SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS TABLE OF CONTENTS
| ATTACHMENT NUMBER |
| ATTACHMENT TITLE |
| J-1502000-01 |
| Definitions and Acronyms |
| J-1502000-02 |
| References and Technical Documents |
| J-1502000-04 |
| Historical Volume of Service Order Workload |
| J-1502000-05 |
| HVAC Water Treatment Inventory |
| J-1502000-06 |
| Boiler and UPV Inventory |
| J-1502000-07 |
| CO2 Fire Suppression Systems |
| J-1502000-07-01 |
| Gaylord/Ansul Hoods and Ducts Inventory |
| J-1502000-07-02 |
| Fire Alarm/Smoke Detection System Inventory |
| J-1502000-08 |
| Vertical Transportation Equipment (VTE) inventory |
| J-1502000-09 |
| Medical Gas Delivery System Inventory |
| J-1502000-10 |
| AV8B Engine Test Cell Inventory |
| J-1502000-11 |
| Hangar Floors Locations |
| J-1502000-12 |
| Paint Stripping Booth Locations |
| J-1502000-13 |
| Reverse Osmosis Systems Location |
| J-1502000-14 |
| Ultra-Violet System location |
| J-1502000-15 |
| Compressed Air System (Atlas Copco) Inventory |
| J-1502000-16 |
| United Blower Inventory |
| J-1502000-16-01 |
| United Blower Map Locations |
| J-1502000-16-02 |
| United Blower Clearance Distance |
| J-1502000-17 |
| Turnstile and Gate Information |
| J1502000-18 |
| Performance Work Statement For Maintenance And Servicing Of Environmental Stabilization Systems Air Dehydration Units (ADU) |
| J-1502000-19 |
| Scale Inventory |
| J-1502000-20 |
| Flow Meter Inventory |
| J-1502000-21 |
| Tool Inventory |
| J-1502000-22 |
| Water Tank Cathodic Protection Inventory |
| J-1502000-23 |
| Parshall Flumes Inventory |
| J-1502000-24 |
| Hach Probes Analyzers and Sensors Inventory |
| J-1502000-25 |
| Gas Monitoring System Inventory |
| J-1502000-26 |
| Grease Trap Inventory |
| J-1502000-27 |
| Sewage Plant Sludge Holding Areas |
| J-1502000-28 |
| Lime Application Fields Information |
| J-1502000-29 |
| Portable Toilet Workload Data |
| J-1502000-30 |
| Sealed Vault Toilet Inventory |
| J-1502000-31 |
| Pond Inventory |
| J-1502000-31-01 |
| Annual Fish Stocking Inventory |
| J-1502000-31-02 |
| Planned Pesticide Use Sheet |
| J-1502000-31-03 |
| Vegetation Management Requirements |
| J-1502000-31-04 |
| Pest Management Operations Report |
| J-1502000-32 |
| HVAC Air Filter Inventory |
ATTACHMENT J-1502000-01
DEFINITIONS AND ACRONYMS
Certified Applicator/
Operator Any individual who applies pesticides or supervises the use of pesticides, and who has been authorized to do so by successfully completing a training program approved by the EPA, followed by formal certification by DoD or a state.
| Contractor's Work Plan (CWP) for Pest Control |
| A Contractor developed document submitted as part of the Contractor proposal that describes how the requirements of this contract will be met. The plan establishes the strategies and methods for conducting a safe, effective, and environmentally sound pest management program. |
| CRANE, CATEGORY 1 |
| Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes. |
| CRANE, CATEGORY 2 & 3 |
| Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, fixed hoists, including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds. |
| CRANE, CATEGORY 4 |
| Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes. |
| EQUIPMENT, COLLATERAL |
| Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project. |
| EQUIPMENT, INSTALLED |
| Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial. |
| EQUIPMENT, PERSONAL PROPERTY |
| Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed. |
| FACILITIES LIFE CYCLE |
| A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal. |
| FACILITIES MAINTENANCE MANAGEMENT |
| The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC/Marine Corps facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.” |
| Integrated Maintenance Program (IMP) |
| IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service calls will not be issued for accomplishment of repairs on systems and equipment maintained under IMP. |
| Integrated Pest Management Plan (IPMP) |
| A required, written long-range, comprehensive planning and operational document that establishes the strategy and methods for conducting a safe, effective, and environmentally sound IPM program. IPM plans are a means of establishing and implementing installation pest management programs and function as the tool used to ensure compliance with applicable pest management laws and regulations. |
| LIFE-CYCLE COSTS |
| A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life. |
| MAINTENANCE, PREVENTIVE |
| Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements. |
| MANAGEMENT INFORMATION SYSTEMS-MAINTENANCE |
| A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance. |
| Pest Control Performance Assessment Representative (PCPAR) |
| A DoD employee trained in pest management, who protects the government's interest through on-site performance assessment (PA) of commercial pest management contracts or other contracts that involve the use of pesticides. |
| Pesticide |
| Any substance or mixture of substances, including biological control agents, registered by EPA under FIFRA intended to destroy, repel, or mitigate pests. Includes insecticides, rodenticides, herbicides, fungicides, plant regulators, defoliants, desiccants, disinfectants, anti-fouling paints, and biocides (such as water treatment chemicals). NAVFACENGCOM pest management consultants do not approve disinfectants or biocides. |
| Registered Pesticide |
| A pesticide registered by EPA for sale and use within the United States. |
| REPAIR |
| Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition. |
| REPLACEMENT |
| Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance. |
| RESTORATION |
| Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes. |
| Safety Data Sheet (SDS) |
| A document (Occupational Safety and Health Administration (OSHA) Form 174, or equivalent) that accompanies a pesticide product, providing the handler with chemical information on ingredients, handling instructions, potential hazards, and manufacturer address and emergency contact information. |
| SERVICE ORDER |
| Any work required to return a facility, system, equipment or component to normal working condition. Service orders are minor facility problem requests or requests for other non-recurring work that is too small to be planned and estimated. |
The purpose of a service order is to provide the Government with a means of issuing work up to a defined liability limit for requirements occurring outside of the specified recurring work. The Government may utilize service orders to accomplish any work up to the respective liability limit based on the service order classification.
| SERVICE ORDER CYCLE |
| Count down starts when the customer is notified that the work has been accepted to be accomplished to the time when the work chit is turned in by the craftsmen as complete is one complete cycle period for a service order. |
| SERVICE ORDER, EMERGENCY |
| Emergency is defined as any facility deficiency that immediately compromises the mission or life, health and safety. Always includes, but is not limited to, failure of any utility, fire protection, environmental control, or security alarm systems. |
| SERVICE ORDER, ROUTINE |
| Routine is defined as any work requirement within the defined LOL that does not qualify as emergency or urgent. |
| SERVICE ORDER, URGENT |
| Urgent is defined as any deficiency that does not immediately endanger personnel or property, but extended delays of repairs could result in damage to Government property, or soon affect the security, health, or well-being of personnel or the continued operation of a service or system. |
| Surveillance |
| Thorough inspections or surveys conducted before or after pest management treatments or on a regular basis to determine the presence and prevalence of pests or disease vectors. |
| SUSTAINMENT |
| Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities. |
| WEIGHT HANDLING EQUIPMENT (WHE) |
| Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE. |
ATTACHMENT J-1502000-01
DEFINITIONS AND ACRONYMS
| BPVC |
| Boiler and Pressure Vessel Code |
| EMCS |
| Energy Management Control System |
| HVAC |
| Heating, Ventilation, and Air Conditioning |
| PTWH |
| Packaged Terminal Water Heaters |
| RPIE |
| Real Property Inventory Equipment |
| SCADA |
| Supervisory Control And Data Acquisition |
| SRM |
| Sustainment, Restoration and Modernization |
| UFC |
| Unified Facilities Criteria |
| UPV |
| Unfired Pressure Vessel |
| VTE |
| Vertical Transportation Equipment |
ATTACHMENT J-1502000-02
REFERENCES AND TECHNICAL DOCUMENTS
Pre-Acceptance Inspection and Tests of Installation of Boiler Equipment, Unfired Pressure Vessels (5 Cu. Ft. and Above), Auxiliary Fuel Incinerators, and Fire Protection Equipment).
A.S.M.E. Boiler and Pressure Vessel Codes
Sheet Metal and AC Contractors National Association Inc. (SMACMA)
Testing, Balancing, and Adjusting of Environmental Systems
Clean Air Act Amendment of 1990
National Fire Codes, Latest Edition
American Society of Heating, Refrigerating and Air Conditioning Engineers Inc. (ASHRAE) Hand Books, Latest Editions
US Air Force Model Pesticide Reduction Plan (July 1996)
| 16 U.S.C. 1531 et seq. |
| Endangered Species Act |
| 42 U.S.C. 4321 et seq., |
| National Environmental Policy Act (NEPA |
| 42 U.S.C. 6901 et seq. |
| Resource Conservation and Recovery Act (RCRA) |
| 7 U.S.C. 136 et seq., |
| Federal Insecticide, Fungicide and Rodenticide Act (FIFRA) as amended |
| American Society for Testing and Materials (ASTM) |
| C 602-69 Agricultural Liming Materials (R80) |
| American Society for Testing and Materials (ASTM) |
| E 11-81 Wire-Cloth Sieves for Testing Purposes |
| Armed Forces Pest Management Board TG No. 11 |
| Hydrogen Phosphide Fumigation of Subsistence with Aluminum Phosphide |
| Armed Forces Pest Management Board TG No. 14 |
| Protective Equipment for Pest Control Personnel |
| Armed Forces Pest Management Board TG No. 15 |
| Pesticide Spill Prevention and Management |
| Armed Forces Pest Management Board TG No. 27 |
| Stored-Product Pest Monitoring Methods |
| Armed Forces Pest Management Board TG No. 29 |
| Integrated Pest Management In and Around Buildings |
| Armed Forces Pest Management Board TG No. 37 |
| Guidelines for Reducing Feral/Stray Cat Populations on Military Installations in the United States |
| ASME 17.1 |
| Safety Code for Elevators and Escalators |
| ASTM E 11-81 |
| Instruction for the woven wire test. |
| Department of Defense Directive 4150.07 |
| Department of Defense Pest Management Program |
| Executive Order 12088 |
| Prevention, Control, and Abatement of Environmental Pollution at Federal Installations |
| Federal Aviation Regulation, Part 137 |
| Agricultural Aircraft Operations |
| MCO _ P11000.7c |
| Work Control |
| NAVFAC MO-114 |
| Maintenance and Operations of Building Plumbing, Heating, and Ventilation Systems (Volumes I, II, and III). |
| NAVFAC MO-118 |
| Inspection of Vertical Transportation Equipment |
| NAVFAC MO-205 |
| Central Heat & Steam Electric Generating Plants (Volumes I – V) |
| NAVFAC MO-206 |
| Operation and Maintenance of Air Compressor Plants |
| NAVFAC MO-209 |
| Maintenance of Steam, Hot Water, and Compressed Air Distribution Systems |
| NAVFAC MO-230 |
| Petroleum Fuel Facilities |
| NAVFAC MO-306 |
| Cathodic Protection |
| NAVFAC MO-307 |
| Corrosion Control |
| NAVFAC MO-321 |
| Facilities Management |
| NAVFAC MO-322 |
| Inspection of Shore Facilities |
| NAVFAC MO-324 |
| Inspection and Certification of Boilers & Unfired Pressure Vessels |
| NAVFAC MO-ll5 |
| Maintenance and Operations of Refrigeration and Air Conditioning Systems and HVAC Controls (Volumes I, II, and III) |
| NAVFAC P-307 |
| Management of Weight Handling Equipment |
| NAVFAC P-307 |
| Management of Weight Handling Equipment |
| NAVFAC P-309 |
| Color Coding for Naval Shore Facilities |
| NAVFAC P-5055 Series |
| Radiation Health Protection Manual |
| NAVFACINST 11300.27B |
| Environmental Quality Boiler Tune Up Program |
| NAVFACINST 11300.28 |
| Boiler Efficiency Improvement Program |
| NAVFACINST 11300.33 |
| Handling, Storage, and Inspection of Shore to Ship Steam Hoses |
| NAVFACINST 11300.34 |
| Color Coding Information |
| NAVFACINST 11300.36 |
| O&M Guidelines for Shore Activity Power Generation and Heating Equipment |
| NAVFACINST 11300.37 |
| Energy and Utilities Policy |
| NAVFACINST 11300.7 |
| Minimum Attendance for Shore Boiler Plants |
| NAVFACINST 4790.1 Series |
| Pressure Testing of Steam and Air Hoses |
| NAVMED P-5055 Series |
| Radiation Health Protection Manual |
| NEESA 20.2-028B |
| PCB Program Management Guide |
| NFGS-l520, l5705, and l5707. |
| NAVFAC Specifications |
| NIST Handbook 44 |
| Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices |
| OPNAV Instruction 6250.4C |
| Navy Pest Management Programs |
| OPNAVINST 4790.1 |
| Par 10.6.11.3 |
| OPNAVINST 5090.1C |
| Environmental Readiness Program Manual, Chapter 17: Pesticide Compliance Ashore |
| OPNAVINST 5100 |
| Par 10.6.11.3 |
| OPNAVINST 5100.23 Series |
| Navy Safety and Occupational Health Manual |
| OPNAVINST 5100.8 Series |
| Navy Safety and Occupational Health (NAVOSH) Program |
| OPNAVINST 5530.14 |
| Physical Security and Loss Prevention Manual |
| OPNAVINST 6470.3 Series |
| Navy Radiation Safety Committee |
SECNAV
| U.S. Department of Agriculture (USDA) Publications |
| Federal Seed Act 7 U.S.C. |
| UFC 3-430-07 |
| Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels |
ATTACHMENT J-1502000-03
SITE MAPS
Maps are available via Contracting Officer after award
ATTACHMENT J-1502000-04
HISTORICALVOLUME OF SERVICE ORDER WORKLOAD
| Labor Categories |
| Emergency Service Orders |
| Urgent Service Orders |
| Routine Service Orders |
Breathing air
| Ceiling roof leak |
| 10 |
| 9 |
| 465 |
Concrete
Fire
Gate
Gutter
HAZMAT
Hood
Light
Locks
Mold
Painting
Pest
Pothole
Refuse
Sewer leak
STRU?
Surfaces
| Utility location marking |
| 10 |
| 3 |
| 199 |
| Total Service Orders |
| 72 |
| 97 |
| 6997 |
ATTACHMENT J-1502000-05
HVAC Water Treatment Inventory
Open Loops
Evapco
BAC
Marley
Marley
Evapco
BAC
BAC
Evapco
Closed Loops
| Facility # |
| Quantity |
| Type |
| Note |
Chilled Water Loop
Hot Water Loop
Chilled Water Loop
| 496 |
| 1 |
| Ground Water Loop |
| 496 and 497 share the Chilled Water loop |
| 1281 |
| 1 |
| Chilled Water Loop |
| 3451 |
| 1 |
| Chilled Water Loop |
| 3542 |
| 1 |
| Chilled Water Loop |
| 3898 |
| 1 |
| Chilled Water Loop |
| 3998 |
| 1 |
| Chilled Water Loop |
Chilled Water Loop
| 4166 |
| 1 |
| Chilled Water Loop |
| 4167 |
| 1 |
| Chilled Water Loop |
| 4168 |
| 1 |
| Chilled Water Loop |
| 4169 |
| 1 |
| Chilled Water Loop |
| 4197 |
| 1 |
| Chilled Water Loop |
| 4198 |
| 1 |
| Chilled Water Loop |
| 4199 |
| 1 |
| Chilled Water Loop |
| 4200 |
| 1 |
| Chilled Water Loop |
| 4280 |
| 1 |
| Chilled Water Loop |
| 4294 |
| 1 |
| Chilled Water Loop |
| 4295 |
| 1 |
| Chilled Water Loop |
| 4296 |
| 1 |
| Chilled Water Loop |
Chilled Water Loop
| 4310 |
| 1 |
| Chilled Water Loop |
| 4311 |
| 1 |
| Chilled Water Loop |
| 4312 |
| 1 |
| Chilled Water Loop |
| 4313 |
| 1 |
| Chilled Water Loop |
| 4335 |
| 1 |
| Chilled Water Loop |
| 4401 |
| 1 |
| Chilled Water Loop |
| 4629 |
| 1 |
| Chilled Water Loop |
| 4843 |
| 1 |
| Chilled Water Loop |
| 4845 |
| 1 |
| Chilled Water Loop |
| 4859 |
| 1 |
| Chilled Water Loop |
| 4867 |
| 1 |
| Chilled Water Loop |
| These two buildings share the same chilled water loop |
| 4881 |
| 2 |
| Chilled Water Loop |
| 4948 |
| 1 |
| Chilled Water Loop |
ATTACHMENT J-1502000-06
BOILER AND UPV INVENTORY
| Facility # |
| Structure |
| Description |
| Equip # |
| Manufacturer |
| Capacity |
| Fuel |
| 152 |
| CHP |
| Steam |
| 1 |
| KEELER |
| 120,000,000 |
| #6 |
| 152 |
| CHP |
| Steam |
| 2 |
| KEELER |
| 120,000,000 |
| #6 |
| 152 |
| CHP |
| Steam |
| 3 |
| INTERNATIONAL |
| 80,000,000 |
| #2 |
| 152 |
| CHP |
| Steam |
| 4 |
| INTERNATIONAL |
| 80,000,000 |
| #2 |
| 192 |
| FIRE STATION #2 |
| H Water |
| 116 |
| PEERLESS |
| 209,000 |
| #2 |
| 199 |
| TOWER |
| Steam |
| G9 |
| KEWANEE |
| 2,650,000 |
| LP GAS |
| 287 |
| GYM |
| Steam |
| 129 |
| Mr. STEAM |
| 41,040 |
| ELECT. |
| 287 |
| STATION GYM /OOC |
| Steam |
| G19 |
| A.O. SMITH |
| 675,000 |
| LP GAS |
| 486 |
| BOQ-4 |
| H Water |
| 94 |
| BRYAN |
| 420,000 |
| #2 |
| 486 |
| BOQ-4 |
| H Water |
| 110 |
| BRYAN |
| 420,000 |
| #2 |
| 487 |
| BOQ-1 |
| Steam |
| 86 |
| BRYAN |
| 650,000 |
| #2 |
| 487 |
| BOQ-1 |
| Steam |
| 95 |
| BRYAN |
| 650,000 |
| #2 |
| 1229 |
| MAG 32 |
| H Water |
| 70 |
| PEERLESS |
| 209,000 |
| #2 |
| 1281 |
| BOWLING CENTER /OOC |
| H Water |
| G1 |
| TELEDYNE LAARS |
| 500,000 |
| LP GAS |
| 1665 |
| VMA-231 |
| H Water |
| G12 |
| A.O. SMITH |
| 480,000 |
| LP GAS |
| 1667 |
| VMAT-202 |
| H Water |
| G13 |
| A.O. SMITH |
| 480,000 |
| LP GAS |
| 1777 |
| MACS 6 |
| H Water |
| 112 |
| BURNHAM |
| 680,000 |
| #2 |
| 1779 |
| 3rd LAAM / OOC |
| Steam |
| 74 |
| WEIL-McLAIN |
| 400,000 |
| #2 |
| 1780 |
| 3rd LAAM / OOC |
| Steam |
| 75 |
| WEIL-McLAIN |
| 1,150,000 |
| #2 |
| 1781 |
| 3rd LAAM / OOC |
| Steam |
| 76 |
| WEIL-McLAIN |
| 400,000 |
| #2 |
| 1782 |
| 3rd LAAM / OOC |
| Steam |
| 77 |
| BURNHAM |
| 620,000 |
| #2 |
| 1783 |
| 3rd LAAM / OOC |
| Steam |
| 79 |
| WEIL-McLAIN |
| 400,000 |
| #2 |
| 1786 |
| MACS-6 |
| H Water |
| 122 |
| SMITH |
| 359,000 |
| #2 |
| 1787 |
| MACS-6 |
| H Water |
| 80 |
| PEERLESS |
| 431,000 |
| #2 |
| 1791 |
| FIRE/CRASH |
| H Water |
| 100 |
| PEERLESS |
| 529,600 |
| #2 |
| 1795 |
| AWTU-2 |
| H Water |
| 113 |
| BURNHAM |
| 346,000 |
| #2 |
| 1799 |
| MASS-1 |
| Steam |
| 83 |
| PEERLESS |
| 215,000 |
| #2 |
| 3452 |
| LAUNDRY DRY LAYUP |
| Steam |
| G6 |
| BURNHAM |
| 2,070,000 |
| LP GAS |
| 3542 |
| ANDY'S |
| Steam |
| G39 |
| WEIL McLAIN |
| 764,000 |
| LP GAS |
| 3542 |
| ANDY'S |
| H Water |
| G15 |
| A.O. SMITH |
| 480,000 |
| LP GAS |
| 3673 |
| BEQ-1 |
| H Water |
| G16 |
| A.O. SMITH |
| 860,000 |
| LP GAS |
| 3742 |
| BEQ-2 |
| H Water |
| G17 |
| A.O. SMITH |
| 860,000 |
| LP GAS |
| 3916 |
| MAINT. SHOP |
| H Water |
| 96 |
| PERLESS |
| 575,000 |
| #2 |
| 3919 |
| MAINT. FAC. |
| H Water |
| 98 |
| BURNHAM |
| 808,000 |
| #2 |
| 3957 |
| TRAINING POOL * |
| H Water |
| G18 |
| A.O. SMITH |
| 480,000 |
| LP GAS |
| 4041 |
| ACROSS RUNWAY |
| H Water |
| 107 |
| BURNHAM |
| 137,400 |
| #2 |
| 4049 |
| MAINT. FAC. |
| H Water |
| 106 |
| PEERLESS |
| 840,000 |
| #2 |
| 4066 |
| FLIGHT SIMULATOR |
| H Water |
| G2 |
| TELEDYNE LAARS |
| 1,000,000 |
| LP GAS |
| 4166 |
| BEQ |
| H Water |
| G20 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4167 |
| BEQ |
| H Water |
| G21 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4168 |
| BEQ |
| H Water |
| G22 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4169 |
| BEQ |
| H Water |
| G23 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4197 |
| BEQ |
| H Water |
| G24 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4198 |
| BEQ |
| H Water |
| G25 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4199 |
| BEQ |
| H Water |
| G26 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4200 |
| BEQ |
| H Water |
| G27 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4201 |
| BEQ |
| H Water |
| G28 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4210 |
| DEBARAKATION |
| Steam |
| G7 |
| RITE ENG. AND MFG |
| 1,010,000 |
| LP GAS |
| 4213 |
| TRAINER FAC. |
| H Water |
| 111 |
| BURNHAM |
| 539,000 |
| #2 |
| 4280 |
| DDS TACT |
| H Water |
| G3 |
| TELEDYNE LAARS |
| 715,000 |
| LP GAS |
| 4294 |
| BEQ |
| H Water |
| G29 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4295 |
| BEQ |
| H Water |
| G30 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4296 |
| BEQ |
| H Water |
| G31 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4298 |
| CHILD CARE |
| H Water |
| 115 |
| PERLESS |
| 575,000 |
| #2 |
| 4310 |
| BEQ |
| H Water |
| G32 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4311 |
| BEQ |
| H Water |
| G33 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4312 |
| BEQ |
| H Water |
| G34 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4313 |
| BEQ |
| H Water |
| G35 |
| TELEDYNE LAARS |
| 600,000 |
| LP GAS |
| 4335 |
| INSTR. BLDG. |
| H Water |
| G4 |
| PEERLESS |
| 649,000 |
| LP GAS |
| 4344 |
| 27 HEADQTRS |
| H Water |
| 117 |
| PEERLESS |
| 390,000 |
| #2 |
| 4397 |
| COMMUNICATIONS |
| H Water |
| G5 |
| TELEDYNE LAARS |
| 500,000 |
| LP GAS |
| 4401 |
| AIR OPS. FAC. |
| H Water |
| 120 |
| PEERLESS |
| 625,000 |
| #2 |
| 4402 |
| WAREHOUSE |
| H Water |
| 119 |
| SMITH |
| 560,000 |
| #2 |
| 4464 |
| WAREHOUSE |
| H Water |
| G8 |
| BURNHAM |
| 1,275,000 |
| LP GAS |
| 4465 |
| WAREHOUSE |
| H Water |
| 123 |
| HURST |
| 536,000 |
| #2 |
| 4470 |
| NADEP/ OOC |
| H Water |
| G10 |
| PETERSON KELLY CO |
| 1,200,000 |
| LP GAS |
| 4563 |
| OPS BLDG |
| H Water |
| 124 |
| CLEAN BURN INC |
| 360,000 |
| #2 |
| 4564 |
| REFUEL MAINT |
| H Water |
| 125 |
| CLEAN BURN INC |
| 240,000 |
| #2 |
| 4571 |
| ENG/MAINT |
| H Water |
| 126 |
| CLEAN BURN INC |
| 360,000 |
| #2 |
| 4571 |
| ENG/MAINT |
| H Water |
| 127 |
| CLEAN BURN INC |
| 360,000 |
| #2 |
| 4576 |
| MOTOR "T" |
| H Water |
| 128 |
| CLEAN BURN INC |
| 240,000 |
| #2 |
| 4629 |
| CHILD DEVELOPMENT |
| H Water |
| G36 |
| A.O. SMITH |
| 450,000 |
| LP GAS |
| 4629 |
| CHILD DEVELOPMENT |
| H Water |
| G37 |
| A.O. SMITH |
| 450,000 |
| LP GAS |
| 4629 |
| CHILD DEVELOPMENT |
| H Water |
| G38 |
| A.O. SMITH |
| 300,000 |
| LP GAS |
| 4639 |
| SEWAGE PLANT |
| H Water |
| 1 |
| BETHLEHAM |
| 600,000 |
| #2 |
| 4639 |
| SEWAGE PLANT |
| H Water |
| 2 |
| BETHLEHAM |
| 600,000 |
| #2 |
| 4639 |
| SEWAGE PLANT |
| H Water |
| 3 |
| HAYES |
| 632,000 |
| #2 |
| 4810 |
| ORDNANCE |
| H Water |
| 97 |
| PEERLESS |
| 144,000 |
| #2 |
| 4810 |
| ORDNANCE |
| H Water |
| 97 |
| PEERLESS |
| 92,000 |
| #2 |
| 4845 |
| UAV |
| H Water |
| G1 |
| FULTON |
| 1,000,000 |
| LP GAS |
| 7019 |
| ATLANTIC |
| H Water |
| G42 |
| WEIL McLAIN |
| 641,000 |
| LP GAS |
| 8048 |
| BOGUE FIELD |
| H Water |
| G11 |
| SMITH |
| 359,000 |
| LP GAS |
| 8052 |
| BOGUE MESS HALL |
| H Water |
| 3 |
| PEERLESS |
| 955,000 |
| #2 |
ATTACHMENT J-1502000-07
CO2 Fire Suppression Systems Inventory
CO2 Fire Suppression System, Bldg. 4066 AV-8B Flight Simulator building. Cherry Point
Tank
| Serial No. |
| Full Weight |
| Actual Weight |
Hydro-Test Date
| 1 |
| TWH-147513 |
| 224.6 |
| 225 |
| 2012 |
| 2 |
| TWH-122659 |
| 220.8 |
| 221 |
| 2012 |
| 3 |
| TWH-147390 |
| 219.6 |
| 220 |
| 2012 |
| 4 |
| TWH-122532 |
| 218.6 |
| 219 |
| 2012 |
| 5 |
| TWH-147639 |
| 219.0 |
| 220 |
| 2012 |
| 6 |
| TWH-147606 |
| 218.4 |
| 219 |
| 2008 |
| 7 |
| TWH-147557 |
| 219.8 |
| 220 |
| 2012 |
CO2 Hand Hose Line System, Bldg. 199, Air Traffic Control Center and Building Cherry Point
Tank/ Location
Model Number
Agent Weight
| RM 137 Radar Shop |
| FT000227 |
| 3M Novec 1230 Fire |
| 421 lbs. |
| RM 151 IFR Room |
| FT000153 |
| Protection System |
| 321 lbs. |
331 lbs.
490 lbs.
ATTACHMENT J-1502000-07-01.
Gaylord/Ansul Hoods and Ducts
| Facility # |
| Name/Description |
| Manufacturer |
| Model |
| Master Cylinder Size |
| Fuse links |
| 3451 |
| Main Galley |
| All wet agent cylinders are 3 gallons in volume and are 21" tall and 7"in diameter |
| 3451 |
| System 2.10 |
| Ansul |
| R-102 |
| Three Tanks |
| Six 350⁰F and one 500⁰ |
| 3451 |
| System 2.29 |
| Ansul |
| R-102 |
| Three Tanks |
| Six 360⁰F |
| 3451 |
| System 2.47 |
| Ansul |
| R-102 |
| Two Tanks |
| Four 360⁰F |
| 3451 |
| System 4.04 |
| Ansul |
| R-102 |
| One Tank |
| One 360⁰F |
| 3451 |
| System 4.24 |
| Ansul |
| R-102 |
| One Tank |
| 3451 |
| System 5.08 |
| Ansul |
| R-102 |
| One Tank |
| Two 360⁰F |
| 3451 |
| System 5.46 |
| Ansul |
| R-102 |
| One Tank |
| One 360⁰F |
| 193 |
| Wall, right end of hood |
| Pyrochem |
| PCL165 |
| 1.65 Gallons |
| One 450⁰F |
| 4221 |
| Left side of hood |
| Ansul |
| I-25A |
| 35 lbs. |
| One 165⁰F |
| 4629 |
| CP-CDC |
| Pyrochem |
| PLC 350 |
| 3.5 Gallons |
| Three 450⁰F |
| 4859 |
| CP-CDC |
| Ansul |
| R-102 |
| 1.5 Gallons |
| Three 450⁰F |
| 7019 |
| Atlantic Field |
| Protex II PC 1600 |
| Wet Chemical System0 |
| 8052 |
| Bogue Field |
| Protex |
| L3000 |
| 3.0 Gallons |
| Three 450⁰F |
| 8052 |
| Bogue Field |
| Protex |
| L3000 |
| 3.0 Gallons |
| Two 450⁰F |
| 8049 |
| Bogue Field |
| Guardian III-B |
| G300-B Wet Chemical System |
RELATED INFORMATION FOR GAYLORD AND ANSUL FIRE SUPPRESSION SYSTEMS
MAINTENANCE, TESTING, CERTIFY GAYLORD, AND ANSUL FIRE SUPPRESSION SYSTEMS
SUGGESTED EFFORTS THAT HAVE RESULTED IN A SATISFACTORY RESULTS.
CONTRACTOR SHALL PERFORM THE FOLLWING ON GAYLORD AND ANSUL FIRE SYSTEMS
Semi-Monthly (every two weeks); Check detergent tank and fill with OEM recommended G510 Detergent at all locations. Clean and maintain cleanliness of the hoods, UV lamps, and ventilation system associated with hood to include filters with appropriate detergent/cleaner in Bldgs. 3451 and 8052.
Monthly; Check and clean all system fittings, Clean hood, UV lamps, and associated components with appropriate detergent/cleaner, and check and clean main grease gutters.
Bi-Monthly (every two months or six times a year) service plus check all system fittings, check inside of hoods for adequate cleaning, and check main grease gutter for foreign materials.
Semi-Annual; Monthly service plus check exhaust fans, adjust belts or replace if needed, lubricate bearings, check air velocity, test “internal fire mode” clean detergent tank, and foot valve. Test and certify Quencher Fire Systems, Test and change fusible links and certify Ansul System.
Semi-Annual and Annual Fire Suppression System Maintenance for Building 193;
Perform Semi-Annual and Annual Maintenance for Wet Chemical Kitchen Hood Fire Suppression System as required by NFPA 17A and OEM Maintenance requirements.
(1) 450 Fusible Link Replacement.
(1) CO2 Cartridge Replacement (Annually).
Semi-Annual and Annual Fume Hood Fire Suppression System Maintenance for Building 4221:
Perform Semi-Annual and Annual Maintenance for Dry Chemical Fume Hood Fire Suppression System as required by FRPA 17 and OEM Maintenance requirements.
(1) 212 Fusible Link Replacement.
ATTACHMENT J-1502000-07-02
FIRE ALARM/SMOKE DETECTION SYSTEM INVENTORY
Location: Buildings 902 and 903 (AV8B storage facility)
| Qty. |
| Part Number |
| Description |
| 2 |
| MSE-3L |
| Siemens MXL-IQ Enclosure |
| 2 |
| SMB-2 |
| Siemens Mainboard / CPU |
| 2 |
| MOM-4 |
| Accessory Motherboard |
| 2 |
| CSM-4 |
| Dual Circuit Output Module |
| 2 |
| PLM-1 |
| Power Limited Module |
| 2 |
| MKB-4 |
| Control / Display Module |
| 10 |
| MSI-10B |
| Addressable Manual Pull Station |
| 10 |
| SB-5R |
| Pull Station Backbox (surface) |
| 2 |
| FP-11 |
| Addressable Photo Smoke Detector |
| 2 |
| TRI-S |
| Addressable Input Module |
| 6 |
| PB-1191 |
| Beam Smoke Detector |
| 6 |
| PBB-1191 |
| Beam Smoke detector Base |
| 24 |
| PBR-1192 |
| 20cm x 20cm Reflector |
| 6 |
| CZM-1 |
| Addressable Beam Monitor Module |
| 2 |
| ASHP |
| Federal Signal Horn (red) |
| 2 |
| UTM |
| Federal Signal Tone Module |
| 2 |
| MT-24 |
| LSM-VFR Wheelock Horn / Strobe |
| 2 |
| DC-MAX-R |
| Wheelock Outdoor Strobe (red) |
| 4 |
| PS12260 |
| Power Sonic 12v 26 ah Batteries |
ATTACHMENT J-1502000-08
Vertical Transportation Equipment (VTE)
P= Passenger, M= Material Lift, F=Freight, D= Dumb-waiter, H=Handicap Lift
| Facility |
| Elevator No. |
| Floors |
| Use |
| Capacity |
| Type |
| Manufacturer |
| 6 Month Cert |
| Yearly Cert |
| 5 year |
Cert
DLA
| 159 |
| 36 |
| 2 |
| P |
| 2000 |
| Hydraulic |
| Southern |
| June 2018 |
FRCE
| 129 |
| 20 |
| 2 |
| P |
| 2500 |
| Hydraulic |
| Dover |
| June 2018 |
| 133 |
| 18 |
| 2 |
| P |
| 2500 |
| Hydraulic |
| ESCO |
| June 2018 |
| 133 |
| 14 |
| 2 |
| M |
| 4000 |
| Hydraulic |
| Southworth |
| June 2018 |
| 133 |
| 15 |
| 2 |
| F |
| 6000 |
| Electric |
| Eagle Air |
| June 2018 |
| 133 |
| 17 No Cert |
| 2 |
| F |
| 6000 |
| Electric |
| Ordnance Corp |
| June 2018 |
| 133 |
| 19 |
| 2 |
| H |
| 750 |
| Hydraulic |
| Porch Lift |
| June 2018 |
| 137 |
| Mezz F 4 |
| 2 |
| F |
| 3000 |
| Hydraulic |
| Ordnance Corp. |
| June 2018 |
| 137 |
| Mezz G 11 |
| 2 |
| F |
| 6000 |
| Hydraulic |
| Ordnance Corp. |
| June 2018 |
| 137 |
| Mezz F 10 |
| 2 |
| F |
| 6000 |
| Hydraulic |
| OCS |
| June 2018 |
| 137 |
| 01 |
| 2 |
| F |
| 4000 |
| Electric |
| Eagle Aircraft |
| June 2018 |
| 137 |
| 07 |
| 2 |
| H |
| 750 |
| Hydraulic |
| Porch Lift |
| June 2018 |
| 137 |
| 39 |
| 2 |
| H |
| 750 |
| Electric |
| Garaventa |
| June 2018 |
| 200 |
| 21 |
| 2 |
| F |
| 2000 |
| Hydraulic |
| Thyssen Krupp |
| June 2018 |
| 245 |
| 22 |
| 2 |
| P |
| 2500 |
| Hydraulic |
| Dover |
| June 2018 |
| 4032 |
| 23 *No Cert |
| 2 |
| F |
| 2500 |
| Electric |
| Southworth |
| June 2018 |
| 4032 |
| 24 *No Cert |
| 2 |
| F |
| UNK |
| Electric |
| Giant Lift |
| June 2018 |
| 4032 |
| 28 |
| 2 |
| D |
| 750 |
| Mechanical |
| American Stair Glide |
| June 2018 |
| 4224 |
| 32 |
| 2 |
| F |
| 6000 |
| Hydraulic |
| Alabama |
| June 2018 |
| 4224 |
| 26 *No Cert |
| 2 |
| F |
| 3000 |
| Electric |
| Southworth |
| June 2018 |
| 4224 |
| 27 |
| 2 |
| P |
| 2000 |
| Electric |
| Alabama |
| June 2018 |
| 4224 |
| 31 |
| 2 |
| F |
| 2000 |
| Electric |
| Southworth |
| June 2018 |
| 4224 |
| 40 |
| 2 |
| H |
| 750 |
| Electric |
| Garaventa |
| June 2018 |
| 4225 |
| 34 |
| 2 |
| P |
| 2000 |
| Hydraulic |
| Montgomery |
| June 2018 |
| 4414 |
| 1 |
| 3 |
| P |
| 4500 |
| Hydraulic |
| Dover |
| June 2018 |
| 4470 |
| 35 |
| 2 |
| P |
| 2500 |
| Hydraulic |
| Dover |
| June 2018 |
| 4841 |
| 1 |
| 2 |
| P |
| 3500 |
| Hydraulic |
| Delaware |
| June 2018 |
FMD
| 1 |
| BLD # 1 |
| 2 |
| P |
| 2500 |
| Hydraulic |
| Delaware |
| June 2018 |
| 159 |
| 159 #37 42703 |
| 2 |
| D |
| 100 |
| Electric |
| East Elect. |
| June 2018 |
| 219 |
| 1 1 |
| 2 |
| P |
| 2500 |
| Hydraulic |
| Webster |
| July 2019 |
| 2 |
| P |
| 2500 |
| Hydraulic |
| Webster |
| June 2018 |
| 2 |
| D |
| 100 |
| Electric |
| MATOT |
| June 2018 |
| 4327 |
| 1 |
| 6 |
| P |
| 2500 |
| Electric |
| Central Elev. Sys |
| June 2018 |
| 4335 |
| 1 |
| 2 |
| P |
| 2000 |
| Hydraulic |
| Dover |
| June 2018 |
| 4356 |
| 1 EP-60 |
| 3 |
| P |
| 2500 |
| Oildraulic |
| Dover |
| June 2018 |
| 2 |
| P |
| 2500 |
| Hydraulic |
| National |
| June 2018 |
| 4867 |
| 1 |
| 4 |
| P |
| 3500 |
| Hydraulic |
| Delaware |
| June 2018 |
| 4868 |
| 1 |
| 4 |
| P |
| 3500 |
| Hydraulic |
| Delaware |
| June 2018 |
| 4 |
| P |
| 3500 |
| Hydraulic |
| Mowery |
| June 2018 |
| 4 |
| P |
| 3500 |
| Hydraulic |
| Mowery |
| June 2018 |
| 4 |
| P |
| 3500 |
| Hydraulic |
| Mowery |
| June 2018 |
| 4 |
| P |
| 3500 |
| Hydraulic |
| Mowery |
| June 2018 |
NAVAL HEALTH CLINIC
| 4389 |
| 1 |
| 3 |
| P |
| 3500 |
| Oildraulic |
| Dover |
| June 2018 |
| 4389 |
| 2 |
| 3 |
| P |
| 3500 |
| Oildraulic |
| Dover |
| June 2018 |
| 4389 |
| 3 |
| 3 |
| P |
| 4500 |
| Oildraulic |
| Dover |
| June 2018 |
| 4389 |
| 4 |
| 3 |
| P |
| 4500 |
| Oildraulic |
| Dover |
| June 2018 |
| 4389 |
| 5 |
| 3 |
| P |
| 3500 |
| Oildraulic |
| Dover |
| June 2018 |
ATTACHMENT J-1502000-09
Medical Gas Delivery System inventory
| Facility Name |
| Equipment |
| Quantity of test items |
| Number of locations |
NAVAL HEALTH CLINIC
| Central Supply Sources |
| Air Compressor |
| 2 sources |
| 2 |
| Pipeline Network Components |
| Outlets/Inlets |
| 475 outlets/inlet s |
| Alarms Panels |
| Area Alarm Panels |
| 3 alarm conditions |
| 17 panels |
Master Alarm Panels
(*Total number of Central Supply Systems=O2, N2O, N2, MA, Vac,…)
| On Site Analysis |
| Medical Air |
| 4 samples |
ATTACHMENT J-1502000-10
AV8B Engine Test Cell Inventory
| Facility # |
| Name/Description |
| Equip # |
| Manufacturer |
| Model No. |
| Serial No. |
| Year Purchase |
RELOCATABLE AV8B ENGINE TEST STAND PM MANUFACTURER’S RECOMMENDED MAINTENANCE
MAIN ENTRANCE DOORS
I. 30 Days Inspect/Replace Filter Elements Combination Regulator Filter:
a. Secure the compressed air supply to the main door pneumatic control assembly by closing the shut off valve.
b. Check the 25-micron element in filter bowl of the Combination Regulator.
c. Replace element if it is dirty or clogged.
d. When complete, restore the compressed air supply by placing the shut off valve in the open position.
II. 30 Days Inspect/Fill Lubricant Fluid Combination Regulator Filter
a. Secure the compressed Air supply to main door pneumatic control assembly by closing the shut off valve.
b. Check fluid level in combination regulator lubricator.
c. Add fluid if fluid level is below the level line.
d. When complete, restore the compressed air supply by placing the shutoff valve in the open position.
III. 90 days inspection:
a. Inspect air lines, control valves, and actuators for leaks
b. Inspect electrical for broken worn, or loose wiring.
c. Inspect latching mechanism (latches, rods, etc.) for condition and freedom of movement.
d. Inspect door leaf hinges for conditions and freedom of movement.
e. Inspect the door seal for condition.
f. Inspect the latch receptacles for distortion and freedom from dirt.
g. Note any deficiencies from above inspection.
IV. 6-month inspection Lubricates Hinges and Latches:
a. Apply Exxon Beacon Lube P920 (or equivalent) to grease fitting for each hinges pin.
b. Apply several drops of Exxon Terasstic 52 (or Equivalent) to the sintered bronze thrust washer on the latch pivot points, rods and bearings on linkage and operating handle.
c. Wipe Latch Keeper Cylinder Rod with a rag dampened with Exxon Terasstic 52 (or equivalent).
d. Cycle the cylinder to work the lubricant into the glands.
AIR START SYSTEM:
I. 150 hours Changing Coolant 50hp Compressor:
a. Shut down compressor using normal shut down procedures.
b. Place a suitable container close to the drain valve.
c. Slowly remove the fill/vent cap.
d. Remove plug from drain valve
e. Open the drain valve and drain coolant into container.
f. Close drain valve.
g. Replace plug in drain valve.
h. Refill the machine following the top up coolant procedure.
II. Yearly Air Filter Indicator 50hp Compressor:
a. Shut down compressor using normal shut down procedures.
b. Check the condition of the filter.
c. Change filter if needed. (Dusty environments require more frequent replacement).
d. Indicator should be checked with unit stopped.
e. Restart compressor using standard restart procedures.
III. Yearly Change Coolant Filter 50hp Compressor:
a. Shut down compressor using normal shut down procedures.
b. Loosen the existing filter.
c. Remove the filter from housing.
d. Replace the old filter in a sealed bag and dispose of in a safe way.
e. Clean the mating face of the housing. Take care to avoid any particles entering the machine.
f. Apply a small amount of lubrication to the new filter seal.
g. Screw the new filter down until the seal makes contract with the housing, then hand tighten a half turn further.
h. Restart Compressor using the standard restart procedure.
i. Check for any leaks.
IV. Yearly Change Separator Cartridges 50hp Compressor:
a. Shut down compressor using normal shut down procedures.
b. Loosen the separator cartridges.
c. Remove the cartridges from the housing.
d. Place the old cartridges in a sealed bag and dispose of safely.
e. Clean the mating face of the housing.
f. Apply small amount of lubricant to the cartridge seal.
g. Screw the new cartridge down until the seal makes contact with the housing, then hand tighten a half turn further.
h. Restart compressor using standard restart procedure.
i. Check for leaks.
V. 3 Months Change Filter Desiccant Dryer:
a. Shut down compressor using normal shut down procedures.
b. Isolate the filter by closing the manual valves before and after the filter.
c. Completely depressurize the filter.
d. Remove the nuts from the manway yoke assembly in the top head.
NOTE: be sure to have hold of the manway cover as to not lose it into the filter.
e. Remove the wing nut from the filter top plate and remove the plate.
f. Remove the elements from the filter housing.
g. Inspect the filter base plate, T-bar, and filter union. Replace as needed.
h. Install new element and hardware.
i. Replace cover plate, and wing nut.
j. Replace manway cover plate, installing a new gasket, then re-attach yoke assembly and tighten.
k. Slowly re-pressurize the filter and place back into service.
COMPRESSED AIR SYSTEM
I. 3 Month Pressure Switch Adjustment (Air Compressor)
a. Disconnect, lock and tag main power supply before making adjustments.
b. Remove the pressure switch cover.
c. Adjust the range by turning the range adjustment screw clockwise (in) to increase the cut out point or counter clockwise (out) to decrease the cut point.
NOTE: One full turn changes the setting approximately 2 PSIG.
d. Replace the pressure switch cover.
e. Reconnect the power supply.
f. Start the compressor.
g. Note the pressure gauge reading at which the compressor cuts out.
h. Repeat the adjustment procedures if necessary.
II. 3 Month Oil Change (Air Compressor):
a. Verify that the compressor is NOT running.
b. 2. Remove the oil drain plug and allow the lubricant to drain into suitable container.
c. Replace the oil drain plug.
d. Unscrew and remove the oil fill plug.
e. Fill the crankcase with XL-300 petroleum based lubricant.
f. Replace the oil fill plug HAND TIGHT ONLY.
III. 3 Month Pilot Valve Adjustment (Air Compressor):
a. Stop the unit and disconnect and tag electrical supply main switch to prevent accentual start up.
b. Remove the pilot valve tube and tube fitting.
c. Remove the pilot valve body and all existing shims.
d. Screw the pilot valve body back into the frame end cover (without any shims) until contact with the thrust pin is felt. Advance the pilot valve body ¼ turn to ½ turn more. If contact with the thrust pin cannot be felt, the following steps may be necessary to locate the contact point
(1) Insert small instrument (punch, rod, nail, etc.) into end of the pilot valve until it contacts the valve stem.
(2) While still inserted in the pilot valve, make a mark on the instrument even with the outside edge of the pilot valve body.
(3) Keeping the instrument pressed lightly against the valve stem, screw the pilot valve body into the frame end cover. When the mark on the instrument starts moving out away from the edge of the pilot valve body, contact has been made with the thrust pin.
(4) Advance the pilot valve body ¼ to ½ turn more.
(5) Measure the gap between the pilot valve body and the frame end cover.
(6) Remove the pilot valve body and add enough shims to fill the gap previously measured.
(7) Screw the pilot valve body back into the frame end cover until the body is tight on the shims.
(8) Reconnect the pilot valve tube fittings.
MOVABLE TURNING VANE:
I. Yearly Annual Inspection
a. Verify calibration date of all pressure gages is less than one year.
b. Inspect condition of pneumatic and flexible electrical hoses and electrical leads.
c. Inspect all bearings (flange bearings, cylindrical cartridges, pillow blocks, etc.).
d. Inspect turning vane surface for cleanliness.
e. Note any deficiencies from above inspections.
f. Take corrective action necessary.
II. 6 Months Gear Motor Lubrication
a. Remove cover from drive unit.
b. Remove lubrication cap from worn gear reducer.
c. Remove drain plug from worn gear reducer and drain existing lubricant into container.
d. Replace drain plug.
e. Refill with new lubrication (AGMA-7)
f. Replace lubrication cap and drive unit cover.
III. 3 Months Bearing Lubrication:
a. Using the grease gun apply Mobil EP111 (or equivalent) to the grease fitting for each of the (8) pillow block bearings at the drive unit.
b. Using the grease gun, apply Mobil EP111 (or equivalent) to the grease fitting for each of the (2) flange bearings located at the turning vane pivot points.
IV. Monthly Inspection:
a. Inspect condition and security of solenoid pilot operated control valve.
b. Inspect condition and security of the filter regulator assembly and filter element.
c. Inspect flexible coupling for damage and alignment with pillow block bearing, sprockets, and gear motor.
d. Inspect sprocket roller chain, connecting links, sleeve bearing, jaw fittings, turnbuckles, and chain connector rods for security and excessive wear.
e. Inspect all electrical connections between the terminal board in the turning vane pneumatic control enclosure, the terminal board in the starter control enclosure, the limit switches, and the push button control station.
f. Inspect all exposed surfaces of the movable turning vane components for dirt and debris.
g. Inspect condition of airline tubing and fittings.
h. Inspect the turning vane latches for security and leakage.
i. Cycle the turning vane up and down to verify the function of the function of the counter weight over the travel limit switches. (Main entrance door must be open)
j. Inspect lubrication level in worm gear motor drive and idler shafts.
k. Inspect movable turning vane components for corrosion.
l. Note any deficiencies from above inspections.
m. Take corrective action as necessary.
V. 3 Months Gear Drive & Motor Replacement (if needed):
a. Ensure that the movable turning vane is full raised and latched.
b. Disconnect and lock-out electrical power at the electrical control cabinet.
c. Remove drive motor cover.
d. Disconnect wiring from the vane motor.
e. Remove the bottom cover from the counterweight guides.
f. Raise the counterweights approximately 12” with the manual hand crank (must release brake switch on motor).
g. Place adequate blocking under both counterweights, then lower the counterweights until they rest securely on the blocking and there is slack in the chains on both sides of the sprockets.
h. Mark the alignments by marking a corresponding “tooth” and “link” nearest the “top” position of the sprocket.
i. Remove the roller chain from the sprocket.
j. Loosen pillow block bearing by removing the ½” bolts which secure them. Do not loosen the pillow blocks or sprockets from the shaft.
k. Loosen the flexible coupling from the drive shaft and slip shaft outward away from the drive motor assembly.
l. Slip end shaft inward placing the flexible coupling on the drive motor shaft (rotate shaft as assembly).
m. Tighten flexible coupling on motor shaft.
n. Replace ½” bolts in pillow block bearing and tighten.
o. Manually crank motor until “marking tooth” is in the “top” position on the sprocket.
p. Re-mount chains onto sprockets making sure to align marked “tooth” and “link” in the chain.
q. Manually crank the counterweights up, removing the blocking, and lower the counterweights removing all slack from the chain.
r. Re-connect motor wiring.
s. Replace all covers.
t. Test operation of system with new components, following normal procedures.
u. Final adjustment in the roller chains can be made with the turnbuckle as necessary.
VI. 3 Months Flexible Shaft Coupling Replacement (if needed):
a. Ensure that the movable turning vane is fully raised and latched.
b. Disconnect and lock-out electrical power at the electrical control cabinet.
c. Remove the drive motor cover.
d. Remove the bottom cover from the counterweight guides.
e. Raise the counterweight approximately 12” with the manual hand crank (must release brake switch on motor).
f. Place adequate blocking under both counterweights, then lower the counterweights until they rest securely on the blocking and the is slack in the chains on both sides of the sprockets.
g. Mark the alignment by marking a corresponding “tooth” and “link” nearest the “top” position of the sprocket.
h. Remove the roller chain from the sprocket.
i. Loosen pillow block bearing by removing the ½” bolts which secure them. Do not loosen the pillow blocks or sprockets from the shaft.
j. Loosen the flexible coupling from the drive shaft and slip shaft outward away from the drive motor assembly.
k. Remove flexible coupling from the motor shaft.
l. Replace flexible coupling and tighten to motor drive shaft.
m. Slip end shaft inward into the flexible coupling on the motor drive shaft. (Rotate the shaft as necessary to place “marked tooth” in the “top” position on the sprocket).
n. Tighten flexible coupling on the end shaft.
o. Replace ½” bolts in the pillow block bearing and tighten.
p. Re-mount chains onto sprockets making sure to align marked “tooth” and “link” in the chain.
q. Manually crank the counterweights up, removing the blocking, and lower the counterweights removing all slack from the chain.
r. Replace all covers.
s. Test operation of system with new components, following normal procedures.
t. Final adjustments in the roller chain can be made with the turnbuckles as necessary.
VII. 3 Months End Chain Sprocket Replacement (if needed):
a. Ensure the movable turning vane is full raised and latched.
b. Disconnect and lock-out electrical power at the electrical control cabinet.
c. Remove the drive motor cover.
d. Remove the bottom cover from the counterweight guides.
e. Raise the counterweights approximately 12” with the manual hand crank (must release brake switch on motor).
f. Place adequate blocking under both counterweights, then lower the counterweights until they rest securely on the blocking and there is slack in the chains on both sides of the sprockets.
g. Mark the alignment by marking a corresponding “tooth” and “link” nearest the “top” position of the sprocket.
h. Remove the roller chain from the sprocket.
i. Loosen pillow block bearings by removing the ½” bolts which secure them.
j. Replace old sprockets with new and tighten on end shaft.
k. Replace ½” bolts in pillow block bearings and tighten.
l. Re-mount chains onto sprockets making sure to align marked “tooth” and “link” in the chain.
m. Manually crank the counterweights up, removing the blocking, and lower the counterweights removing all slack from the chain.
n. Replace all covers.
o. Test operation of system with new components, following normal procedures.
p. Final adjustments in the roller chains can be made with the turnbuckle as necessary.
VIII. 3 Month Counterweight Chain Sprocket Replacement (if needed):
a. Ensure the movable turning vane is full raised and latched.
b. Disconnect and lock-out electrical power at the electrical control cabinet.
c. Remove the drive motor cover.
d. Remove the bottom cover from the counterweight guides.
e. Raise the counterweights approximately 12” with the manual hand crank (must release brake switch on motor).
f. Place adequate blocking under both counterweights, then lower the counterweights until they rest securely on the blocking and there is slack in the chains on both sides of the sprockets.
g. Mark the alignment by marking a corresponding “tooth” and “link” nearest the “top” position of the sprocket.
h. Remove the roller chain from the sprocket.
i. Remove and replace sprocket at the top of the counterweight.
j. Re-mount chains onto sprocket making sure to align marked “tooth” and “link” in chain.
k. Manually crank the counterweights up, removing the blocking, and lower the counterweights removing all slack from the chain.
l. Replace all covers.
m. Test operation of system with new components following normal procedures.
n. Final adjustments in the roller chains can be made with turnbuckles as necessary.
FUEL SYSTEM: LEAK DETECTION (as needed)
I. Cleaning Leak Detection Module:
a. Use damp cloth or sponge to wipe dirt from the leak detection module.
Do not open the enclosure while the unit is wet.
Do not use solvent or abrasive cleaners.
b. Use dry cloth to remove moisture from all surfaces of leaks detection unit.
II. Replacing Fuse in Leak Detection Module:
a. Open cover on the Leak Detection Module.
b. Locate the fuse on the power supply board.
c. Replace using a 200-ma/250-V, quick acting micro fuse with F1 rating, characteristic code F.
d. Close cover on Leak Detection Module.
ATTACHMENT J-1502000-11.
Hangar Floors Locations
| Facility # |
| Name/Description |
| Square footage |
ATTACHMENT J-1502000-12
Paint Stripping Booth Locations
| Facility # |
| Name/Description |
| System |
| 250 |
| Paint Stripping Booth |
| Automated Cleaning Technologies, Inc. (ACT) STR7 Chemical Paint Stripping System |
| 4075 |
| Paint Stripping Booth |
| Cesco Aqua Miser B.O.S.S. Cleaning System |
ATTACHMENT J-1502000-13
Reverse Osmosis Systems Location
| Facility # |
| Name/Description |
| Manufacturer |
| Capacity gpm |
| Serial No. |
| Year Purchase |
| 152 |
| Central Heating Plant |
| Siemens |
| 200 |
| 110005-0300 |
| 2011 |
ATTACHMENT J-1502000-14
Ultra-Violet System location
| Facility # |
| Name/Description |
| Equip # |
| Manufacturer |
| Year Purchase |
| 4376 |
| Waste Water Treatment Plant |
TrojanUV
UV system includes but not limited to 4 banks of bulbs. Each bank has 9 racks and each rack has 6 bulbs. Total number of bulbs 216.
TYPICAL PREVENTIVE MAINTENANCE ON THE ULTRA-VIOLET
SYSTEM
Historically the following has been performed during quarterly Preventative Maintenance:
1. Verify all system components are properly adjusted and installed
2. Verify integrity of electrical connections
3. Verify all external devices are properly connected to the System Control Center
4. Confirm analog input information at the System Control Center
5. Verify communication to each module
6. Confirm all system settings and configuration data
7. Test and validate dose pacing logic. System is introduced with a simulated flow and UVT conditions to ensure correct reaction to parameter changes.
8. Clean, test, and validate operation of the on-line UVT system (if applicable)
9. Suggest UVT Calibrations by HACH (should be under HACH Service Contract for seal replacements - separate from this contract)
10. Verify level sensor operation
11. Test and validate alarm indications
12. Test and validate full control of system components
13. Provide refresher training by demonstration while performing this function.
14. Confirm correct communication to remote SCADA (if applicable)
15. Verify integrity of waterproof seals
16. Test and validate pressure relief valves on hydraulic system if applicable
17. Check hydraulic system pressures and fluid levels if applicable
18. Verify cleaning system operation where applicable Replace ACTi-gel in all wiper collars provide a report of all findings, corrective actions and recommendations at each site for each service visit.
19. Procure and install 216 UV lamps annually on a schedule approved by the KO.
20. Provide a comprehensive report of all findings, corrective actions and recommendations at the conclusion of each service visit.
21. Dispose of all materials, such as coolants, lubricants, acids etc. removed from the UV System, off this military installation at an approved State of North Carolina Disposal Site. Copies of the disposal documentation shall be submitted to the Contracting Officer and the Operator Responsible in Charge (ORC), ATTACHMENT J-1502000-15
Compressed Air System Inventory
| Facility # |
| Name/Description |
| Equip # |
| Serial No. |
| Year Purchase |
| 4357 |
| ATLAS COPCO |
| 1 |
| APF-151585 |
| 4357 |
| ATLAS COPCO |
| 2 |
| APF-155947 |
TYPICAL MAINTENANCE AND SERVICING OF THE ATLAS COPCO
COMPRESSORS
All maintenance and repair services in accordance with the provisions of OEM (Atlas Copco) and shall be an OEM (Atlas Copco) certified technician. All parts shall be OEM (Atlas Copco) original parts.
During Annual Maintenance all repairs will be done to Atlas Copco specifications. The functions listed below are typically accomplished during annual maintenance unless listed otherwise.
1. Take service readings (air, oil, and water T&P).
2. Check Change air filter elements.
3. Replace filter element gear case breather.
4. Check cycle of air intake throttle valve
5. On the 2nd and 4th year replace diaphragm of air throttle valve.
6. On the 2nd and 4th year replace shaft bushing (air intake valve).
7. On the 4th year overhaul air intake valve.
8. On the 2nd year check the function of the check valve.
9. Check Cooler functions.
10. On the 4th year overhaul check valve.
11. On the 1st and 2nd year check condition balance piston diaphragm.
12. On the 4th year change balance piston diaphragm.
13. Check and…