J-0200000-08 ELINS.xlsx

XLSX spreadsheet 182 KB Posted

Attached to
Industrial Services at Portsmouth Naval Shipyard, Kittery, Maine
Solicitation number
N4008521R0103
Issued by

View the file

Other files

File Type Posted
J-0200000-09 ELINS.xlsx XLSX spreadsheet
N4008521R0103 Amendment 0002.pdf PDF
N4008521R0103 Amendment 0001.pdf PDF
RFP_1502000 Attachments.zip ZIP file
J-1602000-03 Equip Inv Tables.xls XLS spreadsheet
0200000 J Management and Administration v2.6.pdf PDF
RFP_N4008521R0103.pdf PDF
1602000 J.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2nd Opt IDIQ

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-12-D-1709
EXHIBIT C - CLIN 9000
Line Item 006 IDIQ - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C709
ELINDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
C700Perform Emergency Trouble Calls (General)The Contractor shall respond to emergency trouble calls within 1 hour of receipt during Government regular working hours and 2 hours of receipt outside Government working hours. Emergency trouble calls are limited to a dollar value of up to4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested and, up to the threshold limit, restore safe, continuous, and reliable equipment operation. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following the call. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.50EA$ 445.58$22,279.00
C701Perform service Trouble Calls (General)The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.100EA$ 381.92$38,192.00
C702Remove and Reinstall Center Barrier Pods - Normal ResponseRemove and reinstall the center barrier pods on the island side of Bridge 2 within seven hours given a 2 day Government notice. Removing the center pods includes relocating the pods off the roadway surface adjacent to Bldg. 33. Upon notification of the Contracting Office, reinstall the center pods by 1430 the following day. Work shall be completed between the hours of 0730 and 1430. All work shall be coordinated with PWD Maine and Security.4EA$ 3,000.00$12,000.00
C703Remove and Reinstall Center Barrier Pods - Emergency ResponseRemove and reinstall the center barrier pods on the island side of Bridge 2 within four hours given a 24 hour Government notice. Removing the center pods includes relocating the pods off the roadway surface adjacent to Bldg. 33. Upon notification of the Contracting Office, reinstall the center pods by 1430 the following day. Work shall be completed between the hours of 0730 and 1430. All work shall be coordinated with PWD Maine and Security.4EA$ 3,500.00$14,000.00
C704Provide Underground Locate ServicesWhen notified by the Government, the Contractor shall, review the Government excavation site area, Yard Plates (old and new), and as-built/building plans adjacent to the excavation site to determine the utilities in the area. The Contractor shall provide appropriate inductive or conductive equipment to locate utilities and ensure utilities are marked within the time required by the State of Maine. While locating utilities, the Contractor shall identify yard plate discrepancies by marking the yard plate field copy. The Contractor shall complete the Government furnished Utility Locate Form/Underground Utility Checklist. Return the completed form and marked-up yard plate field copy to the Government.225HR$ 190.96$42,966.00
C705Provide Hourly Underground Locate Service with Ground Penetration RadarWhen notified by the Government, the Contractor shall, provide hourly underground locate service with ground penetration radar.20HR$ 190.96$3,819.20
C706Unit Priced Labor Work (Negotiated)Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
300LH$ 70.02$21,006.00
C707Unit Priced Labor Work (Negotiated)Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
300LH$ 95.48$28,644.00
C708MaterialPrice for material to support unit priced labor work (negotiated).$250,000.00LS$250,000.00
C709Specific WorkThis ELIN will not be ordered via EMALL. A paper Task Order will be placed. When requirements are identified for potential placement on this contract, the ACO will provide the Contractor with a Statement of Work (SOW) and request a proposal to perform the work. The Contractor will develop a subcontract solicitation document in sufficient detail to establish mutual understanding of the scope among the competing subcontractors and identify potential subcontractors for performance of the requirement. Typically, the Contractor shall solicit a minimum of at least three independent, qualified and complete bids (including line item breakouts) from potential subcontractors. Refer to J-0200000-09 for additional requirements.$2,800,000.00LS$2,800,000.00
C710Perform Service Trouble Calls (Diesel Generators, Diesel and Electric Fire Pump Drivers)The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.10EA$ 990.00$9,900.00
C711Unit Priced Labor Work (Diesel Generators, Diesel and Electric Fire Pump Drivers)Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
200LH$ 142.00$28,400.00
C712Unit Priced Labor Work (Electrician -Electrical Distribution)Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
400LH$ 104.00$41,600.00
C713Technical Support ServicesPrice for performance of specialized technical services that do not fall within UPL ELIN listed above. MUST BE NEGOTIATED BY KO USING ETO PROCESS.$5,000.00LS$ 1.00$ 5,000.00
TOTAL INDEFINITE QUANTITY PRICE 2ND OPTION YEAR$3,317,806.20

6 MONTH Base Opt Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-17-R-1148
EXHIBIT A - CLIN 9000
Line Item 001 Recurring Work - 6 MONTH Base Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
A001NON-CIA
A001AAEmergency Service Orders2EA$ 800.00$1,600.00
A001ABUrgent Service Orders2EA$ 500.00$1,000.00
A001ACRoutine Service Orders2EA$ 400.00$800.00
A001ADDevelop and Implement a Preventative Maintenance Program for Diesel Generators (6 generators X 2 PMs=12) Bldgs 29, 59, 298, 337, 373, 3986MO$ 1,986.64$11,919.84
A001AEPerform Annual Cleaning Services to Bridge 16MO$ 993.32$5,959.92
A001AFPerform Annual Cleaning Services to Bridge 26MO$ 882.95$5,297.70
A001AGPerform Catch Basin Cleaning Services - 300 CB's0MO$ 5,147.53$0.00
A001AHPerform Catch Basin Line Flushing - 3000 LF0MO$ 1,139.87$0.00
A001AIPerform Cleaning of Oil / Water Separators 29(2), 72, 154(2), 299, 320, 376(2)0MO$ 1,579.27$0.00
A001AJDevelop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (2 Diesel Engines: 170A, 337)0MO$ 220.74$0.00
A001AKDevelop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (2 Electric Motors: 298, 373)0MO$ 386.29$0.00
A001ALPerform Cleaning of Storm Water Management Structures, SMS-003-01 (B170), SMS-005-01 and SMS-005-02 (B389)0MO$ 4,366.35$0.00
A001AMBridge 1 Concrete Sealant (Every 2 years= start opt2 & opt4)0MO$ 882.95$0.00
A001ANPerform Annual Testing and Certification of Backflow Preventors (21 = half of inventory)6MO$ 347.66$2,085.96
TOTAL NON-CIA$28,663.42
A002CIA
A002AAEmergency Service Orders2EA$ 800.00$1,600.00
A002ABUrgent Service Orders2EA$ 500.00$1,000.00
A002ACRoutine Service Orders2EA$ 400.00$800.00
A002ADPerform Preventative Maintenance Program for Diesel Generators (Quarterly - 5 generators x 2 PMs=10). CIA Gate 2, CIA Gate 4, DD1, DD2, DD36MO$ 1,655.53$9,933.18
A002AEPerform Preventative Maintenance Program for Diesel Generator - 374 Monthly6MO$ 514.75$3,088.50
A002AFPerform Catch Basin Cleaning - 250 CB's0MO$ 5,147.53$0.00
A002AGPerform Catch Basin Line Flushing - 3000 LF0MO$ 1,029.51$0.00
A002AHInstall and Maintain Water Purification System in Bldg 277 and 3436MO$ 4,414.74$26,488.44
A002AIPerform Maintenance Program on Dry Dock Controls for DD-1, DD-2 and DD-3.6MO$ 5,524.99$33,149.94
A002AJDevelop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (3 Diesel Engines, 86A, 306, 343) Annual0MO$ 331.11$0.00
A002AKDevelop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (5 Electric Motors 92, 178, 2-291, 343)0MO$ 1,214.05$0.00
A002ALDevelop and Implement a Maintenance Program for UPS System at Buildings 374 - Annual6MO$ 386.81$2,320.86
A002AMPerform Annual Testing and Certification of Backflow Preventors (31 = half of inventory)6MO$ 513.21$3,079.26
A002ANPerform Semi-Annual Testing and Certification of Backflow Preventors (5 EA x 1 = 5)6MO$ 41.39$248.34
TOTAL CIA$81,708.52
A003MIDLANT
A003AAEmergency Service Orders2EA$ 800.00$1,600.00
A003ABUrgent Service Orders2EA$ 500.00$1,000.00
A003ACRoutine Service Orders2EA$ 400.00$800.00
A003ADSewer & Drain Clearing Service Orders20EA$ 150.00$3,000.00
A003AESewer & Drain Inspection Recording Service Orders10EA$ 500.00$5,000.00
A003AFPerform Preventative Maintenance Program for Diesel Generators (Quarterly - 6 generators X 2 PMs=12). Bldgs 43, 243, 292, 296, Public Works Mobile, B1636MO$ 1,324.42$7,946.52
A003AGPerform Annual Testing and Certification of Backflow Preventors (37 = half of inventory)6MO$ 612.55$3,675.30
A003AHPerform Quarterly Testing and Certification of Backflow Preventors (2 EA X 2 tests = 4)6MO$ 66.22$397.32
A003AIPerform Sewage Lift Station Cleaning and Inspection 292, 296, 297, 357, 373 (Annual)6MO$ 956.23$5,737.38
A003AJPeform Sewage Lift Station Cleaning and Inspection Video inspection, wash down chanel grinder, wash down bypass & invert channel. B292 (Semi-Annual)6MO$ 868.11$5,208.66
A003AKPerform Sewage Ejector Pump Cleaning and Inspection H10, 238 (Annual)6MO$ 294.20$1,765.20
A003ALPerform Sewage Lift Station Pump Maintenance - 292
(Semi-Annual)6MO$ 164.72$988.32
A003AMPerform Sewage Lift Station Pump Maintenance - 296
(Semi-Annual)6MO$ 164.72$988.32
A003ANPerform Sewage Lift Station Controls Maintenance:
B292 & B296 pH Controllers & Probes (Semi-Annual)6MO$ 308.85$1,853.10
A003AOPerform Sewage Lift Station Controls Maintenance:
B292 Sewage Flow Meter Calibration (Semi-Annual)6MO$ 55.18$331.08
A003APPeform Sewage Lift Station Controls Maintenance:
B292 Gas Detection-System Operation Inspection & Calibration (Quarterly)6MO$ 110.37$662.22
A003AQPerform Annual Preventative Maintenance Program for 2 Stand-By Generators at Bldg 726MO$ 331.11$1,986.66
A003ARProvide Root Treatment - Admiralty Village, Kittery, Maine (3 Areas, 1 Area per year = start Opt 1)0MO$ 1,033.67$0.00
TOTAL MIDLANT$42,940.08
A004MIDLANT - Electrical Distribution Test and Maintenance
A004AAPerform Triennial Electrical Inspection and Testing Batteries, Flooded Lead-Acid, Valve-Regulated9EA$ 382.61$3,443.49
A004ABPerform Triennial Electrical Inspection and Testing Battery Chargers9EA$ 1,887.30$16,985.70
A004ACPerform Annual and Quadrennial Electrical Inspection and Testing Transformer Dry or Oil16EA$ 794.65$12,714.40
A004ADPerform Annual and Quardrennial Electrical Inspection and Testing Med V Switches11EA$ 662.21$7,284.31
A004AEPerform Annual and Quadrennial Electrical Inspection and Testing MV Vacuum Breakers13EA$ 662.31$8,610.03
A004AFPerform Annual and Quadrennial Electrical Inspection and Testing LV Breakers SI99EA$ 278.13$27,534.87
A004AGPerform Quadrennial Electrical Inspection and Testing LV Breakers PI3EA$ 397.33$1,191.99
A004AHPerform Triennial Electrical Inspection and Testing Protective Relays86EA$ 165.55$14,237.30
A004AIPerform Annual Electrical Inspection and Testing Regulators (Each Phase)9EA$ 662.61$5,963.49
A004AJPerform Annual Electrical Inspection and Testing Load Tap Changers2EA$ 2,913.73$5,827.46
A004AKPerform Annual Electrical Inspection and Testing MV Motor Starters4EA$ 1,324.43$5,297.72
A004ALPerform Annual Electrical Inspection and Testing MG Sets (per NETA MTS)1EA$ 7,946.54$7,946.54
A004AMPerform Triennial Electrical Inspection and Testing MG Sets3EA$ 4,503.04$13,509.12
A004ANPerform Annual Electrical Inspection and Testing Oil Samples34EA$ 604.76$20,561.84
A004AOPerform Annual Electrical Inspection and Testing Powerware UPS, B720EA$ 5,489.73$0.00
A004APPerform Annual Electrical Inspection, Testing, and calibration of one Avtron DC Load Box1EA$ 2,979.95$2,979.95
A004AQPerform Annual Electrical Inspection and Testing Adjustable Speed-Drive Systems (Bldg 163 AND Bldg 292)2EA$ 1,986.64$3,973.28
A004ARContractor to provide engineering support to Test Rectifiers1EA$ 6,622.12$6,622.12
A004ASProvide Annual Calibration of Test Equipment0EA$ 99.34$0.00
A004ATProvide 1-year Remote Assistance Premium Service Agreement and Technical Support from Industry Leading Experts for Electrical SCADA, Square D PowerLogic System per SCADA Premium Service Agreement0MO$ 2,759.22$0.00
TOTAL MIDLANT - Electrical Distribution Test and Maintenance$164,683.61
A005ARMY
A005AADevelop and Implement a Preventative Maintenance Program For Diesel Generator (Quarterly - 1 Generator X 2 PMs = 2) 3956MO$ 110.37$662.22
A005ABEmergency Service Orders1EA$ 800.00$800.00
A005ACUrgent Service Orders1EA$ 500.00$500.00
TOTAL ARMY$1,962.22
A006CODE 105
A006AADevelop and Implement a Preventative Maintenance Program for Diesel Generators (2 generators x 2 PMs=4 PMs). B79, 1746MO$ 220.74$1,324.44
A006ABSemi Annual Test of Automatic Transfer Switch in Building 136MO$ 662.21$3,973.26
TOTAL CODE 105$5,297.70
A007CODE 700
A007AA180' Bronto Lift (2 day lease) for crane maintenance0MO$ 2,207.37$0.00
TOTAL CODE 700$0.00

TOTAL RECURRING WORK LINE ITEMS TOTAL $325,255.55

&"Times New Roman,Regular"&F&"Arial,Regular" &"Times New Roman,Regular"Logistics and Technology Services, Inc.

Solicitation No: N40085-17-R-1148 Price Propsal Volume Due Date: May 2, 2017

&A &"Times New Roman,Regular"&P of &N

6 MONTH Base Opt Non Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-17-R-1148
EXHIBIT A - CLIN 9000
Line Item 002 Non-Recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A710
ELINDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Perform Emergency Service Orders (General)The Contractor shall respond to emergency trouble calls within 1 hour of receipt during Government regular working hours and 2 hours of receipt outside Government working hours. Emergency trouble calls are limited to a dollar value of up to4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested and, up to the threshold limit, restore safe, continuous, and reliable equipment operation. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following the call. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.50EA$ 250.00$12,500.00
A701Perform Urgent Service Orders (General)The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.100EA$ 175.00$17,500.00
A702Provide Underground Locate ServicesWhen notified by the Government, the Contractor shall, review the Government excavation site area, Yard Plates (old and new), and as-built/building plans adjacent to the excavation site to determine the utilities in the area. The Contractor shall provide appropriate inductive or conductive equipment to locate utilities and ensure utilities are marked within the time required by the State of Maine. While locating utilities, the Contractor shall identify yard plate discrepancies by marking the yard plate field copy. The Contractor shall complete the Government furnished Utility Locate Form/Underground Utility Checklist. Return the completed form and marked-up yard plate field copy to the Government.225HR$ 50.00$11,250.00
A703Provide Hourly Underground Locate Service with Ground Penetration RadarWhen notified by the Government, the Contractor shall, provide hourly underground locate service with ground penetration radar.20HR$ 250.00$5,000.00
A704Unit Priced Labor Work (Negotiated)Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
1000LH$ 35.00$35,000.00
A705Unit Priced Labor Work (Negotiated)Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
1000LH$ 55.00$55,000.00
A706MaterialPrice for material to support unit priced labor work (negotiated).$500,000.00LS$ 1.00$500,000.00
A707Perform Service Trouble CallsThe Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.10EA$ 250.00$2,500.00
A708Unit Priced Labor Work (Specialized)Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Requires a licenced tradesman. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
500LH$ 60.00$30,000.00
A709Technical Support ServicesPrice for performance of specialized technical services that do not fall within UPL ELIN listed above. MUST BE NEGOTIATED BY KO USING ETO PROCESS.$100,000.00LS$ 1.00$100,000.00
A710Bronto Lift*2 DAY LEASE* 180' Bronto Lift for crane maintenance. Contractor to provide a personnel lift and two operators in support of the Portsmouth Naval Shipyard, Kittery, ME. Contractor shall provide a personnel lift with 180’ reach capacity and two qualified operators per day for a period of 2 days. Preferred work schedule must be coordinated with NAVFAC Performance Assessment Representative. Lift and operator are required for 8 hour work days between the hours of 0700-1530. One operator must operate the basket from the elevated position and one operator must remain on the ground in case of emergency. All service records and operators manuals for the lift must be with the vehicle at all times.

The Contractor shall arrange and hold a pre-construction /safety job brief with all involved parties prior to start of work.

The Contractor shall be responsible for maintaining work site compliance with EM385-1-1 Safety and Health Requirements Manual (2008 Edition, including latest errata and changes).

1EA$26,488$26,488.00
TOTAL NON-RECURRING WORK BASE OPTION YEAR$795,238.00

&"Times New Roman,Regular"&F&"Arial,Regular" &"Times New Roman,Regular"Logistics and Technology Services, Inc.

Solicitation No: N40085-17-R-1148 Price Propsal Volume

&A &"Times New Roman,Regular"&P of &N

1st Opt Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-17-R-1148
EXHIBIT B - CLIN 9001
Line Item 003 Recurring Work - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
B001NON-CIA
B001AAEmergency Service Orders2EA$ 800.00$1,600.00
B001ABUrgent Service Orders2EA$ 500.00$1,000.00
B001ACRoutine Service Orders2EA$ 400.00$800.00
B001ADDevelop and Implement a Preventative Maintenance Program for Diesel Generators (6 generators X 4/yearly = 24) Bldgs 29, 59, 298, 337, 373, 39812MO$ 1,986.64$23,839.68
B001AEPerform Annual Cleaning Services to Bridge 112MO$ 993.32$11,919.84
B001AFPerform Annual Cleaning Services to Bridge 212MO$ 882.95$10,595.40
B001AGPerform Catch Basin Cleaning Services - 300 CB's12MO$ 5,147.53$61,770.36
B001AHPerform Catch Basin Line Flushing - 3000 LF12MO$ 1,139.87$13,678.44
B001AIPerform Cleaning of Oil / Water Separators 29(2), 72, 154(2), 299, 320, 376(2), 38912MO$ 1,579.27$18,951.24NEED PROPOSAL - added OWS @ B389
B001AJDevelop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (2 Diesel Engines: 170A, 337)12MO$ 220.74$2,648.88
B001AKDevelop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (2 Electric Motors: 298, 373)12MO$ 386.29$4,635.48
B001ALPerform Cleaning of Storm Water Management Structures, SMS-003-01 (B170), SMS-005-01 and SMS-005-02 (B389)12MO$ 4,366.35$52,396.20
B001AMBridge 1 Concrete Sealant (Every 2 years=opt2, opt4)0MO$ 882.95$0.00
B001ANPerform Annual Testing and Certification of Backflow Preventors (43)12MO$ 347.66$4,171.92
TOTAL NON-CIA$208,007.44
B002CIA
B002AAEmergency Service Orders2EA$ 800.00$1,600.00
B002ABUrgent Service Orders2EA$ 500.00$1,000.00
B002ACRoutine Service Orders2EA$ 400.00$800.00
B002ADPerform Preventative Maintenance Program for Diesel Generators (Quarterly - 5 generators x 4/ yearly =20) times yearly). CIA Gate 2, CIA Gate 4, DD1, DD2, DD312MO$ 1,655.53$19,866.36
B002AEPerform Preventative Maintenance Program for Diesel Generator - 374 Monthly12MO$ 514.75$6,177.00
B002AFPerform Catch Basin Cleaning - 250 CB's12MO$ 5,147.53$61,770.36
B002AGPerform Catch Basin Line Flushing - 3000 LF12MO$ 1,029.51$12,354.12
B002AHInstall and Maintain Water Purification System in Bldg 277 and 34312MO$ 4,414.74$52,976.88
B002AIPerform Maintenance Program on Dry Dock Controls for DD-1, DD-2 and DD-3.12MO$ 10,774.79$129,297.48
B002AJDevelop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (3 Diesel Engines, 86A, 306, 343) Annual12MO$ 331.11$3,973.32
B002AKDevelop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (5 Electric Motors 92, 178, 2-291, 343)12MO$ 1,214.05$14,568.60
B002ALDevelop and Implement a Maintenance Program for UPS System at Buildings 37412MO$ 386.81$4,641.72
B002AMPerform Annual Testing and Certification of Backflow Preventors (62)12MO$ 513.21$6,158.52
B002ANPerform Semi-Annual Testing and Certification of Backflow Preventors (5 EA x 2 = 10)12MO$ 41.39$496.68
TOTAL CIA$315,681.04
B003MIDLANT
B003AAEmergency Service Orders2EA$ 800.00$1,600.00
B003ABUrgent Service Orders2EA$ 500.00$1,000.00
B003ACRoutine Service Orders2EA$ 400.00$800.00
B003ADSewer & Drain Clearing Service Orders40EA$ 150.00$6,000.00
B003AESewer & Drain Inspection Recording Service Orders20EA$ 500.00$10,000.00
B003AFPerform Preventative Maintenance Program for Diesel Generators (Quarterly - 6 generators X 4 yearly = 24). Bldgs 43, 243, 292, 296, Public Works Mobile, B16312MO$ 1,324.42$15,893.04
B003AGPerform Annual Testing and Certification of Backflow Preventors (74)12MO$ 612.55$7,350.60
B003AHPerform Quarterly Testing and Certification of Backflow Preventors (2 EA X 4 = 8)12MO$ 66.22$794.64
B003AIPerform Sewage Lift Station Cleaning and Inspection 292, 296, 297, 357, 37312MO$ 956.23$11,474.76
B003AJPeform Sewage Lift Station Cleaning and Inspection Video inspection, wash down chanel grinder, wash down bypass & invert channel. B292 (Semi-Annual)12MO$ 868.11$10,417.32
B003AKPerform Sewage Ejector Pump Cleaning and Inspection H10, 238 (Annual)12MO$ 294.20$3,530.40
B003ALPerform Sewage Lift Station Pump Maintenance - 292
(Semi-Annual)12MO$ 164.72$1,976.64
B003AMPerform Sewage Lift Station Pump Maintenance - 296
(Semi-Annual)12MO$ 164.72$1,976.64
B003ANPerform Sewage Lift Station Controls Maintenance:
B292 & B296 pH Controllers & Probes (Semi-Annual)12MO$ 308.85$3,706.20
B003AOPerform Sewage Lift Station Controls Maintenance:
B292 Sewage Flow Meter Calibration (Semi-Annual)12MO$ 55.18$662.16NO COST: This is for clarification only
B003APPeform Sewage Lift Station Controls Maintenance:
B292 Gas Detection-System Operation Inspection & Calibration (Quarterly)12MO$ 110.37$1,324.44NEED PROPOSAL - additional SOW added
B003AQPerform Preventative Maintenance Program for 2 Stand-By Generators at Bldg 7212MO$ 331.11$3,973.32NEED PROPOSAL - additional SOW added (OPT 1, OPT3)
B003ARProvide Root Treatment - Admiralty Village, Kittery, Maine (3 Areas, 1 Area per year)12MO$ 1,033.67$12,404.04
TOTAL MIDLANT$94,884.20
B004MIDLANT - Electrical Distribution Test and Maintenance
B004AAPerform Triennial Electrical Inspection and Testing Batteries, Flooded Lead-Acid, Valve-Regulated9EA$ 382.61$3,443.49
B004ABPerform Triennial Electrical Inspection and Testing Battery Chargers9EA$ 1,887.30$16,985.70
B004ACPerform Annual and Quadrennial Electrical Inspection and Testing Transformer Dry or Oil32EA$ 794.65$25,428.80
B004ADPerform Annual and Quardrennial Electrical Inspection and Testing Med V Switches23EA$ 662.21$15,230.83
B004AEPerform Annual and Quadrennial Electrical Inspection and Testing MV Vacuum Breakers27EA$ 662.21$17,879.67
B004AFPerform Annual and Quadrennial Electrical Inspection and Testing LV Breakers SI197EA$ 278.13$54,791.61
B004AGPerform Quadrennial Electrical Inspection and Testing LV Breakers PI6EA$ 397.33$2,383.98
B004AHPerform Triennial Electrical Inspection and Testing Protective Relays175EA$ 162.71$28,474.25
B004AIPerform Annual Electrical Inspection and Testing Regulators (Each Phase)21EA$ 662.21$13,906.41
B004AJPerform Annual Electrical Inspection and Testing Load Tap Changers4EA$ 1,456.87$5,827.48
B004AKPerform Annual Electrical Inspection and Testing MV Motor Starters8EA$ 662.21$5,297.68
B004ALPerform Annual Electrical Inspection and Testing MG Sets (per NETA MTS)3EA$ 2,648.85$7,946.55
B004AMPerform Triennial Electrical Inspection and Testing MG Sets3EA$ 4,503.04$13,509.12
B004ANPerform Annual Electrical Inspection and Testing Oil Samples69EA$ 298.00$20,562.00
B004AOPerform Annual Electrical Inspection and Testing Powerware UPS, B721EA$ 5,423.51$5,423.51
B004APPerform Annual Electrical Inspection, Testing, and calibration of one Avtron DC Load Box1EA$ 2,979.95$2,979.95
B004AQPerform Annual Electrical Inspection and Testing Adjustable Speed-Drive Systems (Bldg 163 AND Bldg 292)2EA$ 1,986.64$3,973.28
B004ARContractor to provide engineering support to Test Rectifiers2EA$ 3,311.06$6,622.12
B004ASProvide Annual Calibration of Test Equipment1EA$ 99.34$99.34
B004ATProvide 1-year Remote Assistance Premium Service Agreement and Technical Support from Industry Leading Experts for Electrical SCADA, Square D PowerLogic System per SCADA Premium Service Agreement12MO$ 2,759.22$33,110.64
B004AUPerform Semi-Annual PM & Maintenance of FLS on Hardware & Equipment12MO$ - 0$0.00REMOVE
TOTAL MIDLANT - Electrical Distribution Test and Maintenance$283,876.41
B005ARMY
B005AADevelop and Implement a Preventative Maintenance Program For Diesel Generator (Quarterly - 1 Generator X 4/YR= 4) 39512MO$ 110.37$1,324.44
B005ABEmergency Service Orders1EA$800.00$800.00
B005ACUrgent Service Orders1EA$500.00$500.00
TOTAL ARMY$2,624.44
B006CODE 105
B006AADevelop and Implement a Preventative Maintenance Program for Diesel Generators (2 generators x 4 PMs=8 PMs). B79, 17412MO$ 220.74$2,648.88
B006ABSemi Annual Test of Automatic Transfer Switch in Building 1312MO$ 662.21$7,946.52
TOTAL CODE 105$10,595.40
B007CODE 700
B007AA180' Bronto Lift (2 day lease) for crane maintenance12MO$ 2,207.37$26,488.44
TOTAL CODE 700$26,488.44

TOTAL RECURRING WORK LINE ITEMS TOTAL $942,157.37

&A &"Times New Roman,Regular"&P of &N

1st Opt Non Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-17-R-1148
EXHIBIT B - CLIN 9001
Line Item 004 Non-Recurring Work - First Option
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B710
ELINDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B700Perform Emergency Service Orders (General)The Contractor shall respond to emergency trouble calls within 1 hour of receipt during Government regular working hours and 2 hours of receipt outside Government working hours. Emergency trouble calls are limited to a dollar value of up to4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested and, up to the threshold limit, restore safe, continuous, and reliable equipment operation. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following the call. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.50EA$ 250.00$12,500.00
B701Perform Urgent Service Orders (General)The Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.100EA$ 175.00$17,500.00
B702Provide Underground Locate ServicesWhen notified by the Government, the Contractor shall, review the Government excavation site area, Yard Plates (old and new), and as-built/building plans adjacent to the excavation site to determine the utilities in the area. The Contractor shall provide appropriate inductive or conductive equipment to locate utilities and ensure utilities are marked within the time required by the State of Maine. While locating utilities, the Contractor shall identify yard plate discrepancies by marking the yard plate field copy. The Contractor shall complete the Government furnished Utility Locate Form/Underground Utility Checklist. Return the completed form and marked-up yard plate field copy to the Government.225HR$ 50.00$11,250.00
B703Provide Hourly Underground Locate Service with Ground Penetration RadarWhen notified by the Government, the Contractor shall, provide hourly underground locate service with ground penetration radar.20HR$ 250.00$5,000.00
B704Unit Priced Labor Work (Negotiated)Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
1000LH$ 35.00$35,000.00
B705Unit Priced Labor Work (Negotiated)Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
1000LH$ 55.00$55,000.00
B706MaterialPrice for material to support unit priced labor work (negotiated).$500,000.00LS$ 1.00$500,000.00
B707Perform Service Trouble CallsThe Contractor shall respond to service trouble calls within 24 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $75.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost.10EA$ 250.00$2,500.00
B708Unit Priced Labor Work (Specialized)Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Requires a licenced tradesman. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
500LH$ 60.00$30,000.00
B709Technical Support ServicesPrice for performance of specialized technical services that do not fall within UPL ELIN listed above. MUST BE NEGOTIATED BY KO USING ETO PROCESS.$100,000.00LS$ 1.00$100,000.00
B710Bronto Lift*2 DAY LEASE* 180' Bronto Lift for crane maintenance. Contractor to provide a personnel lift and two operators in support of the Portsmouth Naval Shipyard, Kittery, ME. Contractor shall provide a personnel lift with 180’ reach capacity and two qualified operators per day for a period of 2 days. Preferred work schedule must be coordinated with NAVFAC Performance Assessment Representative. Lift and operator are required for 8 hour work days between the hours of 0700-1530. One operator must operate the basket from the elevated position and one operator must remain on the ground in case of emergency. All service records and operators manuals for the lift must be with the vehicle at all times.

The Contractor shall arrange and hold a pre-construction /safety job brief with all involved parties prior to start of work.

The Contractor shall be responsible for maintaining work site compliance with EM385-1-1 Safety and Health Requirements Manual (2008 Edition, including latest errata and changes).

1EA$ 26,488.00$26,488.00
TOTAL NON-RECURRING WORK BASE OPTION YEAR$795,238.00
.

&"Times New Roman,Regular"&F&"Arial,Regular" &"Times New Roman,Regular"Logistics and Technology Services, Inc.

Solicitation No: N40085-17-R-1148 Price Propsal Volume

&A &"Times New Roman,Regular"&P of &N

2nd Opt Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-17-R-1148
EXHIBIT C - CLIN 9002
Line Item 005 Recurring Work - Second Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
C001NON-CIA
C001AAEmergency Service Orders2EA$ 800.00$1,600.00
C001ABUrgent Service Orders2EA$ 500.00$1,000.00
C001ACRoutine Service Orders2EA$ 400.00$800.00
C001ADDevelop and Implement a Preventative Maintenance Program for Diesel Generators (6 generators X 4/yearly = 24) Bldgs 29, 59, 298, 337, 373, 39812MO$ 1,986.64$22,184.13
C001AEPerform Annual Cleaning Services to Bridge 112MO$ 993.32$11,919.84
C001AFPerform Annual Cleaning Services to Bridge 212MO$ 882.95$10,595.40
C001AGPerform Catch Basin Cleaning Services - 300 CB's12MO$ 5,147.53$61,770.36
C001AHPerform Catch Basin Line Flushing - 3000 LF12MO$ 1,139.87$13,678.44
C001AIPerform Cleaning of Oil / Water Separators 29(2), 72, 154(2), 299, 320, 376(2), 38912MO$ 1,729.83$20,757.99
C001AJDevelop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (2 Diesel Engines: 170A, 337)12MO$ 220.74$2,648.88
C001AKDevelop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (2 Electric Motors: 298, 373)12MO$ 441.48$4,194.06
C001ALPerform Cleaning of Storm Water Management Structures, SMS-003-01 (B170), SMS-005-01 and SMS-005-02 (B389)12MO$ 4,366.35$52,396.20
C001AMBridge 1 Concrete Sealant (Every 2 years=start opt2 & opt4)12MO$ 882.95$10,595.40
C001ANPerform Annual Testing and Certification of Backflow Preventors12MO$ 347.66$4,171.92
TOTAL NON-CIA$218,312.62
C002CIA
C002AAEmergency Service Orders2EA$ 800.00$1,600.00
C002ABUrgent Service Orders2EA$ 500.00$1,000.00
C002ACRoutine Service Orders2EA$ 400.00$800.00
C002ADPerform Preventative Maintenance Program for Diesel Generators (Quarterly - 5 generators x 4/ yearly =20) times yearly). CIA Gate 2, CIA Gate 4, DD1, DD2, DD312MO$ 1,655.53$19,866.36
C002AEPerform Preventative Maintenance Program for Diesel Generator - 374 Monthly12MO$ 514.75$6,177.00
C002AFPerform Catch Basin Cleaning - 250 CB's12MO$ 5,147.53$61,770.36
C002AGPerform Catch Basin Line Flushing - 3000 LF12MO$ 1,029.51$12,354.12
C002AHInstall and Maintain Water Purification System in Bldg 277 and 34312MO$ 4,414.74$52,976.88
C002AIPerform Maintenance Program on Dry Dock Controls for DD-1, DD-2 and DD-3.12MO$ 11,164.10$133,969.20
C002AJDevelop and Implement a Preventative Maintenance Program For Diesel Fire Pump Drivers (3 Diesel Engines, 86A, 306, 343) Annual12MO$ 331.11$3,973.32
C002AKDevelop and Implement a Preventative Maintenance Program For Electric Fire Pump Drivers (5 Electric Motors 92, 178, 2-291, 343)12MO$ 1,324.42$15,893.04
C002ALDevelop and Implement a Maintenance Program for UPS System at Buildings 37412MO$ 386.61$4,639.32
C002AMPerform Annual Testing and Certification of Backflow Preventors12MO$ 513.21$6,158.52
C002ANPerform Semi-Annual Testing and Certification of Backflow Preventors (5 EA x 2 = 10)12MO$ 41.39$496.68
TOTAL CIA$321,674.80
C003Non-CIA (MIDLANT)
C003AAEmergency Service Orders2EA$ 800.00$1,600.00
C003ABUrgent Service Orders2EA$ 500.00$1,000.00
C003ACRoutine Service Orders2EA$ 400.00$800.00
C003ADSewer & Drain Clearing Service Orders40EA$ 150.00$6,000.00
C003AESewer & Drain Inspection Recording Service Orders20EA$ 500.00$10,000.00
C003AFPerform Preventative Maintenance Program for Diesel Generators (Quarterly - 6 generators X 4 yearly = 24). Bldgs 43, 243, 292, 296, Public Works Mobile, B16312MO$ 1,324.42$15,893.04
C003AGPerform Annual Testing and Certification of Backflow Preventors12MO$ 612.55$7,350.60
C003AHPerform Quarterly Testing and Certification of Backflow Preventors (2 EA X 4 = 8)12MO$ 66.22$794.64
C003AIPerform Sewage Lift Station Cleaning and Inspection 292, 296, 297, 357, 37312MO$ 956.23$10,518.51
C003AJPeform Sewage Lift Station Cleaning and Inspection Video inspection, wash down chanel grinder, wash down bypass & invert channel. B292 (Semi-Annual)12MO$ 868.11$10,417.32
C003AKPerform Sewage Ejector Pump Cleaning and Inspection H10, 238 (Annual)12MO$ 294.20$3,530.40
C003ALPerform Sewage Lift Station Pump Maintenance - 292
(Semi-Annual)12MO$ 164.72$1,976.64
C003AMPerform Sewage Lift Station Pump Maintenance - 296
(Semi-Annual)12MO$ 164.72$1,976.64
C003ANPerform Sewage Lift Station Controls Maintenance:
B292 & B296 pH Controllers & Probes (Semi-Annual)12MO$ 308.85$3,706.20
C003AOPerform Sewage Lift Station Controls Maintenance:
B292 Sewage Flow Meter Calibration (Semi-Annual)12MO$ 55.18$662.16
C003APPeform Sewage Lift Station Controls Maintenance:
B292 Gas Detection-System Operation Inspection & Calibration (Quarterly)12MO$ 478.98$5,747.76
C003AQPerform Preventative Maintenance Program for 2 Stand-By Generators at Bldg 7212MO$ 331.11$3,973.32DO NOT INCLUDE NETA MTS PM - NOT DUE TILL 3RD OPT
C003ARProvide Root Treatment - Admiralty Village, Kittery, Maine (3 Areas, 1 Area per year)12MO$ 1,033.67$12,404.04
TOTAL MIDLANT$98,351.27
C004Non-CIA (MIDLANT) - Electrical Distribution Test and Maintenance
C004AAPerform Triennial Electrical Inspection and Testing Batteries, Flooded Lead-Acid, Valve-Regulated8EA$ 382.61$3,060.88
C004ABPerform Triennial Electrical Inspection and Testing Battery Chargers8EA$ 1,986.63$15,893.04
C004ACPerform Annual and Quadrennial Electrical Inspection and Testing Transformer Dry or Oil32EA$ 860.88$27,548.16
C004ADPerform Annual and Quardrennial Electrical Inspection and Testing Med V Switches23EA$ 728.43$16,753.89
C004AEPerform Annual and Quadrennial Electrical Inspection and Testing MV Vacuum Breakers27EA$ 728.43$19,667.61
C004AFPerform Annual and Quadrennial Electrical Inspection and Testing LV Breakers SI197EA$ 298.00$58,706.00
C004AGPerform Quadrennial Electrical Inspection and Testing LV Breakers PI6EA$ 215.22$1,291.32
C004AHPerform Triennial Electrical Inspection and Testing Protective Relays175EA$ 195.26$34,170.50
C004AIPerform Annual Electrical Inspection and Testing Regulators (Each Phase)21EA$ 728.43$15,297.03
C004AJPerform Annual Electrical Inspection and Testing Load Tap Changers4EA$ 529.77$2,119.08
C004AKPerform Annual Electrical Inspection and Testing MV Motor Starters8EA$ 485.62$3,884.96
C004ALPerform Annual Electrical Inspection and Testing MG Sets (per NETA MTS)3EA$ 662.21$1,986.63
C004AMPerform Triennial Electrical Inspection and Testing MG Sets0EA$ 1,241.65$0.00
C004ANPerform Annual Electrical Inspection and Testing Oil Samples69EA$ 331.11$22,846.59
C004AOPerform Annual Electrical Inspection and Testing Powerware UPS, B721EA$ 451.96$451.96
C004APPerform Annual Electrical Inspection, Testing, and calibration of one Avtron DC Load Box1EA$ 248.33$248.33
C004AQPerform Annual Electrical Inspection and Testing Adjustable Speed-Drive Systems (Bldg 163 AND Bldg 292)2EA$ 353.18$706.36
C004ARContractor to provide engineering support to Test Rectifiers2EA$ 551.84$1,103.68
C004ASProvide Annual Calibration of Test Equipment1EA$ 105.96$105.96
C004ATProvide 1-year Remote Assistance Premium Service Agreement and Technical Support from Industry Leading Experts for Electrical SCADA, Square D PowerLogic System per SCADA Premium Service Agreement12MO$ 2,759.22$33,110.64
C004AUPerform Semi-Annual PM & Maintenance of FLS on Hardware & Equipment12MO$0.00$0.00Not Included on P00003
TOTAL MIDLANT - Electrical Distribution Test and Maintenance$258,952.62
C005ARMY
C005AADevelop and Implement a Preventative Maintenance Program For Diesel Generator (Quarterly - 1 Generator X 4/YR= 4) 39512MO$ 110.37$1,324.44
C005ABEmergency Service Orders1EA$800.00$800.00
C005ACUrgent Service Orders1EA$500.00$500.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .