Attach 5_Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- N4008520B2519
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
G001MS-19-1719
KITTERY, ME
PORTSMOUTH NAVAL SHIPYARD
PWD-MAINE
IN HOUSE DESIGN
Attachment 5
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - MAINE
AutoCAD SHX Text
NAVAL SHIPYARD - PORTSMOUTH, NH
AutoCAD SHX Text
DESIGN MANAGER
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FEAD/PM&E
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
INCREASE LINE SIZE STEAM AND CONDENSATE B178 TO MH385
AutoCAD SHX Text
LIST OF DRAWINGS
AutoCAD SHX Text SHEET PWD-ME NAVFAC DRAWING PWD-ME NAVFAC DRAWING NAVFAC DRAWING DRAWING SHEET NO. NO. DWG. NO. TITLE NO. NO. DWG. NO. TITLE NO. DWG. NO. TITLE DWG. NO. TITLE TITLE 1 OF 14 G001 MS-19-1719 12808756 TITLE SHEET G001 MS-19-1719 12808756 TITLE SHEET MS-19-1719 12808756 TITLE SHEET 12808756 TITLE SHEET TITLE SHEET 2 OF 14 G002 MS-19-1720 12808757 GENERAL NOTES G002 MS-19-1720 12808757 GENERAL NOTES MS-19-1720 12808757 GENERAL NOTES 12808757 GENERAL NOTES GENERAL NOTES 3 OF 14 CG001 MS-19-1721 12808758 GENERAL EROSION CONTROL NOTES CG001 MS-19-1721 12808758 GENERAL EROSION CONTROL NOTES MS-19-1721 12808758 GENERAL EROSION CONTROL NOTES 12808758 GENERAL EROSION CONTROL NOTES GENERAL EROSION CONTROL NOTES 4 OF 14 CG501 MS-19-1722 12808759 EROSION CONTROL DETAILS CG501 MS-19-1722 12808759 EROSION CONTROL DETAILS MS-19-1722 12808759 EROSION CONTROL DETAILS 12808759 EROSION CONTROL DETAILS EROSION CONTROL DETAILS 5 OF 14 C101 MS-19-1723 12808760 CIVIL SITE PLAN C101 MS-19-1723 12808760 CIVIL SITE PLAN MS-19-1723 12808760 CIVIL SITE PLAN 12808760 CIVIL SITE PLAN CIVIL SITE PLAN 6 OF 14 C501 MS-19-1724 12808761 CIVIL DETAILS C501 MS-19-1724 12808761 CIVIL DETAILS MS-19-1724 12808761 CIVIL DETAILS 12808761 CIVIL DETAILS CIVIL DETAILS 7 OF 14 C502 MS-19-1725 12808762 CIVIL DETAILS C502 MS-19-1725 12808762 CIVIL DETAILS MS-19-1725 12808762 CIVIL DETAILS 12808762 CIVIL DETAILS CIVIL DETAILS 8 OF 14 C503 MS-19-1726 12808763 RAIL DETAILS C503 MS-19-1726 12808763 RAIL DETAILS MS-19-1726 12808763 RAIL DETAILS 12808763 RAIL DETAILS RAIL DETAILS 9 OF 14 M001 MS-19-1727 12808764 GENERAL MECHANICAL LEGEND, NOTES, SYMBOLS AND ABBREVIATIONS M001 MS-19-1727 12808764 GENERAL MECHANICAL LEGEND, NOTES, SYMBOLS AND ABBREVIATIONS MS-19-1727 12808764 GENERAL MECHANICAL LEGEND, NOTES, SYMBOLS AND ABBREVIATIONS 12808764 GENERAL MECHANICAL LEGEND, NOTES, SYMBOLS AND ABBREVIATIONS GENERAL MECHANICAL LEGEND, NOTES, SYMBOLS AND ABBREVIATIONS 10 OF 14 M101 MS-19-1728 12808765 MECHANICAL SITE PLANS M101 MS-19-1728 12808765 MECHANICAL SITE PLANS MS-19-1728 12808765 MECHANICAL SITE PLANS 12808765 MECHANICAL SITE PLANS MECHANICAL SITE PLANS 11 OF 14 M501 MS-19-1729 12808766 MECHANICAL DETAILS M501 MS-19-1729 12808766 MECHANICAL DETAILS MS-19-1729 12808766 MECHANICAL DETAILS 12808766 MECHANICAL DETAILS MECHANICAL DETAILS 12 OF 14 M502 MS-19-1730 12808767 B178 ELEVATIONS M502 MS-19-1730 12808767 B178 ELEVATIONS MS-19-1730 12808767 B178 ELEVATIONS 12808767 B178 ELEVATIONS B178 ELEVATIONS 13 OF 14 M503 MS-19-1731 12808768 MECHANICAL DETAILS AND SCHEDULE M503 MS-19-1731 12808768 MECHANICAL DETAILS AND SCHEDULE MS-19-1731 12808768 MECHANICAL DETAILS AND SCHEDULE 12808768 MECHANICAL DETAILS AND SCHEDULE MECHANICAL DETAILS AND SCHEDULE 14 OF 14 M504 MS-19-1732 12808769 MECHANICAL DETAILSM504 MS-19-1732 12808769 MECHANICAL DETAILSMS-19-1732 12808769 MECHANICAL DETAILS12808769 MECHANICAL DETAILSMECHANICAL DETAILS
AutoCAD SHX Text
WORK LOCATION
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text 12808756
AutoCAD SHX Text
AutoCAD SHX Text 1658818
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text 12/20/2019
AutoCAD SHX Text
JK
AutoCAD SHX Text
LAUNCH RAMP
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
PASS
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
PW-MAINE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
NFA100000493192
AutoCAD SHX Text
AutoCAD SHX Text
NFA100000493940
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1B
AutoCAD SHX Text
KITTERY
AutoCAD SHX Text
PORTSMOUTH
AutoCAD SHX Text
U.S.NAVAL
AutoCAD SHX Text
ACTIVITIES
AutoCAD SHX Text
PORTSMOUTH
AutoCAD SHX Text
HARBOR
AutoCAD SHX Text
MAINE
AutoCAD SHX Text
NEW HAMPSHIRE
AutoCAD SHX Text
PISCATAQUA RIVER
AutoCAD SHX Text
RT.1 BYPASS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: YARDS
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MA.
AutoCAD SHX Text
VT.
AutoCAD SHX Text
MAINE
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
U.S. NAVAL ACTIVITIES
AutoCAD SHX Text
KITTERY, ME
AutoCAD SHX Text
PORTSMOUTH
AutoCAD SHX Text
AUGUSTA
AutoCAD SHX Text
PORTLAND
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: MILES
AutoCAD SHX Text
AREA MAP
AutoCAD SHX Text N.H.
AutoCAD SHX Text
DETAIL IS REFERENCED
AutoCAD SHX Text
SECTION IS REFERENCED
AutoCAD SHX Text
ELEVATION IS REFERENCED
AutoCAD SHX Text
ELEVATION, SECTION OR DETAIL SYMBOLS
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
SHEET NUMBER WHERE
AutoCAD SHX Text
DETAIL LETTER OR NUMBER
AutoCAD SHX Text
REFERENCES
AutoCAD SHX Text
ADDITIONAL SHEET
AutoCAD SHX Text C-102
AutoCAD SHX Text
SHEET NUMBER WHERE
AutoCAD SHX Text
REFERENCES
AutoCAD SHX Text
ADDITIONAL SHEET
AutoCAD SHX Text
INDICATES DIRECTION
AutoCAD SHX Text
OF CUTTING PLANE
AutoCAD SHX Text
ELEVATION LETTER OR NUMBER
AutoCAD SHX Text
REFERENCES
AutoCAD SHX Text
ADDITIONAL SHEET
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
SHEET NUMBER WHERE
AutoCAD SHX Text
SECTION LETTER OR NUMBER
AutoCAD SHX Text
OF CUTTING PLANE
AutoCAD SHX Text
INDICATES DIRECTION
AutoCAD SHX Text C-102
AutoCAD SHX Text C-102
AutoCAD SHX Text A
AutoCAD SHX Text A-000
AutoCAD SHX Text A
AutoCAD SHX Text A-000
AutoCAD SHX Text A
AutoCAD SHX Text A-000
AutoCAD SHX Text
PORTSMOUTH NAVAL SHIPYARD
AutoCAD SHX Text
KITTERY, MAINE
AutoCAD SHX Text
INCREASE LINE SIZE STEAM AND CONDENSATE
AutoCAD SHX Text
B178 TO MH385
AutoCAD SHX Text
AutoCAD SHX Text
DAVID HICKMAN
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
XXX
AutoCAD SHX Text
AMIN BAHROUR
AutoCAD SHX Text
KEITH CHRISTOPHER
AutoCAD SHX Text
JESSE KNOWLTON
AutoCAD SHX Text
KEITH CHRISTOPHER
AutoCAD SHX Text
JESSE KNOWLTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
DRAWFORM REVISION: DECEMBER 2018
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
G002MS-19-1720
PWD-MAINE
IN HOUSE DESIGN
GENERAL NOTES
EROSION CONTROL NOTES:
TRAFFIC NOTES:
UTILITY NOTES:
CONSTRUCTION NOTES:
STRUCTURAL STEEL NOTES:
CONCRETE NOTES:
Attachment 5
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - MAINE
AutoCAD SHX Text
NAVAL SHIPYARD - PORTSMOUTH, NH
AutoCAD SHX Text
DESIGN MANAGER
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FEAD/PM&E
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text 12808757
AutoCAD SHX Text
AutoCAD SHX Text 1658818
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
AutoCAD SHX Text
PORTSMOUTH NAVAL SHIPYARD
AutoCAD SHX Text
KITTERY, MAINE
AutoCAD SHX Text
INCREASE LINE SIZE STEAM AND CONDENSATE
AutoCAD SHX Text
B178 TO MH385
AutoCAD SHX Text
AutoCAD SHX Text
DAVID HICKMAN
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
1. PLANS HAVE BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD PLANS HAVE BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD SURVEY AND OBSERVATION. 2. EXISTING CONDITION CONTOURS SHOWN DEVELOPED BY AERIAL MAPPING EXISTING CONDITION CONTOURS SHOWN DEVELOPED BY AERIAL MAPPING PERFORMED BY AERIAL SURVEY & PHOTO, NORRIDGEWOCK, MAINE, JULY 27, 2001 AND REFERENCE PNSY VERTICAL DATUM MLLW = 96.779 (NAVD 88 00.00). SEE "TOPOGRAPHIC PLAN OF THE PORTSMOUTH NAVAL SHIPYARD KITTERY, MAINE FOR TETRA TECH NUS" DATED 11-22-02. 3. VERTICAL DATUM: NAVD 88. VERTICAL DATUM: NAVD 88. 4. HORIZONTAL DATUM: MAINE STATE COORDINATES. WEST ZONE NAD 83. HORIZONTAL DATUM: MAINE STATE COORDINATES. WEST ZONE NAD 83. 5. PORTSMOUTH NAVAL SHIPYARD GROUND CONTROL ESTABLISHED BY CIVIL PORTSMOUTH NAVAL SHIPYARD GROUND CONTROL ESTABLISHED BY CIVIL CONSULTANTS, SOUTH BERWICK MAINE FEBRUARY 2002. 6. UNLESS OTHERWISE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE UNLESS OTHERWISE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE PLANS TO REMAIN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN POSTS, CURBS, SIDEWALKS AND BACK OF SIDEWALK FEATURES MUST BE VERIFIED, LOCATED, AND PROTECTED DURING ALL PHASES OF CONSTRUCTION. 7. SURVEY CONTROL BOUNDS AND STREET LINE MONUMENTATION MUST NOT BE SURVEY CONTROL BOUNDS AND STREET LINE MONUMENTATION MUST NOT BE DISTURBED DURING THE COURSE OF WORK AND MUST BE PROTECTED. SHOULD ANY BOUND BE DISTURBED, THE CONTRACTOR MUST HIRE, AT HIS OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS ORIGINAL POSITION. 8. SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE GOVERNMENT. SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE GOVERNMENT. 9. FEATURES MAY BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT FEATURES MAY BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT EXPLICITLY CALLED OUT FOR REMOVAL OR DEMOLITION. DEMOLISH ALL FEATURES WITHIN THE LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF THE PROJECT. 10. PREVENT ANY DISTURBANCE OR DAMAGE TO ADJACENT PROPERTIES. PREVENT ANY DISTURBANCE OR DAMAGE TO ADJACENT PROPERTIES. 11. YELLOW PLASTIC: YELLOW PLASTIC: DO NOT USE YELLOW OR ORANGE-YELLOW COLORED MATERIALS FOR THE FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS, SHEETING, TARPS, POLYETHYLENE BOTTLES OR OTHER CONTAINERS, TAPES, BAGS, BANDING, IDENTIFICATION MARKS ON TOOLS, BOUNDARY MARKERS, RIBBONS, VENT DUCTS, ETC. CONTRACTOR GENERATED YELLOW COLORED WASTE MUST BE DISPOSED OF BY THE CONTRACTOR OFF-YARD. SHIPYARD REFUSE CONTAINERS MUST NOT BE USED FOR THE DISPOSAL OF YELLOW COLORED WASTE MATERIALS. YELLOW COLORED ITEMS SUCH AS DESCRIBED ABOVE ARE OF SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE SUBJECT TO STRICT CONTROLS. YELLOW COLORED CONTRACT GENERATED DEBRIS MUST BE BAGGED IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY REMOVED FROM PORTSMOUTH NAVAL SHIPYARD. 12. REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER HAZARDOUS SUBSTANCES. REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER HAZARDOUS SUBSTANCES. (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING DURING THE PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, REGARDLESS OF THE QUANTITY. CALL THE FIRE DEPARTMENT AND CONTRACTING OFFICER TO REPORT THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO CLEAN UP, PACKAGE AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON THE SHIPYARD, AND BILL SUCH COSTS TO THE CONTRACTOR. 13. UNFORESEEN HAZARDOUS MATERIAL UNFORESEEN HAZARDOUS MATERIAL THE DESIGN HAS IDENTIFIED MATERIALS SUCH AS PCB, LEAD PAINT, AND FRIABLE AND NON-FRIABLE ASBESTOS. IF ADDITIONAL MATERIAL, NOT INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH UPON DISTURBANCE DURING CONSTRUCTION OPERATIONS IS ENCOUNTERED, STOP THAT PORTION OF WORK AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY.
AutoCAD SHX Text
1. VERIFY ALL EXISTING UTILITY INFORMATION AND TIE IN LOCATIONS NEEDED TO VERIFY ALL EXISTING UTILITY INFORMATION AND TIE IN LOCATIONS NEEDED TO COMPLETE THE CONSTRUCTION OF NEW UTILITY SYSTEMS AND SITE IMPROVEMENTS. VERIFICATION METHODS MUST INCLUDE BUT NOT BE LIMITED TO TESTS PITS AND CCTV TO VERIFY LOCATION, ELEVATION, SIZE, MATERIAL, AND ANY OTHER INFORMATION REQUIRED TO COMPLETE THE CONSTRUCTION. 2. UTILITIES NOT SHOWN ON THESE PLANS MAY EXIST. THE LOCATION, ELEVATION, UTILITIES NOT SHOWN ON THESE PLANS MAY EXIST. THE LOCATION, ELEVATION, SIZE AND MATERIAL OF ALL UTILITIES MUST BE VERIFIED BEFORE PROCEEDING WITH CONSTRUCTION. ALL UTILITY LINES AND ASSOCIATED STRUCTURES NOT AFFECTED BY THIS PROJECT MUST BE PROTECTED THROUGHOUT ALL PHASES OF WORK. 3. THE LOCATION OF UNDERGROUND UTILITIES WITHIN THE LIMITS OF THE EXCAVATION THE LOCATION OF UNDERGROUND UTILITIES WITHIN THE LIMITS OF THE EXCAVATION OR GROUND PENETRATING WORK MUST BE LOCATED PRIOR TO COMMENCING ANY EXCAVATION OR GROUND PENETRATING WORK. "DIG SAFE" (1-888-344-7233) MUST BE NOTIFIED WITHIN 14 CALENDAR DAYS, BUT NO MORE THEN 30 DAYS, PRIOR TO THE COMMENCEMENT OF THE EXCAVATION OR GROUND PENETRATING ACTIVITY. THE STATE OF MAINE "DIG SAFE" LAW (TITLE 23, MRSA 3360-A) MUST BE FULLY COMPILED WITH. 4. THE EXCAVATOR MUST PREPARE A "PWD ME DIG SAFE UTILITY LOCATE REQUEST THE EXCAVATOR MUST PREPARE A "PWD ME DIG SAFE UTILITY LOCATE REQUEST FORM" AT LEAST 14 CALENDAR DAYS PRIOR TO THE COMMENCEMENT OF THE EXCAVATION OR GROUND PENETRATING ACTIVITY AND SUBMIT THE FORM TO THE CONTRACTING OFFICER (OBTAIN FORM FROM NAVFAC ET). 5. THE GOVERNMENT MUST LOCATE AND MARK THE UNDERGROUND UTILITIES WITHIN THE GOVERNMENT MUST LOCATE AND MARK THE UNDERGROUND UTILITIES WITHIN 14 CALENDAR DAYS OF RECEIVING THE DIG SAFE NOTIFICATION. 6. EXCAVATION OR GROUND PENETRATION ACTIVITIES CAN NOT COMMENCE UNTIL THE EXCAVATION OR GROUND PENETRATION ACTIVITIES CAN NOT COMMENCE UNTIL THE UTILITIES HAVE BEEN MARKED IN THE FIELD AND THE PWD ME DIG SAFE UTILITY LOCATE REQUEST FORM HAS BEEN RETURNED INDICATING THE PWD ME DIG SAFE REVIEW PROCESS HAS BEEN COMPLETED AND EXCAVATION HAS BEEN APPROVED BY THE CONTRACTING OFFICER. 7. IF THE EXCAVATION OR GROUND PENETRATING ACTIVITIES DO NOT COMMENCE IF THE EXCAVATION OR GROUND PENETRATING ACTIVITIES DO NOT COMMENCE WITHIN 27 DAYS OF DIG SAFE NOTIFICATION OR THE EXCAVATION WORK IS EXPANDED OUTSIDE THE LOCATION ORIGINALLY SPECIFIED IN THE NOTIFICATION, THE EXCAVATOR MUST RE-NOTIFY DIG SAFE, THE CONTRACTING OFFICER AND THE PWD ME DIG SAFE COORDINATOR. 8. MAINTAIN THE UTILITY MARKINGS THROUGHOUT THE CONTRACT PERIOD. IF MAINTAIN THE UTILITY MARKINGS THROUGHOUT THE CONTRACT PERIOD. IF ADDITIONAL MARKINGS ARE REQUIRED, THE EXCAVATOR MUST RE-NOTIFY DIG SAFE, THE CONTRACTING OFFICER, AND THE PWD ME DIG SAFE COORDINATOR AT 207-438-1082. 9. ALL SEWER AND DRAIN FRAMES AND GRATES OR COVERS MUST BE ADJUSTED TO ALL SEWER AND DRAIN FRAMES AND GRATES OR COVERS MUST BE ADJUSTED TO MATCH PROPOSED FINISHED GRADE. EXISTING FRAMES AND GRATES OR COVERS MUST BE REMOVED AND NEW FRAMES AND GRATES OR COVERS MUST BE PROVIDED IF EXISTING ITEMS ARE DAMAGED DURING THE COURSE OF WORK. 10. ALL ELECTRIC POWER MANHOLE FRAMES AND COVERS MUST BE ADJUSTED TO ALL ELECTRIC POWER MANHOLE FRAMES AND COVERS MUST BE ADJUSTED TO MATCH FINISH GRADE. REMOVE EXISTING FRAMES AND COVERS AND PROVIDE NEW FRAMES AND COVERS WHEN DAMAGED DURING THE COURSE OF WORK. 11. SHORING SYSTEMS: MECHANICAL MEANS OF EXCAVATION MUST NOT BE USED SHORING SYSTEMS: MECHANICAL MEANS OF EXCAVATION MUST NOT BE USED WHEN EXCAVATING WITHIN 48 INCHES OF ANY MARKED UNDERGROUND UTILITY UNTIL THE UNDERGROUND UTILITY HAS BEEN EXPOSED. MECHANICAL MEANS MAY BE USED, AS NECESSARY, FOR INITIAL PENETRATION AND REMOVAL OF PAVEMENT, ROCK, OR OTHER MATERIALS REQUIRING USE OF MECHANICAL MEANS OF EXCAVATION. ONCE THE UNDERGROUND UTILITIES HAVE BEEN EXPOSED, FURTHER EXCAVATION MUST BE PERFORMED EMPLOYING REASONABLE PRECAUTIONS TO AVOID DAMAGE TO THE UNDERGROUND UTILITIES, INCLUDING BUT NOT LIMITED TO ANY SUBSTANTIAL WEAKENING OF STRUCTURAL OR LATERAL SUPPORT OF THE UTILITY OR PENETRATION OR DESTRUCTION OF THE UTILITY OR THEIR PROTECTIVE COATINGS. 12. ADJUST ALL GATE VALVE BOXES AND CURB STOP BOXES TO FINISH GRADE. ADJUST ALL GATE VALVE BOXES AND CURB STOP BOXES TO FINISH GRADE. REMOVE EXISTING GATE VALVE BOXES AND CURB STOP BOXES AND PROVIDE NEW GATE VALVE BOXES AND CURB STOP BOXES WHEN DAMAGED DURING THE COURSE OF WORK. 13. THE COST FOR THE ADJUSTMENT OR RELOCATION OF PUBLIC AND PRIVATE UTILITY THE COST FOR THE ADJUSTMENT OR RELOCATION OF PUBLIC AND PRIVATE UTILITY PIPES, STRUCTURES AND CASTINGS, INCLUDING BUT NOT LIMITED TO GAS, CABLE TV, AND TELEPHONE, MUST BE PAID BY THE CONTRACTOR. COMPLETION OF SUCH WORK MAY OR MAY NOT BE COMPLETED BY THE PUBLIC AND PRIVATE UTILITY OWNER. THE CONTRACTOR MUST COORDINATE ALL WORK WITH THE PUBLIC UTILITY COMPANIES. 14. PREVENT DEBRIS FROM ENTERING INLETS AND BASINS. PROVIDE AND MAINTAIN PREVENT DEBRIS FROM ENTERING INLETS AND BASINS. PROVIDE AND MAINTAIN INLET PROTECTION FOR THE DURATION OF THE WORK. INSPECT INLETS WEEKLY AND AFTER EACH STORM EVENT, AND REMOVE ACCUMULATED DEBRIS. CLEAN ALL STRUCTURES AT THE COMPLETION OF THE WORK. 15. WHERE ITEMS SUCH AS UTILITY STRUCTURES AND EARTHWORK MATERIALS ARE WHERE ITEMS SUCH AS UTILITY STRUCTURES AND EARTHWORK MATERIALS ARE INDICATED BY TYPE, SEE THE MEDOT STANDARD SPECIFICATIONS, HIGHWAY AND BRIDGES AND SUPPLEMENTARY STANDARD CONSTRUCTION DETAILS FOR CONSTRUCTION, LATEST EDITIONS. 16. WORK OCCURS WITHIN AN AREA OF ARCHAEOLOGICAL SENSITIVITY, BUT WITHIN WORK OCCURS WITHIN AN AREA OF ARCHAEOLOGICAL SENSITIVITY, BUT WITHIN PREVIOUSLY DISTURBED AREAS. IN THE EVENT THAT A POTENTIAL ARCHAEOLOGICAL RESOURCE IS ENCOUNTERED, ALL WORK IN THE IMMEDIATE AREA SHALL CEASE. DO NOT RESUME WORK UNTIL SO DIRECTED BY THE COR OR CM.
AutoCAD SHX Text
1. AVAILABLE STORAGE AND LAYDOWN AREAS ARE EXPLICITLY SHOWN ON THE AVAILABLE STORAGE AND LAYDOWN AREAS ARE EXPLICITLY SHOWN ON THE DRAWINGS. NO OTHER SPACE IS AVAILABLE. COORDINATE FINAL DETAILS WITH THE CONTRACTING OFFICER. 2. ALL CONSTRUCTION MATERIALS MUST BE TRANSPORTED TO AND FROM THE ALL CONSTRUCTION MATERIALS MUST BE TRANSPORTED TO AND FROM THE SITE IN COVERED VEHICLES. PROVIDE VACUUM ASSISTED STREET SWEEPER AT THE SITE AS NECESSARY TO KEEP TRAFFIC AREAS CLEAN. 3. COORDINATE WITH PORTSMOUTH SHIPYARD OPERATIONS DURING THE PROCESS COORDINATE WITH PORTSMOUTH SHIPYARD OPERATIONS DURING THE PROCESS OF THE WORK. 4. SUBMIT A DETAILED CONSTRUCTION SEQUENCING PLAN FOR REVIEW AND SUBMIT A DETAILED CONSTRUCTION SEQUENCING PLAN FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. 5. MAINTAIN SECURITY AT ALL TIMES DURING CONSTRUCTION. MAINTAIN SECURITY AT ALL TIMES DURING CONSTRUCTION. 6. COMPLY WITH ALL APPLICABLE O.S.H.A. REGULATIONS AND SAFETY COMPLY WITH ALL APPLICABLE O.S.H.A. REGULATIONS AND SAFETY REQUIREMENTS. 7. ALL CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50MPH WINDS ALL CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50MPH WINDS VELOCITY WINDS AND BE PREPARED BY A PROFESSIONAL SIGN COMPANY WITH A MINIMUM OF THREE (3) YEARS EXPERIENCE. 8. WHERE CONTRACTOR REMOVES EXISTING SITE FEATURES THAT ARE TO REMAIN WHERE CONTRACTOR REMOVES EXISTING SITE FEATURES THAT ARE TO REMAIN TO FACILITATE INSTALLATION OF NEW WORK FOR THIS PROJECT, REPLACE THE EXISTING SITE FEATURES AT CONTRACTORS EXPENSE. 9. THE CONSTRUCTION LIMIT LINE SHOWN ON DRAWING IS AN APPROXIMATION OF THE CONSTRUCTION LIMIT LINE SHOWN ON DRAWING IS AN APPROXIMATION OF THE CONSTRUCTION LIMITS. THE CONTRACTOR IN COORDINATION WITH THE CONTRACTING OFFICER MAY MODIFY THIS LINE TO ACCOMMODATE THE EFFICIENCY OF CONSTRUCTION PROJECT. 10. ALL WORK TO ACTIVE TRACK REQUIRES COORDINATED TRACK OUTAGES.ALL WORK TO ACTIVE TRACK REQUIRES COORDINATED TRACK OUTAGES.
AutoCAD SHX Text
1. ALL SITE WORK CONDUCTED ON OR AFTER JANUARY 1, 2013 IN THE STATE ALL SITE WORK CONDUCTED ON OR AFTER JANUARY 1, 2013 IN THE STATE OF MAINE SHORELAND ZONE, INCLUDING ANY FILLING, EXCAVATION, LANDSCAPING, AND/OR OTHER EARTHWORK IN EXCESS OF ONE CUBIC YARD OF DISTURBANCE, MUST COMPLY WITH STATE OF MAINE REQUIREMENTS FOR CERTIFICATION IN EROSION AND SEDIMENTATION CONTROL PRACTICES. A CERTIFIED INDIVIDUAL MUST BE RESPONSIBLE FOR MANAGEMENT OF EROSION CONTROL PRACTICES AT THE SITE EACH DAY EARTH MOVING ACTIVITIES OCCUR. A CERTIFIED INDIVIDUAL IS REQUIRED TO VISIT THE SITE EVERY DAY TO ENSURE PROPER EROSION AND SEDIMENT CONTROL PRACTICES ARE FOLLOWED. AS AN ALTERNATIVE, THE CONTRACTOR MAY CHOOSE TO CONTRACT WITH A CERTIFIED INDIVIDUAL TO SUPERVISE THE CONTRACTORS WORK IN SHORELAND AREAS. UNDER THE STATE OF MAINE'S SHORELAND ZONING STATUES, THE PORTSMOUTH NAVAL SHIPYARD IS LOCATED ENTIRELY WITHIN THE STATE'S SHORELAND ZONE. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE DESIGNED IN ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE DESIGNED IN ACCORDANCE WITH THE MAINE EROSION AND SEDIMENTATION CONTROL HANDBOOK FOR CONSTRUCTION: BEST MANAGEMENT PRACTICES, LATEST EDITION. 3. CONSTRUCTION MUST NOT BEGIN UNTIL ALL OF THE TEMPORARY EROSION AND CONSTRUCTION MUST NOT BEGIN UNTIL ALL OF THE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES, HAVE BEEN INSTALLED.
AutoCAD SHX Text
1. MAINTAIN TRAFFIC FLOW DURING THE PROGRESS OF THE WORK. A DETAILED MAINTAIN TRAFFIC FLOW DURING THE PROGRESS OF THE WORK. A DETAILED TRAFFIC CONTROL PLAN MUST BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THE TRAFFIC CONTROL PLAN MUST CONSIDER ALL AFFECTED PORTSMOUTH SHIPYARD OPERATIONS. THE CONTRACTOR MUST UPDATE THE TRAFFIC CONTROL PLAN AS REQUIRED DURING THE PROJECT. 2. MAINTAIN EXISTING TRAFFIC CONTROL SIGNAGE AND INFORMATIONAL SIGNS MAINTAIN EXISTING TRAFFIC CONTROL SIGNAGE AND INFORMATIONAL SIGNS DURING THE PROCESS OF WORK. 3. PROVIDE TEMPORARY TRAFFIC CONTROL DEVICES. PROVIDE TEMPORARY TRAFFIC CONTROL DEVICES. 4. PROVIDE POST MOUNTED AND WALL MOUNTED TRAFFIC CONTROL AND PROVIDE POST MOUNTED AND WALL MOUNTED TRAFFIC CONTROL AND INFORMATION SIGNS IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, AS PUBLISHED BY THE FHWA. 5. ANY WORK THAT IMPACTS ROAD ACCESS ALONG THE NORTH WEST CORNER OF ANY WORK THAT IMPACTS ROAD ACCESS ALONG THE NORTH WEST CORNER OF B178 MUST BE PERFORMED ON SECOND SHIFT, AFTER 5PM. A FIRE LANE OF AT LEAST 20 FEET MUST BE MAINTAINED AT ALL TIMES.
AutoCAD SHX Text
XXX
AutoCAD SHX Text
AMIN BAHROUR
AutoCAD SHX Text
KEITH CHRISTOPHER
AutoCAD SHX Text
JESSE KNOWLTON
AutoCAD SHX Text
KEITH CHRISTOPHER
AutoCAD SHX Text
JESSE KNOWLTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
DRAWFORM REVISION: DECEMBER 2018
AutoCAD SHX Text
1. STEEL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STEEL STEEL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STEEL CONSTRUCTION MANUAL" AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)- 13TH EDITION. 1. ALL CONCRETE CONSTRUCTION SHALL BE IN CONFORMANCE WITH AMERICAN ALL CONCRETE CONSTRUCTION SHALL BE IN CONFORMANCE WITH AMERICAN CONCRETE INSTITUTE BUILDING CODE, ACI 318, LATEST EDITION. 2. ALL CONCRETE SHALL BE NORMAL WEIGHT HAVING A MINIMUM COMPRESSIVE ALL CONCRETE SHALL BE NORMAL WEIGHT HAVING A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 4000 PSI UNLESS NOTED OTHERWISE. A. PORTLAND CEMENT SHALL CONFORM TO ASTM C 150 TYPE II. PORTLAND CEMENT SHALL CONFORM TO ASTM C 150 TYPE II. B. AGGREGATE SHALL CONFORM TO ASTM C33, 3/4" MAXIMUM SIZE. AGGREGATE SHALL CONFORM TO ASTM C33, 3/4" MAXIMUM SIZE. C. WATER SHALL CONFORM TO ASTM C 1602 AND SHALL BE POTABLE. WATER SHALL CONFORM TO ASTM C 1602 AND SHALL BE POTABLE. D. MAXIMUM WATER CEMENT RATIO SHALL BE 0.45. MAXIMUM WATER CEMENT RATIO SHALL BE 0.45. E. MAXIMUM SLUMP SHALL BE 4". MAXIMUM SLUMP SHALL BE 4". F. AIR ENTRAINING AGENT SHALL CONFORM TO ASTM C 260 WITH AIR ENTRAINING AGENT SHALL CONFORM TO ASTM C 260 WITH 6% +/- 1 % TOTAL AIR. 12% TOTAL AIR. 3. REINFORCING STEEL SHALL BE ASTM A615 GRADE 60. ALL DETAILS SHALL BE IN REINFORCING STEEL SHALL BE ASTM A615 GRADE 60. ALL DETAILS SHALL BE IN ACCORDANCE WITH ACI DETAIL STANDARD ACI 315. 4. REINFORCING STEEL SHALL HAVE A CONCRETE COVER AS FOLLOWS, EXCEPT AS REINFORCING STEEL SHALL HAVE A CONCRETE COVER AS FOLLOWS, EXCEPT AS OTHERWISE SHOWN ON DRAWINGS: A. CONCRETE CAST AGAINST EARTH: 3" CONCRETE CAST AGAINST EARTH: 3" B. CONCRETE EXPOSED TO EARTH OR WEATHER: 2" CONCRETE EXPOSED TO EARTH OR WEATHER: 2" C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND: 1" CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND: 1" 5. ALL EXPOSED CONCRETE EDGES SHALL HAVE 3/4" CHAMFER. ALL EXPOSED CONCRETE EDGES SHALL HAVE 3/4" CHAMFER. 6. ALL LAP SPLICES FOR CONTINUOUS REINFORCING, NOT SHOWN ON DRAWINGS, ALL LAP SPLICES FOR CONTINUOUS REINFORCING, NOT SHOWN ON DRAWINGS, SHALL BE IN ACCORDANCE WITH ACI 318. 7. FOR PENETRATIONS GREATER THAN 10" THROUGH CONCRETE WALLS AND SLABS, FOR PENETRATIONS GREATER THAN 10" THROUGH CONCRETE WALLS AND SLABS, PROVIDE ADDITIONAL DIAGONAL REINFORCING BARS AROUND THE OPENING AT EACH FACE EQUAL IN SIZE TO THE MAIN REINFORCING. DIAGONAL BARS SHALL OVERLAP A MINIMUM OF 1'-6". 8. HOT WEATHER CONCRETE INSTALLATION SHALL BE PERFORMED IN ACCORDANCE WITH HOT WEATHER CONCRETE INSTALLATION SHALL BE PERFORMED IN ACCORDANCE WITH ACI 305. COLD WEATHER CONCRETE INSTALLATION SHALL BE PERFORMED IN ACCORDANCE WITH ACI 306. 9. CURING: CURING: A. HORIZONTAL SURFACES SHALL BE KEPT CONTINUOUSLY MOIST FOR A HORIZONTAL SURFACES SHALL BE KEPT CONTINUOUSLY MOIST FOR A MINIMUM OF SEVEN DAYS. B. VERTICAL SURFACES SHALL RECEIVE TWO COATS (ONE AT TIME OF VERTICAL SURFACES SHALL RECEIVE TWO COATS (ONE AT TIME OF STRIPPING AND ANOTHER THREE DAYS LATER) OF AN APPROVED NON-TOXIC CURING COMPOUND. FORMS SHALL REMAIN -PLACE THROUGH INITIAL CURE. 10. FLOWABLE FILL: FLOWABLE FILL SHALL BE A CEMENT CONCRETE BACKFILL MATERIAL FLOWABLE FILL: FLOWABLE FILL SHALL BE A CEMENT CONCRETE BACKFILL MATERIAL THAT FLOWS LIKE A LIQUID, SUPPORTS LIKE A SOLID WHEN CURED, AND LEVELS WITHOUT TAMPING OR VIBRATING TO REACH ONE HUNDRED PERCENT (100%) COMPACTION. THE MATERIAL SHALL BE PROPORTIONED TO YIELD A TWENTY-EIGHT-DAY (28--DAY) MINIMUM COMPRESSIVE STRENGTH OF TWO HUNDRED POUNDS PER SQUARE INCH (200 PSI) IF NOT SPECIFIED ELSEWHERE. THE MATERIAL SHALL BE PRODUCED AND INSTALLED IN ACCORDANCE WITH ACI 229R, AND ACI 116R, WITH A MIX FORMULATION TO BE APPROVED PRIOR TO PLACEMENT OF THE MATERIAL IN THE PROJECT. 11. LEAN CONCRETE: LEAN CONCRETE SHALL CONSIST OF A MIXTURE OF PORTLAND LEAN CONCRETE: LEAN CONCRETE SHALL CONSIST OF A MIXTURE OF PORTLAND CEMENT AND HARD, DURABLE MINERAL AGGREGATE PROPORTIONED SO THAT THE CONCRETE ATTAINS A MINIMUM TWENTY-EIGHT-DAY (28_DAY) COMPRESSIVE STRENGTH OF ONE THOUSAND (1,000) PSI. LEAN CONCRETE MAY BE USED AS AN ALTERNATIVE TO SAND-GRAVEL AND CRUSHED STONE TO CORRECT OVER-EXCAVATION. 12. CONCRETE SHALL BE PLACED IN THE PRESENCE OF A REPRESENTATIVE OF AN CONCRETE SHALL BE PLACED IN THE PRESENCE OF A REPRESENTATIVE OF AN APPROVED TESTING AGENCY AND IN ACCORDANCE WITH THE SPECIFICATIONS IN 03 31 01.00 22. 13. INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AT LEAST 24 HOURS PRIOR INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AT LEAST 24 HOURS PRIOR TO SCHEDULED CONCRETE PLACEMENT. NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE AND STRUCTURAL ENGINEER OF COMPLETION AT LEAST 24 HOURS PRIOR TO THE SCHEDULED COMPLETION OF THE INSTALLATION OF REINFORCEMENT. 14. SUBMIT THE FOLLOWING FOR GOVERNMENT REVIEW AND APPROVAL: SUBMIT THE FOLLOWING FOR GOVERNMENT REVIEW AND APPROVAL: A. MIX DESIGN INCLUDING DATA ON ALL COMPONENTS WITH TEST RESULTS MIX DESIGN INCLUDING DATA ON ALL COMPONENTS WITH TEST RESULTS B. REINFORCING STEEL, INCLUDING PLACEMENT DRAWINGS AND SUPPORTS. REINFORCING STEEL, INCLUDING PLACEMENT DRAWINGS AND SUPPORTS. STRUCTURAL PRECAST CONCRETE NOTES 1. ALL PRECAST CONCRETE, UNLESS OTHERWISE NOTED, SHALL BE STONE AGGREGATE ALL PRECAST CONCRETE, UNLESS OTHERWISE NOTED, SHALL BE STONE AGGREGATE CONCRETE HAVING A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI @ 28 DAYS. ALL OTHER CAST IN PLACE CONCRETE NOTES APPLY. 2. PRECAST MANUFACTURER SHALL SUBMIT BACK-UP DESIGN CALCULATIONS FOR ALL PRECAST MANUFACTURER SHALL SUBMIT BACK-UP DESIGN CALCULATIONS FOR ALL PRECAST ELEMENTS, SIGNED AND SEALED BY A REGISTERED PROFESSIONAL STRUCTURAL ENGINEER.
AutoCAD SHX Text
CONCRETE MATERIAL SCHEDULE
AutoCAD SHX Text
ELEMENT
AutoCAD SHX Text
28 DAY CYLINDER STRENGTH (PSI)
AutoCAD SHX Text
MAXIMUM WATER/ CEMENTITIOUS RATIO
AutoCAD SHX Text
DRY UNIT WEIGHT (PCR)
AutoCAD SHX Text
MAXIMUM AGGREGATE SIZE (IN.)
AutoCAD SHX Text
DESIGN AIR CONTENT (%)
AutoCAD SHX Text
MAXIMUM DESIGN SLUMP* (IN.)
AutoCAD SHX Text
MAXIMUM CHLORIDE CONTENT (%)
AutoCAD SHX Text
WALL, SLABS
AutoCAD SHX Text 4,000
AutoCAD SHX Text 0.40
AutoCAD SHX Text 0.40
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 6%±11/2%
AutoCAD SHX Text 4"/8"
AutoCAD SHX Text 0.30%
AutoCAD SHX Text MANHOLE COVERS: 1. ACCESS MANHOLE AND ASSEMBLY SHALL BE RATED FOR HS-20 LOADING, ACCESS MANHOLE AND ASSEMBLY SHALL BE RATED FOR HS-20 LOADING, HINGED, AND SQUARE STYLE. MATERIAL SHALL BE OF DUCTILE IRON CONFORMING TO ASTM A 536 GRADE 70-50-05 FOR MANHOLE FRAME AND 80-55-06 FOR MANHOLE COVER. PRODUCTS INCLUDES 30-INCH x 30-INCH CLEAR OPENING, TOP AND BOTTOM FLANGE FRAME, AND SINGLE COVER DESIGN WHICH ALLOWS THE COVER TO OPEN TO 120 DEGREES. THE MANHOLE COVER SHALL BE PROVIDED WITH A HOLD OPEN SAFETY ARM THAT CATCHES AT 90 DEGREES TO PREVENT ACCIDENTAL CLOSURE. CASTING SHALL BE SUITABLE FOR HS20 VEHICLE LOADING PLUS 30% INCREASE FOR IMPACT AND SHALL HAVE PASSED A 200,000 POUND PROOF LOAD TEST AS OUTLINED IN AASHTO M306. DRILLED HOLES SHALL BE PROVIDED IN COVERS TO ALLOW FOR AIR QUALITY TESTING INSIDE MANHOLES PRIOR TO OPENING COVERS. MANHOLES SHALL BE PROVIDED WITH A LIFT ASSIST MECHANICAL STRUT. THE ASSEMBLY SHALL BE PROVIDED AS BOLTED. 2. MANHOLE STRUCTURE IDENTIFICATION: PROVIDE LABEL IDENTIFYING COMMODITY MANHOLE STRUCTURE IDENTIFICATION: PROVIDE LABEL IDENTIFYING COMMODITY TYPE AND STRUCTURE NUMBER. COORDINATE LABELING IDENTIFIER WITH KO. LABEL SHALL BE CAST IN BY MFG OR WELDED WITH 1/4" BEAD WELD. TEXT SHALL BE 4" HIGH.
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text 12/20/2019
JK
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CG001MS-19-1721
PWD-MAINE
IN HOUSE DESIGN
Attachment 5
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - MAINE
AutoCAD SHX Text
NAVAL SHIPYARD - PORTSMOUTH, NH
AutoCAD SHX Text
DESIGN MANAGER
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FEAD/PM&E
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
GENERAL EROSION CONTROL NOTES
AutoCAD SHX Text 12808758
AutoCAD SHX Text
AutoCAD SHX Text 1658818
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
AutoCAD SHX Text
PORTSMOUTH NAVAL SHIPYARD
AutoCAD SHX Text
KITTERY, MAINE
AutoCAD SHX Text
INCREASE LINE SIZE STEAM AND CONDENSATE
AutoCAD SHX Text
B178 TO MH385
AutoCAD SHX Text
AutoCAD SHX Text
DAVID HICKMAN
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
XXX
AutoCAD SHX Text
AMIN BAHROUR
AutoCAD SHX Text
KEITH CHRISTOPHER
AutoCAD SHX Text
JESSE KNOWLTON
AutoCAD SHX Text
DAN FISH
AutoCAD SHX Text
PAIGE DICKIE
AutoCAD SHX Text EROSION CONTROL NOTES A. GENERAL NOTES GENERAL NOTES DURING CONSTRUCTION, AND THEREAFTER, EROSION CONTROL MEASURES ARE TO BE IMPLEMENTED AS NOTED. THE SMALLEST PRACTICAL AREA OF LAND SHALL BE EXPOSED AT ONE TIME DURING CONSTRUCTION. WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE EXPOSURE SHALL BE KEPT AT A MAXIMUM OF 30 DAYS. EROSION AND SEDIMENT CONTROL PRACTICES INCLUDE THE USE OF THE FOLLOWING: SILTSACK INLET SEDIMENT CONTROL DEVICE AND CONTINUOUS BERM. CONTRACTOR SHALL DESIGNATE AN ENVIRONMENTAL MANAGER WHO SHALL BE RESPONSIBLE FOR INSPECTING ALL INSTALLED EROSION CONTROL MEASURES, MONITORING THEIR EFFECTIVENESS, AND TO ASSESS RE-VEGETATION PROGRESS. SUBMIT EROSION AND SEDIMENT CONTROL INSPECTION REPORTS TO THE CONTRACTING OFFICER ONCE EVERY 7 CALENDAR DAYS AND BEFORE AND AFTER (24 HOURS) A STORM EVENT PRIOR TO PERMANENT STABILIZATION. EROSION AND SEDIMENT CONTROL MEASURES REQUIRING MODIFICATION OR REPAIRS, OR IF ADDITIONAL MEASURES ARE DEEMED NECESSARY MUST BE COMPLETED WITHIN 7 DAYS AND PRIOR TO THE NEXT STORM EVENT. THE PLACEMENT OF SEDIMENT BARRIERS SHALL BE COMPLETED IN ACCORDANCE WITH GUIDELINES ESTABLISHED BY MEDEP STANDARDS AND IN ACCORDANCE WITH THE EROSION CONTROL PLAN AND DETAILS HEREIN. EROSION CONTROL MEASURES SHALL CONFORM TO THE LATEST REVISION MAINE EROSION AND SEDIMENT CONTROL BMPS, PUBLISHED BY BUREAU OF LAND AND WATER QUALITY MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION. CONTRACTOR SHALL PREPARE DETAILED SCHEDULE AND MARKED UP SITE PLAN INDICATING AREAS OF WORK AND DATES OF DISTURBANCE. EROSION CONTROL MEASURES SHALL REMAIN INSTALLED AND MAINTAINED UNTIL ALL EXPOSED SLOPES HAVE A MINIMUM 85% COVER. EROSION CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS OF PERMANENT STABILIZATION BEING ATTAINED. CONTRACTOR SHALL INSTALL ADDITIONAL MEASURES TO CONTROL EROSION AS IS NECESSARY GIVEN SITE AND WEATHER CONDITIONS. SITE ENTRANCES AND ADJACENT ROADWAYS SHALL BE PERIODICALLY SWEPT TO MINIMIZE TRACKING OF SEDIMENT AND DEBRIS. ALL CATCH BASINS AND DRAINAGE INLETS SUBJECT TO RUNOFF FROM PROJECT SITE SHALL BE CLEANED AFTER THE SITE HAS BEEN FULLY STABILIZED. KEEP DUST DOWN AT ALL TIMES, INCLUDING DURING NONWORKING PERIODS. SPRINKLE OR TREAT, WITH DUST SUPPRESSANTS, THE SOIL AT THE SITE, HAUL ROADS, AND OTHER AREAS DISTURBED BY OPERATIONS. DRY POWER BROOMING WILL NOT BE PERMITTED. INSTEAD, USE VACUUMING, WET MOPPING, WET SWEEPING, OR WET POWER BROOMING. PROVIDE TEMPORARY STABILIZATION FOR DISTURBED AREAS NOT TO BE WORKED UPON WITHIN 14 DAYS OF DISTURBANCE OR PRIOR TO STORM EVENT. PERMANENTLY STABILIZE DISTURBED AREAS WITHIN 7 DAYS OF FINAL GRADING. HAY BALES ARE NOT AN APPROPRIATE EROSION AND SEDIMENT CONTROL DEVICE FOR PNSY. AS SUCH, THEIR USE WILL NOT BE PERMITTED. SOIL STOCKPILES SHALL BE MULCHED WITH HAY OR STRAW AT A RATE OF 75 LBS. PER 1000 S.F. OR WITH A 4" LAYER OF EROSION CONTROL MIX WITHIN 7 DAYS OF STOCKING. SMALL STOCKPILES SHALL BE COVERED WITH A TARP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
DRAWFORM REVISION: DECEMBER 2018
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text 12/20/2019
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CG501MS-19-1722
PWD-MAINE
IN HOUSE DESIGN
Attachment 5
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - MAINE
AutoCAD SHX Text
NAVAL SHIPYARD - PORTSMOUTH, NH
AutoCAD SHX Text
DESIGN MANAGER
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FEAD/PM&E
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
EROSION CONTROL DETAILS
AutoCAD SHX Text 12808759
AutoCAD SHX Text
AutoCAD SHX Text 1658818
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
AutoCAD SHX Text
PORTSMOUTH NAVAL SHIPYARD
AutoCAD SHX Text
KITTERY, MAINE
AutoCAD SHX Text
INCREASE LINE SIZE STEAM AND CONDENSATE
AutoCAD SHX Text
B178 TO MH385
AutoCAD SHX Text
AutoCAD SHX Text
DAVID HICKMAN
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
XXX
AutoCAD SHX Text
AMIN BAHROUR
AutoCAD SHX Text
KEITH CHRISTOPHER
AutoCAD SHX Text
JESSE KNOWLTON
AutoCAD SHX Text
DAN FISH
AutoCAD SHX Text
PAIGE DICKIE
AutoCAD SHX Text CONTINUOUS CONTAINED BERMS: : BERMS SHALL BE FILLED WITH EROSION CONTROL MIX CONSISTING OF A WELL-GRADED MIXTURE OF PARTICLE SIZES AND MAY CONTAIN ROCKS LESS THAN 4" IN DIAMETER. EROSION CONTROL MIX MUST BE FREE OF REFUSE, PHYSICAL CONTAMINANTS, AND MATERIAL TOXIC TO PLANT GROWTH. THE MIX COMPOSITION SHALL MEET THE FOLLOWING STANDARDS: THE ORGANIC MATTER CONTENT SHALL BE BETWEEN 80 AND 100%, DRY WEIGHT BASIS. PARTICLE SIZE BY WEIGHT SHALL BE 100 % PASSING A 6" SCREEN AND A MINIMUM OF 70 %, MAXIMUM OF 85%, PASSING A 0.75" SCREEN. THE ORGANIC PORTION NEEDS TO BE FIBROUS AND ELONGATED. LARGE PORTIONS OF SILTS, CLAYS OR FINE SANDS ARE NOT ACCEPTABLE IN THE MIX. SOLUBLE SALTS CONTENT SHALL BE < 4.0 MMHOS/CM. THE PH SHOULD FALL BETWEEN 5.0 AND 8.0. BERMS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. THEY SHALL BE REPAIRED IMMEDIATELY IF THERE ARE ANY SIGNS OF EROSION OR SEDIMENTATION BELOW THEM. IF THERE ARE SIGNS OF UNDERCUTTING AT THE CENTER OR THE EDGES OF THE BARRIER, OR IMPOUNDING OF LARGE VOLUMES OF WATER BEHIND THEM, THEY SHALL BE REPLACED WITH A TEMPORARY CHECK DAM. FABRIC SHALL BE REPLACED PROMPTLY SHOULD IT DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE EXPECTED USABLE LIFE. BERMS SHOULD BE RESHAPED AS NEEDED. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING AFTER THE BERM IS NO LONGER REQUIRED SHOULD BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED.
AutoCAD SHX Text EROSION CONTROL MIX BERM: : TEMPORARY MULCHING WITH EROSION CONTROL MIX (ECM) CAN BE VERY EFFECTIVE AS A BMP. THE NAVY HIGHLY ENCOURAGES ITS USE IN BERMS AND TO PROTECT EXPOSED SOILS. ECM SHALL MEET THE REQUIREMENTS OF THE STATE OF MAINE, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: ECM SHALL BE COMPOSED OF 80-100% ORGANIC MATTER, FIBROUS AND ELONGATED, WITH THE REMAINING PERCENTAGE OF CONTENT BEING A WELL-GRADED MIXTURE HAVING NO ROCKS EXCEEDING 4 INCHES IN DIAMETER. THE ENTIRETY OF THE MIX MATERIAL SHALL PASS A 6" SCREEN AND 70-85% SHALL PASS A 0.75" SCREEN. THE MIX MATERIAL SHALL NOT CONTAIN ANY SILTS, CLAYS, OR FINE SANDS. ECM SHALL NOT CONTAIN WOOD OR BARK CHIPS, GROUND CONSTRUCTION DEBRIS OR REPROCESSED WOOD PRODUCTS. SHREDDED BARK, STUMP GRINDINGS, AND COMPOSTED BARK CAN BE USED AS ORGANIC CONTENT. A BARRIER OR BERM CONTAINING ECM SHALL BE CONSTRUCTED ON A LEVEL CONTOUR AND SHALL HAVE MINIMUM HEIGHT OF 12 INCHES. ON SLOPES LESS THAN 5% OR AT THE BOTTOM OF STEEPER SLOPES (<2:1) UP TO 20 FEET LONG, THE BARRIER MUST BE A MINIMUM OF 12 INCHES HIGH, AS MEASURED ON THE UPHILL SIDE OF THE BARRIER, AND A MINIMUM OF 24 INCHES WIDE. ON LONGER OR STEEPER SLOPES, THE BARRIER SHOULD BE WIDER TO ACCOMMODATE THE ADDITIONAL RUNOFF. OTHER BMP'S SHOULD BE USED AT LOW POINTS OF CONCENTRATED RUNOFF, BELOW CULVERT OUTLET APRONS, AROUND CATCH BASINS AND CLOSED STORM SYSTEMS, AND AT THE BOTTOM OF STEEP PERIMETER SLOPES THAT ARE MORE THAN 50 FEET FROM TOP TO BOTTOM.
AutoCAD SHX Text
FILL BARRIERS WITH SAND, COARSE GRAVEL OR EROSION CONTROL MIX
AutoCAD SHX Text
LOCATE DRAINAGE CHAMBER AT LOW SPOT FOR ADEQUATE DRAINAGE OF PONDED STORM WATER
AutoCAD SHX Text
DRAINAGE CHAMBER (OPTIONAL)
AutoCAD SHX Text
ROCK FILLED
AutoCAD SHX Text
FRONT VIEW NOT TO SCALE
AutoCAD SHX Text
CONTINUOUS BERM (ON HARD SURFACE)
AutoCAD SHX Text
SLOPE DIRECTION
AutoCAD SHX Text
SLOPE DIRECTION
AutoCAD SHX Text
SLOPE DIRECTION
AutoCAD SHX Text
SLOPE DIRECTION
AutoCAD SHX Text
STEP 2 - CONSTRUCT DAM
AutoCAD SHX Text
STEP 1 - CONSTRUCT LEG
AutoCAD SHX Text
STEP 3 - CONSTRUCT LEG 2
AutoCAD SHX Text
EROSION CONTROL MIX BERM TYPICAL PLACEMENT-ONE SLOPE
AutoCAD SHX Text INSTALLATION WITH J-HOOKS OR "SIMLES" INCREASES EROSION CONTROL MIX BERM EFFICIENCY.
AutoCAD SHX Text
2 SLOPE DIRECTIONS
AutoCAD SHX Text
VALLEY
AutoCAD SHX Text
2 SLOPE DIRECTIONS
AutoCAD SHX Text
VALLEY
AutoCAD SHX Text
SIDE 1
AutoCAD SHX Text
STEP 1 - CONSTRUCT A DAM
AutoCAD SHX Text
2 SLOPE DIRECTIONS
AutoCAD SHX Text
VALLEY
AutoCAD SHX Text
SIDE 1
AutoCAD SHX Text
STEP 2 - CONSTRUCT SIDE 2
AutoCAD SHX Text
DAM
AutoCAD SHX Text
STEP 3 - CONSTRUCT J-HOOKS AS NEEDED
AutoCAD SHX Text INSTALLATION WITH J-HOOKS WILL INCREASE EROSION CONTROL MIX BERM EFFICIENCY AND REDUCE EROSION-CAUSING FAILURES
AutoCAD SHX Text
EROSION CONTROL MIX BERM TYPICAL PLACEMENT-TWO SLOPE
AutoCAD SHX Text
0.4 HA
AutoCAD SHX Text
0.4 HA
AutoCAD SHX Text
FAILURE
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
0.12 HA
AutoCAD SHX Text
0.12 HA
AutoCAD SHX Text
0.12 HA
AutoCAD SHX Text DISCREET SEGMENTS OF COMPOST BERMS, INSTALLED WITH J-HOODS OR "SMILES" WILL BE MUCH MORE EFFECTIVE.
AutoCAD SHX Text INCORRECT - DO NOT LAYOUT "PERIMETER CONTROL" CONTROL MIX BERMS ALONG PROPERTY LINES. ALL SEDIMENT LADEN RUNOFF WILL CONCENTRATE AND OVERWHELM THE SYSTEM.
AutoCAD SHX Text
CORRECT - INSTALL J-HOOKS - INSTALL J-HOOKS
AutoCAD SHX Text
EROSION CONTROL MIX BERM TYPICAL PLACEMENT FOR PERIMETER CONTROL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
WOVEN OR NON-WOVEN GEOSYNTHETIC FABRIC
AutoCAD SHX Text
PONDING HEIGHT
AutoCAD SHX Text
100' (30M) MAXIMUM
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
SIDE VIEW NOT TO SCALE
AutoCAD SHX Text 2:1
AutoCAD SHX Text
LATERAL SUPPORT, SPACED AS NEEDED
AutoCAD SHX Text
DRAWFORM REVISION: DECEMBER 2018
AutoCAD SHX Text
FIELD INLET OR CATCH BASIN GRATE
AutoCAD SHX Text
1" REBAR FOR LIFTING AND REMOVAL
AutoCAD SHX Text
DUMP STRAP (2)
AutoCAD SHX Text
SILTSACK
AutoCAD SHX Text NOTE: INSTALL SILTSACK PER MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. EMPTY OR REMOVE SEDIMENT FROM SILTSACK. WHEN RESTRAINT CORD IS NO LONGER VISIBLE CLEAN, RINSE AND REPLACE AS NEEDED.
AutoCAD SHX Text FIELD INLET OR CATCH BASIN SILTSACK IS CUSTOM MADE FOR EACH BASIN SIZE (L X W X D). CONTACT ACF ENVIRONMENTAL (1-800-644-9223)
AutoCAD SHX Text
SILTSACK INLET SEDIMENT CONTROL DEVICE
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text 12/20/2019
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYNOTES
SITE PLAN N
A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
C101MS-19-1723
PWD-MAINE
IN HOUSE DESIGN
Attachment 5
AutoCAD SHX Text
NO#
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SMOKING SHELTER
AutoCAD SHX Text
GUARD BLDG
AutoCAD SHX Text
CONCRETE PADS
AutoCAD SHX Text
CONCRETE PAD
AutoCAD SHX Text
W/ AIR COND. UNIT
AutoCAD SHX Text
1-1/4" TELE DUCT (FOR FUTURE USE)
AutoCAD SHX Text 115.1
AutoCAD SHX Text 114.9
AutoCAD SHX Text 110.5
AutoCAD SHX Text 109.7
AutoCAD SHX Text 109.5
AutoCAD SHX Text 112.1
AutoCAD SHX Text 106.9
AutoCAD SHX Text 106.9
AutoCAD SHX Text
ABANDONED GRANITE RESERVOIR
AutoCAD SHX Text
ABANDONED GRANITE RESERVOIR
AutoCAD SHX Text
CIA GATE
AutoCAD SHX Text
CAPSTAN 1X3
AutoCAD SHX Text
REMEY ST.
AutoCAD SHX Text
SQ.
AutoCAD SHX Text
PORTSMOUTH
AutoCAD SHX Text
MACDONOUGH AVE.
AutoCAD SHX Text
SQ.
AutoCAD SHX Text
SARATOGA
AutoCAD SHX Text
REMEY ST.
AutoCAD SHX Text H-46
AutoCAD SHX Text
6"AIR
AutoCAD SHX Text
4" AIR D.B.
AutoCAD SHX Text
6" AIR
AutoCAD SHX Text
6" AIR
AutoCAD SHX Text
8" AIR
AutoCAD SHX Text
8" AIR
AutoCAD SHX Text
6" AIR
AutoCAD SHX Text
49.7' 6W AC
AutoCAD SHX Text
AutoCAD SHX Text
1-1/2" COND.
AutoCAD SHX Text 32.5' 2W
AutoCAD SHX Text
26.8' 2W AC
AutoCAD SHX Text
IN CONC.
AutoCAD SHX Text
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AutoCAD SHX Text
AC
AutoCAD SHX Text
78.5' 16W AC
AutoCAD SHX Text
VLT
AutoCAD SHX Text
39.8' 16W AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
42.3' 4W AC
AutoCAD SHX Text
39.8' 6W AC
AutoCAD SHX Text
AutoCAD SHX Text
85.7' 12W AC
AutoCAD SHX Text
AutoCAD SHX Text
41.4' 2W AC
AutoCAD SHX Text
100' 6W DC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AutoCAD SHX Text
111.6' 12W AC
AutoCAD SHX Text
26' 16W AC
AutoCAD SHX Text
NETWORK
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 24B
AutoCAD SHX Text 24A
AutoCAD SHX Text
65' 40W AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AutoCAD SHX Text 14&15
AutoCAD SHX Text
157.7' 12W AC
AutoCAD SHX Text
AC5
AutoCAD SHX Text
AutoCAD SHX Text
VAULT
AutoCAD SHX Text #1
AutoCAD SHX Text
37.5' 12W AC
AutoCAD SHX Text
NETWORK
AutoCAD SHX Text 14&15
AutoCAD SHX Text 24A
AutoCAD SHX Text
AC
AutoCAD SHX Text
188' 15W AC
AutoCAD SHX Text
70' 24W AC
AutoCAD SHX Text
(OVERHEAD)
AutoCAD SHX Text 24A
AutoCAD SHX Text
VLT
AutoCAD SHX Text
100.8' 2W AC
AutoCAD SHX Text
2W AC
AutoCAD SHX Text
1" FLEX. COND. AC
AutoCAD SHX Text
191.3' 6" CI PIPE W/
AutoCAD SHX Text
6W & 12W DC
AutoCAD SHX Text 1054A
AutoCAD SHX Text
DC
AutoCAD SHX Text
131.4' 8W DC
AutoCAD SHX Text 1053B
AutoCAD SHX Text
150.4' 4W DC
AutoCAD SHX Text
8W DC
AutoCAD SHX Text
191.3' 8W & 10W DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
158.3' 24W DC
AutoCAD SHX Text
W/DRAIN COVER
AutoCAD SHX Text 1053B
AutoCAD SHX Text
AutoCAD SHX Text
20W DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
103.7' 24W DC
AutoCAD SHX Text
DC
AutoCAD SHX Text 1053A
AutoCAD SHX Text 16.3' 4W
AutoCAD SHX Text
75.3' 12W DC
AutoCAD SHX Text
113.3' 24W DC
AutoCAD SHX Text
94.9' 12W DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
113.2' 24W DC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DC
AutoCAD SHX Text
24W DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
91.9' 10W DC
AutoCAD SHX Text
DC
AutoCAD SHX Text 1053C
AutoCAD SHX Text
AutoCAD SHX Text
191.3' 8W & 10W DC
AutoCAD SHX Text
225.8' 9W DC
AutoCAD SHX Text
191.3 10W DC
AutoCAD SHX Text
246'18W DC
AutoCAD SHX Text
6" CI PIPE W/
AutoCAD SHX Text
8W DC
AutoCAD SHX Text
DC4
AutoCAD SHX Text
DC3
AutoCAD SHX Text
83.3' 6W DC
AutoCAD SHX Text
19.2' 12W DC
AutoCAD SHX Text
19.1' 12W DC
AutoCAD SHX Text
24' 24W DC
AutoCAD SHX Text
2W DC
AutoCAD SHX Text
6W DC
AutoCAD SHX Text
AB.3"ACET.
AutoCAD SHX Text
AB.3"OXY.
AutoCAD SHX Text
AB. 2-1/2"MAPP
AutoCAD SHX Text
AB. 2"OXYGEN
AutoCAD SHX Text
AB. 2-1/2"MAPP
AutoCAD SHX Text
AB. 2"OXYGEN
AutoCAD SHX Text
AB. 2-1/2"MAPP
AutoCAD SHX Text
AB. 2"OXYGEN
AutoCAD SHX Text
AB.3"ACET.
AutoCAD SHX Text
AB.3"OXY.
AutoCAD SHX Text
AB. 2-1/2"MAPP
AutoCAD SHX Text
AB. 2"OXYGEN
AutoCAD SHX Text
TANK
AutoCAD SHX Text
LIQUID NITROGEN
AutoCAD SHX Text
2" MAPP
AutoCAD SHX Text
2" OXYGEN
AutoCAD SHX Text
AB.(2)2"HW
AutoCAD SHX Text
6"STM
AutoCAD SHX Text
1"CND
AutoCAD SHX Text
2"STM
AutoCAD SHX Text
2"STM
AutoCAD SHX Text
1-1/2"CND
AutoCAD SHX Text
6"STM
AutoCAD SHX Text
8"STM 4" COND.
AutoCAD SHX Text
8"STM 4" COND.
AutoCAD SHX Text
4" CND
AutoCAD SHX Text
3"STM TUNNEL DIST
AutoCAD SHX Text
4"CND
AutoCAD SHX Text
8"STM
AutoCAD SHX Text
(2)6" HW
AutoCAD SHX Text
(2)8" HW
AutoCAD SHX Text
(2)6" HW
AutoCAD SHX Text
(2)6" HW
AutoCAD SHX Text
(2)-2 1/2"HW
AutoCAD SHX Text
(2)2" HW
AutoCAD SHX Text
5" VIT SSG
AutoCAD SHX Text
8" SSG
AutoCAD SHX Text
8" SSG
AutoCAD SHX Text
AB.4" SSG VIT
AutoCAD SHX Text
8"SSG
AutoCAD SHX Text
8" SSG
AutoCAD SHX Text
8" SSG
AutoCAD SHX Text
AutoCAD SHX Text 65A
AutoCAD SHX Text
AutoCAD SHX Text 66A
AutoCAD SHX Text
AutoCAD SHX Text
MH
AutoCAD SHX Text #387
AutoCAD SHX Text (T-39)
AutoCAD SHX Text 322A
AutoCAD SHX Text #388
AutoCAD SHX Text
AutoCAD SHX Text #391
AutoCAD SHX Text #385
AutoCAD SHX Text
MH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CABLE TRENCH
AutoCAD SHX Text 322B
AutoCAD SHX Text #62
AutoCAD SHX Text #420
AutoCAD SHX Text #381A
AutoCAD SHX Text
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
AutoCAD SHX Text
DEMO'D BLDG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
6"FW
AutoCAD SHX Text
AB. 4"FW
AutoCAD SHX Text
AutoCAD SHX Text
6"FW
AutoCAD SHX Text
AutoCAD SHX Text
8"FW
AutoCAD SHX Text
12"FW
AutoCAD SHX Text
8"FW
AutoCAD SHX Text
8"FW
AutoCAD SHX Text
6"FW
AutoCAD SHX Text
AB. FW
AutoCAD SHX Text
AB.FW
AutoCAD SHX Text
AB.FW
AutoCAD SHX Text
4"FW
AutoCAD SHX Text
NO#
AutoCAD SHX Text
12"FW
AutoCAD SHX Text
6"FW
AutoCAD SHX Text
4"FW
AutoCAD SHX Text
8" FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
16"FW
AutoCAD SHX Text
12"FW
AutoCAD SHX Text
12"FW
AutoCAD SHX Text
16"FW
AutoCAD SHX Text #6
AutoCAD SHX Text #37
AutoCAD SHX Text #38
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
12"FW
AutoCAD SHX Text
12"FW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 14-16
AutoCAD SHX Text 14-17
AutoCAD SHX Text 14-18
AutoCAD SHX Text 14-20
AutoCAD SHX Text 14-19
AutoCAD SHX Text 14-21
AutoCAD SHX Text 16-18
AutoCAD SHX Text 16-19
AutoCAD SHX Text 16-20
AutoCAD SHX Text 45-2A
AutoCAD SHX Text
AB.8"VIT SD
AutoCAD SHX Text
AB.6" SD
AutoCAD SHX Text
AB.4"SD
AutoCAD SHX Text
AB.4"SD VIT
AutoCAD SHX Text 45-3
AutoCAD SHX Text 37-6A
AutoCAD SHX Text
8"VIT SD
AutoCAD SHX Text 37-6
AutoCAD SHX Text
DW-20
AutoCAD SHX Text
4"VIT SD
AutoCAD SHX Text
DW-19
AutoCAD SHX Text 45-2
AutoCAD SHX Text 45-1
AutoCAD SHX Text
DW-16
AutoCAD SHX Text
DW-18
AutoCAD SHX Text
6" SD VIT
AutoCAD SHX Text
12" SD
AutoCAD SHX Text
12" SD
AutoCAD SHX Text
12" SD
AutoCAD SHX Text
12" SD
AutoCAD SHX Text
15" SD
AutoCAD SHX Text
15" SD
AutoCAD SHX Text
18" SD
AutoCAD SHX Text
4" CONC. ENCASED
AutoCAD SHX Text 14-15A
AutoCAD SHX Text
6"VIT SD
AutoCAD SHX Text
8"VIT SD
AutoCAD SHX Text
6"VIT SD
AutoCAD SHX Text
22" SD
AutoCAD SHX Text
6" SD VIT
AutoCAD SHX Text
8" SD VIT
AutoCAD SHX Text
12" SD
AutoCAD SHX Text
15" SD
AutoCAD SHX Text
18" SD
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .