Copy of J-0200000-08- ASSET INFORMATION v2 - 2017-04-26.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Facility Support Services Contract for Marine Corps Air Station, Cherry Point, NC
Solicitation number
N4008520R0131
Issued by

About this file

This document contains an asset information file template and details of a related federal contract opportunity for facility support services. The asset information file template outlines 36 data fields required to interface with the MAXIMO asset management system, including asset numbers, descriptions, locations, quantities, costs, and other technical specifications. The related federal contract opportunity is a solicitation from the Department of the Navy to provide all labor, management, tools and equipment for facility investment services at Marine Corps Air Station Cherry Point in North Carolina and its outlying fields, involving maintenance and repair of facilities, ground structures, installed equipment and systems. The period of performance and response deadline are not specified.

View the file

Other files

File Type Posted
0005.pdf PDF
OLF and BT Information.pdf PDF
DBA.pdf PDF
0004.pdf PDF
0003.pdf PDF
0002.pdf PDF
SITE VISIT SIGN IN SHEET 20R0131-20201214061004.pdf PDF
0001.pdf PDF
ATTACHMENT D.docx DOCX document
Attachment F.docx DOCX document
ATTACHMENT C.docx DOCX document
ATTACHMENT E.docx DOCX document
J-0200000-13 ELINS.xls XLS spreadsheet
Corp Experience Form.docx DOCX document
J-1502000-16-01.pdf PDF
Copy of J-0200000-07 - SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
Sol Final.pdf PDF
1502000 J FSSC Cherry filter add done.doc DOC document
2015-5781 Rev. 11.docx DOCX document
PPQ FORM.xls XLS spreadsheet
J-1502000-16-02.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-Asset File Into

ATTACHMENT J-0200000-08

ASSET INFORMATION

Interface: Asset File
VERSION #:V2
Current as of:26 April 2017
Version History
V1 - Updated to reflect current interface in MAXIMO
V2 - Added 3 additional fields (OPT): Asset Comment, PM Program & PM Plan
TABS
1-Asset File InfoThis Sheet
2-Asset File Field ListAsset Template Data Format Information

2-Asset File Field List

ATTACHMENT J-0200000-08

ASSET INFORMATION

Interface: Asset File
VERSION #:V2
Current as of: 26 April 2017
PositionNameRequiredLength
LimitData Format NoteContent Notes
MAXIMO Field Name
1Asset NumY25ASSETNUM
2Changed DateNMM/DD/YYYYCHANGEDATE
3DescriptionY100DESCRIPTION
4Long DescriptionN1,000LONGDESCRIPTION
5Master SystemYMust match Value List in MaximoValue list in REFERENCE SPREADSHEET.
POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc…MASTERSYSTEM
6SystemYMust match Value List in MaximoValue list in REFERENCE SPREADSHEET.
POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc…SYSTEM
7Sub-SystemYMust match Value List in MaximoValue list in REFERENCE SPREADSHEET.
POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc…SUBSYSTEM
8LocationYMust match Value List in MaximoValue list in REFERENCE SPREADSHEETLOCATION
9Site IDYMust match Value List in MaximoValue list in REFERENCE SPREADSHEET -or-
For this contract only: XXXXXSITEID
10Work Center (Person Group)YMust match Value List in MaximoValue list in REFERENCE SPREADSHEET -or-

For this contract:

- use the following identifier "XXXX"PERSONGROUP
11Asset TypeYMust match Value List in MaximoValue list in REFERENCE SPREADSHEETASSETTYPE
12Asset QuantityNIntegerQUANTITY
13Inventory CategoryYMust match Value List in MaximoValue list in REFERENCE SPREADSHEETINVENTORYCATEGORY
14Purchase PriceNIntegerPURCHASEPRICE
15Budgeted CostNIntegerBUDGETCOST
16Replacement CostYIntegerREPLACECOST
17Meter GroupNMust match Value List in MaximoValue list in REFERENCE SPREADSHEETGROUPNAME
18Belongs To (Parent)NMust match an existing ASSETNUM in Maximo.Asset Number of Parent. The asset and its parent can't be created in the same filePARENT
19Contract NumberN25Appended to LONGDESCRIPTION
20Task/Delivery Order NumberN25Appended to LONGDESCRIPTION
21Drawing Reference IDN25Appended to LONGDESCRIPTION
22Warranty Expiration DateNMM/DD/YYYYAppended to LONGDESCRIPTION
23Status DateNLEAVE BLANKLeave blank/Do Not UseSTATUSDATE
24Installation DateYMM/DD/YYYYINSTALLDATE
25Asset StatusNMust match Value List in MaximoValue list in REFERENCE SPREADSHEET -or-
"Operating" for NEW and "Decommissioned or DEA" for removed equipmentSTATUS
26CLASSSTRUCTUREIDNMust match Value List in MaximoValue list in REFERENCE SPREADSHEETCLASSSTRUCTUREID
27Job Plan CodeN25Appended to LONGDESCRIPTION
28Equipment Tag NumberN25Appended to LONGDESCRIPTION
29Additional Loc InfoN250ADDLOCINFO
30ManufacturerNMust match Value List in MaximoValue list in REFERENCE SPREADSHEETMANUFACTURER
31Model NumberN25MODEL
32Serial NumberN25SERIALNUM
33Asset CommentN100ASSETCOMMENT
34Standard Eval Results
(PM Plan)N15Values Depend on Asset Type (i.e. UTILITIES, FACILITIES)Not required, but will default to N/A or NTE if left blank. Valid values determined by Asset Type (Position 11)STANDARDEVAL
35PM Standard Applies
(PM Program)N15Values Depend on Asset Type (i.e. UTILITIES, FACILITIES)Not required, but will default to N/A or NTE if left blank. Valid values determined by Asset Type (Position 11)PMSTANDARD
N/A

File details come from the government source that posted it. Updated .