This document contains a price proposal form and supplementary instructions for a federal solicitation seeking maintenance dredging services. The solicitation involves dredging approximately 108,360 cubic yards of material from Pier R-3 at Naval Weapons Station Yorktown in Virginia from August 13th to September 11th, 2022. An option to dredge around 87,027 cubic yards from Pier CAD-A at the Cheatham Annex is also included. Material will be transported via barge and disposed at the Norfolk Ocean Disposal Site. A minimum daily production rate of 2,500 cubic yards is required. Award will be made on the total price for dredging Pier R-3, Pier CAD-A, associated mobilization/demobilization, and potential upland disposal. Pricing is requested for evaluation of the base requirements and optional items. The solicitation is issued by the Naval Facilities Engineering Command, Department of the Navy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| Figure 1.pdf | ||
| Sediment Report 2.pdf | ||
| R2 Attachment 5 - Bid Schedule.docx | DOCX document | |
| Sediment Report 1.pdf | ||
| Amendment 0003.pdf | ||
| Sediment Report 3.pdf | ||
| Amendment 0001.pdf | ||
| 1685295 _SHEET V-002.pdf | ||
| Amendment 0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY22 Naval Weapons Station Yorktown Pier R3 and Cheatham Annex Pier CAD “A” 1685295
PRICE PROPOSAL FORM
FY22 Naval Weapons Station Yorktown Pier R3 and Cheatham Annex Pier CAD “A”
MAINTENANCE DREDGING
(eProjects WO# 1685295) Base Price (CLIN 0001) – Maintenance Dredging of Naval Weapons Station Yorktown
| CLIN |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001A |
| 1 |
| LS |
| _________ |
| ___________ |
| 0001B |
| 108,360 |
| CY |
| _________ |
| ___________ |
| 0001C |
| 40 |
| HR |
| _________ |
| ___________ |
TOTAL FOR CLIN 0001 ___________
CLIN 0002 (OPTION 0001) - MAINTENANCE DREDGING of Cheatham Annex PIER CAD “A”
| CLIN | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE | ||||
| 0002A | 87,027 | CY | __________ | __________ | ||||
| 0002B | 20 | HR | __________ | ___________ |
TOTAL FOR CLIN 0002 ___________
CLIN 0003 (OPTION 0002) - Mobilization/Demobilization - Cheatham Annex PIER CAD “A”
| CLIN | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0003A | 1 | LS | __________ ___________ |
TOTAL FOR CLIN 0003 ___________
CLIN 0004 (OPTION 0003) – Upland Material Disposal
| CLIN | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE | |||
| 0004A | 195,387 | CY | __________ ___________ |
TOTAL FOR CLIN 0004 ___________
TOTAL FOR CLIN 0001 + CLIN 0002 + CLIN 0003 + CLIN 0004 ___________
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) price for the following items:
Base Price (CLIN 0001) – Maintenance Dredging of Naval Weapons Station Yorktown Pier R3 Price includes the following:
CLIN 0001A thru 0001C in accordance with the drawings and specifications as detailed in the below table.
CLIN 0002 (OPTION 0001) - MAINTENANCE DREDGING of Cheatham Annex PIER CAD “A” The decision to award this bid option as described herein shall be at the sole discretion of the Government. The Government reserves the right to award this option no later than 180 Calendar Days after base contract award. No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.
CLIN 0002A and 0002B in accordance with the drawings and specifications as detailed in the below table. No additional days will be added to the original contract completion date if this Option is awarded.
CLIN 0003 (OPTION 0002) – Mobilization/Demobilization - Cheatham Annex PIER CAD “A” The decision to award this bid option as described herein shall be at the sole discretion of the Government. The Government reserves the right to award this option no later than The Government reserves the right to award this option no later than 180 Calendar Days after base contract award. No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.
CLIN 0003A in accordance with the drawings and specifications as detailed in the below table. No additional days will be added to the original contract completion date if this Option is awarded.
CLIN 004 (OPTION 0003) – Upland Material Disposal The decision to award this bid option as described herein shall be at the sole discretion of the Government. The Government reserves the right to award this option no later than 180 Calendar Days after base contract award. No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.
CLIN 0004A in accordance with the drawings and specifications as detailed in the below table. No additional days will be added to the original contract completion date if this Option is awarded.
(See Note i. below)
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001 (CLINs 0001A through 0001C), CLIN 0002 (CLINs 0002A and 0002B), CLIN 0003 and CLIN 0004. Enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. This contract will be awarded as one lump sum with unit prices required for specifically selected work as shown herein. See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys," "DFARS.236-7008, Contract Prices."
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Options.
| e. | The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices | for the basic requirement and the option quantities. An offer is unbalanced when it is based on | prices significantly less than cost for some work and prices which are significantly overstated for | other work |
| f. | If CLIN 0002 is exercised, additional bonding and consent of surety is | |||
| required. Consequently, the Performance Bond must reflect 100 percent of the aggregate | amount of all Items. |
g. If CLIN 0002 is exercised contractor relocation of equipment and personnel from NWYS Pier R3 to Cheatham Annex Pier CAD “A” shall not be considered mobilization. CLIN 0003 shall be exercised only if the government requires the contractor to demobilize Pier R3 and remobilize to Pier CAD “A” at a negotiated future date.
h. Access to NWSY Pier R3 immediate waterfront area for dredging will be accessible From August 13, 2022 to September 11, 2022. The contractor is encouraged to complete all dredging work in this area within this timeframe.
i. CLIN 0004 shall be exercised in the event that some or all of the material to be dredged from NWYS Pier R3 and/or Cheatham Annex Pier CAD “A” cannot be disposed of at the Norfolk Ocean Disposal Site (NODS). Unit price quoted shall be applicable only to the actual volume of material designated for upland disposal.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.