This document is an amendment to a solicitation for a facility support services contract. The amendment provides site visit information for a mandatory meeting on December 10th at 9:00am at building 163 of Marine Corps Air Station Cherry Point in North Carolina. It requires contractors to RSVP with contact information by December 9th and bring proper PPE including hard hats, ear plugs, and face coverings. The amendment responds to questions by confirming the proposal due date is December 23, 2020 and clarifying that proposals must be submitted electronically. It also releases attachments with forms for past performance references and self-certification of subcontracting work. The solicitation is for a contract to provide all labor, management, and equipment for facility investment services for structures, equipment, and systems at MCAS Cherry Point and its outlying fields, to be awarded by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
0005.pdf PDF
OLF and BT Information.pdf PDF
DBA.pdf PDF
0004.pdf PDF
0003.pdf PDF
0002.pdf PDF
SITE VISIT SIGN IN SHEET 20R0131-20201214061004.pdf PDF
ATTACHMENT D.docx DOCX document
Attachment F.docx DOCX document
ATTACHMENT C.docx DOCX document
ATTACHMENT E.docx DOCX document
J-0200000-13 ELINS.xls XLS spreadsheet
Corp Experience Form.docx DOCX document
J-1502000-16-01.pdf PDF
Copy of J-0200000-07 - SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
Sol Final.pdf PDF
1502000 J FSSC Cherry filter add done.doc DOC document
2015-5781 Rev. 11.docx DOCX document
PPQ FORM.xls XLS spreadsheet
Copy of J-0200000-08- ASSET INFORMATION v2 - 2017-04-26.xlsx XLSX spreadsheet
J-1502000-16-02.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide Site Visit information and respond to PreProposal Questions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0131

X 9B. DATED (SEE ITEM 11)

24-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Dec-2020

CODE

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520R0131

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SITE VISIT INFORMATION

The following are the details for the site visit:

December 10th at 9:00am All contractors are to meet out front of building 163 Contractors should bring proper PPE such as hard hats and ear plugs. Each individual should have a face covering with them as well as following social distancing CDC guidelines.

Please email Ericka Bishop ericka.j.bishop@navy.mil NLT December 9th requesting to attend the site visit. Please provide the following information:

Name Date of Birth Company Name

Please arrive at the Pass and ID office at the front gate in ample time to receive a one day base pass for base entry and then drive over to building 163.

Upon entering the building each person is required to review the COVID‐19 questionnaire form and then take their temperature and sign into the log book indicating their temperature reading by their name.

Please remain in the lobby area of the building until the sponsor comes to the lobby.

PreProposal Questions

QUESTION GOVERNMENT RESPONSE

What is the correct due date?

SF33 states December 23; however, page 2 (Section A) states December 28.

The correct due date is December 23, 2020

Are proposals required to be submitted via email and CD-

ROM?

Section A states via email; however Sections L.3 and M.2 state "electronic and CD-ROM".

Proposals are required to be submitted via email only.

N4008520R0131

Section M.2, Factor 1-Management Approach, a. Workforce Management, item 2 states: "…..and submit Attachment E (Contractor's Self-Performance Certification and Notification of Subcontracting), as part of this factor. "

Please provide Attachment E.

Attachment posted to betaSAM

Please provide Attachment C. Past Performance Questionnaire.

The file titled "PPQ-Form" is actually the "Preaward Inquiry Form (Template)".

Attachment posted to betaSAM

Per M.2: “If the offeror is a Joint Venture (JV), relevant project experience shall be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. An offeror proposing to perform as Prime Contractor for this solicitation may use experience from projects it performed as part of Joint Venture…. As noted above, to be deemed acceptable under this factor, the offeror must submit at least one (1) relevant project where the offeror served as the prime contractor (similar size, scope and complexity as the current requirement).”

In the case where the JV does not have shared experience, please clarify whether the JV must submit at least one project for each JV member, or if the JV offeror can utilize the project experience of one or some of its members. Per 13 CFR 125.8(e), the past performance of individual joint venture members must be considered by the Government.

Accordingly, please confirm that this Factor does not require a JV offeror to submit at least one project for each member.

Each JV member must submit at least one project if there are no projects in the name of the JV.

(End of Summary of Changes)