01 33 10.5 20 DESIGN SUBMITTAL PROCEDURES SCHEDULE APPENDIX A 21JAN2020.pdf
PDF 58 KB Posted
- Attached to
- DB Geiger Facility Repairs
- Solicitation number
- N4008520R4029
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 33 10.5 5 20 SEIGN SUBMITTAL PROCEDURES 16 JAN 2020
PHASE %
CAL. DAYS
PER
PHASE
CAL. DAYS
(CUMULATIVE)
FC 1‐300‐09N DESIGN PROCEDURES AND NOTES DRAWINGS SPECS
CDW‐MEETING 5% 42 42
REFER TO CHAPTER 13. PROVIDE DEVELOPED OPTION(S) AT
FIRST CDW MTG. REVISE PROJECT CONCEPTS TO REFINEMENT
OF PRODUCT DURING SUBSEQUENT CDW MTGS.
YES OUTLINE SPECS
GC REPORT 7 49
YES OUTLINE SPECS
GOVERNMENT REVIEW 7 56
SD‐MEETING 20% 14 70
REFER TO CHAPTER 14. YES YES + RED
LINED SPECS
GOVERNMENT REVIEW 7 77
DD (OVER THE SHOULDER)‐MEETING 65% 21 98
REFER TO CHAPTER 16. YES YES + RED
LINED SPECS
GC REPORT 7 105
YES YES + RED
LINED SPECS
PRE‐FINAL REVIEW (CD & SITE DESIGN) 100% 21 126
REFER TO CHAPTER 17. YES YES + RED
LINED SPECS
GOV REVIEW 14 140
FINAL DESIGN REVIEW 100% 14 154
REFER TO CHAPTER 17. YES YES + RED
LINED SPECS
GOV REVIEW 7 161
CD (For Construction) 100% 14 175 REFER TO CHAPTER 17. FINAL, SEALED FINAL, SEALED
APPENDIX A
File details come from the government source that posted it. Updated .