDITIONAL GENERAL PROJECT NOTES.

2 REFER TO HAZARDOUS MATERIALS, PLUMBING, MECHANICAL, ELECTRICAL

DRAWINGS AND OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

3 IT IS THE GENERAL INTENT OF THE DEMOLITION WORK TO COMPLETELY

REMOVE ALL ITEMS OF EXISTING CONSTRUCTION, WHERE NOTED OR

INDICATED ON THE DRAWINGS, INCLUDING BUT NOT LIMITED TO:

ANCHORS, FASTENERS, BRACKETS, CLIPS, RODS, HANGERS, AND

SUPPORTS COMPLETE.

4 EXISTING DIMENSIONS ARE BASED ON EXISTING DRAWINGS AND FIELD

WORK. VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

PERFORMING ANY WORK. BRING ANY DISCREPANCIES TO THE ATTENTION

OF THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.

5 EXISTING TIMBER STRUCTURE AND ASSOCIATED METAL FASTENERS AND

COMPONENTS, AND EXISTING ROOF SHEATHING BOARDS TO REMAIN.

6 EXISTING SPACE WILL CONTAIN ABANDONED FURNITURE, FILING

CABINETS, AND DEBRIS LEFT BY THE CURRENT TENANT. UNLESS

OTHERWISE NOTED, CONTRACTOR MUST REMOVE AND DISPOSE OF ALL

REMAINING ITEMS IN THE SPACE AS PART OF THE CONTRACT.

7 REMOVE EXISTING CONDUITS, RECEPTACLES, HANGERS, AND ALL OTHER

NON-STRUCTURAL ELEMENTS ATTACHED TO EXISTING TIMBER

STRUCTURAL ELEMENTS COMPLETE.

DEMOLITION KEYNOTESGENERAL SHEET NOTES LEGEND#

1 REMOVE EXISTING WOOD STUD AND GWB PARTITION COMPLETE.

2 REMOVE EXISTING WOOD STAIRS AND ASSOCIATED COMPONENTS

COMPLETE.

3 REMOVE EXISTING WOOD STUD AND PLYWOOD STAIR LANDING COMPLETE.

4 REMOVE EXISTING PLYWOOD PLATFORM AND FIRST FLOOR LEVEL CEILING

CONSTRUCTION COMPLETE.

5 REMOVE EXISTING MECHANICAL DUCTWORK AND ALL ASSOCIATED

COMPONENTS COMPLETE. REFER TO MECHANICAL DRAWINGS.

6 REMOVE EXISTING PLUMBING PIPING AND ALL ASSOCIATED COMPONENTS

COMPLETE. REFER TO PLUMBING DRAWINGS.

7 EXISTING TIMBER COLUMNS AND ROOF STRUCTURE TO REMAIN. REFER TO

GENERAL NOTES AND HAZARDOUS MATERIALS DRAWINGS FOR PAINT

REMOVAL AND REMEDIATION INFORMATION. REFER TO STRUCTURAL

DRAWINGS.

SY

M

DE

S C

RI

PT

I O N

DA

TE

B

C

D

E

2 3 4 5 6 7 8 9

(±7'-0" A.F.F.) (±7'-0 3/4" A.F.F.)

(±9'-8" A.F.F.)

(±7'-0" A.F.F.)

(±6'-10" A.F.F.)

(±6'-10" A.F.F.)

(±7'-8" A.F.F.)

(±9'-0 1/2" A.F.F.)

(±7'-4 3/4" A.F.F.)

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2

4 4

C1

AE301

C1

AE301

REFLECTED CEILING PLAN LEGEND

SYMBOL DESCRIPTION

DEMOLISH EXISTING 2'-0" x 2'-0" ACT.

DEMOLISH EXISTING GYPSUM BOARD CEILING /

BULKHEAD.

FINISHED CEILING HEIGHT ABOVE FINISHED FLOOR(X'-X")

DEMOLISH EXISTING LIGHT FIXTURE, UON. REFER TO

ELECTRICAL DRAWINGS.

DEMOLISH EXISTING CEILING SUPPLY / RETURN

DIFFUSER, UON. REFER TO MECHANICAL DRAWINGS.

EXISTING EXPOSED ROOF STRUCTURE ABOVE TO

REMAIN.

DEMOLISH EXISTING VINYL SOFFIT COMPLETE.

EXISTING WOOD STUD FRAMING AND SHEATHING

BOARDS TO REMAIN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:3

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD103

BU

IL

DI

NG

L

AG

-2

RE

FL

EC

TE

D

CE

IL

IN

G P

LA

N

-D

EM

O

LI

TI

O

N

ALP

12,862,955

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

0 2' 4' 8'

PLAN

NORTH

SCALE: 1/4" = 1'-0" (AD201)

REFLECTED CEILING PLAN - DEMOLITION

DEMOLITION KEYNOTESGENERAL SHEET NOTES #

1 REFER TO SHEET GI002 FOR ADDITIONAL GENERAL PROJECT NOTES.

2 IT IS THE GENERAL INTENT OF THE DEMOLITION WORK TO COMPLETELY

REMOVE ALL ITEMS OF EXISTING CONSTRUCTION, WHERE NOTED OR

INDICATED ON THE DRAWINGS, INCLUDING, BUT NOT LIMITED TO: ANCHORS,

FASTENERS, BRACKETS, CLIPS, RODS, HANGERS, AND SUPPORTS

COMPLETE.

3 EXISTING DIMENSIONS ARE BASED ON EXISTING DRAWINGS AND FIELD

WORK. VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

PERFORMING ANY WORK. BRING ANY DISCREPANCIES TO THE ATTENTION OF

THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.

4 REFER TO INTERIORS, FIRE PROTECTION, PLUMBING, MECHANICAL,

ELECTRICAL, AND TELECOMMUNICATION DRAWINGS FOR ADDITIONAL

INFORMATION.

1 REMOVE EXISTING WOOD PANEL CEILING AND 3 x 3 WOOD BEAMS

COMPLETE.

2 EXISTING TIMBER COLUMN TO REMAIN. REFER TO GENERAL NOTES AND

HAZARDOUS MATERIALS DRAWINGS FOR PAINT REMOVAL AND

REMEDIATION INFORMATION. REFER TO STRUCTURAL DRAWINGS FOR

COLUMN STRUCTURAL REPAIRS. TYPICAL OF 20.

3 EXISTING TIMBER STRUCTURE (INCLUDING BEAMS, JOISTS AND RAFTERS)

AND ROOF STRUCTURE (SHEATHING BOARDS) TO REMAIN. REFER TO

GENERAL NOTES AND HAZARDOUS MATERIALS DRAWINGS FOR PAINT

REMOVAL AND REMEDIATION INFORMATION.

4 REMOVE EXISTING MECHANICAL DUCTWORK COMPLETE. REFER TO

MECHANICAL DRAWINGS.

5 REMOVE EXISTING CEILING FAN AND ASSOCIATED COMPONENTS

COMPLETE.

6 REMOVE EXISTING SOFFIT BOARDS COMPLETE.

SY

M

DE

S C

RI

PT

I O N

DA

TE

98'-10 7/8" ±

'-5

1/ 2"

1 1

1 1

44 4

5 6

C1

AE301

C1

AE301

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:3

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD104

BU

IL

DI

NG

L

AG

-2

RO

O

F

PL

AN

DE

M

O

LI

TI

O

N

ALP

12,862,956

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

0 2' 4' 8'

PLAN

NORTH

SCALE: 1/4" = 1'-0" (AD201)

ROOF PLAN - DEMOLITION

DEMOLITION KEYNOTESGENERAL SHEET NOTES #

1 REFER TO GI002 FOR ADDITIONAL GENERAL PROJECT NOTES.

2 REFER TO HAZARDOUS MATERIALS, PLUMBING, MECHANICAL, ELECTRICAL

DRAWINGS AND OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

3 IT IS THE GENERAL INTENT OF THE DEMOLITION WORK TO COMPLETELY

REMOVE ALL ITEMS OF EXISTING CONSTRUCTION, WHERE NOTED OR

INDICATED ON THE DRAWINGS, INCLUDING BUT NOT LIMITED TO: ANCHORS,

FASTENERS, BRACKETS, CLIPS, RODS, HANGERS, AND SUPPORTS COMPLETE.

4 EXISTING DIMENSIONS ARE BASED ON EXISTING DRAWINGS AND FIELD WORK.

VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

PERFORMING ANY WORK. BRING ANY DISCREPANCIES TO THE ATTENTION OF

THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.

5 EXISTING TIMBER STRUCTURE AND ASSOCIATED METAL FASTENERS AND

COMPONENTS, AND EXISTING ROOF SHEATHING BOARDS TO REMAIN.

1 REMOVE EXISTING ASPHALTIC ROOF SHINGLE ROOFING SYSTEM AND

ASSOCIATED COMPONENTS DOWN TO EXISTING SHEATHING WOOD BOARDS

COMPLETE. SHEATHING WOOD BOARDS ARE EXISTING TO REMAIN.

2 REMOVE EXISTING GUTTER AND ASSOCIATED COMPONENTS COMPLETE.

3 OUTLINE OF BUILDING'S EXTERIOR WALL PERIMETER WALL BELOW.

4 REMOVE EXISTING LOUVERED DORMER VENT COMPLETE.

5 REMOVE EXISTING ANTENNA AND ASSOCIATED COMPONENTS COMPLETE.

6 REMOVE EXISTING VENT PIPE COMPLETE. REFER TO PLUMBING DRAWINGS.

SY

M

DE

S C

RI

PT

I O N

DA

TE

FIRST FLOOR

0"

RIDGE HEIGHT

17'-9 1/2"

LAG-27

2 2 2

33 3

4 4 4

6 6 6

7 7

8 89 9 9

98'-9" ±

2'-0"94'-10" ±2'-0"

22 2222 24

23 23

FIRST FLOOR

0"

RIDGE HEIGHT

17'-9 1/2"

LAG-27

UNITED STATES FLEET FORCES COMMAND

16 7

29'-1 1/2" ±

40'-5 1/2"±

38'-6" ±

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:4

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD201

BU

IL

DI

NG

L

AG

-2

SO

UT

H

AN

D W

ES

T

EX

TE

RI

O

R

EL

EV

AT

IO

NS

DE

M O

LI

TI

O N

ALP

12,862,957

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

0 2' 4' 8'SCALE: 1/4" = 1'-0" (AD101)

EXTERIOR SOUTH ELEVATION - DEMOLITIONC1

0 2' 4' 8'SCALE: 1/4" = 1'-0" (AD101)

EXTERIOR WEST ELEVATION - DEMOLITIONB1

DEMOLITION KEYNOTESGENERAL SHEET NOTES #

1 REFER TO GI002 FOR ADDITIONAL GENERAL PROJECT NOTES.

2 REFER TO HAZARDOUS MATERIALS, PLUMBING, MECHANICAL, ELECTRICAL

DRAWINGS AND OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

3 IT IS THE GENERAL INTENT OF THE DEMOLITION WORK TO COMPLETELY

REMOVE ALL ITEMS OF EXISTING CONSTRUCTION, WHERE NOTED OR

INDICATED ON THE DRAWINGS, INCLUDING BUT NOT LIMITED TO: ANCHORS,

FASTENERS, BRACKETS, CLIPS, RODS, HANGERS, AND SUPPORTS COMPLETE.

4 EXISTING DIMENSIONS ARE BASED ON EXISTING DRAWINGS AND FIELD WORK.

VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

PERFORMING ANY WORK. BRING ANY DISCREPANCIES TO THE ATTENTION OF

THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.

22 REMOVE EXISTING BOARD AND BATTEN VINYL SIDING AND AIR BARRIER

COMPLETE. EXISTING WOOD STUD WALL FRAMING AND SHEATHING

BOARDS TO REMAIN. REMOVE AND REPLACE DAMAGED WOOD BOARDS AS

REQUIRED. FOR BIDDING PURPOSES, ASSUME A TOTAL OF XXX SF OF

WOOD STUD FRAMING AND SHEATHING BOARDS TO BE REPLACED.

23 REMOVE EXISTING CONCRETE CURB. REFER TO STRUCTURAL DRAWINGS.

24 REMOVE EXISTING WOOD STUD WALL FRAMING AND SHEATHING BOARD

CONSTRUCTION TO EXTENTS SHOWN AND PREPARE ROUGH OPENING FOR

DOOR OR WINDOW AS SHOWN ON SHEET AE101.

16 REMOVE EXISTING PAD COMPLETE. REFER TO STRUCTURAL DRAWINGS.

17 EXISTING WOOD DECK TO REMAIN. REMOVE AND SALVAGE WOOD DECK

CONSTRUCTION AS SHOWN TO ALLOW THE COMPLETION OF THE

DEMOLITION AND RENOVATION WORK. STORE WOOD DECKING MATERIAL

THROUGHOUT THE DURATION OF THE WORK AND REINSTALL AFTER THE

RENOVATION WORK HAS BEEN COMPLETED.

18 REMOVE EXISTING PIPING COMPLETE. REFER TO PLUMBING DRAWINGS.

19 REMOVE EXISTING LOUVERED VENT COMPLETE.

20 NATURAL GAS METER TO REMAIN. REFER TO PLUMBING DRAWINGS.

21 CAP EXISTING NATURAL GAS LINES TO BUILDING. REFER TO PLUMBING

DRAWINGS.

8 REMOVE EXISTING WALL PACK LIGHT FIXTURES COMPLETE. REFER TO

ELECTRICAL DRAWINGS.

9 REMOVE EXISTING FASCIA AND SOFFIT CONSTRUCTION COMPLETE.

10 REMOVE EXISTING HOLLOW METAL DOOR AND AND FRAME SYSTEM

COMPLETE.

11 REMOVE EXISTING ELECTRICAL PANEL AND ASSOCIATED COMPONENTS.

REFER TO ELECTRICAL DRAWINGS.

12 REMOVE EXISTING OVERHEAD DOOR AND FRAME SYSTEM COMPLETE.

13 REMOVE EXISTING BUILDING SIGN COMPLETE.

14 EXISTING CANOPY STRUCTURE TO REMAIN.

15 EXISTING TIMBER BEAM TO REMAIN.

1 REMOVE EXISTING EXTERIOR WALL CONSTRUCTION COMPLETE.

2 REMOVE EXISTING ASPHALTIC ROOF SHINGLE ROOFING SYSTEM AND

ASSOCIATED COMPONENTS DOWN TO EXISTING SHEATHING WOOD BOARDS

COMPLETE. SHEATHING WOOD BOARDS ARE EXISTING TO REMAIN.

PREPARE SHEATHING WOOD BOARDS TO RECEIVE ROOF MEMBRANE.

3 EXISTING CURB TO REMAIN. REFER TO STRUCTURAL DRAWINGS.

4 REMOVE EXISTING LOUVERED DORMER VENT COMPLETE.

5 REMOVE EXISTING DOUBLE HUNG 3' x 6' WINDOWS AND SALVAGE FOR

REINSTALLATION.

6 REMOVE EXISTING METAL GUTTER COMPLETE.

7 REMOVE EXISTING DOWNSPOUT AND ALL ASSOCIATED COMPONENTS

COMPLETE.

SY

M

DE

S C

RI

PT

I O N

DA

TE

RIDGE HEIGHT

17'-9 1/2"

4 4 22

6 6

5 5

1 8 16 1616

98'-9"±

2'-0" 94'-10" ± 2'-0"

FIRST FLOOR

0"

RIDGE HEIGHT

17'-9 1/2"

40'-5 1/2" ±

38'-6" ±

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:4

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD202

BU

IL

DI

NG

L

AG

-2

NO

RT

H

AN

D

EA

ST

E

XT

ER

IO

R

EL

EV

AT

IO

NS

DE

M

O

LI

TI

O

N

ALP

12,862,958

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

DEMOLITION KEYNOTESGENERAL SHEET NOTES #

0 2' 4' 8'SCALE: 1/4" = 1'-0" (AD101)

EXTERIOR NORTH ELEVATION - DEMOLITIONC1

0 2' 4' 8'SCALE: 1/4" = 1'-0" (AD101)

EXTERIOR EAST ELEVATION - DEMOLITIONB1

1 REFER TO GI002 FOR ADDITIONAL GENERAL PROJECT NOTES.

2 REFER TO HAZARDOUS MATERIALS, PLUMBING, MECHANICAL, ELECTRICAL

DRAWINGS AND OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

3 IT IS THE GENERAL INTENT OF THE DEMOLITION WORK TO COMPLETELY

REMOVE ALL ITEMS OF EXISTING CONSTRUCTION, WHERE NOTED OR

INDICATED ON THE DRAWINGS, INCLUDING BUT NOT LIMITED TO: ANCHORS,

FASTENERS, BRACKETS, CLIPS, RODS, HANGERS, AND SUPPORTS COMPLETE.

4 EXISTING DIMENSIONS ARE BASED ON EXISTING DRAWINGS AND FIELD WORK.

VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

PERFORMING ANY WORK. BRING ANY DISCREPANCIES TO THE ATTENTION OF

THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.

16 REMOVE EXISTING THRU WALL HVAC UNIT COMPLETE. REFER TO

MECHANICAL DRAWINGS.

17 EXISTING TIMBER BEAM TO REMAIN.

18 REMOVE EXISTING VENT COMPLETE. REFER TO MECHANICAL DRAWINGS.

19 REMOVE EXISTING ANTENNA COMPLETE.

8 REMOVE EXISTING WALL PACK LIGHT FIXTURES COMPLETE. REFER TO

ELECTRICAL DRAWINGS.

9 REMOVE EXISTING FASCIA AND SOFFIT CONSTRUCTION COMPLETE.

10 REMOVE EXISTING HOLLOW METAL DOOR AND AND FRAME SYSTEM

COMPLETE.

11 REMOVE EXISTING OVERHEAD DOOR AND FRAME SYSTEM COMPLETE.

12 REMOVE EXISTING PIPING COMPLETE. REFER TO PLUMBING DRAWINGS.

13 REMOVE EXISTING PAD COMPLETE. REFER TO STRUCTURAL DRAWINGS.

14 REMOVE EXISTING WOOD STUD WALL FRAMING AND SHEATHING BOARD

CONSTRUCTION TO EXTENTS SHOWN AND PREPARE ROUGH OPENING FOR

DOOR OR WINDOW AS SHOWN ON SHEET AE101.

15 REMOVE EXISTING LOUVERED VENT COMPLETE.

1 REMOVE EXISTING BOARD AND BATTEN VINYL SIDING AND AIR BARRIER

COMPLETE. EXISTING WOOD STUD WALL FRAMING AND SHEATHING

BOARDS TO REMAIN. REMOVE AND REPLACE DAMAGED WOOD STUD

FRAMING

2 REMOVE EXISTING ASPHALTIC ROOF SHINGLE ROOFING SYSTEM AND

ASSOCIATED COMPONENTS DOWN TO EXISTING SHEATHING WOOD

BOARDS COMPLETE. SHEATHING WOOD BOARDS ARE EXISTING TO REMAIN.

PREPARE SHEATHING WOOD BOARDS TO RECEIVE ROOF MEMBRANE.

4 REMOVE EXISTING LOUVERED DORMER VENT COMPLETE.

5 REMOVE EXISTING DOUBLE HUNG 3' x 6' WINDOWS AND SALVAGE FOR

REINSTALLATION.

6 REMOVE EXISTING METAL GUTTER COMPLETE.

7 REMOVE EXISTING DOWNSPOUT AND ALL ASSOCIATED COMPONENTS

COMPLETE.

SY

M

DE

S C

RI

PT

I O N

DA

TE

DW

REF.

AD902

D1

AD902

D2

AD902

D3

AD902

D4

AD902

C1 AD902

C2

AD902

C3

AD902

C4

AD902

B1

AD902B2

AD902

B3

AD902

B4

AD902

B5

AD902

A1

AD902 A2

AD902

A3

AD902

A4

AD902

A5

AD903

D1

AD903 D2

AD903D3

AD903 D4

AD903

C1

AD903

C2 AD903

C3

AD903C4

AD903

B1

AD903

B2

AD903

B3

AD903 B4 AD903B5

AD903

A1

AD903A2

AD903

A3

AD903

A4

AD903

A5

AD904

D1

AD904

D2

AD904

D3

AD904D4

AD904

C1

AD904

C2

AD904

C3

AD904C4

AD904

B1

AD904

B2

AD904

B3AD904

B4

AD904

B5

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:4

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD901

BU

IL

DI

NG

L

AG

-2

PH

O

TO

R

EF

ER

EN

CE

P

LA

N

ALP

12,862,959

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

0 2' 4' 8'

PLAN

NORTH

SCALE: 1/4" = 1'-0" (AD201)

FIRST FLOOR PHOTO REFERENCE PLAN

GENERAL SHEET NOTES

1 THESE PHOTOS ARE FOR REFERENCE ONLY. VERIFY ALL EXISTING

CONDITIONS.

SY

M

DE

S C

RI

PT

I O N

DA

TE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:1

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD902

BU

IL

DI

NG

L

AG

-2

RE

FE

RE

NC

E

PH

O

TO

G

RA

PH

S

ALP

12,862,960

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

GENERAL SHEET NOTES

1 THESE PHOTOS ARE FOR REFERENCE ONLY. VERIFY ALL EXISTING

CONDITIONS.

SHEET NOTES

SCALE: NOT TO SCALE (AD901)D1 REFERENCE PHOTO - NOTE 1

SCALE: NOT TO SCALE (AD901)D2 REFERENCE PHOTO - NOTE 2

SCALE: NOT TO SCALE (AD901)D3 REFERENCE PHOTO - NOTE 3

SCALE: NOT TO SCALE (AD901)D4 REFERENCE PHOTO - NOTE 4

SCALE: NOT TO SCALE (AD901)C1 REFERENCE PHOTO - NOTE 5

SCALE: NOT TO SCALE (AD901)C2 REFERENCE PHOTO - NOTE 6

SCALE: NOT TO SCALE (AD901)C3 REFERENCE PHOTO - NOTE 7

SCALE: NOT TO SCALE (AD901)C4 REFERENCE PHOTO - NOTE 8

SCALE: NOT TO SCALE (AD901)B1 REFERENCE PHOTO - NOTE 9

SCALE: NOT TO SCALE (AD901)B2 REFERENCE PHOTO - NOTE 10

SCALE: NOT TO SCALE (AD901)B3 REFERENCE PHOTO - NOTE 11

SCALE: NOT TO SCALE (AD901)B4 REFERENCE PHOTO - NOTE 12

SCALE: NOT TO SCALE (AD901)B5 REFERENCE PHOTO - NOTE 13

SCALE: NOT TO SCALE (AD901)A1 REFERENCE PHOTO - NOTE 14

SCALE: NOT TO SCALE (AD901)A2 REFERENCE PHOTO - NOTE 15

SCALE: NOT TO SCALE (AD901)A3 REFERENCE PHOTO - NOTE 16

SCALE: NOT TO SCALE (AD901)A4 REFERENCE PHOTO - NOTE 17

SCALE: NOT TO SCALE (AD901)A5 REFERENCE PHOTO - NOTE 18

1 VIEW OF OVERALL EXTERIOR BUILDING WEST ELEVATION. CRANE ARM SHOWN

IN PICTURE HAS ALREADY BEEN REMOVED.

2 VIEW OF EXTERIOR SOUTHWEST CORNER OF THE BUILDING.

3 VIEW OF OVERALL EXTERIOR BUILDING SOUTH ELEVATION.

4 VIEW OF ELECTRICAL PANEL AND ASSOCIATED COMPONENTS AT SOUTHWEST

CORNER OF THE BUILDING.

5 VIEW OF PARTIAL EXTERIOR BUILDING SOUTH ELEVATION.

6 VIEW OF OVERALL EXTERIOR BUILDING SOUTH ELEVATION FROM THE

SOUTHEAST CORNER.

7 VIEW OF OVERALL EXTERIOR BUILDING EAST ELEVATION.

8 VIEW OF PAD AT EXTERIOR BUILDING EAST ELEVATION.

9 VIEW OF EXTERIOR NORTHEAST CORNER OF THE BUILDING.

10 VIEW OF DOOR AND DOWNSPOUT AT NORTHEAST CORNER OF THE BUILDING.

11 VIEW OF OVERALL EXTERIOR BUILDING NORTH ELEVATION.

12 VIEW OF EXTERIOR NORTHWEST CORNER OF THE BUILDING.

13 VIEW OF BUILDING'S MAIN ENTRY DOOR.

14 VIEW OF INTERIOR CORNER AT CENTER COLUMN.

15 VIEW OF INTERIOR SPACE LOOKING EAST.

16 VIEW OF INTERIOR LOOKING AT WINDOWS.

17 VIEW OF INTERIOR ELECTRICAL PANEL NEAR MAIN ENTRY.

18 VIEW OF INTERIOR AREA LOOKING AT KITCHENETTE.

SY

M

DE

S C

RI

PT

I O N

DA

TE

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:3

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD903

BU

IL

DI

NG

L

AG

-2

RE

FE

RE

NC

E

PH

O

TO

G

RA

PH

S

ALP

12,862,961

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

GENERAL SHEET NOTES

SHEET NOTES

1 THESE PHOTOS ARE FOR REFERENCE ONLY. VERIFY ALL EXISTING

CONDITIONS.

SCALE: NOT TO SCALE (AD901)D1 REFERENCE PHOTO - NOTE 19

SCALE: NOT TO SCALE (AD901)D2 REFERENCE PHOTO - NOTE 20

SCALE: NOT TO SCALE (AD901)D3 REFERENCE PHOTO - NOTE 21

SCALE: NOT TO SCALE (AD901)D4 REFERENCE PHOTO - NOTE 22

SCALE: NOT TO SCALE (AD901)C1 REFERENCE PHOTO - NOTE 23

SCALE: NOT TO SCALE (AD901)C2 REFERENCE PHOTO - NOTE 24

SCALE: NOT TO SCALE (AD901)C3 REFERENCE PHOTO - NOTE 25

SCALE: NOT TO SCALE (AD901)C4 REFERENCE PHOTO - NOTE 26

SCALE: NOT TO SCALE (AD901)B1 REFERENCE PHOTO - NOTE 27

SCALE: NOT TO SCALE (AD901)B2 REFERENCE PHOTO - NOTE 28

SCALE: NOT TO SCALE (AD901)B3 REFERENCE PHOTO - NOTE 29

SCALE: NOT TO SCALE (AD901)B4 REFERENCE PHOTO - NOTE 30

SCALE: NOT TO SCALE (AD901)B5 REFERENCE PHOTO - NOTE 31

SCALE: NOT TO SCALE (AD901)A1 REFERENCE PHOTO - NOTE 32

SCALE: NOT TO SCALE (AD901)A2 REFERENCE PHOTO - NOTE 33

SCALE: NOT TO SCALE (AD901)A3 REFERENCE PHOTO - NOTE 34

SCALE: NOT TO SCALE (AD901)A4 REFERENCE PHOTO - NOTE 35

SCALE: NOT TO SCALE (AD901)A5 REFERENCE PHOTO - NOTE 36

19 VIEW OF INTERIOR SPACE LOOKING EAST.

20 VIEW OF KITCHENETTE SINK AND CABINETS AREA.

21 VIEW OF INTERIOR SPACE LOOKING WEST TOWARDS DOOR.

22 VIEW OF INTERIOR SPACE LOOKING EAST TOWARDS OFFICE.

23 VIEW OF INTERIOR SPACE LOOKING AT REFRIGERATOR AND CABINETRY.

24 VIEW OF INTERIOR SPACE LOOKING AT OFFICE ENTRANCE AND WINDOW.

25 VIEW OF OFFICE SPACE LOOKING EAST.

26 VIEW OF OFFICE SPACE LOOKING WEST TO OFFICE ENTRY.

27 VIEW OF OFFICE STORAGE ENTRY.

28 VIEW INTO OFFICE STORAGE AREA.

29 VIEW OF ENTRY INTO GENERAL STORAGE AREA.

30 VIEW OF INTERIOR GENERAL STORAGE AREA LOOKING WEST.

31 VIEW OF INTERIOR GENERAL STORAGE AREA LOOKING EAST.

32 VIEW OF MAIN INTERIOR SPACE LOOKING NORTHEAST.

33 VIEW OF MAIN INTERIOR SPACE LOOKING WEST.

34 VIEW OF MAIN INTERIOR SPACE LOOKING EAST TOWARDS DOOR.

35 VIEW OF MAIN INTERIOR SPACE LOOKING EAST.

36 VIEW OF WORKSHOP AREA LOOKING SOUTHWEST TOWARDS DOOR.

SY

M

DE

S C

RI

PT

I O N

DA

TE

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:5

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AD904

BU

IL

DI

NG

L

AG

-2

RE

FE

RE

NC

E

PH

O

TO

G

RA

PH

S

ALP

12,862,962

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AD

1 THESE PHOTOS ARE FOR REFERENCE ONLY. VERIFY ALL EXISTING

CONDITIONS.

GENERAL SHEET NOTES

SHEET NOTES

SCALE: NOT TO SCALE (AD901)D1 REFERENCE PHOTO - NOTE 37

SCALE: NOT TO SCALE (AD901)D2 REFERENCE PHOTO - NOTE 38

SCALE: NOT TO SCALE (AD901)D3 REFERENCE PHOTO - NOTE 39

SCALE: NOT TO SCALE (AD901)D4 REFERENCE PHOTO - NOTE 40

SCALE: NOT TO SCALE (AD901)C1 REFERENCE PHOTO - NOTE 41

SCALE: 1" = 1'-0" (AD901)C2 REFERENCE PHOTO - NOTE 42

SCALE: NOT TO SCALE (AD901)C3 REFERENCE PHOTO - NOTE 43

SCALE: NOT TO SCALE (AD901)C4 REFERENCE PHOTO - NOTE 44

SCALE: NOT TO SCALE (AD901)B1 REFERENCE PHOTO - NOTE 45

SCALE: NOT TO SCALE (AD901)B2 REFERENCE PHOTO - NOTE 46

SCALE: NOT TO SCALE (AD901)B3 REFERENCE PHOTO - NOTE 47

SCALE: NOT TO SCALE (AD901)B4 REFERENCE PHOTO - NOTE 48

SCALE: NOT TO SCALE (AD901)B5 REFERENCE PHOTO - NOTE 49

37 VIEW OF WORKSHOP AREA INTO MEZZANINE STAIRS.

38 VIEW OF WORKSHOP AREA LOOKING NORTHEAST.

39 VIEW OF WORKSHOP AREA LOOKING TOWARDS OVERHEAD DOOR.

40 VIEW OF WORHSHOP AREA INTO STORAGE CABINETS NEXT TO MEZZANINE

STAIR.

41 VIEW OF WORKSHOP AREA LOOKING SOUTHEAST.

42 VIEW OF WORKSHOP AREA LOOKING SOUTH.

43 VIEW OF WORKSHOP AREA LOOKING INTO FRAMED SPACE ALONG SOUTH

WALL.

44 VIEW OF FRAMED SPACE WITHIN WORKSHOP AREA.

45 VIEW OF WORKSHOP AREA LOOKING INTO FRAMED SPACE AT NORTHEAST

CORNER.

46 VIEW OF WORKSHOP AREA TOWARDS OVERHEAD DOOR CORNER.

47 VIEW OF WORKSHOP AREA TOWARDS BOTTOM OF MEZZANINE STAIRS.

48 VIEW OF WORKSHOP AREA INTO STORAGE CABINETS.

49 VIEW OF WORKSHOP AREA FROM TOP LANDING OF MEZZANINE STAIRS.

SY

M

DE

S C

RI

PT

I O N

DA

TE

R

EF

DW

B1

AE201

C1

AE202

C1

AE201

B1

AE202

A

B

C

D

E

2 3 4 5 6 7 8 9

WOMEN'S

MEN'S

RECEPTION

CLOSET

RESTROOM

104 KITCHEN

CPO OFFICE

OFFICE

SUPPLY STORAGE

CORRIDOR

WORK AREA

WORK STORAGE

UTILITY

ELECTRICAL

TELECOMM

SHOWER

SHOWER

101C

109C

116A116B

114 112

101B

101A

109B 109A

116C

7'-2 3/4" 5'-2" 8'-0" 1'-3" 12'-3 3/4" 10'-5"

11'-3 3/4" 30'-8 3/4" 7'-6 1/2"

4'- 9 3

/4" 6'-

6"

1'- 0"

1'- 0 1

/4" 9'-

3 1 /2" 4'-

9 1 /8" 10

5/ 8"

'-8

3/ 4"

7'- 1"

7'- 6 1

/4" 9'-

3 1 /2"

4'-0"

4'- 5"

4'- 8 1

/4" 1'-

5 1 /2"

9'- 0 1

/2"

'-8

10'-10 1/2" 7'-8 3/4"

4'- 8 1

/4"

AE401

B1

AE204

C1

C3

AE402

A1

9 1/2" 11'-0 1/2" ± 10'-10 1/4" ± 11'-1 1/2" ± 10'-11" ± 11'-3" ± 10'-10 1/2" ± 11'-2" ± 15'-11 1/2" ± 10 1/4"

93'-2 1/4" ± 5'-

0 1 /4"

'-1 3/

4"

'-1

3/ 4"

5'-

0 1 /2"

'-4

1/ 4"

B

A

B

DD

A

A A

B

A

A

A

A

AE401

A1

1" 3/4

A3

A1

EQ

EQ

2'-11" 6'-0" 4'-11" 6'-0" 4'-11" 6'-0" 2'-11" 2'-0"

B B

A A A

C1

AE301

C1

AE301

EQ

EQ

A

A

A

E

7'-11 7/8" 1'-5 3/8" 10" 3'-0" 5'-0"

B

5 5 5 5

5 5 5 5

6 6 6 6

8" 3'-0" 3'-8" 3'-0"

6 6 6 6 6

66666

7" 7'-

5"

77 7 7 7 7

8 1'-1"

AE402

A3

RE

IN

ST

AL

L

AS

R

EQ

UI

RE

D

FF

FF

F

F

F

FF

F

F

F

SYMBOL DESCRIPTION

NEW PARTITION AS SCHEDULED. REFER TO SHEET

AE603 FOR PARTITION TYPE SCHEDULES & DETAILS

NEW DOOR AND FRAME AS SCHEDULED. REFER TO

SHEET A-501 FOR DOOR SCHEDULE & DETAILS.

EXISTING WOOD STUD FRAMING AND SHEATHING

BOARDS TO REMAIN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:0

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AE101

BU

IL

DI

NG

L

AG

-2

FI

RS

T

FL

O O

R

PL

AN

NE

W

W O

RK

ALP

12,862,963

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AE

NEW WORK KEYNOTESGENERAL SHEET NOTES LEGEND#

0 2' 4' 8'

PLAN

NORTH

SCALE: 1/4" = 1'-0" (AD201)

FIRST FLOOR PLAN - NEW WORK

1 REFER TO OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

2 REFER TO HAZARDOUS MATERIALS, CIVIL, STRUCTURAL, PLUMBING,

MECHANICAL, AND ELECTRICAL DRAWINGS.

3 REFER TO ENLARGED PLAN DETAILS FOR PARTITION TYPES AND NOTES NOT

INDICATED.

4 DIMENSIONS ARE FROM FACE OF STUD, FACE OF EXISTING, AND COLUMN

CENTERLINE.

5 REFER TO DETAIL XX / XXXX FOR TYPICAL DOOR LOCATION.

15 REINSTALL SALVAGED WOOD DECK CONSTRUCTION AS REQUIRED ONCE

RENOVATION WORK IN ADJACENT AREA HAS BEEN COMPLETED.

16 PROVIDE 5"D x 4"H CONCRETE CURB AT BASE OF EXISTING EXTERIOR

WOOD STUD WALL. PROVIDE 1'-8" HIGH SECTION OF WOOD STUD FRAMING

ABOVE CONCRETE CURB AND INFILL WALL AS REQUIRED TO MATCH

EXTERIOR WALL CONSTRUCTION. REFER TO STRUCTURAL DRAWINGS.

17 RECESSED SLAB AT ENTRANCE MAT. REFER TO SHEET IN101.

8 WALL MOUNTED SINK. REFER TO PLUMBING DRAWINGS.

9 MOP SINK WITH MOP HANGER AND FRP SURROUND. REFER TO PLUMBING

DRAWINGS.

10 STACKABLE WASHER AND DRYER. REFER TO PLUMBING AND ELECTRICAL

DRAWINGS.

11 STRUCTURAL STEEL FRAME FOR MECHANICAL EQUIPMENT. REFER TO

STRUCTURAL DRAWINGS.

12 MECHANICAL EQUIPMENT AND ASSOCIATED COMPONENTS. REFER TO

MECHANICAL DRAWINGS.

13 TELECOMMUNICATIONS SERVER RACK. REFER TO TELECOMMUNICATIONS

DRAWINGS.

14 LINE OF ROOF OVERHANG ABOVE.

1 DISPLAY CASE - SEE DETAIL XXXX.

2 WATER HEATER TANK AND CONCRETE PAD - REFER TO STRUCTURAL AND

PLUMBING DRAWINGS.

3 ELECTRICAL PANEL AND ASSOCIATED EQUIPMENT - REFER TO ELECTRICAL

DRAWINGS.

4 BACKFLOW PREVENTER - REFER TO PLUMBING DRAWINGS.

5 PREFINISHED METAL DOWNSPOUTS (TYPICAL OF 8).

6 EXISTING TIMBER COLUMN TO REMAIN. REFER TO STRUCTURAL DRAWINGS

FOR COLUMN STRUCTURAL REPAIR. REFER TO SHEET IN601 FOR TIMBER

STRUCTURE SCHEDULED FINISHES.

7 INFILL EXTERIOR WALL WITH WOOD STUD AND SHEATHING BOARD

CONSTRUCTION TO MATCH AND ALIGN EXISTING.

SY

M

DE

S C

RI

PT

I O N

DA

TE

OS

OS

OS

OS OS

OS

OS

OS

OS OS

OS

OS OS

OS

OS

OS

OS

OS

OS

A

C

2 3 4 5 6 7 8 9

WOMEN'S

MEN'S

RECEPTION

CLOSET

RESTROOM

KITCHEN

CPO OFFICE

OFFICE

SUPPLY STORAGE

CORRIDOR

WORK AREA

WORK STORAGE

UTILITY

ELECTRICAL

TELECOMM

SHOWER

SHOWER

(8'-6" A.F.F.)(8'-6" A.F.F.)

(8'-6" A.F.F.) (8'-6" A.F.F.)

(8'-6" A.F.F.)

(8'-6" A.F.F.)

(8'-0" A.F.F.)

(8'-6" A.F.F.)

(8'-6" A.F.F.) (8'-6" A.F.F.)

(8'-6" A.F.F.)(8'-6" A.F.F.)

(8'-0" A.F.F.)(8'-0" A.F.F.)

C1

AE301

C1

AE301

1 1 1

1 1

22 2 2

2 2

REFLECTED CEILING PLAN LEGEND

SYMBOL DESCRIPTION

2' - 0" X 2' - 0" ACOUSTICAL CEILING TILE. REFER TO

FINISH SCHEDULE

LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EMERGENCY LIGHT FIXTURE. REFER TO ELECTRICAL

DRAWINGS.

NO CEILING - EXPOSED TO ROOF STRUCTURE ABOVE.

REFER TO FINISH SCHEDULE

GYPSUM BOARD CEILING. REFER TO FINISH SCHEDULE

FINISHED CEILING HEIGHT ABOVE FINISHED FLOOR.(X'-X" A.F.F.)

SYMBOL DESCRIPTION

CEILING SUPPLY DIFFUSER. REFER TO MECHANICAL

DRAWINGS.

CEILING RETURN OR EXHAUST. REFER TO MECHANICAL

DRAWINGS.

WALL MOUNTED EXIT SIGN. REFER TO ELECTRICAL

DRAWINGS.

OCCUPANCY SENSOR. REFER TO ELECTRICAL

DRAWINGS.

OS

SOFFIT BOARD. REFER TO FINISH SCHEDULE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:1

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AE102

BU

IL

DI

NG

L

AG

-2

FI

RS

T

FL

O O

R

RE

FL

EC

TE

D

CE

IL

IN

G

P

LA

N -N

EW

W

O

RK

ALP

12,862,964

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AE

0 2' 4' 8'

PLAN

NORTH

SCALE: 1/4" = 1'-0" (AD201)

REFLECTED CEILING PLAN - NEW WORK

NEW WORK KEYNOTESGENERAL SHEET NOTES #

1 UNLESS OTHERWISE NOTED, CEILING TILE MUST BE CENTERED IN EACH

ROOM, IN ACCORDANCE WITH THE LAYOUTS SHOWN.

2 MAKE ADJUSTMENTS TO ELIMINATE ADDITIONAL, SMALL, OR ODD PIECES OF

CEILING TILE.

3 REFER TO INTERIORS, FIRE PROTECTION, PLUMBING, MECHANICAL,

ELECTRICAL, AND TELECOMMUNICATION DRAWINGS FOR ADDITIONAL

INFORMATION.

4 WHERE CEILING TILES ARE CUT, COPE AND FINISH EDGES TO MATCH UNCUT

TILE.

5 CENTER ALL LIGHT DIFFUSERS, FIXTURES, OCCUPANCY SENSORS, ETC., IN

CEILING TILES, UNLESS OTHERWISE NOTED.

6 DAMP CLEAN AND HAND DRY ALL FIXTURES AND LAMPS JUST PRIOR TO FINAL

INSPECTION.

1 DOUBLE ROLL WINDOW TREATMENT AND ALL ASSOCIATED COMPONENTS.

2 EXISTING TIMBER COLUMN, BEAMS, RAFTER AND ASSOCIATED STRUTURE.

REFER TO FINISH SCHEDULE FOR STAIN FINISH.

3 EXPOSED MECHANICAL DUCTWORK. REFER TO FINISH SCHEDULE FOR METAL

FINISH COLOR.

SY

M

DE

S C

RI

PT

I O N

DA

TE

4 4

AE103

98'-10 1/2" ±

'-4

1/ 2"

2'-11 1/2"

'-0

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:1

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AE103

BU

IL

DI

NG

L

AG

-2

RO

O

F

PL

AN

NE

W

W O

RK

ALP

12,862,965

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AE

NEW WORK KEYNOTESGENERAL SHEET NOTES #

0 2' 4' 8'

PLAN

NORTH

SCALE: 1/4" = 1'-0" (AD201)

ROOF PLAN - NEW WORK

1 STANDING SEAM METAL ROOF. REFER TO FINISH SCHEDULE.

2 PREFINISHED METAL GUTTER. REFER TO FINISH SCHEDULE.

3 MECHANICAL DUCT. REFER TO MECHANICAL DRAWINGS.

4 EXHAUST VENT. REFER TO MECHANICAL DRAWINGS.

5 VENT PIPE. REFER TO PLUMBING DRAWINGS.

6 AIR INTAKE. REFER TO MECHANICAL DRAWINGS.

7 OUTLINE OF BUILDING PERIMETER BELOW.

1 REFER TO OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

2 REFER TO HAZARDOUS MATERIALS, CIVIL, STRUCTURAL, PLUMBING,

MECHANICAL, AND ELECTRICAL DRAWINGS.

0 1' 2' 4'SCALE: 1/2" = 1'-0" (AE103)

ENLARGED ROOF PLAN - NEW WORK2

SY

M

DE

S C

RI

PT

I O N

DA

TE

RIDGE HEIGHT

17'-9 1/2"

123456789

94'-11"

C1

AE301

1 1 1

3 3

9 9 99

910 10 10

1011 11 11 11

12 1213 14 15 13 131016 131016 1213

11'-8 1/2"11'-7 1/2"17'-4"16'-7 3/4" CJ CJ CJ

1819182018

1'-0 1/4"

9 3/8" 1'-1 1/4"

6'-0"6'-0"

1'-0" 1'-0"

2'- 8"

FIRST FLOOR

0"

RIDGE HEIGHT

17'-9 1/2"

A B C D E

38'-7"

2'- 8"

12'-0" 14'-7" 12'-0"CJ CJ

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

3/ 1/

1:

:2

AM

C :\R ev it

L oc al F ile s\

LA

G

-2 7_

9_

A_ R

_s eb as tia n.

ra m os .rv t

AE201

BU

IL

DI

NG

L

AG

-2

SO

UT

H

AN

D W

ES

T

EX

TE

RI

O

R

EL

EV

AT

IO

NS

NE

W W

O

RK

ALP

12,862,966

SAR SAR

03/01/22

LT NINA R. ERB - USFFC

CO

M

PL

ET

E

BU

IL

DI

NG

R

EP

AI

R/

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1675989

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

AE

0 2' 4' 8'SCALE: 1/4" = 1'-0" (AE101)

EXTERIOR NORTH ELEVATION - NEW WORKC1

NEW WORK KEYNOTESGENERAL SHEET NOTES #

0 2' 4' 8'SCALE: 1/4" = 1'-0" (AE101)

EXTERIOR EAST ELEVATION - NEW WORKB1

18 EXHAUST VENT. REFER TO MECHANICAL DRAWINGS.

19 AIR INTAKE. REFER TO MECHANICAL DRAWINGS.

20 VENT PIPE. REFER TO PLUMBING DRAWINGS.

21 MECHANICAL EQUIPMENT AND ASSOCIATED COMPONENTS. REFER TO

MECHANICAL DRAWINGS.

22 STRUCTURAL STEEL FRAME FOR MECHANICAL EQUIPMENT. REFER TO

STRUCTURAL DRAWINGS.

1 PREFINISHED STANDING METAL ROOF.

2 5" x 4" PREFINISHED METAL GUTTER.

3 4" x 3" PREFINISHED METAL DOWNSPOUT.

4 1 x 14 CELLULAR PVC FASCIA BOARD.

5 CELLULAR PVC BED MOULDING.

6 1 x 10 CELLULAR PVC FRIEZE BOARD.

7 4 x 4 CELLULAR PVC CORNER TRIM.

8 CELLULAR PVC SOFFIT BRACKET.

9 VINYL SHAKE SIDING.

10 2 1/4" x 2 3/4" CELLULAR PVC WATERTABLE SILL.

11 3/4" THIN BRICK TO MATCH ADJACENT BUILDING'S BRICK PATTERN, COLOR,

AND STYLE.

12 EXTERIOR DOOR AS SCHEDULED.

13 1 x 6…