1502000 J FSSC Cherry filter add done.doc

DOC document 1 MB Posted

Attached to
Facility Support Services Contract for Marine Corps Air Station, Cherry Point, NC
Solicitation number
N4008520R0131
Issued by

About this file

This solicitation requests facility support services for Marine Corps Air Station Cherry Point, North Carolina and outlying fields. The contractor shall provide all labor, management, supervision, tools, material, and equipment to perform facility investment services for facilities, ground structures, and installed equipment and systems. Services include facilities, ground structures, and installed equipment and systems at Marine Corp Air Station Cherry Point North Carolina and outlying fields Bogue, Atlantic, Bt 11 and Bt 9. Bt 11 and Bt 9 are islands located in the Pamlico Sound, which are accessible only by boat. The solicitation was issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy.

View the file

Other files

File Type Posted
0005.pdf PDF
OLF and BT Information.pdf PDF
DBA.pdf PDF
0004.pdf PDF
0003.pdf PDF
0002.pdf PDF
SITE VISIT SIGN IN SHEET 20R0131-20201214061004.pdf PDF
0001.pdf PDF
ATTACHMENT D.docx DOCX document
Attachment F.docx DOCX document
ATTACHMENT C.docx DOCX document
ATTACHMENT E.docx DOCX document
J-0200000-13 ELINS.xls XLS spreadsheet
Corp Experience Form.docx DOCX document
J-1502000-16-01.pdf PDF
Copy of J-0200000-07 - SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
Sol Final.pdf PDF
2015-5781 Rev. 11.docx DOCX document
PPQ FORM.xls XLS spreadsheet
Copy of J-0200000-08- ASSET INFORMATION v2 - 2017-04-26.xlsx XLSX spreadsheet
J-1502000-16-02.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS TABLE OF CONTENTS

ATTACHMENT NUMBER
ATTACHMENT TITLE
J-1502000-01
Definitions and Acronyms
J-1502000-02
References and Technical Documents
J-1502000-03
Site Maps
J-1502000-04
Historical Volume of Service Order Workload
J-1502000-05
HVAC Water Treatment Inventory
J-1502000-06
Boiler and UPV Inventory
J-1502000-07
CO2 Fire Suppression Systems
J-1502000-07-01
Gaylord/Ansul Hoods and Ducts Inventory
J-1502000-07-02
Fire Alarm/Smoke Detection System Inventory
J-1502000-08
Vertical Transportation Equipment (VTE) inventory
J-1502000-09
Medical Gas Delivery System Inventory
J-1502000-10
AV8B Engine Test Cell Inventory
J-1502000-11
Hangar Floors Locations
J-1502000-12
Paint Stripping Booth Locations
J-1502000-13
Reverse Osmosis Systems Location
J-1502000-14
Ultra-Violet System location
J-1502000-15
Compressed Air System (Atlas Copco) Inventory
J-1502000-16
United Blower Inventory
J-1502000-16-01
United Blower Map Locations
J-1502000-16-02
United Blower Clearance Distance
J-1502000-17
Turnstile and Gate Information
J1502000-18
Performance Work Statement For Maintenance And Servicing Of Environmental Stabilization Systems Air Dehydration Units (ADU)
J-1502000-19
Scale Inventory
J-1502000-20
Flow Meter Inventory
J-1502000-21
Tool Inventory
J-1502000-22
Water Tank Cathodic Protection Inventory
J-1502000-23
Parshall Flumes Inventory
J-1502000-24
Hach Probes Analyzers and Sensors Inventory
J-1502000-25
Gas Monitoring System Inventory
J-1502000-26
Grease Trap Inventory
J-1502000-27
Sewage Plant Sludge Holding Areas
J-1502000-28
Lime Application Fields Information
J-1502000-29
Portable Toilet Workload Data
J-1502000-30
Sealed Vault Toilet Inventory
J-1502000-31
Pond Inventory
J-1502000-31-01
Annual Fish Stocking Inventory
J-1502000-31-02
Planned Pesticide Use Sheet
J-1502000-31-03
Vegetation Management Requirements
J-1502000-31-04
Pest Management Operations Report
J-1502000-32
HVAC Air Filter Inventory

ATTACHMENT J-1502000-01

DEFINITIONS AND ACRONYMS

DEFINITION
DESCRIPTION

Certified Applicator/

Operator Any individual who applies pesticides or supervises the use of pesticides, and who has been authorized to do so by successfully completing a training program approved by the EPA, followed by formal certification by DoD or a state.

Contractor's Work Plan (CWP) for Pest Control
A Contractor developed document submitted as part of the Contractor proposal that describes how the requirements of this contract will be met. The plan establishes the strategies and methods for conducting a safe, effective, and environmentally sound pest management program.
CRANE, CATEGORY 1
Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
CRANE, CATEGORY 2 & 3
Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, fixed hoists, including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
CRANE, CATEGORY 4
Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
EQUIPMENT, COLLATERAL
Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
EQUIPMENT, INSTALLED
Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
EQUIPMENT, PERSONAL PROPERTY
Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
FACILITIES LIFE CYCLE
A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
FACILITIES MAINTENANCE MANAGEMENT
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC/Marine Corps facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service calls will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Integrated Pest Management Plan (IPMP)
A required, written long-range, comprehensive planning and operational document that establishes the strategy and methods for conducting a safe, effective, and environmentally sound IPM program. IPM plans are a means of establishing and implementing installation pest management programs and function as the tool used to ensure compliance with applicable pest management laws and regulations.
LIFE-CYCLE COSTS
A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
MAINTENANCE, PREVENTIVE
Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
MANAGEMENT INFORMATION SYSTEMS-MAINTENANCE
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
Pest Control Performance Assessment Representative (PCPAR)
A DoD employee trained in pest management, who protects the government's interest through on-site performance assessment (PA) of commercial pest management contracts or other contracts that involve the use of pesticides.
Pesticide
Any substance or mixture of substances, including biological control agents, registered by EPA under FIFRA intended to destroy, repel, or mitigate pests. Includes insecticides, rodenticides, herbicides, fungicides, plant regulators, defoliants, desiccants, disinfectants, anti-fouling paints, and biocides (such as water treatment chemicals). NAVFACENGCOM pest management consultants do not approve disinfectants or biocides.
Registered Pesticide
A pesticide registered by EPA for sale and use within the United States.
REPAIR
Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.
REPLACEMENT
Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
RESTORATION
Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Safety Data Sheet (SDS)
A document (Occupational Safety and Health Administration (OSHA) Form 174, or equivalent) that accompanies a pesticide product, providing the handler with chemical information on ingredients, handling instructions, potential hazards, and manufacturer address and emergency contact information.
SERVICE ORDER
Any work required to return a facility, system, equipment or component to normal working condition. Service orders are minor facility problem requests or requests for other non-recurring work that is too small to be planned and estimated.

The purpose of a service order is to provide the Government with a means of issuing work up to a defined liability limit for requirements occurring outside of the specified recurring work. The Government may utilize service orders to accomplish any work up to the respective liability limit based on the service order classification.

SERVICE ORDER CYCLE
Count down starts when the customer is notified that the work has been accepted to be accomplished to the time when the work chit is turned in by the craftsmen as complete is one complete cycle period for a service order.
SERVICE ORDER, EMERGENCY
Emergency is defined as any facility deficiency that immediately compromises the mission or life, health and safety. Always includes, but is not limited to, failure of any utility, fire protection, environmental control, or security alarm systems.
SERVICE ORDER, ROUTINE
Routine is defined as any work requirement within the defined LOL that does not qualify as emergency or urgent.
SERVICE ORDER, URGENT
Urgent is defined as any deficiency that does not immediately endanger personnel or property, but extended delays of repairs could result in damage to Government property, or soon affect the security, health, or well-being of personnel or the continued operation of a service or system.
Surveillance
Thorough inspections or surveys conducted before or after pest management treatments or on a regular basis to determine the presence and prevalence of pests or disease vectors.
SUSTAINMENT
Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
WEIGHT HANDLING EQUIPMENT (WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.

ATTACHMENT J-1502000-01

DEFINITIONS AND ACRONYMS

Acronym
Title
BPVC
Boiler and Pressure Vessel Code
EMCS
Energy Management Control System
HVAC
Heating, Ventilation, and Air Conditioning
PTWH
Packaged Terminal Water Heaters
RPIE
Real Property Inventory Equipment
SCADA
Supervisory Control And Data Acquisition
SRM
Sustainment, Restoration and Modernization
UFC
Unified Facilities Criteria
UPV
Unfired Pressure Vessel
VTE
Vertical Transportation Equipment

ATTACHMENT J-1502000-02

REFERENCES AND TECHNICAL DOCUMENTS

Reference
Title

Pre-Acceptance Inspection and Tests of Installation of Boiler Equipment, Unfired Pressure Vessels (5 Cu. Ft. and Above), Auxiliary Fuel Incinerators, and Fire Protection Equipment).

A.S.M.E. Boiler and Pressure Vessel Codes

Sheet Metal and AC Contractors National Association Inc. (SMACMA)

Testing, Balancing, and Adjusting of Environmental Systems

Clean Air Act Amendment of 1990

National Fire Codes, Latest Edition

American Society of Heating, Refrigerating and Air Conditioning Engineers Inc. (ASHRAE) Hand Books, Latest Editions

US Air Force Model Pesticide Reduction Plan (July 1996)

16 U.S.C. 1531 et seq.
Endangered Species Act
42 U.S.C. 4321 et seq.,
National Environmental Policy Act (NEPA
42 U.S.C. 6901 et seq.
Resource Conservation and Recovery Act (RCRA)
7 U.S.C. 136 et seq.,
Federal Insecticide, Fungicide and Rodenticide Act (FIFRA) as amended
American Society for Testing and Materials (ASTM)
C 602-69 Agricultural Liming Materials (R80)
American Society for Testing and Materials (ASTM)
E 11-81 Wire-Cloth Sieves for Testing Purposes
Armed Forces Pest Management Board TG No. 11
Hydrogen Phosphide Fumigation of Subsistence with Aluminum Phosphide
Armed Forces Pest Management Board TG No. 14
Protective Equipment for Pest Control Personnel
Armed Forces Pest Management Board TG No. 15
Pesticide Spill Prevention and Management
Armed Forces Pest Management Board TG No. 27
Stored-Product Pest Monitoring Methods
Armed Forces Pest Management Board TG No. 29
Integrated Pest Management In and Around Buildings
Armed Forces Pest Management Board TG No. 37
Guidelines for Reducing Feral/Stray Cat Populations on Military Installations in the United States
ASME 17.1
Safety Code for Elevators and Escalators
ASTM E 11-81
Instruction for the woven wire test.
Department of Defense Directive 4150.07
Department of Defense Pest Management Program
Executive Order 12088
Prevention, Control, and Abatement of Environmental Pollution at Federal Installations
Federal Aviation Regulation, Part 137
Agricultural Aircraft Operations
MCO _ P11000.7c
Work Control
NAVFAC MO-114
Maintenance and Operations of Building Plumbing, Heating, and Ventilation Systems (Volumes I, II, and III).
NAVFAC MO-118
Inspection of Vertical Transportation Equipment
NAVFAC MO-205
Central Heat & Steam Electric Generating Plants (Volumes I – V)
NAVFAC MO-206
Operation and Maintenance of Air Compressor Plants
NAVFAC MO-209
Maintenance of Steam, Hot Water, and Compressed Air Distribution Systems
NAVFAC MO-230
Petroleum Fuel Facilities
NAVFAC MO-306
Cathodic Protection
NAVFAC MO-307
Corrosion Control
NAVFAC MO-321
Facilities Management
NAVFAC MO-322
Inspection of Shore Facilities
NAVFAC MO-324
Inspection and Certification of Boilers & Unfired Pressure Vessels
NAVFAC MO-ll5
Maintenance and Operations of Refrigeration and Air Conditioning Systems and HVAC Controls (Volumes I, II, and III)
NAVFAC P-307
Management of Weight Handling Equipment
NAVFAC P-307
Management of Weight Handling Equipment
NAVFAC P-309
Color Coding for Naval Shore Facilities
NAVFAC P-5055 Series
Radiation Health Protection Manual
NAVFACINST 11300.27B
Environmental Quality Boiler Tune Up Program
NAVFACINST 11300.28
Boiler Efficiency Improvement Program
NAVFACINST 11300.33
Handling, Storage, and Inspection of Shore to Ship Steam Hoses
NAVFACINST 11300.34
Color Coding Information
NAVFACINST 11300.36
O&M Guidelines for Shore Activity Power Generation and Heating Equipment
NAVFACINST 11300.37
Energy and Utilities Policy
NAVFACINST 11300.7
Minimum Attendance for Shore Boiler Plants
NAVFACINST 4790.1 Series
Pressure Testing of Steam and Air Hoses
NAVMED P-5055 Series
Radiation Health Protection Manual
NEESA 20.2-028B
PCB Program Management Guide
NFGS-l520, l5705, and l5707.
NAVFAC Specifications
NIST Handbook 44
Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices
OPNAV Instruction 6250.4C
Navy Pest Management Programs
OPNAVINST 4790.1
Par 10.6.11.3
OPNAVINST 5090.1C
Environmental Readiness Program Manual, Chapter 17: Pesticide Compliance Ashore
OPNAVINST 5100
Par 10.6.11.3
OPNAVINST 5100.23 Series
Navy Safety and Occupational Health Manual
OPNAVINST 5100.8 Series
Navy Safety and Occupational Health (NAVOSH) Program
OPNAVINST 5530.14
Physical Security and Loss Prevention Manual
OPNAVINST 6470.3 Series
Navy Radiation Safety Committee

SECNAV

U.S. Department of Agriculture (USDA) Publications
Federal Seed Act 7 U.S.C.
UFC 3-430-07
Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels

ATTACHMENT J-1502000-03

SITE MAPS

Maps are available via Contracting Officer after award

ATTACHMENT J-1502000-04

HISTORICALVOLUME OF SERVICE ORDER WORKLOAD

Labor Categories
Emergency Service Orders
Urgent Service Orders
Routine Service Orders

Breathing air

Carpentry
0
2
601
Ceiling roof leak
10
9
465

Concrete

Doors
2
11
869
Electrical
3
Elevator
1
1
117
Fence
2
0
23

Fire

Floor
1

Gate

Gutter

HAZMAT

Hood

HVAC
16
27
1375

Light

1
284

Locks

Mechanical
6
15
549

Mold

Painting

1
63

Pest

Plumbing
8
20
733

Pothole

Refuse

Sewer leak

Signage
1

STRU?

Surfaces

Utility location marking
10
3
199
Window glass
1
Water leak
11
7
325
Total Service Orders
72
97
6997

ATTACHMENT J-1502000-05

HVAC Water Treatment Inventory

Open Loops

294
Cooling Tower

Evapco

486
Cooling Tower

BAC

3673
Cooling Tower

Marley

3742
Cooling Tower

Marley

4305
Cooling Tower

Evapco

4414
Cooling Tower

BAC

4415
Cooling Tower

BAC

4563
Cooling Tower

Evapco

Closed Loops

Facility #
Quantity
Type
Note
1
1
Chilled Water Loop
1
Hot Water Loop
131
1
Chilled Water Loop
199
1

Chilled Water Loop

Hot Water Loop

232
1
Chilled Water Loop
244
1

Chilled Water Loop

487
1
Ground Water Loop
496
1
Ground Water Loop
496 and 497 share the Chilled Water loop
497
1
Ground Water Loop
1281
1
Chilled Water Loop
1
Hot Water Loop
3451
1
Chilled Water Loop
1
Hot Water Loop
3542
1
Chilled Water Loop
1
Hot Water Loop
3898
1
Chilled Water Loop
1
Hot Water Loop
3998
1
Chilled Water Loop
1
Hot Water Loop
4066
1

Chilled Water Loop

4166
1
Chilled Water Loop
1
Hot Water Loop
4167
1
Chilled Water Loop
1
Hot Water Loop
4168
1
Chilled Water Loop
1
Hot Water Loop
4169
1
Chilled Water Loop
1
Hot Water Loop
4197
1
Chilled Water Loop
4198
1
Chilled Water Loop
4199
1
Chilled Water Loop
4200
1
Chilled Water Loop
4280
1
Chilled Water Loop
1
Hot Water Loop
4294
1
Chilled Water Loop
4295
1
Chilled Water Loop
4296
1
Chilled Water Loop
4305
1

Chilled Water Loop

4310
1
Chilled Water Loop
4311
1
Chilled Water Loop
4312
1
Chilled Water Loop
4313
1
Chilled Water Loop
4335
1
Chilled Water Loop
1
Hot Water Loop
4401
1
Chilled Water Loop
1
Hot Water Loop
4629
1
Chilled Water Loop
1
Hot Water Loop
4843
1
Chilled Water Loop
1
Hot Water Loop
4845
1
Chilled Water Loop
1
Hot Water Loop
4859
1
Chilled Water Loop
1
Hot Water Loop
4867
1
Chilled Water Loop
These two buildings share the same chilled water loop
4875
1
Ground Water Loop
4881
2
Chilled Water Loop
2
Hot Water Loop
4948
1
Chilled Water Loop
1
Hot Water Loop

ATTACHMENT J-1502000-06

BOILER AND UPV INVENTORY

Facility #
Structure
Description
Equip #
Manufacturer
Capacity
Fuel
152
CHP
Steam
1
KEELER
120,000,000
#6
152
CHP
Steam
2
KEELER
120,000,000
#6
152
CHP
Steam
3
INTERNATIONAL
80,000,000
#2
152
CHP
Steam
4
INTERNATIONAL
80,000,000
#2
192
FIRE STATION #2
H Water
116
PEERLESS
209,000
#2
199
TOWER
Steam
G9
KEWANEE
2,650,000
LP GAS
287
GYM
Steam
129
Mr. STEAM
41,040
ELECT.
287
STATION GYM /OOC
Steam
G19
A.O. SMITH
675,000
LP GAS
486
BOQ-4
H Water
94
BRYAN
420,000
#2
486
BOQ-4
H Water
110
BRYAN
420,000
#2
487
BOQ-1
Steam
86
BRYAN
650,000
#2
487
BOQ-1
Steam
95
BRYAN
650,000
#2
1229
MAG 32
H Water
70
PEERLESS
209,000
#2
1281
BOWLING CENTER /OOC
H Water
G1
TELEDYNE LAARS
500,000
LP GAS
1665
VMA-231
H Water
G12
A.O. SMITH
480,000
LP GAS
1667
VMAT-202
H Water
G13
A.O. SMITH
480,000
LP GAS
1777
MACS 6
H Water
112
BURNHAM
680,000
#2
1779
3rd LAAM / OOC
Steam
74
WEIL-McLAIN
400,000
#2
1780
3rd LAAM / OOC
Steam
75
WEIL-McLAIN
1,150,000
#2
1781
3rd LAAM / OOC
Steam
76
WEIL-McLAIN
400,000
#2
1782
3rd LAAM / OOC
Steam
77
BURNHAM
620,000
#2
1783
3rd LAAM / OOC
Steam
79
WEIL-McLAIN
400,000
#2
1786
MACS-6
H Water
122
SMITH
359,000
#2
1787
MACS-6
H Water
80
PEERLESS
431,000
#2
1791
FIRE/CRASH
H Water
100
PEERLESS
529,600
#2
1795
AWTU-2
H Water
113
BURNHAM
346,000
#2
1799
MASS-1
Steam
83
PEERLESS
215,000
#2
3452
LAUNDRY DRY LAYUP
Steam
G6
BURNHAM
2,070,000
LP GAS
3542
ANDY'S
Steam
G39
WEIL McLAIN
764,000
LP GAS
3542
ANDY'S
H Water
G15
A.O. SMITH
480,000
LP GAS
3673
BEQ-1
H Water
G16
A.O. SMITH
860,000
LP GAS
3742
BEQ-2
H Water
G17
A.O. SMITH
860,000
LP GAS
3916
MAINT. SHOP
H Water
96
PERLESS
575,000
#2
3919
MAINT. FAC.
H Water
98
BURNHAM
808,000
#2
3957
TRAINING POOL *
H Water
G18
A.O. SMITH
480,000
LP GAS
4041
ACROSS RUNWAY
H Water
107
BURNHAM
137,400
#2
4049
MAINT. FAC.
H Water
106
PEERLESS
840,000
#2
4066
FLIGHT SIMULATOR
H Water
G2
TELEDYNE LAARS
1,000,000
LP GAS
4166
BEQ
H Water
G20
TELEDYNE LAARS
600,000
LP GAS
4167
BEQ
H Water
G21
TELEDYNE LAARS
600,000
LP GAS
4168
BEQ
H Water
G22
TELEDYNE LAARS
600,000
LP GAS
4169
BEQ
H Water
G23
TELEDYNE LAARS
600,000
LP GAS
4197
BEQ
H Water
G24
TELEDYNE LAARS
600,000
LP GAS
4198
BEQ
H Water
G25
TELEDYNE LAARS
600,000
LP GAS
4199
BEQ
H Water
G26
TELEDYNE LAARS
600,000
LP GAS
4200
BEQ
H Water
G27
TELEDYNE LAARS
600,000
LP GAS
4201
BEQ
H Water
G28
TELEDYNE LAARS
600,000
LP GAS
4210
DEBARAKATION
Steam
G7
RITE ENG. AND MFG
1,010,000
LP GAS
4213
TRAINER FAC.
H Water
111
BURNHAM
539,000
#2
4280
DDS TACT
H Water
G3
TELEDYNE LAARS
715,000
LP GAS
4294
BEQ
H Water
G29
TELEDYNE LAARS
600,000
LP GAS
4295
BEQ
H Water
G30
TELEDYNE LAARS
600,000
LP GAS
4296
BEQ
H Water
G31
TELEDYNE LAARS
600,000
LP GAS
4298
CHILD CARE
H Water
115
PERLESS
575,000
#2
4310
BEQ
H Water
G32
TELEDYNE LAARS
600,000
LP GAS
4311
BEQ
H Water
G33
TELEDYNE LAARS
600,000
LP GAS
4312
BEQ
H Water
G34
TELEDYNE LAARS
600,000
LP GAS
4313
BEQ
H Water
G35
TELEDYNE LAARS
600,000
LP GAS
4335
INSTR. BLDG.
H Water
G4
PEERLESS
649,000
LP GAS
4344
27 HEADQTRS
H Water
117
PEERLESS
390,000
#2
4397
COMMUNICATIONS
H Water
G5
TELEDYNE LAARS
500,000
LP GAS
4401
AIR OPS. FAC.
H Water
120
PEERLESS
625,000
#2
4402
WAREHOUSE
H Water
119
SMITH
560,000
#2
4464
WAREHOUSE
H Water
G8
BURNHAM
1,275,000
LP GAS
4465
WAREHOUSE
H Water
123
HURST
536,000
#2
4470
NADEP/ OOC
H Water
G10
PETERSON KELLY CO
1,200,000
LP GAS
4563
OPS BLDG
H Water
124
CLEAN BURN INC
360,000
#2
4564
REFUEL MAINT
H Water
125
CLEAN BURN INC
240,000
#2
4571
ENG/MAINT
H Water
126
CLEAN BURN INC
360,000
#2
4571
ENG/MAINT
H Water
127
CLEAN BURN INC
360,000
#2
4576
MOTOR "T"
H Water
128
CLEAN BURN INC
240,000
#2
4629
CHILD DEVELOPMENT
H Water
G36
A.O. SMITH
450,000
LP GAS
4629
CHILD DEVELOPMENT
H Water
G37
A.O. SMITH
450,000
LP GAS
4629
CHILD DEVELOPMENT
H Water
G38
A.O. SMITH
300,000
LP GAS
4639
SEWAGE PLANT
H Water
1
BETHLEHAM
600,000
#2
4639
SEWAGE PLANT
H Water
2
BETHLEHAM
600,000
#2
4639
SEWAGE PLANT
H Water
3
HAYES
632,000
#2
4810
ORDNANCE
H Water
97
PEERLESS
144,000
#2
4810
ORDNANCE
H Water
97
PEERLESS
92,000
#2
4845
UAV
H Water
G1
FULTON
1,000,000
LP GAS
7019
ATLANTIC
H Water
G42
WEIL McLAIN
641,000
LP GAS
8048
BOGUE FIELD
H Water
G11
SMITH
359,000
LP GAS
8052
BOGUE MESS HALL
H Water
3
PEERLESS
955,000
#2

ATTACHMENT J-1502000-07

CO2 Fire Suppression Systems Inventory

CO2 Fire Suppression System, Bldg. 4066 AV-8B Flight Simulator building. Cherry Point

Tank

Serial No.
Full Weight
Actual Weight

Hydro-Test Date

1
TWH-147513
224.6
225
2012
2
TWH-122659
220.8
221
2012
3
TWH-147390
219.6
220
2012
4
TWH-122532
218.6
219
2012
5
TWH-147639
219.0
220
2012
6
TWH-147606
218.4
219
2008
7
TWH-147557
219.8
220
2012
8
TWH-112625
221.6
222
2012
Spare
477201
220
220
2012

CO2 Hand Hose Line System, Bldg. 199, Air Traffic Control Center and Building Cherry Point

Tank/ Location

Model Number

Agent Weight

RM 137 Radar Shop
FT000227
3M Novec 1230 Fire
421 lbs.
RM 151 IFR Room
FT000153
Protection System
321 lbs.
RM 151 IFR Room
FT000153

331 lbs.

RM 148 COM Rm
FT000227

490 lbs.

ATTACHMENT J-1502000-07-01.

Gaylord/Ansul Hoods and Ducts

Facility #
Name/Description
Manufacturer
Model
Master Cylinder Size
Fuse links
3451
Main Galley
All wet agent cylinders are 3 gallons in volume and are 21" tall and 7"in diameter
3451
System 2.10
Ansul
R-102
Three Tanks
Six 350⁰F and one 500⁰
3451
System 2.29
Ansul
R-102
Three Tanks
Six 360⁰F
3451
System 2.47
Ansul
R-102
Two Tanks
Four 360⁰F
3451
System 4.04
Ansul
R-102
One Tank
One 360⁰F
3451
System 4.24
Ansul
R-102
One Tank
3451
System 5.08
Ansul
R-102
One Tank
Two 360⁰F
3451
System 5.46
Ansul
R-102
One Tank
One 360⁰F
193
Wall, right end of hood
Pyrochem
PCL165
1.65 Gallons
One 450⁰F
4221
Left side of hood
Ansul
I-25A
35 lbs.
One 165⁰F
4629
CP-CDC
Pyrochem
PLC 350
3.5 Gallons
Three 450⁰F
4859
CP-CDC
Ansul
R-102
1.5 Gallons
Three 450⁰F
Denlar
D100
3.5 Gallons
7019
Atlantic Field
Protex II PC 1600
Wet Chemical System0
8052
Bogue Field
Protex
L3000
3.0 Gallons
Three 450⁰F
8052
Bogue Field
Protex
L3000
3.0 Gallons
Two 450⁰F
8049
Bogue Field
Guardian III-B
G300-B Wet Chemical System

RELATED INFORMATION FOR GAYLORD AND ANSUL FIRE SUPPRESSION SYSTEMS

MAINTENANCE, TESTING, CERTIFY GAYLORD, AND ANSUL FIRE SUPPRESSION SYSTEMS

SUGGESTED EFFORTS THAT HAVE RESULTED IN A SATISFACTORY RESULTS.

CONTRACTOR SHALL PERFORM THE FOLLWING ON GAYLORD AND ANSUL FIRE SYSTEMS

Semi-Monthly (every two weeks); Check detergent tank and fill with OEM recommended G510 Detergent at all locations. Clean and maintain cleanliness of the hoods, UV lamps, and ventilation system associated with hood to include filters with appropriate detergent/cleaner in Bldgs. 3451 and 8052.

Monthly; Check and clean all system fittings, Clean hood, UV lamps, and associated components with appropriate detergent/cleaner, and check and clean main grease gutters.

Bi-Monthly (every two months or six times a year) service plus check all system fittings, check inside of hoods for adequate cleaning, and check main grease gutter for foreign materials.

Semi-Annual; Monthly service plus check exhaust fans, adjust belts or replace if needed, lubricate bearings, check air velocity, test “internal fire mode” clean detergent tank, and foot valve. Test and certify Quencher Fire Systems, Test and change fusible links and certify Ansul System.

Semi-Annual and Annual Fire Suppression System Maintenance for Building 193;

Perform Semi-Annual and Annual Maintenance for Wet Chemical Kitchen Hood Fire Suppression System as required by NFPA 17A and OEM Maintenance requirements.

(1) 450 Fusible Link Replacement.

(1) CO2 Cartridge Replacement (Annually).

Semi-Annual and Annual Fume Hood Fire Suppression System Maintenance for Building 4221:

Perform Semi-Annual and Annual Maintenance for Dry Chemical Fume Hood Fire Suppression System as required by FRPA 17 and OEM Maintenance requirements.

(1) 212 Fusible Link Replacement.

ATTACHMENT J-1502000-07-02

FIRE ALARM/SMOKE DETECTION SYSTEM INVENTORY

Location: Buildings 902 and 903 (AV8B storage facility)

Qty.
Part Number
Description
2
MSE-3L
Siemens MXL-IQ Enclosure
2
SMB-2
Siemens Mainboard / CPU
2
MPS-12
Power Supply
2
MOM-4
Accessory Motherboard
2
CSM-4
Dual Circuit Output Module
2
PLM-1
Power Limited Module
2
MKB-4
Control / Display Module
10
MSI-10B
Addressable Manual Pull Station
10
SB-5R
Pull Station Backbox (surface)
2
FP-11
Addressable Photo Smoke Detector
2
DB-11
Detector Base
2
TRI-S
Addressable Input Module
6
PB-1191
Beam Smoke Detector
6
PBB-1191
Beam Smoke detector Base
24
PBR-1192
20cm x 20cm Reflector
6
CZM-1
Addressable Beam Monitor Module
2
ASHP
Federal Signal Horn (red)
2
UTM
Federal Signal Tone Module
2
MT-24
LSM-VFR Wheelock Horn / Strobe
2
DC-MAX-R
Wheelock Outdoor Strobe (red)
4
PS12260
Power Sonic 12v 26 ah Batteries

ATTACHMENT J-1502000-08

Vertical Transportation Equipment (VTE)

P= Passenger, M= Material Lift, F=Freight, D= Dumb-waiter, H=Handicap Lift

Facility
Elevator No.
Floors
Use
Capacity
Type
Manufacturer
6 Month Cert
Yearly Cert
5 year

Cert

DLA

159
36
2
P
2000
Hydraulic
Southern
June 2018

FRCE

129
20
2
P
2500
Hydraulic
Dover
June 2018
133
18
2
P
2500
Hydraulic
ESCO
June 2018
133
14
2
M
4000
Hydraulic
Southworth
June 2018
133
15
2
F
6000
Electric
Eagle Air
June 2018
133
17 No Cert
2
F
6000
Electric
Ordnance Corp
June 2018
133
19
2
H
750
Hydraulic
Porch Lift
June 2018
137
Mezz F 4
2
F
3000
Hydraulic
Ordnance Corp.
June 2018
137
Mezz G 11
2
F
6000
Hydraulic
Ordnance Corp.
June 2018
137
Mezz F 10
2
F
6000
Hydraulic
OCS
June 2018
137
01
2
F
4000
Electric
Eagle Aircraft
June 2018
137
07
2
H
750
Hydraulic
Porch Lift
June 2018
137
39
2
H
750
Electric
Garaventa
June 2018
200
21
2
F
2000
Hydraulic
Thyssen Krupp
June 2018
245
22
2
P
2500
Hydraulic
Dover
June 2018
4032
23 *No Cert
2
F
2500
Electric
Southworth
June 2018
4032
24 *No Cert
2
F
UNK
Electric
Giant Lift
June 2018
4032
28
2
D
750
Mechanical
American Stair Glide
June 2018
4224
32
2
F
6000
Hydraulic
Alabama
June 2018
4224
26 *No Cert
2
F
3000
Electric
Southworth
June 2018
4224
27
2
P
2000
Electric
Alabama
June 2018
4224
31
2
F
2000
Electric
Southworth
June 2018
4224
40
2
H
750
Electric
Garaventa
June 2018
4225
34
2
P
2000
Hydraulic
Montgomery
June 2018
4414
1
3
P
4500
Hydraulic
Dover
June 2018
4470
35
2
P
2500
Hydraulic
Dover
June 2018
4841
1
2
P
3500
Hydraulic
Delaware
June 2018

FMD

1
BLD # 1
2
P
2500
Hydraulic
Delaware
June 2018
159
159 #37 42703
2
D
100
Electric
East Elect.
June 2018
219
1 1
2
P
2500
Hydraulic
Webster
July 2019
2
P
2500
Hydraulic
Webster
June 2018
2
D
100
Electric
MATOT
June 2018
4327
1
6
P
2500
Electric
Central Elev. Sys
June 2018
4335
1
2
P
2000
Hydraulic
Dover
June 2018
4356
1 EP-60
3
P
2500
Oildraulic
Dover
June 2018
2
P
2500
Hydraulic
National
June 2018
4867
1
4
P
3500
Hydraulic
Delaware
June 2018
4868
1
4
P
3500
Hydraulic
Delaware
June 2018
4
P
3500
Hydraulic
Mowery
June 2018
4
P
3500
Hydraulic
Mowery
June 2018
4
P
3500
Hydraulic
Mowery
June 2018
4
P
3500
Hydraulic
Mowery
June 2018

NAVAL HEALTH CLINIC

4389
1
3
P
3500
Oildraulic
Dover
June 2018
4389
2
3
P
3500
Oildraulic
Dover
June 2018
4389
3
3
P
4500
Oildraulic
Dover
June 2018
4389
4
3
P
4500
Oildraulic
Dover
June 2018
4389
5
3
P
3500
Oildraulic
Dover
June 2018

ATTACHMENT J-1502000-09

Medical Gas Delivery System inventory

Facility Name
Equipment
Quantity of test items
Number of locations

NAVAL HEALTH CLINIC

Central Supply Sources
Air Compressor
2 sources
2
HP Manifold
3 sources
1
Vacuum Pump
1 sources
1
Pipeline Network Components
Outlets/Inlets
475 outlets/inlet s
Alarms Panels
Area Alarm Panels
3 alarm conditions
17 panels

Master Alarm Panels

(*Total number of Central Supply Systems=O2, N2O, N2, MA, Vac,…)

15 TCSS
2 panels
On Site Analysis
Medical Air
4 samples
Nitrogen
2 samples
Nitrous Oxide
2 samples
Oxygen
4 samples

ATTACHMENT J-1502000-10

AV8B Engine Test Cell Inventory

Facility #
Name/Description
Equip #
Manufacturer
Model No.
Serial No.
Year Purchase

RELOCATABLE AV8B ENGINE TEST STAND PM MANUFACTURER’S RECOMMENDED MAINTENANCE

MAIN ENTRANCE DOORS

I. 30 Days Inspect/Replace Filter Elements Combination Regulator Filter:

a. Secure the compressed air supply to the main door pneumatic control assembly by closing the shut off valve.

b. Check the 25-micron element in filter bowl of the Combination Regulator.

c. Replace element if it is dirty or clogged.

d. When complete, restore the compressed air supply by placing the shut off valve in the open position.

II. 30 Days Inspect/Fill Lubricant Fluid Combination Regulator Filter

a. Secure the compressed Air supply to main door pneumatic control assembly by closing the shut off valve.

b. Check fluid level in combination regulator lubricator.

c. Add fluid if fluid level is below the level line.

d. When complete, restore the compressed air supply by placing the shutoff valve in the open position.

III. 90 days inspection:

a. Inspect air lines, control valves, and actuators for leaks

b. Inspect electrical for broken worn, or loose wiring.

c. Inspect latching mechanism (latches, rods, etc.) for condition and freedom of movement.

d. Inspect door leaf hinges for conditions and freedom of movement.

e. Inspect the door seal for condition.

f. Inspect the latch receptacles for distortion and freedom from dirt.

g. Note any deficiencies from above inspection.

IV. 6-month inspection Lubricates Hinges and Latches:

a. Apply Exxon Beacon Lube P920 (or equivalent) to grease fitting for each hinges pin.

b. Apply several drops of Exxon Terasstic 52 (or Equivalent) to the sintered bronze thrust washer on the latch pivot points, rods and bearings on linkage and operating handle.

c. Wipe Latch Keeper Cylinder Rod with a rag dampened with Exxon Terasstic 52 (or equivalent).

d. Cycle the cylinder to work the lubricant into the glands.

AIR START SYSTEM:

I. 150 hours Changing Coolant 50hp Compressor:

a. Shut down compressor using normal shut down procedures.

b. Place a suitable container close to the drain valve.

c. Slowly remove the fill/vent cap.

d. Remove plug from drain valve

e. Open the drain valve and drain coolant into container.

f. Close drain valve.

g. Replace plug in drain valve.

h. Refill the machine following the top up coolant procedure.

II. Yearly Air Filter Indicator 50hp Compressor:

a. Shut down compressor using normal shut down procedures.

b. Check the condition of the filter.

c. Change filter if needed. (Dusty environments require more frequent replacement).

d. Indicator should be checked with unit stopped.

e. Restart compressor using standard restart procedures.

III. Yearly Change Coolant Filter 50hp Compressor:

a. Shut down compressor using normal shut down procedures.

b. Loosen the existing filter.

c. Remove the filter from housing.

d. Replace the old filter in a sealed bag and dispose of in a safe way.

e. Clean the mating face of the housing. Take care to avoid any particles entering the machine.

f. Apply a small amount of lubrication to the new filter seal.

g. Screw the new filter down until the seal makes contract with the housing, then hand tighten a half turn further.

h. Restart Compressor using the standard restart procedure.

i. Check for any leaks.

IV. Yearly Change Separator Cartridges 50hp Compressor:

a. Shut down compressor using normal shut down procedures.

b. Loosen the separator cartridges.

c. Remove the cartridges from the housing.

d. Place the old cartridges in a sealed bag and dispose of safely.

e. Clean the mating face of the housing.

f. Apply small amount of lubricant to the cartridge seal.

g. Screw the new cartridge down until the seal makes contact with the housing, then hand tighten a half turn further.

h. Restart compressor using standard restart procedure.

i. Check for leaks.

V. 3 Months Change Filter Desiccant Dryer:

a. Shut down compressor using normal shut down procedures.

b. Isolate the filter by closing the manual valves before and after the filter.

c. Completely depressurize the filter.

d. Remove the nuts from the manway yoke assembly in the top head.

NOTE: be sure to have hold of the manway cover as to not lose it into the filter.

e. Remove the wing nut from the filter top plate and remove the plate.

f. Remove the elements from the filter housing.

g. Inspect the filter base plate, T-bar, and filter union. Replace as needed.

h. Install new element and hardware.

i. Replace cover plate, and wing nut.

j. Replace manway cover plate, installing a new gasket, then re-attach yoke assembly and tighten.

k. Slowly re-pressurize the filter and place back into service.

COMPRESSED AIR SYSTEM

I. 3 Month Pressure Switch Adjustment (Air Compressor)

a. Disconnect, lock and tag main power supply before making adjustments.

b. Remove the pressure switch cover.

c. Adjust the range by turning the range adjustment screw clockwise (in) to increase the cut out point or counter clockwise (out) to decrease the cut point.

NOTE: One full turn changes the setting approximately 2 PSIG.

d. Replace the pressure switch cover.

e. Reconnect the power supply.

f. Start the compressor.

g. Note the pressure gauge reading at which the compressor cuts out.

h. Repeat the adjustment procedures if necessary.

II. 3 Month Oil Change (Air Compressor):

a. Verify that the compressor is NOT running.

b. 2. Remove the oil drain plug and allow the lubricant to drain into suitable container.

c. Replace the oil drain plug.

d. Unscrew and remove the oil fill plug.

e. Fill the crankcase with XL-300 petroleum based lubricant.

f. Replace the oil fill plug HAND TIGHT ONLY.

III. 3 Month Pilot Valve Adjustment (Air Compressor):

a. Stop the unit and disconnect and tag electrical supply main switch to prevent accentual start up.

b. Remove the pilot valve tube and tube fitting.

c. Remove the pilot valve body and all existing shims.

d. Screw the pilot valve body back into the frame end cover (without any shims) until contact with the thrust pin is felt. Advance the pilot valve body ¼ turn to ½ turn more. If contact with the thrust pin cannot be felt, the following steps may be necessary to locate the contact point

(1) Insert small instrument (punch, rod, nail, etc.) into end of the pilot valve until it contacts the valve stem.

(2) While still inserted in the pilot valve, make a mark on the instrument even with the outside edge of the pilot valve body.

(3) Keeping the instrument pressed lightly against the valve stem, screw the pilot valve body into the frame end cover. When the mark on the instrument starts moving out away from the edge of the pilot valve body, contact has been made with the thrust pin.

(4) Advance the pilot valve body ¼ to ½ turn more.

(5) Measure the gap between the pilot valve body and the frame end cover.

(6) Remove the pilot valve body and add enough shims to fill the gap previously measured.

(7) Screw the pilot valve body back into the frame end cover until the body is tight on the shims.

(8) Reconnect the pilot valve tube fittings.

MOVABLE TURNING VANE:

I. Yearly Annual Inspection

a. Verify calibration date of all pressure gages is less than one year.

b. Inspect condition of pneumatic and flexible electrical hoses and electrical leads.

c. Inspect all bearings (flange bearings, cylindrical cartridges, pillow blocks, etc.).

d. Inspect turning vane surface for cleanliness.

e. Note any deficiencies from above inspections.

f. Take corrective action necessary.

II. 6 Months Gear Motor Lubrication

a. Remove cover from drive unit.

b. Remove lubrication cap from worn gear reducer.

c. Remove drain plug from worn gear reducer and drain existing lubricant into container.

d. Replace drain plug.

e. Refill with new lubrication (AGMA-7)

f. Replace lubrication cap and drive unit cover.

III. 3 Months Bearing Lubrication:

a. Using the grease gun apply Mobil EP111 (or equivalent) to the grease fitting for each of the (8) pillow block bearings at the drive unit.

b. Using the grease gun, apply Mobil EP111 (or equivalent) to the grease fitting for each of the (2) flange bearings located at the turning vane pivot points.

IV. Monthly Inspection:

a. Inspect condition and security of solenoid pilot operated control valve.

b. Inspect condition and security of the filter regulator assembly and filter element.

c. Inspect flexible coupling for damage and alignment with pillow block bearing, sprockets, and gear motor.

d. Inspect sprocket roller chain, connecting links, sleeve bearing, jaw fittings, turnbuckles, and chain connector rods for security and excessive wear.

e. Inspect all electrical connections between the terminal board in the turning vane pneumatic control enclosure, the terminal board in the starter control enclosure, the limit switches, and the push button control station.

f. Inspect all exposed surfaces of the movable turning vane components for dirt and debris.

g. Inspect condition of airline tubing and fittings.

h. Inspect the turning vane latches for security and leakage.

i. Cycle the turning vane up and down to verify the function of the function of the counter weight over the travel limit switches. (Main entrance door must be open)

j. Inspect lubrication level in worm gear motor drive and idler shafts.

k. Inspect movable turning vane components for corrosion.

l. Note any deficiencies from above inspections.

m. Take corrective action as necessary.

V. 3 Months Gear Drive & Motor Replacement (if needed):

a. Ensure that the movable turning vane is full raised and latched.

b. Disconnect and lock-out electrical power at the electrical control cabinet.

c. Remove drive motor cover.

d. Disconnect wiring from the vane motor.

e. Remove the bottom cover from the counterweight guides.

f. Raise the counterweights approximately 12” with the manual hand crank (must release brake switch on motor).

g. Place adequate blocking under both counterweights, then lower the counterweights until they rest securely on the blocking and there is slack in the chains on both sides of the sprockets.

h. Mark the alignments by marking a corresponding “tooth” and “link” nearest the “top” position of the sprocket.

i. Remove the roller chain from the sprocket.

j. Loosen pillow block bearing by removing the ½” bolts which secure them. Do not loosen the pillow blocks or sprockets from the shaft.

k. Loosen the flexible coupling from the drive shaft and slip shaft outward away from the drive motor assembly.

l. Slip end shaft inward placing the flexible coupling on the drive motor shaft (rotate shaft as assembly).

m. Tighten flexible coupling on motor shaft.

n. Replace ½” bolts in pillow block bearing and tighten.

o. Manually crank motor until “marking tooth” is in the “top” position on the sprocket.

p. Re-mount chains onto sprockets making sure to align marked “tooth” and “link” in the chain.

q. Manually crank the counterweights up, removing the blocking, and lower the counterweights removing all slack from the chain.

r. Re-connect motor wiring.

s. Replace all covers.

t. Test operation of system with new components, following normal procedures.

u. Final adjustment in the roller chains can be made with the turnbuckle as necessary.

VI. 3 Months Flexible Shaft Coupling Replacement (if needed):

a. Ensure that the movable turning vane is fully raised and latched.

b. Disconnect and lock-out electrical power at the electrical control cabinet.

c. Remove the drive motor cover.

d. Remove the bottom cover from the counterweight guides.

e. Raise the counterweight approximately 12” with the manual hand crank (must release brake switch on motor).

f. Place adequate blocking under both counterweights, then lower the counterweights until they rest securely on the blocking and the is slack in the chains on both sides of the sprockets.

g. Mark the alignment by marking a corresponding “tooth” and “link” nearest the “top” position of the sprocket.

h. Remove the roller chain from the sprocket.

i. Loosen pillow block bearing by removing the ½” bolts which secure them. Do not loosen the pillow blocks or sprockets from the shaft.

j. Loosen the flexible coupling from the drive shaft and slip shaft outward away from the drive motor assembly.

k. Remove flexible coupling from the motor shaft.

l. Replace flexible coupling and tighten to motor drive shaft.

m. Slip end shaft inward into the flexible coupling on the motor drive shaft. (Rotate the shaft as necessary to place “marked tooth” in the “top” position on the sprocket).

n. Tighten flexible coupling on the end shaft.

o. Replace ½” bolts in the pillow block bearing and tighten.

p. Re-mount chains onto sprockets making sure to align marked “tooth” and “link” in the chain.

q. Manually crank the counterweights up, removing the blocking, and lower the counterweights removing all slack from the chain.

r. Replace all covers.

s. Test operation of system with new components, following normal procedures.

t. Final adjustments in the roller chain can be made with the turnbuckles as necessary.

VII. 3 Months End Chain Sprocket Replacement (if needed):

a. Ensure the movable turning vane is full raised and latched.

b. Disconnect and lock-out electrical power at the electrical control cabinet.

c. Remove the drive motor cover.

d. Remove the bottom cover from the counterweight guides.

e. Raise the counterweights approximately 12” with the manual hand crank (must release brake switch on motor).

f. Place adequate blocking under both counterweights, then lower the counterweights until they rest securely on the blocking and there is slack in the chains on both sides of the sprockets.

g. Mark the alignment by marking a corresponding “tooth” and “link” nearest the “top” position of the sprocket.

h. Remove the roller chain from the sprocket.

i. Loosen pillow block bearings by removing the ½” bolts which secure them.

j. Replace old sprockets with new and tighten on end shaft.

k. Replace ½” bolts in pillow block bearings and tighten.

l. Re-mount chains onto sprockets making sure to align marked “tooth” and “link” in the chain.

m. Manually crank the counterweights up, removing the blocking, and lower the counterweights removing all slack from the chain.

n. Replace all covers.

o. Test operation of system with new components, following normal procedures.

p. Final adjustments in the roller chains can be made with the turnbuckle as necessary.

VIII. 3 Month Counterweight Chain Sprocket Replacement (if needed):

a. Ensure the movable turning vane is full raised and latched.

b. Disconnect and lock-out electrical power at the electrical control cabinet.

c. Remove the drive motor cover.

d. Remove the bottom cover from the counterweight guides.

e. Raise the counterweights approximately 12” with the manual hand crank (must release brake switch on motor).

f. Place adequate blocking under both counterweights, then lower the counterweights until they rest securely on the blocking and there is slack in the chains on both sides of the sprockets.

g. Mark the alignment by marking a corresponding “tooth” and “link” nearest the “top” position of the sprocket.

h. Remove the roller chain from the sprocket.

i. Remove and replace sprocket at the top of the counterweight.

j. Re-mount chains onto sprocket making sure to align marked “tooth” and “link” in chain.

k. Manually crank the counterweights up, removing the blocking, and lower the counterweights removing all slack from the chain.

l. Replace all covers.

m. Test operation of system with new components following normal procedures.

n. Final adjustments in the roller chains can be made with turnbuckles as necessary.

FUEL SYSTEM: LEAK DETECTION (as needed)

I. Cleaning Leak Detection Module:

a. Use damp cloth or sponge to wipe dirt from the leak detection module.

Do not open the enclosure while the unit is wet.

Do not use solvent or abrasive cleaners.

b. Use dry cloth to remove moisture from all surfaces of leaks detection unit.

II. Replacing Fuse in Leak Detection Module:

a. Open cover on the Leak Detection Module.

b. Locate the fuse on the power supply board.

c. Replace using a 200-ma/250-V, quick acting micro fuse with F1 rating, characteristic code F.

d. Close cover on Leak Detection Module.

ATTACHMENT J-1502000-11.

Hangar Floors Locations

Facility #
Name/Description
Square footage
131
Hangar
81,318
250
Hangar
78,000
1665
Hangar
48,000
1667
Hangar
48,000
1700
Hangar
30,000
1701
Hangar
30,000
3998
Hangar
37,500

ATTACHMENT J-1502000-12

Paint Stripping Booth Locations

Facility #
Name/Description
System
250
Paint Stripping Booth
Automated Cleaning Technologies, Inc. (ACT) STR7 Chemical Paint Stripping System
4075
Paint Stripping Booth
Cesco Aqua Miser B.O.S.S. Cleaning System

ATTACHMENT J-1502000-13

Reverse Osmosis Systems Location

Facility #
Name/Description
Manufacturer
Capacity gpm
Serial No.
Year Purchase
152
Central Heating Plant
Siemens
200
110005-0300
2011

ATTACHMENT J-1502000-14

Ultra-Violet System location

Facility #
Name/Description
Equip #
Manufacturer
Year Purchase
4376
Waste Water Treatment Plant

TrojanUV

UV system includes but not limited to 4 banks of bulbs. Each bank has 9 racks and each rack has 6 bulbs. Total number of bulbs 216.

TYPICAL PREVENTIVE MAINTENANCE ON THE ULTRA-VIOLET

SYSTEM

Historically the following has been performed during quarterly Preventative Maintenance:

1. Verify all system components are properly adjusted and installed

2. Verify integrity of electrical connections

3. Verify all external devices are properly connected to the System Control Center

4. Confirm analog input information at the System Control Center

5. Verify communication to each module

6. Confirm all system settings and configuration data

7. Test and validate dose pacing logic. System is introduced with a simulated flow and UVT conditions to ensure correct reaction to parameter changes.

8. Clean, test, and validate operation of the on-line UVT system (if applicable)

9. Suggest UVT Calibrations by HACH (should be under HACH Service Contract for seal replacements - separate from this contract)

10. Verify level sensor operation

11. Test and validate alarm indications

12. Test and validate full control of system components

13. Provide refresher training by demonstration while performing this function.

14. Confirm correct communication to remote SCADA (if applicable)

15. Verify integrity of waterproof seals

16. Test and validate pressure relief valves on hydraulic system if applicable

17. Check hydraulic system pressures and fluid levels if applicable

18. Verify cleaning system operation where applicable Replace ACTi-gel in all wiper collars provide a report of all findings, corrective actions and recommendations at each site for each service visit.

19. Procure and install 216 UV lamps annually on a schedule approved by the KO.

20. Provide a comprehensive report of all findings, corrective actions and recommendations at the conclusion of each service visit.

21. Dispose of all materials, such as coolants, lubricants, acids etc. removed from the UV System, off this military installation at an approved State of North Carolina Disposal Site. Copies of the disposal documentation shall be submitted to the Contracting Officer and the Operator Responsible in Charge (ORC), ATTACHMENT J-1502000-15

Compressed Air System Inventory

Facility #
Name/Description
Equip #
Serial No.
Year Purchase
4357
ATLAS COPCO
1
APF-151585
4357
ATLAS COPCO
2
APF-155947

TYPICAL MAINTENANCE AND SERVICING OF THE ATLAS COPCO

COMPRESSORS

All maintenance and repair services in accordance with the provisions of OEM (Atlas Copco) and shall be an OEM (Atlas Copco) certified technician. All parts shall be OEM (Atlas Copco) original parts.

During Annual Maintenance all repairs will be done to Atlas Copco specifications. The functions listed below are typically accomplished during annual maintenance unless listed otherwise.

1. Take service readings (air, oil, and water T&P).

2. Check Change air filter elements.

3. Replace filter element gear case breather.

4. Check cycle of air intake throttle valve

5. On the 2nd and 4th year replace diaphragm of air throttle valve.

6. On the 2nd and 4th year replace shaft bushing (air intake valve).

7. On the 4th year overhaul air intake valve.

8. On the 2nd year check the function of the check valve.

9. Check Cooler functions.

10. On the 4th year overhaul check valve.

11. On the 1st and 2nd year check condition balance piston diaphragm.

12. On the 4th year change balance piston diaphragm.

13. Check and…