Attach 6_eOMSI Draft Workbook.pdf

PDF 874 KB Posted

Attached to
Increase Line Size Steam and Condensate B178 to MH385
Solicitation number
N4008520B2519
Issued by

View the file

Other files

File Type Posted
Attach 4_Submittal Register.pdf PDF
Attach 7_PNSY Electrical Standards - Rev C.pdf PDF
Attach 1_Bid Form.pdf PDF
Attach 5_Drawings.pdf PDF
Attach 3_Technical Specifications.pdf PDF
Attach 2_Div 1 Specs.pdf PDF
1658818_Scope of Work.pdf PDF
N40085-20-B-2519.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Position 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Name Asset Num Description Long Description MASTER SYSTEM SYSTEM SUBSYSTEM Building

Number Asset

Quantity Replacement

Cost Contract Number

Task/ Delivery

Order Number

Warranty Expiration

Date

Installation Date

CLASSIFICATIONI

D Room Number Manufacturer Model Serial # PAY ITEM

Explanation

Asset tag number for

MaximoTo be filled in by

NAVFAC FOS

Primary Asset Name (100 Character Limit) To be completed by DOR

Additional Relevant Information (e.g. size, capacity, limits, etc…) (1000 Character Limit) To be completed by KTR

Reference values from Model & Facility Data Matrix tab (SYSTEM) Selected By

DOR

Reference values from Model & Facility Data Matrix tab (SUBSYSTEM) Selected By DOR

MAXIMO

building number provided by DOR (Any questions ask FOS)

To be completed by DOR (refer to Model &

Facility Data Matrix, Field)

Can be edited by KTR for changes during project

Install cost (material and labor) from schedule of values, bid proposal, etc.

To be completed by KTR

To be completed by GVT

To be completed by GVT

MM/DD/YYYY

To be completed by KTR

MM/DD/YYYY

To be completed by

KTR

Reference values from Model & Facility Data Matrix tab (SUBITEM)

Location for installed equipment/asset.

Include floor & room number. (include equipment tag e.g AHU_1, FANN001) To be completed by KTR

To be completed by

KTR

To be completed by

KTR

To be completed by KTR

To be completed by KTR

EXAMPLE K000000 CONDENSING UNIT, AIR COOLED ACCU‐3A SERVES HP‐24 / HP‐25 D30 ‐ HVAC D3030 ‐ COOLING GENERATING SYSTEMS D3030221 ‐ CONDENSING UNIT, AIR COOLED PNSY‐59 1 $5,000 N40085‐16‐C‐9329 2/1/2019 2/1/2018 D3030221 OUTDOOR PAD 1ST SET FROM STAIRS, ACCU‐3B FUJITSU AOUA120TLCVG TNN000034 Steam Trap L10 ‐ Steam Utilities L1020 ‐ Distribution L1020100 ‐ Service Area PNSY‐178 1 12" Butterfly Valve L10 ‐ Steam Utilities L1020 ‐ Distribution L1020100 ‐ Service Area MH385 2 6" Butterfly Valve L10 ‐ Steam Utilities L1020 ‐ Distribution L1020100 ‐ Service Area MH385 1 6" Butterfly Valve L10 ‐ Steam Utilities L1030 ‐ Return L1030100 ‐ Service Area MH420A 1 10" Butterfly Valve P10 ‐ Compressed AirP1020 ‐ Distribution P1020100 ‐ Service Area MH385 2 6" Butterfly Valve P10 ‐ Compressed AirP1020 ‐ Distribution P1020100 ‐ Service Area MH385 1

KTR FACILITY DATA FILE

Each facility component or piece of equipment will be a new row. Refer to Model & Facility Data Matrix for guidance on which fields are applicable to specific components & equipment.

USE UPPER CASE TO FILL OUT DATA FILE

Attachment 6

File details come from the government source that posted it. Updated .