Line
Act-ivity
Trans-mittal #
Specification Section
SD
# SD Description Item Submitted
Paragraph
Classi-fication:
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
1 01 14 00.00 22 01 Preconstruction Submittals List of Contact Personnel 1.5.1 G
2 01 20 00.00 22 01 Preconstruction Submittals Schedule of Prices 1.3 G
3 01 30 00.00 22 01 Preconstruction Submittals NAVFAC Red Zone Checklist G
4 01 30 00.00 22 01 Preconstruction Submittals NAVFAC PWD ME Follow-on Services List 1.8 G N/A
5 01 31 23.13 20 01 Preconstruction Submittals List of Contractor's Personnel 1.4.2 G
6 01 32 16.00 20 01 Preconstruction Submittals Construction Schedule 1.2 G
7 01 32 16.00 20 07 Certificates Monthly Updates 1.4 N/A
8 01 33 00 01 Preconstruction Submittals Submittal Register 1.5 G
9 01 33 10.05 20 01 Preconstruction Submittals Consolidated RFP Documents 2.1 G N/A
10 01 33 10.05 20 01 Preconstruction Submittals Submittal Register 1.5.5 G
11 01 33 10.05 20 05 Design Data Design Drawings 1.7 G N/A
12 01 33 10.05 20 05 Design Data Specifications 1.8 G N/A
13 01 33 10.05 20 05 Design Data Design Analysis 1.9 G N/A
14 01 33 10.05 20 05 Design Data Design Submittals 2.2 G N/A
15 01 33 10.05 20 11 Closeout Submittals Record Documents G
16 01 33 10.05 20 11 Closeout Submittals DD Form 1354 G N/A
17 01 35 26.00 22 01 Preconstruction Submittals Accident Prevention Plan (APP) 1.7 G
18 01 35 26.00 22 06 Test Reports Monthly Exposure Reports 1.4
19 01 35 26.00 22 06 Test Reports Notifications and Reports 1.12
20 01 35 26.00 22 06 Test Reports Accident Reports 1.12.2 G
21 01 35 26.00 22 06 Test Reports LHE Inspection Reports 1.12.3
22 01 35 26.00 22 07 Certificates Crane Operators/Riggers 1.6.1.5
23 01 35 26.00 22 07 Certificates Standard Lift Plan 1.7.2.2 G
24 01 35 26.00 22 07 Certificates Critical Lift Plan 1.7.2.3 G
25 01 35 26.00 22 07 Certificates Naval Architecture Analysis 1.7.2.3 G N/A
26 01 35 26.00 22 07 Certificates Activity Hazard Analysis (AHA) 1.8
27 01 35 26.00 22 07 Certificates Confined Space Entry Permit 1.9.1
28 01 35 26.00 22 07 Certificates Hot Work Permit 1.9.1
29 01 35 26.00 22 07 Certificates Certificate of Compliance 1.12.4
30 01 35 26.00 22 07 Certificates Third Party Certification of Barge- Mounted Mobile Cranes N/A
31 01 35 26.00 22 07 Certificates License Certificates 1.14
32 01 35 26.00 22 07 Certificates Radiography Operation Planning Work Sheet 1.14.1 G
33 01 44 00.22 01 Preconstruction Submittals Archaeologist Qualifications 1.4 G 34 01 44 00.22 06 Test Reports Archaeological Monitoring Reports 3.2 35 01 45 00.10 22 01 Preconstruction Submittals QC Plan 1.6 G
36 01 50 00.00 22 01 Preconstruction Submittals Construction site plan 1.4 G
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
TITLE: Attach 4_Submittal Register
SUBMITTAL REGISTER
JOB NAME: Increase Line Size Steam and Condensate B178 to MH385 LOCATION: Portsmouth Naval Shipyard
CONTRACT NO:
CONTRACTOR:
Attachment 4 ivity
Trans-mittal #
Specification Section
SD
# SD Description Item Submitted
Paragraph
Classi-fication:
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
TITLE: Attach 4_Submittal Register
SUBMITTAL REGISTER
JOB NAME: Increase Line Size Steam and Condensate B178 to MH385 LOCATION: Portsmouth Naval Shipyard
CONTRACT NO:
CONTRACTOR:
37 01 50 00.00 22 01 Preconstruction Submittals Traffic control plan 3.3.1 G
38 01 50 00.00 22 06 Test Reports Backflow Preventer Tests 2.2.5 G N/A
39 01 50 00.00 22 07 Certificates Backflow Tester 1.5.1 G N/A
40 01 50 00.00 22 07 Certificates Backflow Preventers 1.5 G N/A
41 01 57 19.00 22 01 Preconstruction Submittals Preconstruction Survey 1.5.1 G
42 01 57 19.00 22 01 Preconstruction Submittals Solid Waste Management Plan 3.4 G
43 01 57 19.00 22 01 Preconstruction Submittals Regulatory Notifications 1.5.2 G
44 01 57 19.00 22 01 Preconstruction Submittals Environmental Management Plan
(EMP) 3.1 G
45 01 57 19.00 22 01 Preconstruction Submittals Dirt and Dust Control Plan 3.14.1 G
46 01 57 19.00 22 01 Preconstruction Submittals Contractor Hazardous Material Inventory Log 3.6 G
47 01 57 19.00 22 01 Preconstruction Submittals Storm Water Management/Erosion and Sedimentation Control Plan 3.2.1 G
48 01 57 19.00 22 06 Test Reports Laboratory Analysis 3.13.4.2 G
49 01 57 19.00 22 06 Test Reports Disposal Requirements 3.15.2 G
50 01 57 19.00 22 06 Test Reports Erosion and Sediment Control Inspection Reports 3.2.4 G
51 01 57 19.00 22 06 Test Reports Solid Waste Management Report 3.4.1 G
52 01 57 19.00 22 11 Closeout Submittals Storm Water Management and Erosion Control Compliance Notebook 3.2.1 G
53 01 57 19.00 22 11 Closeout Submittals Waste Determination Documentation 3.5 G
54 01 57 19.00 22 11 Closeout Submittals Disposal Documentation for Hazardous and Regulated Waste 3.13.4.4 G
55 01 57 19.00 22 11 Closeout Submittals Contractor 40 CFR Employee Training Records 1.5.5 G
56 01 57 19.00 22 11 Closeout Submittals Solid Waste Management Report 3.4.1 G
57 01 57 19.00 22 11 Closeout Submittals Contractor Hazardous Material Inventory Log 3.6 G
58 01 57 19.00 22 11 Closeout Submittals Hazardous Waste/Debris Management 3.13.4 G
59 01 57 19.00 22 11 Closeout Submittals Regulatory Notifications 1.5.2 G
60 01 74 19.00 22 01 Preconstruction Submittals Waste Management Plan 1.3 G
61 01 74 19.00 22 11 Closeout Submittals Records 1.4 G
62 01 78 00.00 22 03 Product Data As-Built Record of Equipment and Materials 1.3.2 G
63 01 78 00.00 22 03 Product Data Warranty Management Plan 1.7.1 G
64 01 78 00.00 22 03 Product Data Warranty Tags 1.7.4 G
65 01 78 00.00 22 03 Product Data Final Cleaning G
66 01 78 00.00 22 03 Product Data Spare Parts Data 1.4 G N/A
67 01 78 00.00 22 08 Manufacturer’s Instructions Preventative Maintenance 1.5 G
68 01 78 00.00 22 08 Manufacturer’s Instructions Condition Monitoring (Predictive Testing) 1.5 G ivity
Trans-mittal #
Specification Section
SD
# SD Description Item Submitted
Paragraph
Classi-fication:
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
TITLE: Attach 4_Submittal Register
SUBMITTAL REGISTER
JOB NAME: Increase Line Size Steam and Condensate B178 to MH385 LOCATION: Portsmouth Naval Shipyard
CONTRACT NO:
CONTRACTOR:
69 01 78 00.00 22 08 Manufacturer’s Instructions Inspection 1.5 G
70 01 78 00.00 22 08 Manufacturer’s Instructions Instructions 1.7.1 G
71 01 78 00.00 22 10 Operation and Maintenance Data Operation and Maintenance Manuals 1.9 G N/A
72 01 78 00.00 22 11 Closeout Submittals Record Drawings 1.3.1 G
73 01 78 00.00 22 11 Closeout Submittals Certification of EPA Designated Items 1.6 G
74 01 78 00.00 22 11 Closeout Submittals Certification of EPA Designated Items 1.6 G
75 01 78 00.00 22 11 Closeout Submittals Red Zone Documents 1.3.6 G
76 01 78 23 10 Operation and Maintenance Data O&M Database G N/A
77 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1 G N/A
78 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3 G N/A
79 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2 G N/A
80 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4 G N/A
81 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6 G N/A
82 01 78 24.00 22 11 Closeout Submittals eOMSI, Progress Submittal 1.4.1 G
83 01 78 24.00 22 11 Closeout Submittals eOMSI, Prefinal Submittal 1.4.2 G
84 01 78 24.00 22 11 Closeout Submittals eOMSI, Final Submittal 1.4.3 G 85 02 82 00.00 22 03 Product Data Amended Water 1.2.2 G
86 02 82 00.00 22 03 Product Data Safety Data Sheets (SDS) for All Materials 1.3.9 G
87 02 82 00.00 22 03 Product Data Encapsulants 2.1 G 88 02 82 00.00 22 03 Product Data Respirators 3.1.2.1 G 89 02 82 00.00 22 03 Product Data Local Exhaust Equipment 3.1.7 G
90 02 82 00.00 22 03 Product Data Pressure Differential Automatic Recording Instrument 3.1.7 G
91 02 82 00.00 22 03 Product Data Vacuums 3.1.8 G 92 02 82 00.00 22 03 Product Data Glovebags 3.1.10 G 93 02 82 00.00 22 06 Test Reports Air Sampling Results 1.5.5 G
94 02 82 00.00 22 06 Test Reports Pressure Differential Recordings for Local Exhaust System 1.5.6 G
95 02 82 00.00 22 06 Test Reports Clearance Sampling 3.2.13.5 G 96 02 82 00.00 22 06 Test Reports Asbestos Disposal Quantity Report 3.3.3.2 G 97 02 82 00.00 22 07 Certificates Employee Training 1.3.4 G 98 02 82 00.00 22 07 Certificates Notifications 1.3.5 G 99 02 82 00.00 22 07 Certificates Respiratory Protection Program 1.3.7 G 100 02 82 00.00 22 07 Certificates Asbestos Hazard Abatement Plan 1.3.10 G 101 02 82 00.00 22 07 Certificates Testing Laboratory 1.3.11 G 102 02 82 00.00 22 07 Certificates Medical Certification 1.3.14 G
103 02 82 00.00 22 07 Certificates Private Qualified Person Documentation 1.5.1 G
104 02 82 00.00 22 07 Certificates Competent Person 1.5.2 G 105 02 82 00.00 22 07 Certificates Worker's License 1.5.3 G 106 02 82 00.00 22 07 Certificates Contractor's License 1.5.4 G
107 02 82 00.00 22 07 Certificates Federal, State or Local Citations on Previous Projects 1.5.7 G
108 02 82 00.00 22 07 Certificates Encapsulants 2.1 G ivity
Trans-mittal #
Specification Section
SD
# SD Description Item Submitted
Paragraph
Classi-fication:
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
TITLE: Attach 4_Submittal Register
SUBMITTAL REGISTER
JOB NAME: Increase Line Size Steam and Condensate B178 to MH385 LOCATION: Portsmouth Naval Shipyard
CONTRACT NO:
CONTRACTOR:
109 02 82 00.00 22 07 Certificates Equipment Used to Contain Airborne Asbestos Fibers 3.1 G
110 02 82 00.00 22 07 Certificates Water Filtration Equipment 3.1.3.3 G 111 02 82 00.00 22 07 Certificates Vacuums 3.1.8 G 112 02 82 00.00 22 07 Certificates Ventilation Systems 3.1.8 G 113 02 82 00.00 22 11 Closeout Submittals Permits 1.3.5 114 02 82 00.00 22 11 Closeout Submittals Licenses 1.3.5 G 115 02 82 00.00 22 11 Closeout Submittals Notifications 1.3.5 G 116 02 82 00.00 22 11 Closeout Submittals Respirator Program Records 1.3.7.1 G 117 02 82 00.00 22 11 Closeout Submittals Rental Equipment 1.7.1 G 118 03 31 01.00 22 Preconstruction Submittals Mix Design 29.a G
119 03 31 01.00 22 Preconstruction Submittals Rebar Placement Drawings 29.b G
120 03 31 01.00 22 Preconstruction Submittals Rebar Coating and Patching Methods and Materials, if applicable 29.c G
121 03 31 01.00 22 Preconstruction Submittals Rebar Supports, Spacers, Etc. 29.d G
122 03 31 01.00 22 Preconstruction Submittals Curing Method and Curing Compound 29.e G
123 03 31 01.00 22 Preconstruction Submittals Cold Weather Concreting Plan (if applicable) 29.f G
124 03 31 01.00 22 Preconstruction Submittals Hot Weather Concreting Plan (if applicable) 29.g G
125 03 31 01.00 22 Preconstruction Submittals Concrete Quality Control Plan Supplement to the Contractor's Quality Control Plan
29.h G
126 03 31 01.00 22 Preconstruction Submittals Current Certification of the Testing Agency/Laboratory(ies) 29.i G
127 03 31 01.00 22 Preconstruction Submittals Current Certification of Field Testing Technician(s) 29.j G
128 03 31 01.00 22 Preconstruction Submittals Current Certification of Laboratory Testing Technician(s) 29.k G
129 03 31 01.00 22 Preconstruction Submittals Manufacturer's Data on Form Ties 29.l.1 G
130 03 31 01.00 22 Preconstruction Submittals Manufacturer's Data on Expansion Joint Materials, Including Sealants 29.l.2 G
131 03 31 01.00 22 Preconstruction Submittals Manufacturer's Data on Water Stops, Including Splicing and Joining 29.l.3 G
132 03 31 01.00 22 Preconstruction Submittals Samples of the items above, if requested by the Government after review of the Manufacturer's data
29.l.4 G
133 03 31 01.00 22 Preconstruction Submittals Manufacturer's data on bar supports, spacers, etc. 29.l.5 G
134 09 97 13.28 03 Product Data Polyethylene-Butyl Adhesive Coating System; G G
135 09 97 13.28 03 Product Data Tape Coating System; G G 136 09 97 13.28 03 Product Data Electrical-flaw detector; G 137 09 97 13.28 03 Product Data Mastics; G 138 09 97 13.28 06 Test Reports Inspector's certificate; G 139 09 97 13.28 08 Manufacturer’s Instructions Electrical-flaw detector; G
140 22 15 26.00 20 02 Shop Drawings Medium pressure compressed air system; G G
141 22 15 26.00 20 03 Product Data Piping and tubing; G G 142 22 15 26.00 20 03 Product Data Fittings 2.1.2 G 143 22 15 26.00 20 03 Product Data Valves; G G
144 22 15 26.00 20 06 Test Reports Non-Destructive Examination (NDE) report for welding of piping 3.1.3 ivity
Trans-mittal #
Specification Section
SD
# SD Description Item Submitted
Paragraph
Classi-fication:
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
TITLE: Attach 4_Submittal Register
SUBMITTAL REGISTER
JOB NAME: Increase Line Size Steam and Condensate B178 to MH385 LOCATION: Portsmouth Naval Shipyard
CONTRACT NO:
CONTRACTOR:
145 22 15 26.00 20 06 Test Reports Leak tightness test; G G 146 31 23 00.00 22 01 Preconstruction Submittals Shoring and Sheeting Plan 3.1.1 G 147 31 23 00.00 22 01 Preconstruction Submittals Dewatering Work Plan 1.7.2 G 148 31 23 00.00 22 01 Preconstruction Submittals Excavation and Trenching Plan 1.7.1 G
149 31 23 00.00 22 01 Preconstruction Submittals Excess Soil Disposal & Soil Sampling Plan 1.7.4 G
150 31 23 00.00 22 01 Preconstruction Submittals Archeologists Qualifications 1.7.5 G 151 31 23 00.00 22 06 Test Reports Pervious Granular Fill 3.12.2.3 G 152 31 23 00.00 22 06 Test Reports Borrow Materials 2.4 G 153 31 23 00.00 22 06 Test Reports Fill and backfill 3.12.2.1 G 154 31 23 00.00 22 06 Test Reports Select material 3.12.2.2 G 155 31 23 00.00 22 06 Test Reports Density tests 3.12.2.4 G 156 31 23 00.00 22 06 Test Reports Moisture Content Tests G
157 31 23 00.00 22 07 Certificates Aggregates Sourcing Certification Letter 1.6 G
158 33 61 13 02 Shop Drawings Heat Distribution System 3.5 G 159 33 61 13 03 Product Data Interruption of Existing Service 3.1.1 G 160 33 61 13 03 Product Data Work Plan 1.5.1 G 161 33 61 13 03 Product Data Quality Assurance Plan 1.5.1 162 33 61 13 03 Product Data Connecting to Existing Work 3.1.3 G 163 33 61 13 06 Test Reports Operational Test 3.6.2.3 G 164 33 61 13 06 Test Reports Tests 3.6 G 165 33 61 13 07 Certificates Manufacturer 1.5.1 G 166 33 61 13 07 Certificates UHDS Design 1.3.2 G 167 33 61 13 07 Certificates Certificate of Compliance G 168 33 61 13 07 Certificates Welding 3.4 169 33 61 13.19 02 Shop Drawings Detail Drawings 1.3.1 G 170 33 61 13.19 03 Product Data Support of the Equipment 2.1 171 33 61 13.19 03 Product Data Piping and Fittings; G G 172 33 61 13.19 03 Product Data Valves; G G 173 33 61 13.19 03 Product Data Insulation; G G 174 33 61 13.19 03 Product Data Sump Pumps; G G 175 33 61 13.19 03 Product Data Steam Traps G