J-0200000-09 ELINS.xlsx
XLSX spreadsheet 181 KB Posted
- Solicitation number
- N4008521R0103
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008521R0103 Amendment 0002.pdf | ||
| N4008521R0103 Amendment 0001.pdf | ||
| J-0200000-08 ELINS.xlsx | XLSX spreadsheet | |
| RFP_1502000 Attachments.zip | ZIP file | |
| J-1602000-03 Equip Inv Tables.xls | XLS spreadsheet | |
| 0200000 J Management and Administration v2.6.pdf | ||
| RFP_N4008521R0103.pdf | ||
| 1602000 J.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2nd Opt IDIQ
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-12-D-1709 |
| EXHIBIT C - CLIN 9000 |
| Line Item 006 IDIQ - Base Period | |||||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||||
| ELINs C700 through C709 | |||||||||
| ELIN | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | |||
| C700 | Perform Emergency Trouble Calls (General) | The Contractor shall respond to emergency trouble calls within 1 hour of receipt during Government regular working hours and 2 hours of receipt outside Government working hours. Emergency trouble calls are limited to a dollar value of up to4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested and, up to the threshold limit, restore safe, continuous, and reliable equipment operation. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following the call. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 50 | EA | $ 445.58 | $22,279.00 | |||
| C701 | Perform service Trouble Calls (General) | The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 100 | EA | $ 381.92 | $38,192.00 | |||
| C702 | Remove and Reinstall Center Barrier Pods - Normal Response | Remove and reinstall the center barrier pods on the island side of Bridge 2 within seven hours given a 2 day Government notice. Removing the center pods includes relocating the pods off the roadway surface adjacent to Bldg. 33. Upon notification of the Contracting Office, reinstall the center pods by 1430 the following day. Work shall be completed between the hours of 0730 and 1430. All work shall be coordinated with PWD Maine and Security. | 4 | EA | $ 3,000.00 | $12,000.00 | |||
| C703 | Remove and Reinstall Center Barrier Pods - Emergency Response | Remove and reinstall the center barrier pods on the island side of Bridge 2 within four hours given a 24 hour Government notice. Removing the center pods includes relocating the pods off the roadway surface adjacent to Bldg. 33. Upon notification of the Contracting Office, reinstall the center pods by 1430 the following day. Work shall be completed between the hours of 0730 and 1430. All work shall be coordinated with PWD Maine and Security. | 4 | EA | $ 3,500.00 | $14,000.00 | |||
| C704 | Provide Underground Locate Services | When notified by the Government, the Contractor shall, review the Government excavation site area, Yard Plates (old and new), and as-built/building plans adjacent to the excavation site to determine the utilities in the area. The Contractor shall provide appropriate inductive or conductive equipment to locate utilities and ensure utilities are marked within the time required by the State of Maine. While locating utilities, the Contractor shall identify yard plate discrepancies by marking the yard plate field copy. The Contractor shall complete the Government furnished Utility Locate Form/Underground Utility Checklist. Return the completed form and marked-up yard plate field copy to the Government. | 225 | HR | $ 190.96 | $42,966.00 | |||
| C705 | Provide Hourly Underground Locate Service with Ground Penetration Radar | When notified by the Government, the Contractor shall, provide hourly underground locate service with ground penetration radar. | 20 | HR | $ 190.96 | $3,819.20 | |||
| C706 | Unit Priced Labor Work (Negotiated) | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | |||||||
| 300 | LH | $ 70.02 | $21,006.00 | ||||||
| C707 | Unit Priced Labor Work (Negotiated) | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | |||||||
| 300 | LH | $ 95.48 | $28,644.00 | ||||||
| C708 | Material | Price for material to support unit priced labor work (negotiated). | $250,000.00 | LS | $250,000.00 | ||||
| C709 | Specific Work | This ELIN will not be ordered via EMALL. A paper Task Order will be placed. When requirements are identified for potential placement on this contract, the ACO will provide the Contractor with a Statement of Work (SOW) and request a proposal to perform the work. The Contractor will develop a subcontract solicitation document in sufficient detail to establish mutual understanding of the scope among the competing subcontractors and identify potential subcontractors for performance of the requirement. Typically, the Contractor shall solicit a minimum of at least three independent, qualified and complete bids (including line item breakouts) from potential subcontractors. Refer to J-0200000-09 for additional requirements. | $2,800,000.00 | LS | $2,800,000.00 | ||||
| C710 | Perform Service Trouble Calls (Diesel Generators, Diesel and Electric Fire Pump Drivers) | The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 10 | EA | $ 990.00 | $9,900.00 | |||
| C711 | Unit Priced Labor Work (Diesel Generators, Diesel and Electric Fire Pump Drivers) | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | |||||||
| 200 | LH | $ 142.00 | $28,400.00 | ||||||
| C712 | Unit Priced Labor Work (Electrician -Electrical Distribution) | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | |||||||
| 400 | LH | $ 104.00 | $41,600.00 | ||||||
| C713 | Technical Support Services | Price for performance of specialized technical services that do not fall within UPL ELIN listed above. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | $5,000.00 | LS | $ 1.00 | $ 5,000.00 | |||
| TOTAL INDEFINITE QUANTITY PRICE 2ND OPTION YEAR | $3,317,806.20 |
6 MONTH Base Opt Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-17-R-1148 |
| EXHIBIT A - CLIN 9000 |
| Line Item 001 Recurring Work - 6 MONTH Base Option Period | ||||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELINs A001 through A007 | ||||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC | ||
| A001 | NON-CIA | |||||||
| A001AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | |||
| A001AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | |||
| A001AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | |||
| A001AD | Develop and Implement a Preventative Maintenance Program for Diesel Generators (6 generators X 2 PMs=12) Bldgs 29, 59, 298, 337, 373, 398 | 6 | MO | $ 1,986.64 | $11,919.84 | |||
| A001AE | Perform Annual Cleaning Services to Bridge 1 | 6 | MO | $ 993.32 | $5,959.92 | |||
| A001AF | Perform Annual Cleaning Services to Bridge 2 | 6 | MO | $ 882.95 | $5,297.70 | |||
| A001AG | Perform Catch Basin Cleaning Services - 300 CB's | 0 | MO | $ 5,147.53 | $0.00 | |||
| A001AH | Perform Catch Basin Line Flushing - 3000 LF | 0 | MO | $ 1,139.87 | $0.00 | |||
| A001AI | Perform Cleaning of Oil / Water Separators 29(2), 72, 154(2), 299, 320, 376(2) | 0 | MO | $ 1,579.27 | $0.00 | |||
| A001AJ | Develop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (2 Diesel Engines: 170A, 337) | 0 | MO | $ 220.74 | $0.00 | |||
| A001AK | Develop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (2 Electric Motors: 298, 373) | 0 | MO | $ 386.29 | $0.00 | |||
| A001AL | Perform Cleaning of Storm Water Management Structures, SMS-003-01 (B170), SMS-005-01 and SMS-005-02 (B389) | 0 | MO | $ 4,366.35 | $0.00 | |||
| A001AM | Bridge 1 Concrete Sealant (Every 2 years= start opt2 & opt4) | 0 | MO | $ 882.95 | $0.00 | |||
| A001AN | Perform Annual Testing and Certification of Backflow Preventors (21 = half of inventory) | 6 | MO | $ 347.66 | $2,085.96 | |||
| TOTAL NON-CIA | $28,663.42 | |||||||
| A002 | CIA | |||||||
| A002AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | |||
| A002AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | |||
| A002AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | |||
| A002AD | Perform Preventative Maintenance Program for Diesel Generators (Quarterly - 5 generators x 2 PMs=10). CIA Gate 2, CIA Gate 4, DD1, DD2, DD3 | 6 | MO | $ 1,655.53 | $9,933.18 | |||
| A002AE | Perform Preventative Maintenance Program for Diesel Generator - 374 Monthly | 6 | MO | $ 514.75 | $3,088.50 | |||
| A002AF | Perform Catch Basin Cleaning - 250 CB's | 0 | MO | $ 5,147.53 | $0.00 | |||
| A002AG | Perform Catch Basin Line Flushing - 3000 LF | 0 | MO | $ 1,029.51 | $0.00 | |||
| A002AH | Install and Maintain Water Purification System in Bldg 277 and 343 | 6 | MO | $ 4,414.74 | $26,488.44 | |||
| A002AI | Perform Maintenance Program on Dry Dock Controls for DD-1, DD-2 and DD-3. | 6 | MO | $ 5,524.99 | $33,149.94 | |||
| A002AJ | Develop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (3 Diesel Engines, 86A, 306, 343) Annual | 0 | MO | $ 331.11 | $0.00 | |||
| A002AK | Develop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (5 Electric Motors 92, 178, 2-291, 343) | 0 | MO | $ 1,214.05 | $0.00 | |||
| A002AL | Develop and Implement a Maintenance Program for UPS System at Buildings 374 - Annual | 6 | MO | $ 386.81 | $2,320.86 | |||
| A002AM | Perform Annual Testing and Certification of Backflow Preventors (31 = half of inventory) | 6 | MO | $ 513.21 | $3,079.26 | |||
| A002AN | Perform Semi-Annual Testing and Certification of Backflow Preventors (5 EA x 1 = 5) | 6 | MO | $ 41.39 | $248.34 | |||
| TOTAL CIA | $81,708.52 | |||||||
| A003 | MIDLANT | |||||||
| A003AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | |||
| A003AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | |||
| A003AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | |||
| A003AD | Sewer & Drain Clearing Service Orders | 20 | EA | $ 150.00 | $3,000.00 | |||
| A003AE | Sewer & Drain Inspection Recording Service Orders | 10 | EA | $ 500.00 | $5,000.00 | |||
| A003AF | Perform Preventative Maintenance Program for Diesel Generators (Quarterly - 6 generators X 2 PMs=12). Bldgs 43, 243, 292, 296, Public Works Mobile, B163 | 6 | MO | $ 1,324.42 | $7,946.52 | |||
| A003AG | Perform Annual Testing and Certification of Backflow Preventors (37 = half of inventory) | 6 | MO | $ 612.55 | $3,675.30 | |||
| A003AH | Perform Quarterly Testing and Certification of Backflow Preventors (2 EA X 2 tests = 4) | 6 | MO | $ 66.22 | $397.32 | |||
| A003AI | Perform Sewage Lift Station Cleaning and Inspection 292, 296, 297, 357, 373 (Annual) | 6 | MO | $ 956.23 | $5,737.38 | |||
| A003AJ | Peform Sewage Lift Station Cleaning and Inspection Video inspection, wash down chanel grinder, wash down bypass & invert channel. B292 (Semi-Annual) | 6 | MO | $ 868.11 | $5,208.66 | |||
| A003AK | Perform Sewage Ejector Pump Cleaning and Inspection H10, 238 (Annual) | 6 | MO | $ 294.20 | $1,765.20 | |||
| A003AL | Perform Sewage Lift Station Pump Maintenance - 292 | |||||||
| (Semi-Annual) | 6 | MO | $ 164.72 | $988.32 | ||||
| A003AM | Perform Sewage Lift Station Pump Maintenance - 296 | |||||||
| (Semi-Annual) | 6 | MO | $ 164.72 | $988.32 | ||||
| A003AN | Perform Sewage Lift Station Controls Maintenance: | |||||||
| B292 & B296 pH Controllers & Probes (Semi-Annual) | 6 | MO | $ 308.85 | $1,853.10 | ||||
| A003AO | Perform Sewage Lift Station Controls Maintenance: | |||||||
| B292 Sewage Flow Meter Calibration (Semi-Annual) | 6 | MO | $ 55.18 | $331.08 | ||||
| A003AP | Peform Sewage Lift Station Controls Maintenance: | |||||||
| B292 Gas Detection-System Operation Inspection & Calibration (Quarterly) | 6 | MO | $ 110.37 | $662.22 | ||||
| A003AQ | Perform Annual Preventative Maintenance Program for 2 Stand-By Generators at Bldg 72 | 6 | MO | $ 331.11 | $1,986.66 | |||
| A003AR | Provide Root Treatment - Admiralty Village, Kittery, Maine (3 Areas, 1 Area per year = start Opt 1) | 0 | MO | $ 1,033.67 | $0.00 | |||
| TOTAL MIDLANT | $42,940.08 | |||||||
| A004 | MIDLANT - Electrical Distribution Test and Maintenance | |||||||
| A004AA | Perform Triennial Electrical Inspection and Testing Batteries, Flooded Lead-Acid, Valve-Regulated | 9 | EA | $ 382.61 | $3,443.49 | |||
| A004AB | Perform Triennial Electrical Inspection and Testing Battery Chargers | 9 | EA | $ 1,887.30 | $16,985.70 | |||
| A004AC | Perform Annual and Quadrennial Electrical Inspection and Testing Transformer Dry or Oil | 16 | EA | $ 794.65 | $12,714.40 | |||
| A004AD | Perform Annual and Quardrennial Electrical Inspection and Testing Med V Switches | 11 | EA | $ 662.21 | $7,284.31 | |||
| A004AE | Perform Annual and Quadrennial Electrical Inspection and Testing MV Vacuum Breakers | 13 | EA | $ 662.31 | $8,610.03 | |||
| A004AF | Perform Annual and Quadrennial Electrical Inspection and Testing LV Breakers SI | 99 | EA | $ 278.13 | $27,534.87 | |||
| A004AG | Perform Quadrennial Electrical Inspection and Testing LV Breakers PI | 3 | EA | $ 397.33 | $1,191.99 | |||
| A004AH | Perform Triennial Electrical Inspection and Testing Protective Relays | 86 | EA | $ 165.55 | $14,237.30 | |||
| A004AI | Perform Annual Electrical Inspection and Testing Regulators (Each Phase) | 9 | EA | $ 662.61 | $5,963.49 | |||
| A004AJ | Perform Annual Electrical Inspection and Testing Load Tap Changers | 2 | EA | $ 2,913.73 | $5,827.46 | |||
| A004AK | Perform Annual Electrical Inspection and Testing MV Motor Starters | 4 | EA | $ 1,324.43 | $5,297.72 | |||
| A004AL | Perform Annual Electrical Inspection and Testing MG Sets (per NETA MTS) | 1 | EA | $ 7,946.54 | $7,946.54 | |||
| A004AM | Perform Triennial Electrical Inspection and Testing MG Sets | 3 | EA | $ 4,503.04 | $13,509.12 | |||
| A004AN | Perform Annual Electrical Inspection and Testing Oil Samples | 34 | EA | $ 604.76 | $20,561.84 | |||
| A004AO | Perform Annual Electrical Inspection and Testing Powerware UPS, B72 | 0 | EA | $ 5,489.73 | $0.00 | |||
| A004AP | Perform Annual Electrical Inspection, Testing, and calibration of one Avtron DC Load Box | 1 | EA | $ 2,979.95 | $2,979.95 | |||
| A004AQ | Perform Annual Electrical Inspection and Testing Adjustable Speed-Drive Systems (Bldg 163 AND Bldg 292) | 2 | EA | $ 1,986.64 | $3,973.28 | |||
| A004AR | Contractor to provide engineering support to Test Rectifiers | 1 | EA | $ 6,622.12 | $6,622.12 | |||
| A004AS | Provide Annual Calibration of Test Equipment | 0 | EA | $ 99.34 | $0.00 | |||
| A004AT | Provide 1-year Remote Assistance Premium Service Agreement and Technical Support from Industry Leading Experts for Electrical SCADA, Square D PowerLogic System per SCADA Premium Service Agreement | 0 | MO | $ 2,759.22 | $0.00 | |||
| TOTAL MIDLANT - Electrical Distribution Test and Maintenance | $164,683.61 | |||||||
| A005 | ARMY | |||||||
| A005AA | Develop and Implement a Preventative Maintenance Program For Diesel Generator (Quarterly - 1 Generator X 2 PMs = 2) 395 | 6 | MO | $ 110.37 | $662.22 | |||
| A005AB | Emergency Service Orders | 1 | EA | $ 800.00 | $800.00 | |||
| A005AC | Urgent Service Orders | 1 | EA | $ 500.00 | $500.00 | |||
| TOTAL ARMY | $1,962.22 | |||||||
| A006 | CODE 105 | |||||||
| A006AA | Develop and Implement a Preventative Maintenance Program for Diesel Generators (2 generators x 2 PMs=4 PMs). B79, 174 | 6 | MO | $ 220.74 | $1,324.44 | |||
| A006AB | Semi Annual Test of Automatic Transfer Switch in Building 13 | 6 | MO | $ 662.21 | $3,973.26 | |||
| TOTAL CODE 105 | $5,297.70 | |||||||
| A007 | CODE 700 | |||||||
| A007AA | 180' Bronto Lift (2 day lease) for crane maintenance | 0 | MO | $ 2,207.37 | $0.00 | |||
| TOTAL CODE 700 | $0.00 |
TOTAL RECURRING WORK LINE ITEMS TOTAL $325,255.55
&"Times New Roman,Regular"&F&"Arial,Regular" &"Times New Roman,Regular"Logistics and Technology Services, Inc.
Solicitation No: N40085-17-R-1148 Price Propsal Volume Due Date: May 2, 2017
&A &"Times New Roman,Regular"&P of &N
6 MONTH Base Opt Non Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-17-R-1148 |
| EXHIBIT A - CLIN 9000 |
| Line Item 002 Non-Recurring Work - Base Period | ||||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||||
| ELINs A700 through A710 | ||||||||
| ELIN | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | ||
| A700 | Perform Emergency Service Orders (General) | The Contractor shall respond to emergency trouble calls within 1 hour of receipt during Government regular working hours and 2 hours of receipt outside Government working hours. Emergency trouble calls are limited to a dollar value of up to4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested and, up to the threshold limit, restore safe, continuous, and reliable equipment operation. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following the call. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 50 | EA | $ 250.00 | $12,500.00 | ||
| A701 | Perform Urgent Service Orders (General) | The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 100 | EA | $ 175.00 | $17,500.00 | ||
| A702 | Provide Underground Locate Services | When notified by the Government, the Contractor shall, review the Government excavation site area, Yard Plates (old and new), and as-built/building plans adjacent to the excavation site to determine the utilities in the area. The Contractor shall provide appropriate inductive or conductive equipment to locate utilities and ensure utilities are marked within the time required by the State of Maine. While locating utilities, the Contractor shall identify yard plate discrepancies by marking the yard plate field copy. The Contractor shall complete the Government furnished Utility Locate Form/Underground Utility Checklist. Return the completed form and marked-up yard plate field copy to the Government. | 225 | HR | $ 50.00 | $11,250.00 | ||
| A703 | Provide Hourly Underground Locate Service with Ground Penetration Radar | When notified by the Government, the Contractor shall, provide hourly underground locate service with ground penetration radar. | 20 | HR | $ 250.00 | $5,000.00 | ||
| A704 | Unit Priced Labor Work (Negotiated) | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||||
| 1000 | LH | $ 35.00 | $35,000.00 | |||||
| A705 | Unit Priced Labor Work (Negotiated) | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||||
| 1000 | LH | $ 55.00 | $55,000.00 | |||||
| A706 | Material | Price for material to support unit priced labor work (negotiated). | $500,000.00 | LS | $ 1.00 | $500,000.00 | ||
| A707 | Perform Service Trouble Calls | The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 10 | EA | $ 250.00 | $2,500.00 | ||
| A708 | Unit Priced Labor Work (Specialized) | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Requires a licenced tradesman. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||||
| 500 | LH | $ 60.00 | $30,000.00 | |||||
| A709 | Technical Support Services | Price for performance of specialized technical services that do not fall within UPL ELIN listed above. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | $100,000.00 | LS | $ 1.00 | $100,000.00 | ||
| A710 | Bronto Lift | *2 DAY LEASE* 180' Bronto Lift for crane maintenance. Contractor to provide a personnel lift and two operators in support of the Portsmouth Naval Shipyard, Kittery, ME. Contractor shall provide a personnel lift with 180’ reach capacity and two qualified operators per day for a period of 2 days. Preferred work schedule must be coordinated with NAVFAC Performance Assessment Representative. Lift and operator are required for 8 hour work days between the hours of 0700-1530. One operator must operate the basket from the elevated position and one operator must remain on the ground in case of emergency. All service records and operators manuals for the lift must be with the vehicle at all times. |
The Contractor shall arrange and hold a pre-construction /safety job brief with all involved parties prior to start of work.
The Contractor shall be responsible for maintaining work site compliance with EM385-1-1 Safety and Health Requirements Manual (2008 Edition, including latest errata and changes).
| 1 | EA | $26,488 | $26,488.00 | |
| TOTAL NON-RECURRING WORK BASE OPTION YEAR | $795,238.00 |
&"Times New Roman,Regular"&F&"Arial,Regular" &"Times New Roman,Regular"Logistics and Technology Services, Inc.
Solicitation No: N40085-17-R-1148 Price Propsal Volume
&A &"Times New Roman,Regular"&P of &N
1st Opt Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-17-R-1148 |
| EXHIBIT B - CLIN 9001 |
| Line Item 003 Recurring Work - First Option Period | |||||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||||||
| ELINs B001 through B007 | |||||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC | |||
| B001 | NON-CIA | ||||||||
| B001AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | ||||
| B001AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | ||||
| B001AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | ||||
| B001AD | Develop and Implement a Preventative Maintenance Program for Diesel Generators (6 generators X 4/yearly = 24) Bldgs 29, 59, 298, 337, 373, 398 | 12 | MO | $ 1,986.64 | $23,839.68 | ||||
| B001AE | Perform Annual Cleaning Services to Bridge 1 | 12 | MO | $ 993.32 | $11,919.84 | ||||
| B001AF | Perform Annual Cleaning Services to Bridge 2 | 12 | MO | $ 882.95 | $10,595.40 | ||||
| B001AG | Perform Catch Basin Cleaning Services - 300 CB's | 12 | MO | $ 5,147.53 | $61,770.36 | ||||
| B001AH | Perform Catch Basin Line Flushing - 3000 LF | 12 | MO | $ 1,139.87 | $13,678.44 | ||||
| B001AI | Perform Cleaning of Oil / Water Separators 29(2), 72, 154(2), 299, 320, 376(2), 389 | 12 | MO | $ 1,579.27 | $18,951.24 | NEED PROPOSAL - added OWS @ B389 | |||
| B001AJ | Develop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (2 Diesel Engines: 170A, 337) | 12 | MO | $ 220.74 | $2,648.88 | ||||
| B001AK | Develop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (2 Electric Motors: 298, 373) | 12 | MO | $ 386.29 | $4,635.48 | ||||
| B001AL | Perform Cleaning of Storm Water Management Structures, SMS-003-01 (B170), SMS-005-01 and SMS-005-02 (B389) | 12 | MO | $ 4,366.35 | $52,396.20 | ||||
| B001AM | Bridge 1 Concrete Sealant (Every 2 years=opt2, opt4) | 0 | MO | $ 882.95 | $0.00 | ||||
| B001AN | Perform Annual Testing and Certification of Backflow Preventors (43) | 12 | MO | $ 347.66 | $4,171.92 | ||||
| TOTAL NON-CIA | $208,007.44 | ||||||||
| B002 | CIA | ||||||||
| B002AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | ||||
| B002AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | ||||
| B002AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | ||||
| B002AD | Perform Preventative Maintenance Program for Diesel Generators (Quarterly - 5 generators x 4/ yearly =20) times yearly). CIA Gate 2, CIA Gate 4, DD1, DD2, DD3 | 12 | MO | $ 1,655.53 | $19,866.36 | ||||
| B002AE | Perform Preventative Maintenance Program for Diesel Generator - 374 Monthly | 12 | MO | $ 514.75 | $6,177.00 | ||||
| B002AF | Perform Catch Basin Cleaning - 250 CB's | 12 | MO | $ 5,147.53 | $61,770.36 | ||||
| B002AG | Perform Catch Basin Line Flushing - 3000 LF | 12 | MO | $ 1,029.51 | $12,354.12 | ||||
| B002AH | Install and Maintain Water Purification System in Bldg 277 and 343 | 12 | MO | $ 4,414.74 | $52,976.88 | ||||
| B002AI | Perform Maintenance Program on Dry Dock Controls for DD-1, DD-2 and DD-3. | 12 | MO | $ 10,774.79 | $129,297.48 | ||||
| B002AJ | Develop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (3 Diesel Engines, 86A, 306, 343) Annual | 12 | MO | $ 331.11 | $3,973.32 | ||||
| B002AK | Develop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (5 Electric Motors 92, 178, 2-291, 343) | 12 | MO | $ 1,214.05 | $14,568.60 | ||||
| B002AL | Develop and Implement a Maintenance Program for UPS System at Buildings 374 | 12 | MO | $ 386.81 | $4,641.72 | ||||
| B002AM | Perform Annual Testing and Certification of Backflow Preventors (62) | 12 | MO | $ 513.21 | $6,158.52 | ||||
| B002AN | Perform Semi-Annual Testing and Certification of Backflow Preventors (5 EA x 2 = 10) | 12 | MO | $ 41.39 | $496.68 | ||||
| TOTAL CIA | $315,681.04 | ||||||||
| B003 | MIDLANT | ||||||||
| B003AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | ||||
| B003AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | ||||
| B003AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | ||||
| B003AD | Sewer & Drain Clearing Service Orders | 40 | EA | $ 150.00 | $6,000.00 | ||||
| B003AE | Sewer & Drain Inspection Recording Service Orders | 20 | EA | $ 500.00 | $10,000.00 | ||||
| B003AF | Perform Preventative Maintenance Program for Diesel Generators (Quarterly - 6 generators X 4 yearly = 24). Bldgs 43, 243, 292, 296, Public Works Mobile, B163 | 12 | MO | $ 1,324.42 | $15,893.04 | ||||
| B003AG | Perform Annual Testing and Certification of Backflow Preventors (74) | 12 | MO | $ 612.55 | $7,350.60 | ||||
| B003AH | Perform Quarterly Testing and Certification of Backflow Preventors (2 EA X 4 = 8) | 12 | MO | $ 66.22 | $794.64 | ||||
| B003AI | Perform Sewage Lift Station Cleaning and Inspection 292, 296, 297, 357, 373 | 12 | MO | $ 956.23 | $11,474.76 | ||||
| B003AJ | Peform Sewage Lift Station Cleaning and Inspection Video inspection, wash down chanel grinder, wash down bypass & invert channel. B292 (Semi-Annual) | 12 | MO | $ 868.11 | $10,417.32 | ||||
| B003AK | Perform Sewage Ejector Pump Cleaning and Inspection H10, 238 (Annual) | 12 | MO | $ 294.20 | $3,530.40 | ||||
| B003AL | Perform Sewage Lift Station Pump Maintenance - 292 | ||||||||
| (Semi-Annual) | 12 | MO | $ 164.72 | $1,976.64 | |||||
| B003AM | Perform Sewage Lift Station Pump Maintenance - 296 | ||||||||
| (Semi-Annual) | 12 | MO | $ 164.72 | $1,976.64 | |||||
| B003AN | Perform Sewage Lift Station Controls Maintenance: | ||||||||
| B292 & B296 pH Controllers & Probes (Semi-Annual) | 12 | MO | $ 308.85 | $3,706.20 | |||||
| B003AO | Perform Sewage Lift Station Controls Maintenance: | ||||||||
| B292 Sewage Flow Meter Calibration (Semi-Annual) | 12 | MO | $ 55.18 | $662.16 | NO COST: This is for clarification only | ||||
| B003AP | Peform Sewage Lift Station Controls Maintenance: | ||||||||
| B292 Gas Detection-System Operation Inspection & Calibration (Quarterly) | 12 | MO | $ 110.37 | $1,324.44 | NEED PROPOSAL - additional SOW added | ||||
| B003AQ | Perform Preventative Maintenance Program for 2 Stand-By Generators at Bldg 72 | 12 | MO | $ 331.11 | $3,973.32 | NEED PROPOSAL - additional SOW added (OPT 1, OPT3) | |||
| B003AR | Provide Root Treatment - Admiralty Village, Kittery, Maine (3 Areas, 1 Area per year) | 12 | MO | $ 1,033.67 | $12,404.04 | ||||
| TOTAL MIDLANT | $94,884.20 | ||||||||
| B004 | MIDLANT - Electrical Distribution Test and Maintenance | ||||||||
| B004AA | Perform Triennial Electrical Inspection and Testing Batteries, Flooded Lead-Acid, Valve-Regulated | 9 | EA | $ 382.61 | $3,443.49 | ||||
| B004AB | Perform Triennial Electrical Inspection and Testing Battery Chargers | 9 | EA | $ 1,887.30 | $16,985.70 | ||||
| B004AC | Perform Annual and Quadrennial Electrical Inspection and Testing Transformer Dry or Oil | 32 | EA | $ 794.65 | $25,428.80 | ||||
| B004AD | Perform Annual and Quardrennial Electrical Inspection and Testing Med V Switches | 23 | EA | $ 662.21 | $15,230.83 | ||||
| B004AE | Perform Annual and Quadrennial Electrical Inspection and Testing MV Vacuum Breakers | 27 | EA | $ 662.21 | $17,879.67 | ||||
| B004AF | Perform Annual and Quadrennial Electrical Inspection and Testing LV Breakers SI | 197 | EA | $ 278.13 | $54,791.61 | ||||
| B004AG | Perform Quadrennial Electrical Inspection and Testing LV Breakers PI | 6 | EA | $ 397.33 | $2,383.98 | ||||
| B004AH | Perform Triennial Electrical Inspection and Testing Protective Relays | 175 | EA | $ 162.71 | $28,474.25 | ||||
| B004AI | Perform Annual Electrical Inspection and Testing Regulators (Each Phase) | 21 | EA | $ 662.21 | $13,906.41 | ||||
| B004AJ | Perform Annual Electrical Inspection and Testing Load Tap Changers | 4 | EA | $ 1,456.87 | $5,827.48 | ||||
| B004AK | Perform Annual Electrical Inspection and Testing MV Motor Starters | 8 | EA | $ 662.21 | $5,297.68 | ||||
| B004AL | Perform Annual Electrical Inspection and Testing MG Sets (per NETA MTS) | 3 | EA | $ 2,648.85 | $7,946.55 | ||||
| B004AM | Perform Triennial Electrical Inspection and Testing MG Sets | 3 | EA | $ 4,503.04 | $13,509.12 | ||||
| B004AN | Perform Annual Electrical Inspection and Testing Oil Samples | 69 | EA | $ 298.00 | $20,562.00 | ||||
| B004AO | Perform Annual Electrical Inspection and Testing Powerware UPS, B72 | 1 | EA | $ 5,423.51 | $5,423.51 | ||||
| B004AP | Perform Annual Electrical Inspection, Testing, and calibration of one Avtron DC Load Box | 1 | EA | $ 2,979.95 | $2,979.95 | ||||
| B004AQ | Perform Annual Electrical Inspection and Testing Adjustable Speed-Drive Systems (Bldg 163 AND Bldg 292) | 2 | EA | $ 1,986.64 | $3,973.28 | ||||
| B004AR | Contractor to provide engineering support to Test Rectifiers | 2 | EA | $ 3,311.06 | $6,622.12 | ||||
| B004AS | Provide Annual Calibration of Test Equipment | 1 | EA | $ 99.34 | $99.34 | ||||
| B004AT | Provide 1-year Remote Assistance Premium Service Agreement and Technical Support from Industry Leading Experts for Electrical SCADA, Square D PowerLogic System per SCADA Premium Service Agreement | 12 | MO | $ 2,759.22 | $33,110.64 | ||||
| B004AU | Perform Semi-Annual PM & Maintenance of FLS on Hardware & Equipment | 12 | MO | $ - 0 | $0.00 | REMOVE | |||
| TOTAL MIDLANT - Electrical Distribution Test and Maintenance | $283,876.41 | ||||||||
| B005 | ARMY | ||||||||
| B005AA | Develop and Implement a Preventative Maintenance Program For Diesel Generator (Quarterly - 1 Generator X 4/YR= 4) 395 | 12 | MO | $ 110.37 | $1,324.44 | ||||
| B005AB | Emergency Service Orders | 1 | EA | $800.00 | $800.00 | ||||
| B005AC | Urgent Service Orders | 1 | EA | $500.00 | $500.00 | ||||
| TOTAL ARMY | $2,624.44 | ||||||||
| B006 | CODE 105 | ||||||||
| B006AA | Develop and Implement a Preventative Maintenance Program for Diesel Generators (2 generators x 4 PMs=8 PMs). B79, 174 | 12 | MO | $ 220.74 | $2,648.88 | ||||
| B006AB | Semi Annual Test of Automatic Transfer Switch in Building 13 | 12 | MO | $ 662.21 | $7,946.52 | ||||
| TOTAL CODE 105 | $10,595.40 | ||||||||
| B007 | CODE 700 | ||||||||
| B007AA | 180' Bronto Lift (2 day lease) for crane maintenance | 12 | MO | $ 2,207.37 | $26,488.44 | ||||
| TOTAL CODE 700 | $26,488.44 |
TOTAL RECURRING WORK LINE ITEMS TOTAL $942,157.37
&A &"Times New Roman,Regular"&P of &N
1st Opt Non Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-17-R-1148 |
| EXHIBIT B - CLIN 9001 |
| Line Item 004 Non-Recurring Work - First Option | ||||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||||
| ELINs B700 through B710 | ||||||||
| ELIN | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | ||
| B700 | Perform Emergency Service Orders (General) | The Contractor shall respond to emergency trouble calls within 1 hour of receipt during Government regular working hours and 2 hours of receipt outside Government working hours. Emergency trouble calls are limited to a dollar value of up to4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested and, up to the threshold limit, restore safe, continuous, and reliable equipment operation. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following the call. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 50 | EA | $ 250.00 | $12,500.00 | ||
| B701 | Perform Urgent Service Orders (General) | The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 100 | EA | $ 175.00 | $17,500.00 | ||
| B702 | Provide Underground Locate Services | When notified by the Government, the Contractor shall, review the Government excavation site area, Yard Plates (old and new), and as-built/building plans adjacent to the excavation site to determine the utilities in the area. The Contractor shall provide appropriate inductive or conductive equipment to locate utilities and ensure utilities are marked within the time required by the State of Maine. While locating utilities, the Contractor shall identify yard plate discrepancies by marking the yard plate field copy. The Contractor shall complete the Government furnished Utility Locate Form/Underground Utility Checklist. Return the completed form and marked-up yard plate field copy to the Government. | 225 | HR | $ 50.00 | $11,250.00 | ||
| B703 | Provide Hourly Underground Locate Service with Ground Penetration Radar | When notified by the Government, the Contractor shall, provide hourly underground locate service with ground penetration radar. | 20 | HR | $ 250.00 | $5,000.00 | ||
| B704 | Unit Priced Labor Work (Negotiated) | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||||
| 1000 | LH | $ 35.00 | $35,000.00 | |||||
| B705 | Unit Priced Labor Work (Negotiated) | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||||
| 1000 | LH | $ 55.00 | $55,000.00 | |||||
| B706 | Material | Price for material to support unit priced labor work (negotiated). | $500,000.00 | LS | $ 1.00 | $500,000.00 | ||
| B707 | Perform Service Trouble Calls | The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. | 10 | EA | $ 250.00 | $2,500.00 | ||
| B708 | Unit Priced Labor Work (Specialized) | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Requires a licenced tradesman. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||||
| 500 | LH | $ 60.00 | $30,000.00 | |||||
| B709 | Technical Support Services | Price for performance of specialized technical services that do not fall within UPL ELIN listed above. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | $100,000.00 | LS | $ 1.00 | $100,000.00 | ||
| B710 | Bronto Lift | *2 DAY LEASE* 180' Bronto Lift for crane maintenance. Contractor to provide a personnel lift and two operators in support of the Portsmouth Naval Shipyard, Kittery, ME. Contractor shall provide a personnel lift with 180’ reach capacity and two qualified operators per day for a period of 2 days. Preferred work schedule must be coordinated with NAVFAC Performance Assessment Representative. Lift and operator are required for 8 hour work days between the hours of 0700-1530. One operator must operate the basket from the elevated position and one operator must remain on the ground in case of emergency. All service records and operators manuals for the lift must be with the vehicle at all times. |
The Contractor shall arrange and hold a pre-construction /safety job brief with all involved parties prior to start of work.
The Contractor shall be responsible for maintaining work site compliance with EM385-1-1 Safety and Health Requirements Manual (2008 Edition, including latest errata and changes).
| 1 | EA | $ 26,488.00 | $26,488.00 | |
| TOTAL NON-RECURRING WORK BASE OPTION YEAR | $795,238.00 | |||
| . |
&"Times New Roman,Regular"&F&"Arial,Regular" &"Times New Roman,Regular"Logistics and Technology Services, Inc.
Solicitation No: N40085-17-R-1148 Price Propsal Volume
&A &"Times New Roman,Regular"&P of &N
2nd Opt Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-17-R-1148 |
| EXHIBIT C - CLIN 9002 |
| Line Item 005 Recurring Work - Second Option Period | |||||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||||||
| ELINs C001 through C007 | |||||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC | |||
| C001 | NON-CIA | ||||||||
| C001AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | ||||
| C001AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | ||||
| C001AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | ||||
| C001AD | Develop and Implement a Preventative Maintenance Program for Diesel Generators (6 generators X 4/yearly = 24) Bldgs 29, 59, 298, 337, 373, 398 | 12 | MO | $ 1,986.64 | $22,184.13 | ||||
| C001AE | Perform Annual Cleaning Services to Bridge 1 | 12 | MO | $ 993.32 | $11,919.84 | ||||
| C001AF | Perform Annual Cleaning Services to Bridge 2 | 12 | MO | $ 882.95 | $10,595.40 | ||||
| C001AG | Perform Catch Basin Cleaning Services - 300 CB's | 12 | MO | $ 5,147.53 | $61,770.36 | ||||
| C001AH | Perform Catch Basin Line Flushing - 3000 LF | 12 | MO | $ 1,139.87 | $13,678.44 | ||||
| C001AI | Perform Cleaning of Oil / Water Separators 29(2), 72, 154(2), 299, 320, 376(2), 389 | 12 | MO | $ 1,729.83 | $20,757.99 | ||||
| C001AJ | Develop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (2 Diesel Engines: 170A, 337) | 12 | MO | $ 220.74 | $2,648.88 | ||||
| C001AK | Develop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (2 Electric Motors: 298, 373) | 12 | MO | $ 441.48 | $4,194.06 | ||||
| C001AL | Perform Cleaning of Storm Water Management Structures, SMS-003-01 (B170), SMS-005-01 and SMS-005-02 (B389) | 12 | MO | $ 4,366.35 | $52,396.20 | ||||
| C001AM | Bridge 1 Concrete Sealant (Every 2 years=start opt2 & opt4) | 12 | MO | $ 882.95 | $10,595.40 | ||||
| C001AN | Perform Annual Testing and Certification of Backflow Preventors | 12 | MO | $ 347.66 | $4,171.92 | ||||
| TOTAL NON-CIA | $218,312.62 | ||||||||
| C002 | CIA | ||||||||
| C002AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | ||||
| C002AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | ||||
| C002AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | ||||
| C002AD | Perform Preventative Maintenance Program for Diesel Generators (Quarterly - 5 generators x 4/ yearly =20) times yearly). CIA Gate 2, CIA Gate 4, DD1, DD2, DD3 | 12 | MO | $ 1,655.53 | $19,866.36 | ||||
| C002AE | Perform Preventative Maintenance Program for Diesel Generator - 374 Monthly | 12 | MO | $ 514.75 | $6,177.00 | ||||
| C002AF | Perform Catch Basin Cleaning - 250 CB's | 12 | MO | $ 5,147.53 | $61,770.36 | ||||
| C002AG | Perform Catch Basin Line Flushing - 3000 LF | 12 | MO | $ 1,029.51 | $12,354.12 | ||||
| C002AH | Install and Maintain Water Purification System in Bldg 277 and 343 | 12 | MO | $ 4,414.74 | $52,976.88 | ||||
| C002AI | Perform Maintenance Program on Dry Dock Controls for DD-1, DD-2 and DD-3. | 12 | MO | $ 11,164.10 | $133,969.20 | ||||
| C002AJ | Develop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (3 Diesel Engines, 86A, 306, 343) Annual | 12 | MO | $ 331.11 | $3,973.32 | ||||
| C002AK | Develop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (5 Electric Motors 92, 178, 2-291, 343) | 12 | MO | $ 1,324.42 | $15,893.04 | ||||
| C002AL | Develop and Implement a Maintenance Program for UPS System at Buildings 374 | 12 | MO | $ 386.61 | $4,639.32 | ||||
| C002AM | Perform Annual Testing and Certification of Backflow Preventors | 12 | MO | $ 513.21 | $6,158.52 | ||||
| C002AN | Perform Semi-Annual Testing and Certification of Backflow Preventors (5 EA x 2 = 10) | 12 | MO | $ 41.39 | $496.68 | ||||
| TOTAL CIA | $321,674.80 | ||||||||
| C003 | Non-CIA (MIDLANT) | ||||||||
| C003AA | Emergency Service Orders | 2 | EA | $ 800.00 | $1,600.00 | ||||
| C003AB | Urgent Service Orders | 2 | EA | $ 500.00 | $1,000.00 | ||||
| C003AC | Routine Service Orders | 2 | EA | $ 400.00 | $800.00 | ||||
| C003AD | Sewer & Drain Clearing Service Orders | 40 | EA | $ 150.00 | $6,000.00 | ||||
| C003AE | Sewer & Drain Inspection Recording Service Orders | 20 | EA | $ 500.00 | $10,000.00 | ||||
| C003AF | Perform Preventative Maintenance Program for Diesel Generators (Quarterly - 6 generators X 4 yearly = 24). Bldgs 43, 243, 292, 296, Public Works Mobile, B163 | 12 | MO | $ 1,324.42 | $15,893.04 | ||||
| C003AG | Perform Annual Testing and Certification of Backflow Preventors | 12 | MO | $ 612.55 | $7,350.60 | ||||
| C003AH | Perform Quarterly Testing and Certification of Backflow Preventors (2 EA X 4 = 8) | 12 | MO | $ 66.22 | $794.64 | ||||
| C003AI | Perform Sewage Lift Station Cleaning and Inspection 292, 296, 297, 357, 373 | 12 | MO | $ 956.23 | $10,518.51 | ||||
| C003AJ | Peform Sewage Lift Station Cleaning and Inspection Video inspection, wash down chanel grinder, wash down bypass & invert channel. B292 (Semi-Annual) | 12 | MO | $ 868.11 | $10,417.32 | ||||
| C003AK | Perform Sewage Ejector Pump Cleaning and Inspection H10, 238 (Annual) | 12 | MO | $ 294.20 | $3,530.40 | ||||
| C003AL | Perform Sewage Lift Station Pump Maintenance - 292 | ||||||||
| (Semi-Annual) | 12 | MO | $ 164.72 | $1,976.64 | |||||
| C003AM | Perform Sewage Lift Station Pump Maintenance - 296 | ||||||||
| (Semi-Annual) | 12 | MO | $ 164.72 | $1,976.64 | |||||
| C003AN | Perform Sewage Lift Station Controls Maintenance: | ||||||||
| B292 & B296 pH Controllers & Probes (Semi-Annual) | 12 | MO | $ 308.85 | $3,706.20 | |||||
| C003AO | Perform Sewage Lift Station Controls Maintenance: | ||||||||
| B292 Sewage Flow Meter Calibration (Semi-Annual) | 12 | MO | $ 55.18 | $662.16 | |||||
| C003AP | Peform Sewage Lift Station Controls Maintenance: | ||||||||
| B292 Gas Detection-System Operation Inspection & Calibration (Quarterly) | 12 | MO | $ 478.98 | $5,747.76 | |||||
| C003AQ | Perform Preventative Maintenance Program for 2 Stand-By Generators at Bldg 72 | 12 | MO | $ 331.11 | $3,973.32 | DO NOT INCLUDE NETA MTS PM - NOT DUE TILL 3RD OPT | |||
| C003AR | Provide Root Treatment - Admiralty Village, Kittery, Maine (3 Areas, 1 Area per year) | 12 | MO | $ 1,033.67 | $12,404.04 | ||||
| TOTAL MIDLANT | $98,351.27 | ||||||||
| C004 | Non-CIA (MIDLANT) - Electrical Distribution Test and Maintenance | ||||||||
| C004AA | Perform Triennial Electrical Inspection and Testing Batteries, Flooded Lead-Acid, Valve-Regulated | 8 | EA | $ 382.61 | $3,060.88 | ||||
| C004AB | Perform Triennial Electrical Inspection and Testing Battery Chargers | 8 | EA | $ 1,986.63 | $15,893.04 | ||||
| C004AC | Perform Annual and Quadrennial Electrical Inspection and Testing Transformer Dry or Oil | 32 | EA | $ 860.88 | $27,548.16 | ||||
| C004AD | Perform Annual and Quardrennial Electrical Inspection and Testing Med V Switches | 23 | EA | $ 728.43 | $16,753.89 | ||||
| C004AE | Perform Annual and Quadrennial Electrical Inspection and Testing MV Vacuum Breakers | 27 | EA | $ 728.43 | $19,667.61 | ||||
| C004AF | Perform Annual and Quadrennial Electrical Inspection and Testing LV Breakers SI | 197 | EA | $ 298.00 | $58,706.00 | ||||
| C004AG | Perform Quadrennial Electrical Inspection and Testing LV Breakers PI | 6 | EA | $ 215.22 | $1,291.32 | ||||
| C004AH | Perform Triennial Electrical Inspection and Testing Protective Relays | 175 | EA | $ 195.26 | $34,170.50 | ||||
| C004AI | Perform Annual Electrical Inspection and Testing Regulators (Each Phase) | 21 | EA | $ 728.43 | $15,297.03 | ||||
| C004AJ | Perform Annual Electrical Inspection and Testing Load Tap Changers | 4 | EA | $ 529.77 | $2,119.08 | ||||
| C004AK | Perform Annual Electrical Inspection and Testing MV Motor Starters | 8 | EA | $ 485.62 | $3,884.96 | ||||
| C004AL | Perform Annual Electrical Inspection and Testing MG Sets (per NETA MTS) | 3 | EA | $ 662.21 | $1,986.63 | ||||
| C004AM | Perform Triennial Electrical Inspection and Testing MG Sets | 0 | EA | $ 1,241.65 | $0.00 | ||||
| C004AN | Perform Annual Electrical Inspection and Testing Oil Samples | 69 | EA | $ 331.11 | $22,846.59 | ||||
| C004AO | Perform Annual Electrical Inspection and Testing Powerware UPS, B72 | 1 | EA | $ 451.96 | $451.96 | ||||
| C004AP | Perform Annual Electrical Inspection, Testing, and calibration of one Avtron DC Load Box | 1 | EA | $ 248.33 | $248.33 | ||||
| C004AQ | Perform Annual Electrical Inspection and Testing Adjustable Speed-Drive Systems (Bldg 163 AND Bldg 292) | 2 | EA | $ 353.18 | $706.36 | ||||
| C004AR | Contractor to provide engineering support to Test Rectifiers | 2 | EA | $ 551.84 | $1,103.68 | ||||
| C004AS | Provide Annual Calibration of Test Equipment | 1 | EA | $ 105.96 | $105.96 | ||||
| C004AT | Provide 1-year Remote Assistance Premium Service Agreement and Technical Support from Industry Leading Experts for Electrical SCADA, Square D PowerLogic System per SCADA Premium Service Agreement | 12 | MO | $ 2,759.22 | $33,110.64 | ||||
| C004AU | Perform Semi-Annual PM & Maintenance of FLS on Hardware & Equipment | 12 | MO | $0.00 | $0.00 | Not Included on P00003 | |||
| TOTAL MIDLANT - Electrical Distribution Test and Maintenance | $258,952.62 | ||||||||
| C005 | ARMY | ||||||||
| C005AA | Develop and Implement a Preventative Maintenance Program For Diesel Generator (Quarterly - 1 Generator X 4/YR= 4) 395 | 12 | MO | $ 110.37 | $1,324.44 | ||||
| C005AB | Emergency Service Orders | 1 | EA | $800.00 | $800.00 | ||||
| C005AC | Urgent Service Orders | 1 | EA | $500.00 | $500.00 |