Attachment A 1733372_WP2_SPC.pdf

PDF 16 MB Posted

Attached to
B670 Load Bank Platform for DDGX Project
Solicitation number
N4008521R2653
Issued by

About this file

This document appears to be Attachment A for the B670 Load Bank Platform for DDGX Project solicitation issued by the Department of the Navy Naval Facilities Engineering Command (NAVFAC).

The solicitation seeks proposals for a load bank platform to support the DDGX project. Key details include:

  • Solicitation Number: N4008521R2653
  • Anticipated Contract Type: To be determined
  • Required Products/Services: Provision of a load bank platform system to support the DDGX project
  • Period of Performance: Not specified
  • Set-Asides: None indicated
  • Pricing: Offerors must provide pricing information, but the specific pricing terms are not detailed in this attachment
  • Response Deadline: Not provided in this attachment
  • Award Date: Not provided in this attachment
  • Incumbent Information: Not provided

This attachment provides technical specifications and requirements for the load bank platform, including details on the physical dimensions, environmental conditions, electrical and control requirements, and other performance parameters. It does not include the full Statement of Objectives or other solicitation details beyond these technical specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO.

At the

PREPARED BY:

Architectural: Mechanical:

Civil: Electrical:

Structural:

APPROVED BY:

Specifications:

For Commander, NAVFAC:

Date: 21 JUN 2024

Submitted By: Date:

NAVFAC ATLANTIC

1733372

NAVFAC CONTRACT NO. N40085-24-R-2653

DDG(X) LBTS WP2: Exterior Load Bank Platform at B670

Philadelphia Navy Yard Philadelphia, Pennsylvania

WRA

801 S. Caroline St.

Baltimore, MD 21231

N40085-17-D-5005

Laura Leas, AIA Anthony Olsen, P.E.

Robert Allison, P.E.

William Fitchett, P.E.

Craig Hossfeld,P.E.

Il Kim, P.E.

Frederick Hunsicker, WRA

Geotechnical:

Fire Protection:

Approved for Public Release: Distribution is Unlimited Refer to PRA #NSWCPD-002656

P.E.

DDG( X) LBTS WP2: Ext er i or Load Bank Pl at f or m at B670 1733372

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 02/ 11, CHG 1: 08/ 14 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK

01 14 00 11/ 22, CHG 1: 02/ 23 WORK RESTRI CTI ONS

01 20 00 11/ 20, CHG 3: 02/ 23 PRI CE AND PAYMENT PROCEDURES

01 30 00 11/ 20, CHG 2: 05/ 22 ADMI NI STRATI VE REQUI REMENTS

01 31 23. 13 20 05/ 17, CHG 8: 02/ 23 ELECTRONI C CONSTRUCTI ON AND FACI LI TY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 32 17. 00 20 05/ 18, CHG 3: 08/ 20 COST- LOADED NETWORK ANALYSI S SCHEDULES

( NAS)

01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES

01 35 26 11/ 20, CHG 3: 02/ 22 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00 08/ 23 QUALI TY CONTROL

01 45 35 11/ 20 SPECI AL I NSPECTI ONS

01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND

CONTROLS

01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS

01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON

01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND

DI SPOSAL

01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS

01 78 23 05/ 23 OPERATI ON AND MAI NTENANCE DATA

01 78 24. 00 20 05/ 23, CHG 1: 11/ 23 FACI LI TY DATA WORKBOOK ( FDW)

01 78 30. 00 22 01/ 23 GI S DATA DELI VERABLES

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 08/ 22 DEMOLI TI ON

02 61 13 02/ 10, CHG 1: 02/ 21 EXCAVATI ON AND HANDLI NG OF

CONTAMI NATED MATERI AL

02 82 00 11/ 18, CHG 1: 11/ 19 ASBESTOS REMEDI ATI ON

02 83 00 11/ 18 LEAD REMEDI ATI ON

DI VI SI ON 03 - CONCRETE

03 30 00 02/ 19, CHG 6: 11/ 23 CAST- I N- PLACE CONCRETE

DI VI SI ON 05 - METALS

05 05 20 05/ 22 POST- I NSTALLED CONCRETE AND MASONRY

ANCHORS

05 05 23. 16 08/ 18 STRUCTURAL WELDI NG

05 12 00 08/ 18, CHG 2: 05/ 21 STRUCTURAL STEEL

05 30 00 05/ 15, CHG 2: 08/ 18 STEEL DECKS

05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS

05 51 00 08/ 23 METAL STAI RS

05 51 33 02/ 16, CHG 2: 02/ 18 METAL LADDERS

05 52 00 08/ 23 METAL RAI LI NGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 08/ 16, CHG 2: 11/ 18 ROUGH CARPENTRY

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 22 00 08/ 23 ROOF AND DECK I NSULATI ON

07 52 00 05/ 12 MODI FI ED BI TUMI NOUS MEMBRANE ROOFI NG

07 60 00 08/ 23 FLASHI NG AND SHEET METAL

07 92 00 08/ 23 JOI NT SEALANTS

DI VI SI ON 09 - FI NI SHES

09 90 00 02/ 21 PAI NTS AND COATI NGS

DI VI SI ON 11 - EQUI PMENT

11 14 00 06/ 14 PEDESTRI AN CONTROL EQUI PMENT

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00. 00 20 08/ 10, CHG 3: 08/ 18 BASI C MECHANI CAL MATERI ALS AND METHODS

23 05 15 05/ 22 COMMON PI PI NG FOR HVAC

23 07 00 02/ 13, CHG 7: 05/ 20 THERMAL I NSULATI ON FOR MECHANI CAL

SYSTEMS

23 31 13. 00 40 08/ 22 METAL DUCTS

DI VI SI ON 26 - ELECTRI CAL

26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM

26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG

26 56 00 08/ 21 EXTERI OR LI GHTI NG

DI VI SI ON 31 - EARTHWORK

31 23 00. 00 20 02/ 11, CHG 2: 08/ 15 EXCAVATI ON AND FI LL

31 62 00 07/ 13 MI CROPI LES

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 31 13. 53 11/ 21 HI GH- SECURI TY FENCES ( CHAI N LI NK AND

ORNAMENTAL) AND GATES

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 2

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/ 11, CHG 1: 08/ 14

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

CONTRACT DRAWI NGS ARE AS FOLLOWS:

DRAWI NG NAVFAC TI TLE

NO. DWG NO.

2G001 12901635 COVER SHEET

2G002 12901636 DRAWI NG I NDEX

2G003 12901637 GENERAL PROJECT NOTES

2G004 12901638 PHI LADELPHI A NAVY YARD ANNEX SI TE MAP

2G005 12901639 OVERALL SI TE PLAN - DDG( X) LBTS COORDI NATI ON

WI TH BUI LDI NG 77- 87 COMPLEX PROJECTS NOT I N

CONTRACT

2G006 12901640 SI TE PLAN - DDG( X) LBTS COORDI NATI ON WI TH

BUI LDI NG 77- 87 COMPLEX PROJECTS NOT I N

CONTRACT

2G007 12901641 LI FE SAFETY PLANS

2G008 12901642 OVERALL SI TE AND BUI LDI NGS 77H AND 670

ACCESS PLAN

2C001 12901643 GENERAL CI VI L NOTES

2C002 12901644 CI VI L LEGEND AND ABBREVI ATI ONS

2C003 12901645 EROSI ON AND SEDI MENT CONTROL NOTES

2C101 12901646 EXI STI NG CONDI TI ONS AND DEMOLI TI ON PLAN

2C102 12901647 SI TE PLAN

2C103 12901648 EROSI ON AND SEDI MENT CONTROL PLAN

2C501 12901649 SI TEWORK DETAI LS

2C502 12901650 FENCE DETAI LS

2C503 12901651 FENCE DETAI LS

2C504 12901652 EROSI ON AND SEDI MENT CONTROL DETAI LS

2C505 12901653 EROSI ON AND SEDI MENT CONTROL DETAI LS

2H101 12901654 HAZARDOUS MATERI ALS PLAN

2XD101 12901655 FI RST FLOOR PLAN

2XD801 12901656 BUI LDI NG GENERAL DEMOLI TI ON - PHOTOGRAPHS

2XD802 12901657 BUI LDI NG GENERAL DEMOLI TI ON - PHOTOGRAPHS

2S001 12901658 GENERAL STRUCTURAL NOTES

2S002 12901659 GENERAL STRUCTURAL NOTES AND STRUCTURAL

ABBREVI ATI ONS

2S003 12901660 TYPI CAL STRUCTURAL DETAI LS

2S004 12901661 TYPI CAL STRUCTURAL DETAI LS

2S005 12901662 TYPI CAL STRUCTURAL DETAI LS

2S006 12901663 TYPI CAL STRUCTURAL DETAI LS

2SD101 12901664 FLOOR PLAN - DEMOLI TI ON

DOCUMENT 00 01 15 Page 1

2SD102 12901665 ROOF FRAMI NG PLAN - DEMOLI TI ON

2S101 12901666 FOUNDATI ON AND FLOOR PLAN

2S102 12901667 ROOF FRAMI NG PLAN

2S103 12901668 LOAD BANK PLATFORM TRUSS BOTTOM CHORD

FRAMI NG PLAN

2S104 12901669 LOAD BANK PLATFORM TRUSS TOP CHORD FRAMI NG

PLA

2S201 12901670 TRUSS ELEVATI ONS

2S202 12901671 TRUSS ELEVATI ONS

2S203 12901672 BRACED FRAME ELEVATI ONS

2S204 12901673 BRACED FRAME DETAI LS

2S301 12901674 BUI LDI NG CROSS SECTI ON

2S501 12901675 PI LE AND PI LE CAP DETAI LS

2S502 12901676 SECTI ONS AND DETAI LS

2S601 12901677 GRAPHI CAL COLUMN SCHEDULE AND DETAI LS

2S602 12901678 PEDESTAL SCHEDULE AND DETAI LS

2A001 12901679 ARCHI TECTURAL GENERAL NOTES AND

ABBREVI ATI ONS

2AD121 12901680 FI RST FLOOR DEMOLI TI ON PLAN

2AD122 12901681 ROOF DEMOLI TI ON PLAN

2AD123 12901682 DEMOLI TI ON SECTI ONS

2AD124 12901683 DEMOLI TI ON DETAI LS

2A101 12901684 FI RST FLOOR PLAN

2A102 12901685 ROOF PLAN

2A201 12901686 EXTERI OR ELEVATI ONS

2A301 12901687 BUI LDI NG SECTI ONS

2A501 12901688 STAI R DETAI LS

2A502 12901689 STAI R DETAI LS

2A503 12901690 I NTERI OR ELEVATI ON AND SECTI ON

2A504 12901691 DETAI LS

2A505 12901692 DETAI LS

2F001 12901693 ABBREVI ATI ONS, LEGEND, AND GENERAL NOTESV

2FD101 12901694 FI RST FLOOR DEMOLI TI ON PLAN

2F101 12901695 FI RST FLOOR PLAN

2FA001 12901696 ABBREVI ATI ONS, LEGEND, AND GENERAL NOTES

2FAD101 12901697 FI RST FLOOR DEMOLI TI ON PLA

2FA101 12901698 FI RST FLOOR PLAN

2M001 12901699 MECHANI CAL GENERAL NOTES, ABBREVI ATI ONS AND

LEGEND

2MD101 12901700 FI RST FLOOR PLAN - DEMOLI TI ON

2M101 12901701 FI RST FLOOR PLAN

2M501 12901702 MECHANI CAL DETAI LS

2E001 12901703 ELECTRI CAL LEGEND AND DEFI NI TI ONS

2E002 12901704 ELECTRI CAL ABBREVI ATI ONS AND GENERAL NOTES

2ED101 12901705 FI RST FLOOR PLAN - DEMOLI TI ON

2ED102 12901706 FI RST FLOOR PLAN - CONDUI T - DEMOLI TI ON

2E101 12901707 FI RST FLOOR PLAN - LI GHI TI NG

2E102 12901708 FI RST FLOOR PLAN - POWER

DOCUMENT 00 01 15 Page 2

2E103 12901709 ROOF PLAN - LI GHTI NG

2E104 12901710 ROOF PLAN - POWER

2E105 12901711 GROUNDI NG PLAN

2E106 12901712 FI RST FLOOR PLAN - CONDUI T

2E501 12901713 ONE LI NE DI AGRAM

2E601 12901714 ELECTRI CAL DETAI LS

2E701 12901715 SCHEDULES

- - End of Document - -

DOCUMENT 00 01 15 Page 3

THI S PAGE I NTENTI ONALLY LEFT BLANK

DOCUMENT 00 01 15 Page 4

SECTI ON 01 11 00

SUMMARY OF WORK

08/ 15, CHG 2: 08/ 21

PART 1 GENERAL

1. 1 WORK COVERED BY CONTRACT DOCUMENTS

1. 1. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes a st eel - f r amed pl at f or m above Bui l di ng 670, r e- r oof i ng of Bui l di ng 670, s i t e wor k, secur i t y f ence, and i nci dent al r el at ed wor k.

1. 1. 2 Locat i on

The wor k i s l ocat ed at t he Phi l adel phi a Navy Yar d Annex, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 2 OCCUPANCY OF PREMI SES

Bui l di ng( s) wi l l be occupi ed dur i ng per f or mance of wor k under t hi s Cont r act .

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.

1. 3 EXI STI NG WORK

I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 15 days pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

Pr ovi de a t hi r d par t y, i ndependent pr i vat e ut i l i t y l ocat i ng company t o i dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o

SECTI ON 01 11 00 Page 1 be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 2

SECTI ON 01 14 00

WORK RESTRI CTI ONS

11/ 22, CHG 1: 02/ 23

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.

Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Cont act Per sonnel

Modi f i cat i ons t o Emer gency Exi t Pl an; G

1. 2 SPECI AL SCHEDULI NG REQUI REMENTS

a. Gover nment emer gency exi t t hr ough Bui l di ng 670 must be mai nt ai ned f or t he dur at i on of t he pr oj ect . Modi f i cat i ons t o exi t access t o accommodat e wor k must be i n accor dance wi t h NFPA 101 and NFPA 241.

Pr ovi de modi f i cat i ons t o emer gency exi t pl an t o t he cont r act i ng of f i cer i n wr i t i ng f or AHJ appr oval . Pat hs must i ncl ude bar r i er s, l i ght i ng, f l oor , et c. as r equi r ed per NFPA. Schedul e must t r ack when changes t o exi t access wi l l occur t o al l ow f or Gover nment t o not i f y bui l di ng occupant s. Dur i ng over head r oof i ng wor k, pr ovi de over head pr ot ect i on of t he emer gency exi t pat h t hr ough Bui l di ng 670. I ncl ude over head pr ot ect i on i n t he modi f i cat i ons t o emer gency exi t pl an.

b. The emer gency exi t t hr ough Bui l di ng 670 cannot be bl ocked or i mpeded dur i ng r egul ar wor k hour s ( 7 a. m. t o 4 p. m. ) . Any wor k t hat bl ocks or i mpedes t he emer gency exi t t hr ough Bui l di ng 670 must be per f or med dur i ng wor k out si de r egul ar hour s ( see par agr aph WORK OUTSI DE REGULAR

HOURS) .

c. Rer out i ng of exi st i ng chi l l ed wat er pi pi ng must be cl osel y coor di nat ed wi t h t he Cont r act i ng Of f i cer . Out age r equest s must be coor di nat ed a mi ni mum of 15 busi ness days i n advance. Pl anned out age wi ndow must be i ncl uded i n t he basel i ne schedul e. The Gover nment r eser ves t he r i ght t o sel ect an out age wi ndow such t hat i t al i gns wi t h t he cont r act or ' s sequence of wor k and does not i mpact t he pr oj ect cr i t i cal pat h.

d. The wor k under t hi s cont r act r equi r es speci al at t ent i on t o t he schedul i ng and conduct of t he wor k i n connect i on wi t h exi st i ng oper at i ons. I dent i f y on t he const r uct i on schedul e each f act or whi ch const i t ut es a pot ent i al i nt er r upt i on t o oper at i ons.

1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 3. 1 Act i v i t y Regul at i ons

Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and

SECTI ON 01 14 00 Page 1 secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.

1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s

Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

1. 3. 1. 2 Ci t i zenshi p Requi r ement s

Wor k under t hi s cont r act i s r est r i ct ed t o U. S. c i t i zens who do not hol d duel c i t i zenshi p. No empl oyee or r epr esent at i ve of t he Cont r act or wi l l be admi t t ed t o t he wor k s i t e unl ess t hey f ur ni sh sat i sf act or y pr oof t hat t hey ar e a c i t i zen of t he Uni t ed St at es.

Document s accept abl e f or Pr oof of Ci t i zenshi p i ncl ude:

a. Bi r t h r egi st r at i on car d

b. Cer t i f i cat e of l i ve bi r t h, bi r t h cer t i f i cat e

c. Cer t i f i cat e of Nat ur al i zat i on

d. Cer t i f i cat e of r egi st r at i on

e. DD- 214 ( Must Ci t e Bi r t hpl ace) f . DD For m 4 ( Cont r act f or Enl i st ment and Must Ci t e Bi r t hpl ace)

g. DD 1966 ( Appl i cat i on f or Enl i st ment )

h. Mi l i t ar y di schar ge paper s ( must c i t e bi r t hpl ace) i . Del ayed bi r t h cer t i f i cat e j . Hawai i cer t i f i cat e of f or ei gn bi r t h

k. Hospi t al bi r t h cer t i f i cat e l . Mar r i age l i cense cer t i f i cat e

m. Mer chant mar i ne cer t i f i cat e

n. Mi l i t ar y of f i cer I D car d

o. Not i f i cat i on of bi r t h r egi st r at i on

p. St at e of Hawai i I D car d

q. USA passpor t r . Ver bal i nqui r y wi t h St at e of Hawai i Vi t al St at i st i cs Of f i ce

1. 3. 1. 3 Appl i cat i on f or Cont r act or I dent i f i cat i on Badges

The Cont r act or ' s empl oyees or r epr esent at i ves who wi l l be wor ki ng i nsi de NSWCPD f aci l i t i es or secur e per i met er s must obt ai n a Cont r act or ' s I D badge whi ch can be val i d f or up t o 6 mont hs. The Cont r act or wi l l be r equi r ed t o submi t a Let t er of Badge Request on company l et t er head t o t he Cont r act i ng Of f i cer ( COR) i ncl udi ng t he cont r act name, cont r act number , cont r act dur at i on, bui l di ng/ l ocat i on of wor k, COR cont act i nf or mat i on, NSWCPD poi nt - of - cont act i nf or mat i on, and t he names and per sonal i nf or mat i on f or each cont r act or empl oyee or r epr esent at i ve ( DOB, SSN, pl ace of bi r t h, c i t i zenshi p st at us) t o t he COR f or Secur i t y r evi ew and appr oval . A Let t er of Badge Request i s r equi r ed t o be submi t t ed whenever expi r i ng badges ar e needed t o be r enewed f or cont i nued wor k on t he cont r act , cont ai ni ng t he same i nf or mat i on i ncl uded i n t he i ni t i al r equest .

For Cont r act or empl oyees or r epr esent at i ves t hat do not have a CONFI DENTI AL or hi gher secur i t y c l ear ance, t he Cont r act or shal l pr ovi de a compl et ed SECNAV 5512/ 1 ( DoN Local Popul at i on I D Car d/ Base Access

SECTI ON 01 14 00 Page 2

Regi st r at i on For m) f or each empl oyee or r epr esent at i ve t o t he COR f or CNRMA ( Command Navy Regi on Mi d- At l ant i c) vet t i ng, r evi ew and appr oval .

Once appr oved, t he Cont r act or ' s empl oyees or r epr esent at i ves wi l l r epor t t o Secur i t y ( Bui l di ng 29) wi t h a compl et ed I - 9 f or m, al ong wi t h t wo f or ms of i dent i f i cat i on speci f i ed on t he I - 9 f or m, f or i ssuance of t he I D badge.

The Cont r act or must obt ai n t he r equi r ed empl oyee I D badges f r om t he Gover nment at hi s own expense, at no addi t i onal cost . The I D badge must be r et ur ned wi t hi n 5 cal endar days t o Secur i t y ( Bui l di ng 29) when an empl oyee l eaves t he Cont r act or ' s ser vi ce, when t he j ob i s compl et e, or t he I D badge has expi r ed. The Gover nment i s not r esponsi bl e f or any cost or l ost t i me associ at ed wi t h obt ai ni ng or t he use of dai l y or Cont r act or I D badges.

One- Day Vi s i t or Badges: The Cont r act or ' s empl oyees or r epr esent at i ves can obt ai n a dai l y Vi s i t or ' s badge f r om t he Secur i t y desk i nsi de NSWCPD f aci l i t i es, however , a Gover nment escor t wi l l be r equi r ed at al l t i mes and t he badge wi l l onl y be val i d f or t he f aci l i t y wher e t he badge was i ssued.

The use of dai l y v i s i t or ' s I D badge i s not r ecommended as a Gover nment escor t must be schedul ed i n advance and escor t ' s avai l abi l i t y i s l i mi t ed and gr ant ed on a case- by- case basi s ( i . e. avai l abi l i t y i s not guar ant eed) .

The Cont r act or ' s per sonnel woul d have t o obt ai n dai l y passes, be subj ect t o dai l y mandat or y vehi c l e i nspect i on, and woul d have l i mi t ed access t o t he i nst al l at i on i f usi ng a Vi s i t or badge. The Gover nment i s not r esponsi bl e f or any cost or l ost t i me associ at ed wi t h escor t avai l abi l i t y i n conj unct i on wi t h t he use of Vi s i t or ' s badges f or t he Cont r act or ' s empl oyees or r epr esent at i ves.

1. 3. 1. 4 Gener al Access Requi r ement s and Rest r i ct i ons

The f ol l owi ng access r equi r ement s and r est r i ct i ons appl y t o wor k at any NSWCPD f aci l i t y or secur ed per i met er .

a. No empl oyee or r epr esent at i ve of t he Cont r act or wi l l be admi t t ed t o t he s i t e of t he wor k unl ess he/ she has sat i sf act or i l y compl et ed t he Appl i cat i on f or Cont r act or I dent i f i cat i on Badge pr ocess and has f ur ni shed sat i sf act or y pr oof t hat he/ she i s a c i t i zen of t he Uni t ed St at es. The Gover nment Secur i t y Of f i ce must appr ove each base appl i cat i on f or m bef or e t he empl oyee or r epr esent at i ve wi l l be aut hor i zed admi t t ance t o t he s i t e of wor k by t he Gover nment .

b. The Cont r act or i s r esponsi bl e t o col l ect and account f or al l i dent i f i cat i on badges i ssued t o hi s/ her per sonnel at t he expi r at i on of t he cont r act , expi r at i on of t he badge or when no l onger r equi r ed.

Col l ect ed badges must be r et ur ned by t he Cont r act or t o t he NSWCPD Secur i t y Of f i ce ( Bui l di ng 29) .

c. Compl y wi t h al l secur i t y r egul at i ons cur r ent l y i n f or ce as communi cat ed di r ect l y by t he Gover nment Secur i t y per sonnel and as conveyed by t he COR.

d. Empl oyees or r epr esent at i ves of t he Cont r act or , whi l e wor ki ng at NSWCPD, must di spl ay t he Gover nment i ssued badge over t he f r ont of t hei r out er c l ot hi ng at al l t i mes. When of f of NSWCPD pr oper t y, r emove badge f r om cl ot hi ng and conceal .

e. Up t o t hr ee member s of t he Cont r act or t eam wi l l be al l owed t o oper at e t he over head door i n t he NW cor ner of B77H and t he over head door i n B670. NSWCPD wi l l pr ovi de t r ai ni ng f or door oper at i on. Door s must r emai n c l osed unt i l t hey need t o be opened f or equi pment ent er i ng or

SECTI ON 01 14 00 Page 3 l eavi ng t he bui l di ng and must be const ant l y moni t or ed when open. The door s must be secur ed i mmedi at el y f ol l owi ng i t s use, unl ess ot her wi se per mi t t ed by t he Command Secur i t y Di r ect or . Use of over head door s i s st r i ct l y f or equi pment , vehi c l es, oper at or s of t he equi pment and vehi c l es, and del i ver y or r emoval of mat er i al s t hat cannot be del i ver ed t hr ough pedest r i an door s. Over head door use f or cont r act or per sonnel access i s pr ohi bi t ed.

f . Fence gat es ar e onl y per mi t t ed t o be opened by Gover nment per sonnel or Access Cont r ol Per sonnel ( ACP) . The ACP i s not someone who wor ks f or t he Cont r act or . The ACP or Gover nment per sonnel must guar d t he gat e dur i ng t he ent i r e t i me t he gat e i s un- secur ed. The gat e must be secur ed i mmedi at el y f ol l owi ng i t s use, unl ess ot her wi se per mi t t ed by t he Command Secur i t y Di r ect or . Coor di nat e al l r equest s f or gat e access 24 hour s i n advance of t he wor k. Wher e gat e access i s r equi r ed f or a dur at i on exceedi ng 15 mi nut es i n dur at i on or mor e t han t wo t i mes i n a s i ngl e wor k day, coor di nat e a mi ni mum of t hr ee busi ness days i n advance of t he wor k.

g. Commer ci al vehi c l es ( wi t h company l ogo) t hat ar e r equi r ed t o ent er t he f ence l i ne per i met er or ent er t he bui l di ng at any NSWCPD f aci l i t y must be i nspect ed by CNRMA Pol i ce pr i or t o ent er i ng t he pr oper t y. Pr oof of val i d vehi c l e r egi st r at i on and i nsur ance document at i on must be pr ovi ded f or al l commer ci al vehi c l es and dr i ver s must have a val i d dr i ver s l i cense and NSWCPD access badgi ng avai l abl e at al l t i mes. No per sonal l y- owned vehi c l es ar e per mi t t ed wi t hi n t he f ence l i ne per i met er of any NSWCPD f aci l i t y . Coor di nat e vehi c l e i nspect i ons wi t h t he COR.

h. No Cont r act or or per sonal l y owned camer as ar e al l owed i nsi de NSWCPD f aci l i t i es. I f phot ogr aphs ar e r equi r ed f or desi gn or const r uct i on r ecor ds, submi t a wr i t t en r equest t o t he Cont r act i ng Of f i cer t o have phot ogr aphs t aken by a Gover nment Of f i c i al usi ng a Gover nment camer a.

Phot ogr aphs t aken by t he Gover nment wi l l be r evi ewed by Secur i t y bef or e r el ease t o t he Cont r act or .

i . I f a secur i t y al ar m i s r equi r ed t o be t empor ar i l y di sabl ed f or a const r uct i on act i v i t y t he Cont r act or must submi t a compl et ed Request t o Mask Secur i t y Al ar m f or m t o t he COR at l east t hr ee busi ness days i n advance of t he r equi r ed dat e. The COR wi l l coor di nat e wi t h t he NSWCPD Secur i t y Of f i ce t o obt ai n appr oval f or t he r equest .

j . Use of Cont r act or - owned l apt op comput er s wi t hi n NSWCPD f aci l i t i es, or t he const r uct i on s i t e under t hi s cont r act , r equi r es submi ssi on of an Aut hor i zat i on Request f or Oper at i on of Non- DoD Por t abl e El ect r oni c Devi ces f or m at l east t hr ee busi ness days i n advance.

k. Commer ci al and per sonal l y owned vehi c l e ( POV) par ki ng i n Gover nment par ki ng l ot s i s r est r i ct ed t o Gover nment empl oyees and aut hor i zed Cont r act or per sonnel onl y v i a i ssuance of a par ki ng pl acar d. Li mi t ed par ki ng pl acar ds ar e avai l abl e f or Cont r act or per sonnel and ar e not guar ant eed t o be avai l abl e f or t hi s cont r act . Unaut hor i zed par ki ng i n Gover nment par ki ng l ot s may r esul t i n DoN Pol i ce t i cket i ng.

l . Unl ess appr oved vi a submi ssi on of t he at t ached " Aut hor i zat i on Request f or Oper at i on of Non- Gover nment Por t abl e El ect r oni c Devi ces" , Por t abl e El ect r oni c Devi ces ( PEDs) ar e not per mi t t ed. A por t abl e el ect r oni c devi ce i s any pi ece of l i ght wei ght , el ect r oni cal l y power ed equi pment capabl e of communi cat i on or dat a pr ocessi ng. Exampl es i ncl ude:

SECTI ON 01 14 00 Page 4 t abl et s, l apt op comput er s, e- r eader s, smar t wat ches, f i t bi t s, et c.

Two- way r adi os wi l l not be per mi t t ed at any t i me.

m. Al l bags and bel ongi ngs wi l l be subj ect t o i nspect i on by t he t he Gover nment bef or e br i ngi ng anyt hi ng i nt o t he j ob s i t e. Al l i t ems bei ng car r i ed i nt o and out of t he pr oj ect s i t e ar e subj ect t o physi cal i nspect i on at any t i me.

n. The j ob s i t e i s t o be secur ed at t he end of each wor k day by t he Cont r act or , wi t h over si ght by t he t he Gover nment , t o pr event access by unaut hor i zed per sonnel and t o pr event t amper i ng wi t h st or ed bui l di ng mat er i al s.

o. Al l per sonnel , vehi c l es, and cont ai ner s ar e subj ect t o sear ch and i nspect i on f or access t o t he const r uct i on s i t e. Any i ndi v i dual s f ound i n possessi on of pr ohi bi t ed i t ems may be r equi r ed t o be r emoved f r om si t e and/ or may be subj ect t o di sci pl i nar y or l egal act i on based on t he nat ur e of t he i t em. Possessi on of i t ems i n v i ol at i on of l ocal or f eder al l aw wi l l necessi t at e t he i nvol vement of l ocal l aw enf or cement aut hor i t i es.

p. Pr ohi bi t ed I t ems

1. The f ol l owi ng i t ems ar e pr ohi bi t ed wi t hout pr i or appr oval f r om t he t he Gover nment ( l apt ops wi l l be al l owed when appr oved as i ndi cat ed above) :

o Fi r ear ms and ammuni t i on;

o Expl osi ves or i ncendi ar y devi ces ( does not i ncl ude expl osi ve power ed t ool s cust omar i l y used on si mi l ar j ob s i t es) or hi ghl y vol at i l e subst ances o Camer as or phot ogr aphi c equi pment or any equi pment capabl e of r ecor di ng i nt el l i gi bl e i mages ( cel l phones wi t h phot ogr aphi c capabi l i t i es ar e aut hor i zed on t he const r uct i on s i t e; however , use of t he camer a f eat ur e i s pr ohi bi t ed on t he const r uct i on s i t e. Vi ol at i ons of t hi s pol i cy wi l l r esul t i n t he of f ender bei ng deni ed access t o t he const r uct i on s i t e) o Unpr ocessed f i l m of any k i nd o Tr ansmi t t i ng or r ecor di ng equi pment or mi cr ophones o Sound r ecor di ng equi pment i ncl udi ng magnet i c t ape, magnet i c wi r e o Speaker s o Comput er s o I l l egal subst ances o Al cohol

Pr ohi bi t ed and Rest r i ct ed I t ems l i s t s ar e subj ect t o r evi ew and change, wi t h addi t i onal i t ems added l at er . Cont r act or secur i t y r epr esent at i ves wi l l be advi sed of any changes made t o t hese l i s t s.

1. 3. 1. 5 No Smoki ng Pol i cy

Smoki ng i s pr ohi bi t ed wi t hi n and out si de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.

SECTI ON 01 14 00 Page 5

1. 3. 2 Wor ki ng Hour s

Regul ar wor ki ng hour s wi l l consi st of a per i od est abl i shed by t he Cont r act i ng Of f i cer , bet ween 7 a. m. and 4 p. m. , , , excl udi ng Gover nment hol i days.

1. 3. 3 Wor k Out si de Regul ar Hour s

Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Submi t l i s t of per sonnel who wi l l wor k dur i ng t he of f hour s f or coor di nat i on wi t h bui l di ng and car d r eader . Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.

1. 3. 4 Occupi ed and Exi st i ng Bui l di ng

The Cont r act or shal l be wor ki ng i n an exi st i ng bui l di ng whi ch i s occupi ed.

The exi st i ng bui l di ngs and t hei r cont ent s must be kept secur e at al l t i mes. Pr ovi de t empor ar y c l osur es as r equi r ed t o mai nt ai n secur i t y as di r ect ed by t he Cont r act i ng Of f i cer .

Pr ovi de dust cover s or pr ot ect i ve encl osur es t o pr ot ect exi st i ng wor k t hat r emai ns, and Gover nment mat er i al l ocat ed i n t he bui l di ng dur i ng t he const r uct i on per i od. Per f or m dust mi t i gat i on as needed t o avoi d per sonnel , equi pment , and oper at i onal i mpact .

The Navy wi l l be conduct i ng t est s and per f or mi ng ot her cont r act s i n and ar ound Bui l di ng 77 Hi gh and Bui l di ng 670 dur i ng t he const r uct i on per i od.

Cont r act or must coor di nat e t hei r wor k wi t h t he Navy' s oper at i ons, equi pment t est i ng schedul e, and ot her cont r act or s. Navy' s act i v i t i es or t est i ng schedul e wi l l make ar eas of t he bui l di ng and door s unavai l abl e t o t he Cont r act or f or cer t ai n per i ods of t i me. The Navy wi l l pr ovi de not i f i cat i on a mi ni mum of t wo weeks i n advance.

Use of exi st i ng cr anes i nsi de Bui l di ng 77 Hi gh i s not al l owed.

The nor t h and east dr i ve ai s l e i n Bui l di ng 77 Hi gh i s used f or access by t he Navy f or oper at i ons out si de of t he ar ea of t he wor k. Do not par k vehi c l es or bl ock t he dr i ve ai s l e. Coor di nat e use of t he dr i ve ai s l e wi t h t he Cont r act i ng Of f i cer .

Gover nment emer gency exi t t hr ough Bui l di ng 670 must be mai nt ai ned f or t he dur at i on of t he pr oj ect .

Bui l di ng 670 must be ent i r el y separ at ed f r om Bui l di ng 77H dur i ng demol i t i on and const r uct i on. Pr ovi de t empor ar y const r uct i on par t i t i on / dust cont r ol bar r i er as i ndi cat ed.

1. 3. 5 Ut i l i t y Cut over s and I nt er r upt i ons

a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es

SECTI ON 01 14 00 Page 6 r equi r ed i n par agr aph WORK OUTSI DE REGULAR HOURS.

b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ce.

c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, compr essed ai r , and gas ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph

WORK OUTSI DE REGULAR HOURS.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 14 00 Page 7

THI S PAGE I NTENTI ONALLY LEFT BLANK

SECTI ON 01 14 00 Page 8

SECTI ON 01 20 00

PRI CE AND PAYMENT PROCEDURES

11/ 20, CHG 3: 02/ 23

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EP 1110- 1- 8 ( 2021) Engi neer i ng and Desi gn - - Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.

Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ear ned Val ue Repor t ; G

1. 3 EARNED VALUE REPORT

1. 3. 1 Dat a Requi r ed

Thi s Cont r act r equi r es t he use of a cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Schedul e of Pr i ces must not be used wi t h cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Use Ear ned Val ue Repor t der i ved f r om cost - l oaded NAS. Wi t hi n 15 cal endar days of not i ce of awar d, pr epar e and del i ver t o t he Cont r act i ng Of f i cer a Ear ned Val ue Repor t ( const r uct i on Cont r act ) as di r ect ed by t he Cont r act i ng Of f i cer . Pr ovi de a det ai l ed br eakdown of t he Cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces and ext ended pr i ces. Cont r act or over head and pr of i t i ncl udi ng sal ar i es f or f i el d of f i ce per sonnel , i f appl i cabl e, must be pr opor t i onat el y spr ead over al l pay i t ems and not i ncl uded as i ndi v i dual pay i t ems.

1. 4 CONTRACT MODI FI CATI ONS

I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, base equi pment use r at es upon t he appl i cabl e pr ovi s i ons of t he

EP 1110- 1- 8.

SECTI ON 01 20 00 Page 1

1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT

1. 5. 1 Cont ent of I nvoi ce

Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR

52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.

a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .

b. The Ear ned Val ue Repor t f r om t he cost - l oaded NAS.

c. Cont r act or ' s Mont hl y Est i mat e f or Voucher and Cont r act or s Cer t i f i cat i on ( NAVFAC For m 4330) wi t h Subcont r act or and suppl i er payment cer t i f i cat i on. Ot her document s, i ncl udi ng but not l i mi t ed t o, t hat need t o be r ecei ved pr i or t o pr ocessi ng payment i ncl ude t he f ol l owi ng submi t t al s as r equi r ed. These i t ems ar e st i l l r equi r ed mont hl y even when a pay voucher i s not submi t t ed.

d. Mont hl y Wor k- hour r epor t .

e. Updat ed Const r uct i on Pr ogr ess Schedul e and t abul ar r epor t s r equi r ed by t he cont r act .

f . Cont r act or Saf et y Sel f Eval uat i on Checkl i st .

g. Updat ed submi t t al r egi st er .

h. Sol i d Wast e Di sposal Repor t .

i . Cer t i f i ed payr ol l s.

j . Updat ed t est i ng l ogs.

k. Ot her suppor t i ng document s as r equest ed.

1. 5. 2 Submi ssi on of I nvoi ces

I f DFARS Cl ause 252. 232- 7006 Wi de Ar ea Wor kFl ow Payment I nst r uct i ons i s i ncl uded i n t he Cont r act , pr ovi de t he document s l i s t ed i n above par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow ( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of at t achment s. I f a document cannot be at t ached i n WAWF due t o syst em or s i ze r est r i ct i on, pr ovi de i t as i nst r uct ed by t he Cont r act i ng Of f i cer .

Mont hl y i nvoi ces and suppor t i ng f or ms f or wor k per f or med t hr ough t he anni ver sar y awar d dat e of t he Cont r act must be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 5 cal endar days of t he dat e of i nvoi ce. For exampl e, i f Cont r act awar d dat e i s t he 7t h of t he mont h, t he dat e of each mont hl y i nvoi ce must be t he 7t h and t he i nvoi ce must be submi t t ed by t he 12t h of t he mont h.

SECTI ON 01 20 00 Page 2

1. 5. 3 Fi nal I nvoi ce

a. A f i nal i nvoi ce must be accompani ed by t he cer t i f i cat i on r equi r ed by DFARS 252. 247. 7023 Tr anspor t at i on of Suppl i es by Sea, and t he Cont r act or ' s Fi nal Rel ease. I f t he Cont r act or i s i ncor por at ed, t he Fi nal Rel ease must cont ai n t he cor por at e seal . An of f i cer of t he cor por at i on must s i gn and t he cor por at e secr et ar y must cer t i f y t he Fi nal Rel ease.

b. For f i nal i nvoi ces bei ng submi t t ed v i a WAWF, t he or i gi nal Cont r act or ' s Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea must be pr ovi ded di r ect l y t o t he r espect i ve Cont r act i ng Of f i cer pr i or t o submi ssi on of t he f i nal i nvoi ce. Once r ecei pt of t he or i gi nal Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea has been conf i r med by t he Cont r act i ng Of f i cer , t he Cont r act or must t hen submi t f i nal i nvoi ce and at t ach a copy of t he Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea i n WAWF.

c. Fi nal i nvoi ces not accompani ed by t he Cont r act or ' s Fi nal Rel ease and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea wi l l be consi der ed i ncompl et e and wi l l be r et ur ned t o t he Cont r act or .

1. 6 PAYMENTS TO THE CONTRACTOR

Payment s wi l l be made on submi ssi on of i t emi zed r equest s by t he Cont r act or whi ch compl y wi t h t he r equi r ement s of t hi s sect i on, and wi l l be subj ect t o r educt i on f or over payment s or i ncr ease f or under payment s made on pr evi ous payment s t o t he Cont r act or .

1. 6. 1 Obl i gat i on of Gover nment Payment s

The obl i gat i on of t he Gover nment t o make payment s r equi r ed under t he pr ovi s i ons of t hi s Cont r act wi l l , at t he di scr et i on of t he Cont r act i ng Of f i cer , be subj ect t o r educt i ons and suspensi ons per mi t t ed under t he FAR and agency r egul at i ons i ncl udi ng t he f ol l owi ng i n accor dance wi t h FAR

32. 103 Pr ogr ess Payment s Under Const r uct i on Cont r act s:

a. Reasonabl e deduct i ons due t o def ect s i n mat er i al or wor kmanshi p;

b. Cl ai ms whi ch t he Gover nment may have agai nst t he Cont r act or under or i n connect i on wi t h t hi s Cont r act ;

c. Unl ess ot her wi se adj ust ed, r epayment t o t he Gover nment upon demand f or over payment s made t o t he Cont r act or ; and

d. Fai l ur e t o mai nt ai n accur at e " as- bui l t " i n accor dance wi t h FAR

52. 236. 21.

1. 6. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s

Pr ogr ess payment s may be made t o t he Cont r act or f or mat er i al s del i ver ed on t he si t e, f or mat er i al s st or ed of f const r uct i on s i t es, or mat er i al s t hat ar e i n t r ansi t t o t he const r uct i on s i t es under t he f ol l owi ng condi t i ons:

a. FAR 52. 232- 5( b) Payment s Under Fi xed Pr i ce Const r uct i on Cont r act s.

b. Mat er i al s del i ver ed on t he si t e but not i nst al l ed, i ncl udi ng compl et ed pr epar at or y wor k, and of f - s i t e mat er i al s t o be consi der ed f or pr ogr ess

SECTI ON 01 20 00 Page 3 payment must be maj or hi gh cost , l ong l ead, speci al or der , or speci al t y i t ems, not suscept i bl e t o det er i or at i on or physi cal damage i n st or age or i n t r ansi t t o t he const r uct i on s i t e. Exampl es of mat er i al s accept abl e f or payment consi der at i on i ncl ude, but ar e not l i mi t ed t o, st r uct ur al st eel , non- magnet i c st eel , non- magnet i c aggr egat e, equi pment , machi ner y, l ar ge pi pe and f i t t i ngs, pr ecast / pr est r essed concr et e pr oduct s, pl ast i c l umber ( e. g. , f ender pi l es/ cur bs) , and hi gh- vol t age el ect r i cal cabl e. Mat er i al s not accept abl e f or payment i ncl ude consumabl e mat er i al s such as nai l s, f ast ener s, condui t s, gypsum boar d, gl ass, i nsul at i on, and wal l cover i ngs.

c. Mat er i al s t o be consi der ed f or pr ogr ess payment pr i or t o i nst al l at i on must be speci f i cal l y and separ at el y i dent i f i ed i n t he Cont r act or ' s est i mat es of wor k submi t t ed f or t he Cont r act i ng Of f i cer ' s appr oval i n accor dance wi t h Ear ned Val ue Repor t r equi r ement of t hi s Cont r act .

Request s f or pr ogr ess payment consi der at i on f or such i t ems must be suppor t ed by document s est abl i shi ng t hei r val ue and t hat t he t i t l e r equi r ement s of t he c l ause at FAR 52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s have been met .

d. Mat er i al s ar e adequat el y i nsur ed and pr ot ect ed f r om t hef t and exposur e.

e. Pr ovi de a wr i t t en consent f r om t he sur et y company wi t h each payment r equest f or of f s i t e mat er i al s.

f . Mat er i al s i n t r ansi t t o t he j ob s i t e or st or age si t e ar e not accept abl e f or payment .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 20 00 Page 4

SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

11/ 20, CHG 2: 05/ 22

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y - - Saf et y and Heal t h Requi r ement s Manual

1. 2 MI NI MUM I NSURANCE REQUI REMENTS

Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by t he Commonweal t h of Pennsyl vani a.

1. 3 SUPERVI SI ON

1. 3. 1 Super i nt endent Qual i f i cat i ons

Pr ovi de pr oj ect super i nt endent wi t h a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.

1. 3. 2 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of Cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he Cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .

1. 3. 3 Dut i es

The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng subcont r act or s and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect . The super i nt endent i s r equi r ed t o at t end Red Zone meet i ngs, par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.

SECTI ON 01 30 00 Page 1

1. 3. 4 Non- Compl i ance Act i ons

The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o ensur e t i mel y compl et i on.

Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .

1. 4 PRECONSTRUCTI ON MEETI NG

I mmedi at el y af t er awar d, pr i or t o commenci ng any wor k at t he s i t e, coor di nat e wi t h t he Cont r act i ng Of f i cer a t i me and pl ace t o meet f or t he Pr econst r uct i on Meet i ng. The meet i ng must t ake pl ace wi t hi n 35 cal endar days af t er awar d of t he cont r act , but pr i or t o commencement of any wor k at t he s i t e. The pur pose of t hi s meet i ng i s t o di scuss and devel op a mut ual under st andi ng of t he admi ni st r at i ve r equi r ement s of t he Cont r act i ncl udi ng but not l i mi t ed t o: dai l y r epor t i ng, i nvoi c i ng, val ue engi neer i ng, saf et y, base- access, out age r equest s, hot wor k per mi t s, schedul e r equi r ement s, qual i t y cont r ol , schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, submi t t al s, cyber secur i t y, pr osecut i on of t he wor k, gover nment accept ance, f i nal i nspect i ons and cont r act c l ose- out . Cont r act or must pr esent and di scuss t hei r basi c appr oach t o schedul i ng t he const r uct i on wor k and any r equi r ed phasi ng.

1. 4. 1 At t endees

Cont r act or at t endees must i ncl ude t he Pr oj ect Manager , Super i nt endent , Si t e Saf et y and Heal t h Of f i cer ( SSHO) , Qual i t y Cont r ol Manager and maj or subcont r act or s.

1. 5 FACI LI TY TURNOVER PLANNI NG MEETI NGS ( Red Zone Meet i ngs)

Meet wi t h t he Gover nment t o i dent i f y st r at egi es t o ensur e t he pr oj ect i s car r i ed t o expedi t i ous c l osur e and t ur nover t o t he Cl i ent . St ar t pl anni ng t he t ur nover pr ocess at t he Pr e- Const r uct i on Conf er ence meet i ng wi t h a di scussi on of t he Red Zone pr ocess and convene at r egul ar l y schedul ed NAVFAC Red Zone Meet i ngs begi nni ng at appr oxi mat el y 75 per cent of pr oj ect compl et i on. I ncl ude t he f ol l owi ng i n t he f aci l i t y Tur nover ef f or t :

1. 5. 1 Red Zone Checkl i st

a. Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve ( COTR) wi l l pr ovi de t he Cont r act or a copy of t he Red Zone Checkl i st t empl at e.

b. Pr i or t o 75 per cent compl et i on, modi f y t he Red Zone Checkl i st t empl at e by addi ng or del et i ng cr i t i cal act i v i t i es appl i cabl e t o t he pr oj ect and assi gn pl anned compl et i on dat es f or each act i v i t y. Submi t t he modi f i ed Red Zone Checkl i st t o t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer may r equest addi t i onal act i v i t i es be added t o t he Red Zone Checkl i st at any t i me as necessar y.

1. 5. 2 Meet i ngs

a. Conduct r egul ar Red Zone Meet i ngs begi nni ng at appr oxi mat el y 75 per cent pr oj ect compl et i on, or t hr ee t o s i x mont hs pr i or t o Benef i c i al Occupancy Dat e ( BOD) , whi chever comes f i r st .

SECTI ON 01 30 00 Page 2

b. The Cont r act i ng Of f i cer wi l l est abl i sh t he f r equency of t he meet i ngs, whi ch i s expect ed t o i ncr ease as t he pr oj ect compl et i on dr aws near er .

At t he begi nni ng, Red Zone meet i ngs may be ever y t wo weeks t hen i ncr ease t o weekl y t owar ds t he f i nal mont h of t he pr oj ect .

c. Usi ng t he Red Zone Checkl i st as a Pl an of Act i on and Mi l est ones ( POAM) and basi s f or di scussi on, r evi ew upcomi ng cr i t i cal act i v i t i es and st r at egi es t o ensur e wor k i s…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .