Attachment D Price Proposal Form.pdf
PDF 263 KB Posted
- Attached to
- B670 Load Bank Platform for DDGX Project
- Solicitation number
- N4008521R2653
About this file
This document is an Attachment D Price Proposal Form for a federal contract opportunity related to the DDG(X) Land Based Test Site (LBTS) WP2 project. It provides a price schedule for various line items, including the base price for the entire work, subtotals for specific work elements such as the B670 roof replacement and load bank superstructure, and unit prices for optional items like removal and disposal of contaminated soils and built-up roofing.
The overall total price for Contract Line Items (CLINs) 0001 through 0004 is required. The government will evaluate offers and award the contract based on the total price, including any option items exercised. The government reserves the unilateral right to award the option items within 240 calendar days after contract award, and the contract completion date remains 330 calendar days after award if the options are exercised. The government may reject an offer as unbalanced if the prices for the basic requirement and option quantities are significantly disproportionate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GENERAL REQUIREMENTS FOR DDGX PROJECT.pdf | ||
| Attachment A 1733372 DWG.pdf | ||
| Attachment A 1733372_WP2_SPC.pdf | ||
| Attachment E SECNAV 5512 Form.pdf | ||
| Attachment C Pre-Proposal Inquiry (PPI) Form.xlsx | XLSX spreadsheet | |
| Attachment G PIEE Vendor Access Instructions.pdf | ||
| ATTACHMENT B WAGE DETERMINATION.pdf | ||
| Attachment F ODP Badge Access Request.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
PRICE SCHEDULE
Provide line-item prices, where indicated by blank underlines, for the following items:
Line Item Description Quantity Unit Unit Price Sub-Total Total Price
0001 BASE PRICE: Total Price for the entire work for DDG(X) Land Based Test Site (LBTS) WP2 in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $_____
0001A Subtotal of Base Price for the B670 roof replacement in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $_____
0001B Subtotal of Base Price for the load bank superstructure, foundation, stairs, and electrical work in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $_____
0001C Subtotal of Base Price for the steel grate platform in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $_____
0001D Subtotal of Base Price for non-structural building modifications in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $_____
0001E Unit Price for providing Foundation Piling complete in accordance with the drawings and specifications, but excluding work provided in another line item.
5,900 VLF $_____ $_____
0002 Option Item No. 1: Unit Price for removal and disposal of contaminated soils complete in accordance with the drawings
26 CY $_____ $_____
TOTAL PRICE FOR CLINs 0001 - 0004 $___________________
GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Item (CLIN) 0001A-E, and the extended total under CLIN 0001. For CLINs 0001E, and 0002 through 0004, enter unit price and extended total in space provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for the option(s) (CLINs 0002 through 004) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the option(s).
c. The Government reserves the unilateral right to award CLIN(s) 0002 through 0004 to the Contractor at the proposed price within 240 calendar days after the contract award. A firm fixed proposed price is required for CLINs 0001 through 0004. No provision is made for economic price adjustment. If Options are exercised, the contract completion date remains 330 calendar days after award of the contract.
d. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
e. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
f. If CLIN(s) 0002 through 0004 are exercised, additional bonding and consent of surety is required.
Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.
and specifications, but excluding work provided in another line item. Quantity is in addition to what is included in the drawings and specifications.
0003 Option Item No. 2: Unit Price for removal and disposal of oily water complete in accordance with the drawings and specifications, but excluding work provided in another line item. Quantity is in addition to what is included in the drawings and specifications.
100 Gal $_____ $_____
0004 Option Item No. 3: Unit Price for removal and disposal of built-up roofing on Building 670 in accordance with the drawings and specifications, but excluding work provided in another line item.
8,050 SF $_____ $_____