About this file

This is a summary of an amendment to a solicitation for an Indefinite Delivery Indefinite Quantity Remedial Action Operation Multiple Award Contract. The amendment extends the proposal due date from March 15, 2022 to April 14, 2022. It also answers previously submitted prime contractor questions and notes that an additional amendment will address questions not covered. The solicitation is for environmental remediation services including operation and maintenance of remedies and long-term monitoring at sites within Hampton Roads Virginia, West Virginia, North Carolina, and South Carolina. The Navy intends to award up to five contracts with a maximum total value of $30 million over five years. Task orders will range from $50,000 to $250,000 for fixed-price work. The solicitation is 100% set aside for small businesses. Required services include assessment of remedy effectiveness, contaminant monitoring, and optimization of remedial action systems.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the proposal due date to April 14, 2022 and answ er PPI Questions. There w ill be an additional amendment to answ er questions related to key personnel.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Mar-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R0149

X 9B. DATED (SEE ITEM 11)

15-Feb-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Mar-2022

CODE

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R0149

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The purpose of Amendment 0002 is to extend the proposal due date to 4/14/2022 and answer PPI questions. An additional amendment will answer questions that are not answered on Part 1.

Please see attached:

PPI Questions Part 1 (Excel) Imange (PDF Files ) A1 – MW6AandB_rs.pdf A-MW5_rs.pdf A-MW7_rs.pdf B-15WAandB_rs.pdf B-17W_rs.pdf NSN Site 1 Technical Specifications

Technical Specifications Coordinate System and Horizontal and Vertical Datum(s):

1. Horizontal – All data shall be reported in the Virginia State Plane Coordinate System, South Zone, on the North American Datum of 1983 (NAD 83) current adjustment for the horizontal.

2. Vertical – All data shall be reported on the North American Vertical Datum of 1988 (NAVD 88) current adjustment.

Accuracy:

1. Control

a. Horizontal control work shall comply with Third Order Class II (1:20,000) or better, as outlined in the FGDC Geospatial Positioning Accuracy Standards, Part 4: Standards for Architecture, Engineering, Construction (A/E/C), and Facility Management.

b. Vertical Control work shall comply with Second Order Class II (0.035√m) or better, as outlined in the FGDC Geospatial Positioning Accuracy Standards, Part 4: Standards for A/E/C and Facility Management.

c. In addition to the above ratio closure requirements the relative accuracy of the on‐site control monuments shall be twice as accurate for the horizontal and at least as accurate for the vertical, as the relative accuracy cited herein for “Monitoring Well Surveys”.

If GPS is allowed for establishing on‐site horizontal control points, each point shall be checked with a significantly different satellite constellation. The Surveyor shall also perform and document direct field measurement checks between the monuments established by GPS.

Conventional survey control loops for the QC check shall achieve closures as stated above and as outlined in the FGDC Geospatial Positioning Accuracy Standards, Part 4: Standards for A/E/C, and Facility Management.

If GPS is allowed for establishing vertical control points, each point shall be checked with a significantly different satellite constellation. The Surveyor shall also perform and document direct differential level loop closure checks between the monuments established using GPS.

Conventional survey control loops for the QC checks shall achieve closures as stated above and as outlined in the FGDC Geospatial Positioning Accuracy Standards, Part 4; Standards for A/E/C, and Facility Management.

d. The Surveyor is responsible for ensuring that all recovered or established control points and monuments meet the standards set forth for permanent or semi‐permanent control monuments in USACE EM 1110‐1‐1002, available at:

http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx.

2. Other Features – All other surveys (other than control surveys), shall comply with FGDC Geospatial Positioning Accuracy Standards, Part 4: Standards for A/E/C, and Facility Management with relative accuracy tolerance of +/‐ 0.10 foot for the horizontal and +/‐ 0.03 foot for the vertical on all other hard surfaces including monitoring well casings and +/‐ 0.10 foot for the vertical on soft or natural ground surfaces (if applicable).

To reduce roundoff error in inverse calculations the Surveyor shall report all control monument coordinates (x, y,

z) to three decimal places and all other coordinates to two decimal places.

For monitoring well elevation surveys RTK GPS cannot be used and differential level loops from the on‐site control monuments/benchmarks turning through the top of the PVC casings and back to the on‐site control monuments/benchmarks is required.

Standards and Deliverable Formats The following standards and delivery formats apply to the tasks listed in this statement of work:

1. Survey Accuracy Standard: FGDC Geospatial Positioning Accuracy Standards, Part 4: Standards for Architecture, Engineering, Construction (A/E/C), and Facility Management

2. Map Accuracy Standards: ASPRS 2014 Map Accuracy Standards – With equivalent 1990 ASPRS Class 1 map accuracy for the horizontal scale and if applicable contour interval, except that all field surveyed points shall retain their accuracy based on the requirements of the accuracy section of this document.

3. CAD Standards: National CAD Standards (NCS), as published for the National Institute of Building Sciences.

4. GIS Standards: Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE), most current version.

5. All survey information shall be delivered in a native and current version of MicroStation, AutoCAD, or ESRI ArcMap as an electronic drawing. All GIS drawings shall be provided in ESRI’s shapefile or geodatabase format, along with the accompanying map document file (.mxd) in ArcMap Version 10.5 or newer. The drawing shall show all information surveyed and where applicable provided to the Surveyor. If 3D data are provided, all features shall be at their correct elevations.

6. Point Data Delivery Format: All surveyed points (all control points found and set, monitoring wells, and other survey points/features) shall be delivered in an Excel electronic file in coordinate geometry format.

All points delivered shall have unique point numbers assigned. Each point shall contain a point number, easting (x‐coordinate), northing (y‐coordinate), elevation (z‐coordinate), an alphanumeric field code, and a description to identify what the point is. For the monitoring wells the description shall include well point names.

Drawing/Map Products Minimum Content Requirements Minimum Content Requirements

Title Block North Arrow Scale (Bar) Contour Interval

Date of Survey Legend with symbols & abbreviations

Datum – Horizontal and Vertical

Grid Ticks – A minimum of four Grid Values on the Grid Ticks All survey control monuments found and set

Surveyors Certificate – Which certifies that all work complies with the specified accuracy requirements of the SOW and with federal, state, and local codes, ordinances, laws, and regulations.

Surveyors Seal – stamped, dated, and signed.

Geo referenced control polygon with coordinate annotation

Survey Methods

1. Control

a. If existing horizontal control monuments are not recovered a minimum of two inter‐visible pairs of control monuments (a minimum of three monuments in total) shall be set utilizing a semi‐ permanent marker (e.g. 30‐inch, #5 re‐bar or larger, or equivalent), set at ground level. The Surveyor shall also perform and document direct conventional Total Station measurements and traverse closure checks between any monuments established using GPS.

b. If existing vertical control monuments (benchmarks) are not recovered, at least two vertical control monuments/benchmarks shall be set utilizing an existing semi‐permanent concrete headwall or foundation, or other concrete structure. If none are available, the Surveyor can use the semi‐permanent horizontal control monuments or establish other semi‐permanent monuments (e.g. 30‐inch, #5 re‐bar or equivalent), set at ground level. The Surveyor shall also perform and document direct differential level loop closure checks between any monuments established using GPS.

c. Control monuments shall be set as close as possible to the site and in a location that will, by observation, maintain stability.

2. Monitoring Well Locations

a. The elevation point for the monitoring wells shall be established at the top of the inner

(plastic/PVC) well casing with the well plastic cap removed. A permanent mark (notch or ink) designating the elevation point shall be established on the plastic monitoring well casing, typically the north side. This elevation shall be collected as a turning point on a level loop from the on‐site control/benchmark turning through the monitoring well casings and back to an on‐ site control monument/benchmark. This reading will require that the cover of the protective steel casing be unlocked and removed.. The cover shall be replaced and locked when the well is not under the direct observation of the Surveyor.

b. Determine the elevation of the ground surface directly adjacent to each monitoring well (not the concrete pad surrounding the well casing). This elevation can be collected as a side shot on level loop and taped difference to inner well casing should be visually cross checked.

c. If allowed by the client/facility, obtain photographs of each well location with the steel casing lid removed or in an open position.

d. Determine the horizontal position (x, y, coordinates) of each monitoring well location.

e. All elevations shall be established using differential leveling techniques. Level loops shall always contain and be verified between two benchmarks. Level loops shall be closed as specified or better and if not shall be re‐ran until the specified closures are met.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Mar-2022 02:00 PM to 14-Apr-2022 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

GENERAL OFFEROR INFORMATION

GENERAL OFFEROR INFORMATION

B.1 Contract Title: Remedial Action Operations / Long Term Management, Multiple Award Contract (RAOMAC) for NAVFAC Mid‐Atlantic Area of Operation

B.2 Type of Contract: This is a combination Indefinite Delivery / Indefinite Quantity (IDIQ) Remedial Action Operations Multiple Award Contract (RAOMAC)

B.3 Minimum Guarantee: The only work authorized under this contract is that which is ordered by The Government through issuance of a task order. The Government makes no representation as to the number of task orders or the total actual amount of work to be ordered. However, during the term of the contract, a minimum of $5,000 is guaranteed to be ordered to each awardee under the performance period of the contract. Contractors are not guaranteed work in excess of the minimum guarantee specified herein. The $5,000 minimum guarantee is the only minimum guarantee for the entire contract period, and that value of work or dollar amount may be ordered or paid at any time during the duration of the contract, including the base and any option periods, to satisfy the minimum guarantee. The minimum guarantee is subject to deductive offesets for failure to perform work, failure to complete work, and or defective work.

B.4 Set‐Aside: Small Business Set – Aside, FAR Clause 52.219‐6

B.5 NAICS Code: The NAICS Code assigned to this procurement is 562910 with a size standard of Fewer than 750 employees with a total aggregate of $30,000,000.00. Refer to On‐Line Representations and Certifications Application via System for Award Management (SAM) at https://www.sam.gov/ .

B.6 Wage Determination (Service): Service Contract Act (SCA) wages are included in this solicitation For the seed project. Refer to Section J.

B.7 Bid Guarantee/ Bonding Requirements: A bid guarantee is not required. Bonding requirements will Be determined per individual task orders.

B.8 Contract Term: This contract contains provisions for a Base Period with four (4) Option Periods, not To exceed a total of five (5) years. The Government has the option to extend the Term of the Contract in accordance with Section I, Contract Clauses, 5252.217‐8, Option to Extend the Contract‐Service (Jun 1994)

B.9 Place of Performance: NAVFAC MIDLANT anticipates awarding a Remedial Action Operations Multiple Award Contract(s)(RAOMAC) for projects within Hampton Roads, West Virginia, North Carolina, and South Carolina Area of Responsibility (AOR).

B.10 Period of Performance: The period of performance will be determined at the time of award.

B.11 Incorporation of Technical Proposal

a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.

b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.

B.12 Request For Proposals (RFP) Information/Clarification Questions

Contractors are required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due by email to andre.d.forte.civ@us.navy.mil. This is the most efficient way to ensure all questions are addressed in a timely manner.

B.13 Request for Proposal (RFP) Files:

Solicitations are posted to the SAM website (https://www.sam.gov) as mandated by our Agency.

By necessity, these files are protected to prevent unauthorized editing.

It is the sole responsibility of the Offeror to obtain the RFP files, along with any Amendments, from this website.

Unprotected editable file copies of the RFP documents including: Word, Excel and /or .pdf files (Adobe Acrobat Files) will not be provided. Please plan accordingly.

B.14 Proposal Delivery:

NOTICE TO PROPOSER (updated)

Submitting Your Proposal

Proposals that are sent via the United States Postal Service or a commercial carrier, such as Federal Express, shall be addressed to:

NAVFAC MID‐LANT Acquisition Core Attn: Andre D. Forte 9324 Virginia Avenue Building Z‐140, Room 216 Norfolk, Virginia 23511

Proposals that are hand carried excluding commercial carriers noted above shall be delivered to Andre Forte (Contract Specialist) at the Norfolk Naval Station Pass and ID located at 9040 Hampton Blvd, Norfolk, VA 23505 on April 14, 2022 at 10:00 AM. Please email andre.d.forte.civ@navy.mil in order to confirm that you will hand deliver.

Please Note: email of proposals, acknowledgement of amendments or modifications to proposals

WILL NOT BE ACCEPTED.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

SECTION H

H.1 HOLIDAYS. All or a portion of the effort under this contract will be performed on a Government installation.

Listed below are the holidays observed by the Federal Government. The Contractor will not be allowed to work on the Government installation on these days. In the event any of the holidays occur on a Saturday or Sunday, then such holiday shall be observed by the Contractor in accordance with the practice as observed by the assigned Government employees at the using activity.

HOLIDAY OBSERVANCE

New Year’s Day 1 January Martin Luther King Jr. Day Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Fourth Thursday in November

Christmas Day 25 December

H.2 GOVERNMENT FURNISHED/CONTRACTOR AQUIRED PROPERTY. In accordance with FAR 52.245-2, the Government may furnish or direct the Contractor to purchase, for use in connection with this contract, various property items to be identified on individual task orders. Each task order, as applicable, will identify the property, quantity, original or estimated acquisition value, and place of delivery.

H.3 INSURANCE. Within fifteen (15) days after award of this contract, the Contractor shall furnish to the Contracting Officer a Certificate of Insurance as evidence of the existence of the following insurance coverage in amount not less than the amount specified in accordance with FAR 52.228-5, “INSURANCE – WORK ON A GOVERNMENT INSTALLATION (JAN 1997)” incorporated in Section I. This insurance must be maintained during the entire performance period.

H.3.1 INSURANCE COVERAGE. Below are the minimum coverage amounts:

a. Comprehensive General Liability: $500,000

b. Automobile Liability: $200,000 per person; % 500,000 per occurrence for bodily injury; $20,000 per occurrence for property damage

c. Workman’s Compensation: As required by Federal and State Workers’ compensation and occupational disease statutes

d. Employer Liability Coverage: $100,000, except in states where workers compensation may not be written by private carriers

e. Other Insurance As Required By State Law.

H.3.2 GOVERNMENT OWNED EQUIPMENT AND VEHICLES. Above insurance coverages are to extend to Contractor personnel operating Government owned equipment and vehicles.

H.3.3 NOTIFICATION. The Certificate of Insurance shall provide for thirty (30) days writer notice to the Contracting Officer by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned “Insurance” clause including this paragraph in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required above. The Contractor shall maintain a copy of all subcontractor’s proofs of required insurance and shall make copies available to the Navy Technical Representative prior to the subcontractor’s commencement of on-site work and the Contracting Officer upon request.

H.4 RELEASE OF INFORMATION. The Contractor shall not make public release of any information relating to all or any part of this contract without prior approval of the Contracting Officer. For the purpose of this clause, “information” includes but is not limited to new releases, articles, manuscripts, brochures, advertisements, still motion pictures, speeches, trade association meetings, symposia, published professional papers, internet web pages etc… H.4.1 SUBMITTAL. Two copies of any information proposed for release must be submitted to the Contracting Officer for security and policy reviews and clearance 45 days prior to release. Information copies shall also be sent to the Administrative Contracting Officer, if applicable, and the COTR.

H.4.2 SUBCONTRACTS. The Contractor further agrees to include this clause in any subcontract awarded as a result of this contract.

H.5 SECURITY. The contract, or performance thereof, may involve access to information affecting the national defense of the United States within the meaning of Espionage Laws, Title 18, U.S.C. Sections 793 and 794. The transmission or revelation of the classified contents, or of classified matter to which access may be had, in any manner to an unauthorized person is prohibited by law.

H.6 SERVICE CONTRACT ACT (SCA) WAGES. The Contractor is responsible to ensure all eligible employees are paid in accordance with the appropriate SCA Wage Determination. The following Department of Labor Wage Determinations are applicable to this contact. These determinations specify the minimum wages and fringe benefits to be paid to applicable workers under this contract.

SERVICE CONTRACT ACT WAGE DETERMINATION

1. 2015-4341, Revision No. 19, dated 12/27/2021 Service Contract Act Wage Determinations cited above are found at Section J, Attachment K. Task orders for areas not covered under these Attachments will identify and incorporate the appropriate Service Contract Act Wage Determinations as necessary and applicable.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

LIST OF ATTACHMENTS

TABLE OF CONTENTS

Attachment Number Title/Description

J1 Scope of Work – Seed Project

J2 Price Proposal Form

J3 Area 1 Well and Deficiency Location

J4 Well Rehab Table xls.

J5 Survey Benchmarks

J6 Wage Determinations

J7 PPI Template

J8 Relevant Experience Individual Project Data Sheet

J9 Relevant Experience Project Checklist

J10 Past Performance Questionnaire

SECTION M - EVALUATION FACTORS FOR AWARD

EVALUATION FACTORS FOR AWARD

EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-cost/price factors:

Factor 1 – Management Approach

Factor 2 – Recent, Relevant Experience of the Firm

Factor 3 – Safety

Factor 4 – Past Performance

Factor 5 – Technical Approach for seed project

Price

2. The relative order of importance of the non-cost/price factors is Factors 1, 2, 3 and 5 are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment rating determined from the evaluation of Factor 4.

All evaluation factors other than cost or price, when combined, are approximately equal in importance to price in the best value determination. The importance of price will increase if the offeror’s non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government.

Award will be made to the responsible offerors whose offers conforms to the solicitation and represent the best value to the Government, price and non-price factors considered.

3. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Non-Cost/Price Factors Submission Requirements:

Non-cost/price Factors Binder: Offeror shall submit one (1) marked “Original” and five (5) copies, each in a separate three-ring binder with following characteristics:

• 8 1/2 x 11 format

• 10-12-point Times New Roman font

• 125 page limit (inclusive of all charts, resumes forms and other documentation to the solicitation requirements), pages sequentially numbered. Price proposals are not part of the 125 page limitation.

• Include a cover page with Contract Number, Contract Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact and their phone number and email address

• Include only information in response to Factors 1, 2, 3, 4 and 5 separated by tabs as applicable.

• A complete electronic copy of the technical proposal as a single .pdf file on a CD-ROM (include with the “original” technical submission)

(b) Price (Proposed Seed Project):

(1) Solicitation Submittal Requirements: Offerors shall submit an original and one (1) copy of the price proposal, in a separate three ring binder, that shall include the following:

i. SF33, signed with all amendments acknowledged and executed representations and certifications (SAM)

ii. Confirm submission of the most recent Vets 4212 Report

iii. Provide name of financial institution, point of contact, telephone number and e-mail address. Provide a signed statement of release giving the reference permission to release the information to the Navy.

iv. The price proposal shall be submitted at the same time as the technical proposal.

v. In addition to providing a hard copy of the price proposals, offerors shall also provide one

(1) non-rewritable CD with pricing information. Offerors are advised that in the event of a discrepancy between pricing information contained on the CD and the hard copy, the hard copy will govern.

(2) Basis of Evaluation: The Government will evaluate the price of the “Seed Project” included in the solicitation. The offerors shall provide a complete breakdown of the sample project tasks in the form of an Implementation Plan (IP) and Price Proposal (PP). The Government intends to award the “Seed Project” via Task Order 0001 to the successful offeror determined to be most advantageous to the Government, price and technical factors considered. A maximum of four (4) additional offerors may simultaneously receive an award as a result of this solicitation. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

(1) Factor 1, Management Approach:

(i) Solicitation Submittal Requirements.

(1) Submit a narrative that discusses the following topics: a) Describe the Offeror’s ability to manage multiple projects simultaneously; b) address how offeror will provide labor, materials, equipment, subcontractors, and project management for sites. Offeror information provided shall not exceed five (5) pages total.

(2) Indicate the type and percentage of work the Offeror will self-perform. Offeror must meet the requirements of FAR 52.219-14, Limitation on Subcontracting. Explain how you will manage your subcontracts under multiple projects at varying locations. Information provided shall not exceed three (3) pages..

(3) Discuss the firm’s general quality control procedures, identifying how Remedial Action Operation and Long-Term Management quality will be managed and maintained. Explain how you will manage and control the three phases of the Quality Control Program (i.e., preparation phase, initial phase, Follow-up phase) to assure a highly performing QC program is provided. Discuss how you define the activities for which the three phases of control are performed, and discuss the actual inspection activities and documentation of inspections at each phase. Information provided shall not exceed five (5) pages.

(ii) Basis of Evaluation

The Government will evaluate the narrative responses to determine whether the offeror has demonstrated:

(1) A logical plan for managing multiple projects at various sites.

(2) A detailed plan for providing labor, materials, equipment, subcontractors, and project management for sites of awarded task orders.

(3) A detailed discussion of quality control procedures that utilize the three phases of quality control as well as proposed subcontractor management practices.

Higher ratings may be given for demonstration of the following:

A detailed plan to manage projects with limited field seasons at various times of the year and/or in challenging locations. Examples may include work in severe weather conditions, remote locations, and/or within required regulatory limitations due to natural habitat, migratory or mating seasons, endangered species, or other similar protection measures as may have been imposed by federal, state, or local governments.

(2) Factor 2, Recent, Relevant Experience of the firm:

Definitions and qualifying information:

(a) “Relevant experience” is work completed by an offeror that is similar in size, scope, and complexity to the types of projects intended to be awarded under the IDIQ contract. Projects Note that once a relevancy determination is made, a further delineation regarding the “degree” of relevancy for the projects offered may be made by reviewing officials.

Further “degrees” of relevancy for the projects determined to be relevant will be as follows:

Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

(b) A “project” is defined as a single contract or single task order awarded under an indefinite quantity or on-call contract.

(c) The term “substantially complete” shall mean that more than 80% of the project has been performed.

(d) “Within the past five (5) years” shall be calculated from the date of the proposal submission. .

(e) “Long Term Management” (LTM) occurs when the selected remedy has achieved the cleanup goals (possibly done under the remedial action or RAO phase) and the hazardous substances remain at the site above levels that would allow unlimited use and unrestricted exposure.

LTM may include long-term monitoring, implementation and/or management of land use controls (LUCs), maintenance of the final remedy, and preparation of the five-year review.

(f) “Remedial Action” (RA) may include, but are not limited to the construction of various soil, sediment, and/or groundwater remediation systems that functions as containment (e.g. soil cover, RCRA cap, slurry wall, pump and treatment system); in-situ treatment (e.g. natural attenuation, soil vapor extraction, enhanced bio-remediation, air-sparging) or ex-situ treatment (air stripping, constructed wetlands, off site disposal, stabilization, solidification)

(g) “Remedial Action Operation” (RAO) is the phase of the CERCLA process when the remediation system (possibly constructed under the remedial action phase) is in place and is operating, or the chemical or biological processes are occurring leading to the cleanup objective. RAO may include active remediation, monitoring, operation, and optimization for extended periods of time to reduce contaminants to site cleanup standards; along with the implementation and management /maintenance of Land Use Controls (LUCs).

(h) For the purposes of this solicitation, the term “TEAM” shall be defined as two or more companies which form a partnership or joint venture to act as a potential PRIME CONTRACTOR for the purposes of contract performance under the subject solicitation. A team member is one of more of those companies. A team member is NOT a subcontractor for the purposes of this solicitation. This definition shall be used and applied consistently throughout this solicitation

(i) Solicitation Submittal Requirements.

(1) Submit three (3) relevant Remedial Action Operation (RAO) projects and one(1) relevant

Long Term Management (LTM) projects. The offeror shall submit a total of four (4) projects.

Projects must have been completed or substantially completed within the last five (5) years.

Offeror (OR YOUR TEAM member) must have been the prime contractor for each project;

subcontractor experience will not be considered.

(2) Submit one (1) examples of an actual LTM environmental reports that offeror prepared and submitted to local, state or federal agencies. The one (1) report should be directly associated with any of the relevant projects submitted for Factor 2. These reports should be submitted as separate attachments and do not count toward the total page restriction for Project Data Sheets.

Complete the “Relevant Experience Individual Project Data Sheet” (Attachment J8) for each project. Each Project Data Sheet package may not be longer than six (6) pages in length.

Complete and submit a “Relevant Experience Project Checklist” (Attachment J9) that covers all of the relevant projects submitted for this factor. This Checklist will serve as the contractor’s self-assessment of the type of services contained in each of the relevant projects. This Checklist does not count towards the total page restriction for Project Data Sheets. LTM Reports developed in accordance with CERCLA requirements should also be annotated on the “Relevant Experience Project Checklist.”

Joint venture offerors must include two (2) relevant projects performed by the joint venture as existing OR two (2) relevant projects each performed by each firm comprising the joint venture. The Small Business Administration (SBA) determines the validity of a joint venture under an 8(a) Program.

Projects may include work with federal, state, or local governments, as well as private industry. Firms are responsible for providing project description and applicable experience in sufficient detail to permit evaluation of project relevancy.

(3) Offerors (and team members) shall demonstrate experience working multiple projects simultaneously typical of those ordered by indefinite delivery/indefinite type contracts.

(ii) Basis of Evaluation:

(1) The Government’s evaluation will assess the contractor’s recent (within the past five years) and relevant experience with respect to size, scope, and complexity.

(2) Projects submitted by Joint Ventures in which the joint venture partners performed together

(either as joint venture partners or in a prime-sub relationship), will be given more weight than submitted projects in which the Joint Venture firms did not perform together.

(3) Higher ratings may be given for demonstration of the following:

(a) Experience with relevant projects of the following size: At least one (1) Remedial Action Operation project with annual value of $250,000 or above and at least one Long-Term Management project submitted with value of $100,000 annually or above.

(b) Offeror’s (and team members) demonstrated knowledge and experience with type of projects anticipated for this RAOMAC in NAVFAC Mid-Atlantic’s “Hampton

Roads” area (defined as Naval Station Norfolk and outlying facilities within 50 miles of Naval Station Norfolk) and the “Mid-Atlantic Area: (defined as West Virginia, North Carolina, and South Carolina) in terms of codes, specific state & federal environmental regulations, laws, permit requirements, construction materials, general practices, topography and subsurface conditions, etc.

(c) Specific type of RAO/LTM work: While there are many examples of environmental restoration RAO/LTM work, the following specific types of environmental restoration RAO/LTM types are deemed more important to this RFP than others. Therefore, ensure that you provide your firm’s (and team members) experience, if any, in the following types of work, which are listed in descending order of importance (weight).

1. Treatment plant operation & optimization: Provide experience with the operation and optimization of groundwater (especially complex, multiple treatment trains) treatment facilities including operating, maintaining, monitoring, repairing and incidental construction support. Provide the size, duration and yearly operation and maintenance cost of the treatment facility, and task order or contract pricing.

Optimization experience shall include optimizing equipment performance, monitoring requirements and overall system protectiveness (containment of site plume, etc). Include significant recommendations (alternate technologies, studies, groundwater modeling efforts) and how they were incorporated into the facilities’ operation in order to reduce costs or improve protectiveness. Provide experience with RAO/LTM systems start up and shut down support including the transition of the facility to other parties for operation and maintenance.

2. Site management & remedy maintenance: Experience with site management and maintenance including, but not limited to, protection of human health and the environment, site security, disposal of investigation derived wastes, decommissioning of wells, sampling, and construction support required for ensuring the protection of an existing remedy (i.e. installation of fencing, landfill maintenance and erosion control, provision of warning signs)

3. Technical Reports: Experience with the preparation of RAO/LTM technical reports

(i.e. annual reports, Operation and Maintenance Manuals, site sampling results reports, 5 year review reports) for each site noted above.

(3) Factor 3, Safety:

(i) Solicitation Submittal Requirements: The Offeror shall submit the following information: The

Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as safety narrative, as described further below. (For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe bust be explained in detail, to include root cause and corrective actions.

NOTE: Dart and TCR shall not be submitted for subcontractors

(1) DART Rate: Submit five (5) previous complete calendar years’ [CY2017, CY2018, CY2019, CY2020, and CY2021] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.

(2) TCR Rate: Submit five (5) previous complete calendar years’ [CY2017, 2018, 2019, 2020, and 2021] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.

b. Calculation of TCR rate: Multiply the total number of TCR incidents by

200,000, and then divide by the number of employee labor hours worked.

(3) Technical Approach for Safety:

a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.

(4) Provide documentation that a safety program is in place that meets the requirements of the most recent US Army Corps of Engineers Safety and Health Requirements Manual, EM- 385-1-1 and OSHA 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response. Information shall not exceed three (3) pages.

(5) The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

NOTE: In the event the prime will perform all work with its in-house staff, that is NO subcontractors will be used at any level, provide this information in your narrative to document why the required information concerning subcontractors is not included in your proposal. Failure to provide the required information or an affirmative statement that the offeror shall perform all work itself without subcontractors will be considered a material defect rendering the proposal UNACCEPTABLE for this factor.

All information outlined above in (1), (2), and (3) MUST be provided or the proposal will be considered UNACCPTABLE. If information is not available in the submitted narratives, provide a reason for missing required information.

(ii) Basis of Evaluation: The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negatives trends and extenuating circumstances that impact the rating.

(1) DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing DART rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.

d. This chart correlates the DART rate to the level of risk:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0

(2) TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing TCR rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.

d. This chart correlates the TCR rate to the level of risk:

Risk TCR Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater than 6.0

(3) Technical Approach to Safety. To determine the degree to which the Offeror:

a. Describes a viable SMS that addresses elements; such as

b. Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

c. Describes a methodical process of evaluating subcontractor’s safety performance in their selection process.

d. Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.

e. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page. Information on pages beyond this will not be considered.

(4) The Government reserves the right to review other available sources

(public/Governmentinternal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc. The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The Government will also evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.

NOTE: In the event the prime will perform all work with its in-house staff, that is

NO subcontractors will be used at any level, provide this information in your narrative to document why the required information concerning subcontractors is not included in your proposal. Failure to provide the required information or an affirmative statement that the offeror shall perform all work itself without subcontractors will be considered a material defect rendering the proposal UNACCEPTABLE for this factor.

All information outlined above in (1), (2), and (3) MUST be provided or the proposal will be considered UNACCPTABLE. If information is not available in the submitted narratives, provide a reason for missing required information.

(4) Factor 4, Past Performance:

Definitions

Past Performance is a measure of the degree to which an offeror satisfied its customers’ requirements in the past and complied with applicable laws and regulations.

(i) Solicitation Submittal Requirements:

(1) For each project submitted under Factor 2; IF A COMPLETED CPARS EVALUATION IS

AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT

A COMPLETED CPARS EVALUATION, the Past Performance Questionnaire (PPQ), Attachment J10, included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1. AN

OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS

AVAILABLE.

(2) IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Section J), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Andre Forte, via email at andre.forte.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

(3) Also…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .