Attach 3_Technical Specifications.pdf
PDF 544 KB Posted
- Solicitation number
- N4008520B2519
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 4_Submittal Register.pdf | ||
| Attach 7_PNSY Electrical Standards - Rev C.pdf | ||
| Attach 1_Bid Form.pdf | ||
| Attach 6_eOMSI Draft Workbook.pdf | ||
| Attach 5_Drawings.pdf | ||
| Attach 2_Div 1 Specs.pdf | ||
| 1658818_Scope of Work.pdf | ||
| N40085-20-B-2519.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC MIDLANT, Public Works Department, Maine
WORK ORDER NO.
N40080-2020-1658818 WO #
TECHNICAL SPECIFICATIONS
Increase Line Size Steam and Condensate B178 to MH385
At the
Portsmouth Naval Shipyard
PREPARED BY:
NAVFAC Midlant PWD ME Building 59
Portsmouth Naval Shipyard Kittery, Maine 03801-2032
REQUEST FOR PROPOSAL PREPARED BY:
Architectural: N/A Electrical: N/A Civil: Paige Dickie Fire Protection: N/A Structural: Doug LaBranche Environmental: Kari Moore Mechanical: Jesse Knowlton Estimating: N/A
_Jesse Knowlton__________________________________________ Submitted By: Signature Date:
Approved By PME Signature Date:
__Jesse Knowlton___________________________________________________________________ Design Manager: Signature Date:
Increase Line Size Steam and Condensate B178 to MH385 1658818
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 44 00.22 ARCHAEOLOGICAL MONITORING (PWD ME)
DIVISION 02 - EXISTING CONDITIONS
02 82 00.00 22 ASBESTOS REMEDIATION (PNS PROJECTS)
DIVISION 09 - FINISHES
09 97 13.28 PROTECTION OF BURIED STEEL PIPING AND STEEL BULKHEAD TIE
RODS
DIVISION 22 - PLUMBING
22 15 26.00 20 HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
DIVISION 31 - EARTHWORK
31 23 00.00 22 EXCAVATION AND FILL
DIVISION 33 - UTILITIES
33 61 13 PRE-ENGINEERED UNDERGROUND HEAT DISTRIBUTION SYSTEM
33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
Attachment 3
SECTION 01 44 00.22
ARCHAEOLOGICAL MONITORING (PWD ME)
08/17
PART 1 GENERAL
1.1 SUMMARY
Perform archaeological monitoring for all forms of soil disturbing activities and excavations as identified in project drawings. Work shall include, but is not limited to: background research and review of previous surveys, monitoring during excavation, installation of components, regrading and other work indicated or specified. Results of monitoring efforts shall be summarized in an executive summary (if needed), draft report, final draft report and final report. Potential archaelological resources present within the project area include, but are not limited to the following: The National Register of Historic Places eligible Marine Railway.
The Government will provide existing documentation pertaining to the site, which will include previous investigations, plans, photographs, and research.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 79 (2012) Curation Of Federally-Owned And Administered Archaeological Collections
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Archaeologist Qualifications; G
SD-06 Test Reports
Archaeological Monitoring Reports; G
Submit Executive Summary (if needed), Draft, Final Draft and Final Archaeological Reports.
1.4 QUALITY ASSURANCE
The Archaeologist shall meet the standards of the Secretary of the Interior as required by the National Historic Preservation Act (Section 112, a, 1, SECTION 01 44 00.22 Page 1
A), OPNAVINST 5090.1C (Section 27-4.a.1), and the Principal Investigator shall be an archaeologist on the Maine Historic Preservation Commission's Approved List as a Level II. Field staff do not need to be on the Level II list as long as they are supervised by an archaeologist with those qualifications. The Archaeologist shall specialize in historic resources.
Submit Archaeologist Qualifications.
1.5 COORDINATION
The Contractor is responsible for obtaining permission and clearance from the appropriate PWD ME personnel to enter areas of the required fieldwork.
The Contractor is responsible for recording minutes (if applicable) of all meetings and furnishing a copy of the minutes to PWD ME within 15 days.
Coordinate with PWD ME Cultural Resources Manager prior to start of excavation to review the proposed approach to work.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 INSPECTION AND MONITORING
a. The Archaeologist shall observe excavation activities for archaeological resources. The Archaeologist shall be present on the project site according to a schedule agreed upon by Contracting Officer until it is determined that project construction activities could have no effects on significant archaeological resources.
b. The Archaeologist shall advise all project contractors to be on the alert for evidence of the presence of the expected resource(s), of how to identify the evidence of the expected resource(s), and of the appropriate protocol in the event of apparent discovery of an archaeological resource. GPS points, photographs, sketch maps and measured drawings may be required to document resources encountered.
c. If an intact archaeological resource is encountered, all soil disturbing activities in the vicinity of the resource shall cease. The Archaeologist shall be empowered to temporarily redirect excavation/ construction crews and heavy equipment until the resource is evaluated.
The Archaeologist shall immediately notify the PWD ME Representative of the encountered archaeological resource. The Archaeologist shall, after making a reasonable effort to assess the identity, integrity, and significance of the encountered archaeological resource, present the findings of this assessment to PWD ME.
d. The Contractor shall be responsible for the safety of all work conducted and will insure that the work area is safe during any archaeological investigation. This includes providing appropriate shoring, access and egress routes and any needed equipment. No one will be expected to enter the excavation until it has been deemed safe and it will be the responsibility of the Contractor to insure that the archaeological monitors have the ability to enter the excavation as needed.
3.2 ARCHAEOLOGICAL MONITORING REPORTS
Record findings of the archaeological monitoring at project completion in a
SECTION 01 44 00.22 Page 2 written report. The report shall include a map created by GPS points showing the location of any resources documented and shall be illustrated by photographs. The Archaeologist shall record and be authorized to collect archaeological material as warranted for analysis.
3.2.1 Report Requirements:
a. If a potentially significant resource is encountered, summarize the results of the archaeological investigations in an executive summary provided electronically. The summary is not to exceed ten pages and shall be accompanied by a field map of the area and the location of the archaeological features. If applicable, the executive summary shall also include recommendations to avoid or minimize impact to the potential site. The executive summary shall be submitted no later than 2 business days after the potentially significant resource is encountered.
b. Provide two (2) hard copies and one (1) electronic copy of a draft report (99 percent complete) for review by the Government. Once the draft report has been reviewed by the Government, the Contractor shall be notified of any recommended changes in a timely manner by the NAVFAC representative. Production of the final draft report shall be within ten (10) business days of receipt of the Government comments.
c. Provide two (2) hard copies and one (1) electronic copy of the final draft report for review by the Government and Maine SHPO. The final draft report shall be completed in accordance with current State of Maine archaeological survey requirements.
d. Once the final draft report has been reviewed by the SHPO, the Contractor shall be notified of any recommended changes in a timely manner by the NAVFAC representative. Production of three (3) hard copy and three (3) electronic copy final reports should be within ten (10) business days of receipt of the Government comments.
e. The final report shall be completed in accordance with current State of Maine archaeological survey requirements and the associated materials.
f. The Contractor shall submit reports (e.g., progress reports, draft and final reports, etc.) directly to the PWD ME representative within 30 days of completion of monitoring. Copies of submittal distribution letters shall be forwarded to the Contract Specialist.
g. The Contractor shall submit all informal documents regarding archeological field site reconnaissance and archaeological site mapping (field notes, etc.) directly to the PWD ME representative. Upon request or after acceptance of the final report, all field notes, photographs, artifacts and related data will be turned over to the Contracting Officer.
h. The Contractor shall submit all documentation in editable electronic format (Microsoft Word, Excel, ESRI ArcINFO, etc.) and in PDF upon completion of work. Three hard copies of the report shall also be submitted upon completion and acceptance of work.
i. The Contractor is required to prepare and submit all data, reports, graphics, maps, charts, etc. in an electronic format consistent with the platform currently used by the PWD ME Cultural Resources GIS database. Details and requirements will be provided to the Contractor
SECTION 01 44 00.22 Page 3 by the NTR upon award of this contract.
3.3 ARTIFACT CURATION
Artifacts recovered during the monitoring effort shall be cleaned, recorded, and curated in accordance with 36 CFR 79. The Archaeologist shall identify a repository for permanent curation and pay initial curation fees. If no suitable repository is identified, artifacts shall be provided to the Government with the Final Report Submission.
-- End of Section --
SECTION 01 44 00.22 Page 4
SECTION 02 82 00.00 22
ASBESTOS REMEDIATION
(PNS PROJECTS)
11/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems
ASTM INTERNATIONAL (ASTM)
ASTM C732 (2006; R 2012) Aging Effects of Artificial Weathering on Latex Sealants
ASTM D2794 (1993; R 2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D4397 (2016) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM D522/D522M (2014) Mandrel Bend Test of Attached Organic Coatings
ASTM E119 (2018) Standard Test Methods for Fire Tests of Building Construction and Materials
ASTM E1368 (2014) Visual Inspection of Asbestos Abatement Projects
ASTM E736/E736M (2017) Standard Test Method for Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members
ASTM E84 (2018) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
COMPRESSED GAS ASSOCIATION (CGA)
CGA G-7 (2014) Compressed Air for Human
SECTION 02 82 00.00 22 Page 1
Respiration; 6th Edition
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z87.1 (2015) Occupational and Educational Personal Eye and Face Protection Devices
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH NMAM (2016; 5th Ed) NIOSH Manual of Analytical Methods
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance
EPA 560/5-85-024 (1985) Guidance for Controlling Asbestos-Containing Materials in Buildings (Purple Book)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.147 Control of Hazardous Energy (Lock Out/Tag Out)
29 CFR 1926.103 Respiratory Protection
29 CFR 1926.1101 Asbestos
29 CFR 1926.200 Accident Prevention Signs and Tags
29 CFR 1926.51 Sanitation
29 CFR 1926.59 Hazard Communication
40 CFR 61-SUBPART A General Provisions
40 CFR 61-SUBPART M National Emission Standard for Asbestos
40 CFR 763 Asbestos
42 CFR 84 Approval of Respiratory Protective Devices
49 CFR 107 Hazardous Materials Program Procedures
49 CFR 171 General Information, Regulations, and Definitions
SECTION 02 82 00.00 22 Page 2
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)
NAVFAC P-502 (2017) Asbestos Program Management
ND OPNAVINST 5100.23 (2005; Rev G) Navy Occupational Safety and Health (NAVOSH) Program Manual
UNDERWRITERS LABORATORIES (UL)
UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units
STATE OF MAINE, DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
ME L&C PROGRAM State of Maine Licensing and Certification Program http://www.mainelegislature.org/legis/statutes/38/title
06 096 CMR 425 Asbestos Management Regulations http://www.maine.gov/sos/cec/rules/06/096/096c425.doc
1.2 DEFINITIONS
1.2.1 ACM
Asbestos Containing Materials.
1.2.2 Amended Water
Water containing a wetting agent or surfactant with a maximum surface tension of 0.00042 psi.
1.2.3 Area Sampling
Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.
1.2.4 Asbestos
The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and actinolite asbestos and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content of the material is determined to be equal to or greater than one percent.
1.2.5 Asbestos Control Area
That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris.
SECTION 02 82 00.00 22 Page 3
1.2.6 Asbestos Fibers
Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.
1.2.7 Asbestos Permissible Exposure Limit
0.1 fibers per cubic centimeter of air as an 8-hour time weighted average measured in the breathing zone as defined by 29 CFR 1926.1101 or other Federal legislation having legal jurisdiction for the protection of workers health.
1.2.8 Authorized Person
Any person authorized by the Contractor and required by work duties to be present in the regulated areas.
1.2.9 Background
The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard abatement efforts. Background concentrations for other (contaminated) areas are measured in similar but asbestos free locations.
1.2.10 Competent Person (CP)
A person meeting the requirements for competent person as specified in 29 CFR 1926.1101 including a person capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically trained in a training course which meet the criteria of EPA's Model Accreditation Plan ( 40 CFR 763) for project designer or supervisor, or its equivalent. The competent person must have a current State of Maine asbestos contractors or supervisors license.
1.2.11 Contractor
The Contractor is that individual, or entity under contract to perform the herein listed work.
1.2.12 Disposal Bag
A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101, used for transporting asbestos waste from containment to disposal site.
1.2.13 Disturbance
Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in one standard sized glovebag or waste bag, not larger than 60 inches in length and width in order to access a building component.
1.2.14 Encapsulation
The abatement of an asbestos hazard through the appropriate use of chemical
SECTION 02 82 00.00 22 Page 4 encapsulants.
1.2.15 Encapsulants
Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with performance requirements as specified herein.
a. Removal Encapsulant (can be used as a wetting agent)
b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material)
c. Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating all asbestos fibers and preventing fiber release due to routine mechanical damage)
d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed).
1.2.16 Friable Asbestos Material
A term defined in 40 CFR 61-SUBPART M and EPA 340/1-90/018 meaning any material which contains equal to or greater than 1 percent asbestos, as determined using the method specified in 40 CFR 763, Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
1.2.17 Glovebag Technique
Those asbestos removal and control techniques put forth in 29 CFR 1926.1101.
1.2.18 Government Consultant (GC)
That qualified person employed directly by the Government to monitor, sample, inspect the work or in some other way advise the Contracting Officer. The GC is normally a private consultant, but can be an employee of the Government.
1.2.19 HEPA Filter Equipment
High efficiency particulate air (HEPA) filtered vacuum and exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters must retain 99.97 percent of particles
0.3 microns or larger as indicated in UL 586.
1.2.20 Model Accreditation Plan (MAP)
USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763.
1.2.21 Negative Pressure Enclosure (NPE)
That engineering control technique described as a negative pressure enclosure in 29 CFR 1926.1101.
SECTION 02 82 00.00 22 Page 5
1.2.22 NESHAP
National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61-SUBPART M.
1.2.23 Nonfriable Asbestos Material
Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.
1.2.24 Permissible Exposure Limits (PELs)
1.2.24.1 PEL-Time Weighted Average(TWA)
Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8-hour time weighted average (TWA).
1.2.24.2 PEL-Excursion Limit
An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.
1.2.25 Personal Sampling
Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific employee, as performed in accordance with 29 CFR 1926.1101.
1.2.26 Private Qualified Person (PQP)
That qualified person hired by the Contractor to perform the herein listed tasks.
1.2.27 Qualified Person (QP)
A Registered Architect, Professional Engineer, Certified Industrial Hygienist, consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate State Model Accreditation Plan as described in 40 CFR 763 as a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer; and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The QP must be qualified to perform visual inspections as indicated in ASTM E1368. The QP must be appropriately licensed in the State of Maine.
1.2.28 TEM
Refers to Transmission Electron Microscopy.
1.2.29 Time Weighted Average (TWA)
The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.
SECTION 02 82 00.00 22 Page 6
1.2.30 Transite
A generic name for asbestos cement wallboard and pipe.
1.2.31 Wetting Agent
A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied. An equivalent wetting agent must have a surface tension of at most
0.00042 psi.
1.2.32 Worker
Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101, to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation, if required by the OSHA Class of work to be performed or by the state where the work is to be performed. The worker must be appropriately licensed in the State of Maine.
1.3 REQUIREMENTS
1.3.1 Description of Work
The work covered by this section includes the handling and control of asbestos containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos containing materials generated by the work. More specific operational procedures must be outlined in the Asbestos Hazard Abatement Plan called for elsewhere in this specification. The asbestos work includes the demolition and removal of steam and condensate pipe insulation located in a concrete utility trenchand as indicated on the Drawings, which is governed by MEDEP Chapter 425: Asbestos Management Regulations, 40 CFR 763, NAVFAC P-502, and other applicable Federal, State, and local requirements.
Under normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; however, this material may release airborne asbestos fibers during demolition and removal and therefore must be handled in accordance with the removal and disposal procedures as specified herein. Provide negative pressure enclosure and glovebag techniques as outlined in this specification. The work area(s) will be evacuated during the asbestos abatement work. A competent person must supervise asbestos removal work as specified herein.
1.3.2 Unexpected Discovery of Asbestos
Notify the Contracting Officer if any previously untested building components suspected to contain asbestos are impacted by the work.
1.3.3 Medical Requirements
Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101.
1.3.3.1 Medical Examinations
Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1926.1101 or other
SECTION 02 82 00.00 22 Page 7 pertinent State or local directives. This requirement must have been satisfied within the 12 months prior to the start of work on this contract. The same medical examination must be given on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before or after the termination of employment in such occupation. Specifically identify x-ray films of asbestos workers to the consulting radiologist and mark medical record jackets with the word
"ASBESTOS."
1.3.3.2 Medical Records
Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of indefinite time after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to:
The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician upon the request of the employee or former employee.
1.3.4 Employee Training
Submit certificates, prior to the start of work but after the main abatement submittal, signed by each employee indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with 40 CFR 763 and 49 CFR 172; understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 on an initial and annual basis. Organize certificates by individual worker, not grouped by type of certification. Post appropriate evidence of compliance with the training requirements of 40 CFR 763. Train personnel involved in the asbestos control work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) training criteria or State training criteria whichever is more stringent.
Document the training by providing: dates of training, training entity, course outline, names of instructors, and qualifications of instructors upon request by the Contracting Officer. Furnish each employee with respirator training and fit testing administered by the PQP as required by 29 CFR 1926.1101 and 29 CFR 1926.103. Fully cover engineering and other hazard control techniques and procedures. Asbestos workers must have a current State of Maine asbestos worker's license. Comply with the
ME L&C PROGRAM.
1.3.5 Permits, Licenses and Notifications
Prior to the start of work, obtain necessary permits and licenses in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities. Notify the Maine Department of Environmental Protection, the NAVFAC Asbestos Program Manager, and the Contracting Officer in writing 20 working days prior to commencement of work in accordance with MEDEP Chapter 425: Asbestos Management Regulations and 40 CFR 61-SUBPART M and for approval by NAVFAC NPT. Notify the Contracting Officer and other appropriate Government agencies in writing 20 working days prior to the start of asbestos work as indicated in applicable laws, ordinances, criteria, rules, and regulations. Submit copies of all Notifications to the Contracting Officer. Notify the Shipyard fire
SECTION 02 82 00.00 22 Page 8 department 3 days prior to removing fire-proofing material from the building including notice that the material contains asbestos.
1.3.6 Environment, Safety and Health Compliance
In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of Federal, State, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of EM 385-1-1, 29 CFR 1926.1101, 40 CFR 61-SUBPART A, 40 CFR 61-SUBPART M, 40 CFR 763, 49 CFR 171, and ND OPNAVINST 5100.23. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Government apply. The following laws, ordinances, criteria, rules and regulations regarding removal, handling, storing, transporting and disposing of asbestos materials apply:
a. U.S. EPA, Title 40, CFR Part 61, National Standards for Hazardous Air Pollutants (NESHAP), Subparts A and M.
b. OSHA, 29 CFR, Part 1926.1101, Asbestos in Construction.
c. State of Maine, Department of Environmental Protection (ME DEP), 06 096 CMR Asbestos Management Regulations, Chapter 425, effective date 4-3-2011.
1.3.7 Respiratory Protection Program
Establish and implement a respirator program as required by 29 CFR 1926.1101, and 29 CFR 1926.103. Submit a written description of the program to the Contracting Officer. Submit a written program manual or operating procedure including methods of compliance with regulatory statutes.
1.3.7.1 Respirator Program Records
Submit records of the respirator program as required by 29 CFR 1926.103, and 29 CFR 1926.1101.
1.3.7.2 Respirator Fit Testing
The Contractor's PQP must conduct a qualitative or quantitative fit test conforming to 29 CFR 1926.103 for each worker required to wear a respirator, and any authorized visitors who enter a regulated area where respirators are required to be worn. A respirator fit test must be performed prior to initially wearing a respirator and every 12 months thereafter. If physical changes develop that will affect the fit, a new fit test must be performed. Functional fit checks must be performed each time a respirator is put on and in accordance with the manufacturer's recommendation.
1.3.7.3 Respirator Selection and Use Requirements
Provide respirators, and ensure that they are used as required by 29 CFR 1926.1101 and in accordance with CGA G-7 and the manufacturer's recommendations. Respirators must be approved by the National Institute for Occupational Safety and Health NIOSH, under the provisions of 42 CFR 84, SECTION 02 82 00.00 22 Page 9 for use in environments containing airborne asbestos fibers. For air-purifying respirators, the particulate filter must be high-efficiency particulate air (HEPA)/(N-,R-,P-100). The initial respirator selection and the decisions regarding the upgrading or downgrading of respirator type must be made by the Contractor's Designated IH based on the measured or anticipated airborne asbestos fiber concentrations to be encountered.
1.3.8 Asbestos Hazard Control Supervisor
The Contractor must be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work.
1.3.9 Hazard Communication
Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Safety Data Sheets (SDS) for all materials brought to the site.
1.3.10 Asbestos Hazard Abatement Plan
Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined space entry procedures and equipment and work procedures to be used in the removal and demolition of materials containing asbestos. The plan, not to be combined with other hazard abatement plans, must be prepared, signed, and sealed by the PQP. Provide a Table of Contents for each abatement submittal, which follows the sequence of requirements in the contract. The plan must include but not be limited to the precise personal protective equipment to be used including, but not limited to, respiratory protection, type of whole-body protection and if reusable coveralls are to be employed decontamination methods (operations and quality control plan), the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, change rooms, removal method, interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan must also include (both fire and medical emergency) response plans and an Activity Hazard Analyses (AHAs) in accordance with EM 385-1-1. The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. The Contractor, Asbestos Hazard Control Supervisor, CP, and PQP must meet with the Contracting Officer prior to beginning work, to discuss in detail the Asbestos Hazard Abatement Plan, including work procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification. Any changes required in the specification as a result of the plan must be identified specifically in the plan to allow for free discussion and approval by the Contracting Officer prior to starting work.
1.3.11 Testing Laboratory
Submit the name, address, and telephone number of each testing laboratory selected for the sampling, analysis, and reporting of airborne concentrations of asbestos fibers along with evidence that each laboratory selected holds the appropriate State license and permits and certification that each laboratory is American Industrial Hygiene Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry
SECTION 02 82 00.00 22 Page 10
(AAR) and successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program. Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos analysis. The testing laboratory firm must be independent of the asbestos contractor and must have no employee or employer relationship which could constitute a conflict of interest.
1.3.12 Landfill Approval
Landfill approval is not required as Portsmouth Naval Shipyard takes responsibility for disposal of all asbestos waste generated on the Shipyard.
1.3.13 Transporter Certification
Transporter certification is not required as Portsmouth Naval Shipyard takes responsibility for transport and disposal of all asbestos waste generated on the Shipyard.
1.3.14 Medical Certification
Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in 29 CFR 1926.1101 and 29 CFR 1926.103 as prescribed by law. Submit certificates prior to the start of work but after the main abatement submittal.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Amended Water; G
Safety Data Sheets (SDS) for All Materials; G
Encapsulants; G
Respirators; G
Local Exhaust Equipment; G
Pressure Differential Automatic Recording Instrument; G
Vacuums; G
Glovebags; G
SD-06 Test Reports
Air Sampling Results; G
SECTION 02 82 00.00 22 Page 11
Pressure Differential Recordings for Local Exhaust System; G
Clearance Sampling; G
Asbestos Disposal Quantity Report; G
SD-07 Certificates
Employee Training; G
Notifications; G
Respiratory Protection Program; G
Asbestos Hazard Abatement Plan; G
Testing Laboratory; G
Medical Certification; G
Private Qualified Person Documentation; G
Competent Person; G
Worker's License; G
Contractor's License; G
Federal, State or Local Citations on Previous Projects; G
Encapsulants; G
Equipment Used to Contain Airborne Asbestos Fibers; G
Water Filtration Equipment; G
Vacuums; G
Ventilation Systems; G
SD-11 Closeout Submittals
Permits and Licenses; G
Notifications; G
Respirator Program Records; G
Rental Equipment; G
1.5 QUALITY ASSURANCE
1.5.1 Private Qualified Person Documentation
Submit the name, address, and telephone number of the Private Qualified Person (PQP) selected to prepare the Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, SECTION 02 82 00.00 22 Page 12 and Asbestos Project Designer as described by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The PQP must be appropriately licensed in the State of Maine as a Project Monitor. The PQP and the asbestos contractor must not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP must be a first tier subcontractor.
1.5.2 Competent Person Documentation
The Competent Person must be experienced in the administration and supervision of asbestos abatement projects including exposure assessment and monitoring, work practices, abatement methods, protective measures for personnel, setting up and inspecting asbestos abatement work areas, evaluating the integrity of containment barriers, placement and operation of local exhaust systems, ACM generated waste containment and disposal procedures, decontamination units installation and maintenance requirements, site safety and health requirements, and notification of other employees onsite. The Competent Person must be on-site at all times when asbestos abatement activities are underway. Submit training certification and a current State of Maine Asbestos Contractor's and Supervisor's License. Submit evidence that the Competent Person has a minimum of 2 years of on-the-job asbestos abatement experience relevant to OSHA competent person requirements.
1.5.3 Worker's License
Submit documentation that workers meet the requirements of 29 CFR 1926.1101, 40 CFR 61-SUBPART M and have a current State of Maine Asbestos Workers License.
1.5.4 Contractor's License
Submit a copy of the asbestos contractor's license issued by the State of Maine. Submit the following certification along with the license: "I certify that the personnel I am responsible for during the course of this project fully understand the contents of 29 CFR 1926.1101, 40 CFR 61-SUBPART M, EM 385-1-1, and the Federal, State and local requirements for those asbestos abatement activities that they will be involved in." This certification statement must be signed by the Company's President or Chief Executive.
1.5.5 Air Sampling Results
Complete fiber counting and provide results to the PQP and GC for review within 16 hours of the "time off" of the sample pump. Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in excess of the acceptable limits. Submit sampling results to the Contracting Officer and the affected Contractor employees where required by law within three working days, signed by the testing laboratory employee performing air sampling, the employee that analyzed the sample, and the PQP and GC. Notify the Contractor and the Contracting Officer immediately of any variance in the pressure differential which could cause adjacent unsealed areas to have asbestos fiber concentrations in excess of 0.010 fibers per cubic centimeter or background whichever is higher. In no circumstance must levels exceed 0.10 fibers per cubic centimeter.
SECTION 02 82 00.00 22 Page 13
1.5.6 Pressure Differential Recordings for Local Exhaust System
Provide a local exhaust system that creates a negative pressure of at least
0.02 inches of water relative to the pressure external to the enclosure and operate it continuously, 24-hours a day, until the temporary enclosure of the asbestos control area is removed. Submit pressure differential recordings for each work day to the PQP and GC for review and to the Contracting Officer within 24-hours from the end of each work day.
1.5.7 Federal, State or Local Citations on Previous Projects
Submit a statement, signed by an officer of the company, containing a record of any citations issued by Federal, State or local regulatory agencies relating to asbestos activities within the last 5 years (including projects, dates, and resolutions); a list of penalties incurred through non-compliance with asbestos project specifications, including liquidated damages, overruns in scheduled time limitations and resolutions; and situations in which an asbestos-related contract has been terminated (including projects, dates, and reasons for terminations). If there are none, a negative declaration signed by an officer of the company must be provided.
1.5.8 Preconstruction Conference
Conduct a safety preconstruction conference to discuss the details of the Asbestos Hazard Abatement Plan, Accident Prevention Plan (APP) including the AHAs required in specification Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME). The safety preconstruction conference must include the Contractor and their Designated Competent Person, NAVFAC Asbestos Program Manager, Designated IH and Project Supervisor and the Contracting Officer. Deficiencies in the APP will be discussed. Onsite work must not begin until the APP has been accepted.
1.6 SECURITY
A log book must be kept documenting entry into and out of the regulated area. Entry into regulated areas must only be by personnel authorized by the Contractor and the Contracting Officer. Personnel authorized to enter regulated areas must be trained, medically evaluated, and wear the required personal protective equipment.
1.7 EQUIPMENT
1.7.1 Rental Equipment
Provide a copy of the written notification to the rental company concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.
PART 2 PRODUCTS
2.1 ENCAPSULANTS
Encapsulants must conform to current USEPA requirements, contain no toxic or hazardous substances as defined in 29 CFR 1926.59, and conform to the following performance requirements.
SECTION 02 82 00.00 22 Page 14
2.1.1 Removal Encapsulants
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test
2.1.2 Bridging Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3-hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test
2.1.3 Penetrating Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
SECTION 02 82 00.00 22 Page 15
Requirement Test Standard
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Cohesion/Adhesion Test - 50 pounds of force/foot
ASTM E119
Fire Resistance - Negligible affect on fire resistance rating over 3-hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test
2.1.4 Lock-down Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3-hour test (Tested with fireproofing over encapsulant applied directly to steel member)
ASTM E119
Bond Strength: 100 pounds of force/foot
ASTM E736/E736M
(Tests compatibility with cementitious and fibrous fireproofing)
2.2 DUCT TAPE
Industrial grade duct tape of appropriate widths suitable for bonding sheet plastic and disposal container.
SECTION 02 82 00.00 22 Page 16
2.3 DISPOSAL CONTAINERS
Leak-tight (defined as solids, liquids, or dust that cannot escape or spill out) disposal containers must be provided for ACM wastes as required by 29 CFR 1926.1101. Disposal containers can be in the form of:
a. Disposal Bags
2.4 SHEET PLASTIC
Sheet plastic must be polyethylene of 6 mil minimum thickness and must be provided in the largest sheet size necessary to minimize seams. Film must be clear and conform to ASTM D4397, except as specified below.
2.4.1 Flame Resistant
Where a potential for fire exists, flame-resistant sheets must be provided. Film must be frosted and must conform to the requirements of
NFPA 701.
2.4.2 Reinforced
Reinforced sheets must be provided where high skin strength is required, such as where it constitutes the only barrier between the regulated area and the outdoor environment. The sheet stock must consist of translucent, nylon-reinforced or woven-polyethylene thread laminated between 2 layers of polyethylene film. Film must meet flame resistant standards of NFPA 701.
2.5 MASTIC REMOVING SOLVENT
Mastic removing solvent must be nonflammable and must not contain methylene chloride, glycol ether, or halogenated hydrocarbons. Solvents used onsite must have a flash point greater than 140 degrees F.
2.6 LEAK-TIGHT WRAPPING
At least two layers of 6 mil minimum thick polyethylene sheet stock must be used for the containment of removed asbestos-containing components or materials such as large tanks, boilers, insulated pipe segments and other materials. Upon placement of the ACM component or material, each layer must be individually leak-tight sealed with duct tape.
2.7 VIEWING INSPECTION WINDOW
Where feasible, a minimum of one clear, 1/8 inch thick, acrylic sheet, 18 by 24 inches, must be installed as a viewing inspection window at eye level on a wall in each containment enclosure. The windows must be sealed leak-tight with industrial grade duct tape.
2.8 WETTING AGENTS
Removal encapsulant (a penetrating encapsulant) must be provided when conducting removal abatement activities that require a longer removal time or are subject to rapid evaporation of amended water. The removal encapsulant must be capable of wetting the ACM and retarding fiber release during disturbance of the ACM greater than or equal to that provided by amended water. Performance requirements for penetrating encapsulants are specified in paragraph ENCAPSULANTS above.
SECTION 02 82 00.00 22 Page 17
PART 3 EXECUTION
3.1 EQUIPMENT
Provide the Contracting Officer or the Contracting Officer's Representative, with at least two complete sets of personal protective equipment as required for entry to and inspection of the asbestos control area. Provide equivalent training to the Contracting Officer or a designated representative as provided to Contractor employees in the use of the required personal protective equipment. Provide manufacturer's certificate of compliance for all equipment used to contain airborne asbestos fibers.
3.1.1 Air Monitoring Equipment
The Contractor's PQP must approve air monitoring equipment. The equipment must include, but must not be limited to:
a. High-volume sampling pumps that can be calibrated and operated at a constant airflow up to 16 liters per minute.
b. Low-volume, battery powered, body-attachable, portable personal pumps that can be calibrated to a constant airflow up to approximately 3.5 liters per minute, and a self-contained rechargeable power pack capable of sustaining the calibrated flow rate for a minimum of 10 hours. The pumps must also be equipped with an automatic flow control unit which must maintain a constant flow, even as filter resistance increases due to accumulation of fiber and debris on the filter surface.
c. Single use standard 25 mm diameter cassette, open face, 0.8 micron pore size, mixed cellulose ester membrane filters and cassettes with 50 mm electrically conductive extension cowl, and shrink bands for personal air sampling.
3.1.2 Respirators
Select respirators from those approved by the National Institute for Occupational Safety and Health (NIOSH), Department of Health and Human Services.
3.1.2.1 Respirators for Handling Asbestos
Provide personnel engaged in pre-cleaning, cleanup, handling, encapsulation, removal and demolition of asbestos materials with respiratory protection as indicated in 29 CFR 1926.1101 and 29 CFR 1926.103.
Breathing air must comply with CGA G-7.
3.1.3 Exterior Whole Body Protection
3.1.3.1 Outer Protective Clothing
Provide personnel exposed to asbestos with disposable "non-breathable," or reusable "non-breathable" whole body outer protective clothing, head coverings, gloves, and foot coverings. Provide disposable plastic or rubber gloves to protect hands. Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but must not be used alone. Make sleeves secure at the wrists, make foot coverings secure at the ankles, and make clothing secure at the neck by the use of tape.
SECTION 02 82 00.00 22 Page 18
3.1.3.2 Work Clothing
Provide cloth work clothes for wear under the outer protective clothing and foot coverings and either dispose of or properly decontaminate them as recommended by the PQP after each use.
3.1.3.3 Personal Decontamination Unit
Provide a temporary, negative pressure unit with a separate decontamination locker room and clean locker room with a shower that complies with 29 CFR 1926.51(f)(4)(ii) through (V) in between for personnel required to wear whole body protective clothing. Provide two separate lockers for each asbestos worker, one in each locker room. Keep street clothing and street shoes in the clean locker.
This is the start of the file's text. The full file is on GovTribe.