This solicitation seeks bucket dredging services at two piers located at Naval Weapons Station Yorktown in Yorktown, Virginia. The contractor will be required to dredge approximately 108,360 cubic yards of mud and silt material at Pier R-3, with an option to dredge approximately 87,027 cubic yards of additional material at Pier CAD-A. Dredged materials must be transported via bottom dumping barge or scow and disposed of at the Norfolk Ocean Disposal Site. The project schedule allows dredging to take place 24 hours a day, 7 days a week, with a minimum daily production rate of 2,500 cubic yards. The solicitation was issued by the Naval Facilities Engineering Command of the Department of the Navy. Interested offerors should visit the provided link for more details on the requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Attachment 5 - Bid Schedule.docx | DOCX document | |
| Amendment 0004.pdf | ||
| Sediment Report 2.pdf | ||
| R2 Attachment 5 - Bid Schedule.docx | DOCX document | |
| Sediment Report 1.pdf | ||
| Amendment 0003.pdf | ||
| Sediment Report 3.pdf | ||
| Amendment 0001.pdf | ||
| 1685295 _SHEET V-002.pdf | ||
| Amendment 0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
james.georgo Polygon Approximate Limits Of Dredging Area Availble from August 13 to September 11, 2022. While it is likely that the entire R3 Pier front will remain open during the stated time frame, the contractor shall dredge in two phases allowing for approximately 1/2 of the pier length to be available to moor a vessel should the need arise. Should the government require the contractor to stand down due to ship movements, weapons loading, etc.. paid down time will apply pursuant to the project specifications.
james.georgo Typewritten Text RFI Figure 1 05-09-2022