ACQR5144957
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No. N40085-19-R-9053 Design-Bid-Build (DBB), Construction of P1479 Outdoor Infantry Immersion Trainer, Marine Corps Base, Camp Lejeune, NC
The purpose of this amendment is to provide responses to additional inquiries regarding discussion questions.
This amendment also extends the due date for revised proposals to 14 February 2019 NLT 2:00 PM EST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9053
X 9B. DATED (SEE ITEM 11)
06-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Feb-2019
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9053
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
SOLICITATION NO. N40085‐19‐R‐9053
PROJECT TITLE/LOCATION: Construction of P1479 Outdoor Infantry Immersion Trainer, Marine Corps Base, Camp Lejeune, NC
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
11/28/2018, resubmitted 1‐
25‐19 ##‐S‐201 Detail2
For village buildings such as buildings #49, 52, 68 and 75 please confirm what the exterior balcony (2/##‐S‐201, at 22’‐6” x 5’‐0”) is constructed of. For example; we understand that the guardrail is metal but is the walk platform and support columns precast or misc. metal components.
The exterior balcony consists of precast slabs and precast columns as indicated on the plans. MMSA
11/28/2018, resubmitted 1‐
25‐19 99‐A‐702 Detail 1
The majority of the 2‐story precast village buildings call out ladders at the roof hatches and a few like building #4 do not. Should we assume that we need a ladder at all roof hatches or are some meant as rappelling access only? See 1/99‐A‐702 for reference.
All roof hatches get ladder. LS3P
11/28/2018, resubmitted 1‐
25‐19 99‐A‐702, 89‐A‐110 11/99‐A‐702
Please confirm whether or not a guardrail and gate is not required at all roof hatches as per 11/99‐A‐702. There is a note for reference on 89‐A‐110 but it is not noted this way throughout the other buildings.
All roof hatches get guardrail and gate.
LS3P
11/28/2018, resubmitted 1‐
25‐19 General
The majority of the 1 & 2‐story precast village buildings call out “Walkable WP/Seal over immersive village roof” but some do not. Should we assume all roof slabs have this note? If not all of these buildings have this requirement, please provide a finish schedule noting this.
All village precast roof structures get traffic coating and sealant waterproofing system. LS3P
11/28/2018, resubmitted 1‐
25‐19
14‐A‐201A & 202A and 41‐A‐201A
The exterior finishes on building 14 is not fully shown, please clarify the 360 finish of this building. I.e. is it all PRE‐1? (see 14‐A‐201A and 202A and 41‐A‐201A)
Per spec, drwgs and village finish schedule/A350‐A352) all bldgs, site walls and site mounted equipment enclosures receive scenic painting
11/28/2018, resubmitted 1‐
25‐19 41‐A‐201A
The exterior finish on building 41 depicts the same on 3 sides (PRE‐2 & PRE‐3) of the building and then it changes to PRE‐1 & PRE‐3 on 1 side (see 41‐A‐201A), is this as planned?
Per spec, drwgs and village finish schedule/A350‐A352) all bldgs, site walls and site mounted equipment enclosures receive scenic painting
11/28/2018, resubmitted 1‐
25‐19 52‐A‐201A
The exterior finish on building 52 depicts the same on 2 sides (PRE‐1) of the building and then it changes to PRE‐0 & PRE‐2 on the other 2 sides (see 52‐A‐201A), is this as planned?
Per spec, drwgs and village finish schedule/A350‐A352) all bldgs, site walls and site mounted equipment enclosures receive scenic painting
11/28/2018, resubmitted 1‐
25‐19
There is a weapon cache shown in building #69. Where is the detail for this and is
CFCI?
See attached pdf for weapon cache.
REFERENCE
Question No. QUESTION GOVERNMENT RESPONSEDate Received
July 2011
P1479 Outdoor Infantry Immersion Trainer, Marine Corps Base, Camp Lejeune, NC
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
11/28/2018, resubmitted 1‐
25‐19
73‐A‐201A and 89‐A‐ 202A
On page 73‐A‐201A and 89‐A‐202A, detail 1 there appears to be rectangular block outs on these details, what are these?
Some rendered village building elevations have rectangular block‐ outs. If it's not noted and there is no matching block‐out in the corresponding elevation please disregard the block‐out. Ex: 72‐A‐201 and 72‐A‐201A ‐ bldg. 72 back elevations ‐ both show same block‐out for window opening. However, 73‐A‐ 20 and 73‐A‐201A ‐ bldg. 73 front elevations ‐ block‐out shows on rendered elevation 73‐A‐20, so please disregard. LS3P
11/28/2018, resubmitted 1‐
25‐19 89‐A‐101 & 89‐201
1/89‐A‐101 and 3/89‐201
There are notes on the drawings such as 1/89‐A‐101 and 3/89‐201 that states “IED Typ”. What is this, where is the detail and is this a CFCI? item?
“IED” is a note for precaster. Please see PRECAST GENERAL NOTEs #6 on drawings: "IED – 8” to 12” irregular shaped with 1 ½” deep depression from wall surface. Locate between 18” to 36” above adjacent finished grade or finish floor, which ever is higher”.
LS3P
11/28/2018, resubmitted 1‐
25‐19
99‐A‐601 and 99‐A‐
3/99‐A‐601 and 21/99‐A‐
3/99‐A‐601 and 21/99‐A‐403; For window types 1,2 and 3 specifically window openings called out as “security grills” what does this infill look like? It is very confusing as there are openings #1, 2 or 3 “A, B or C” that are wood shutters, openings labeled #’s 1, 2 or 3 that are simply openings and then there are callouts for security grills that are not on these pages – example 89‐A‐101. Please clarify all.
Windows 1, 2, 3 (A403) per jamb detail 26/99‐A‐402 no infill, just perimeter HSS frame. Windows 1B, 1C, 2B, 3B with barn wood shutters reference detail 35/99‐A402 with hinged jambs.
Security grill assume same perimeter HSS with welded wire mesh 3"x3", 9 gage, galvanized. Reference building elevations for locations
11/28/2018, resubmitted 1‐
25‐19 99‐A‐601 14/99‐A‐601
Do all Arch openings above doors (interior and exterior) follow detail 14/99‐A‐601 requiring galvanneal sheets on both sides although the majority of these doors are plywood? What is the finish of this galvanneal material?
Sheets both sides of door. Finish on galvannel panels is the textured finish per finish schedule A350‐A351, galvaneal panel
11/28/2018, resubmitted 1‐
25‐19 General
Per the drawings, the galvanneal panels in the shipping containers are shown as painted/finished, the galvanneal panels in the precast buildings are not shown as painted. What are the criteria for finishing these if any? A finish schedule will be helpful if differing finishes are required as they are not labeled throughout.
See village finish schedules A350‐ A351. Galvanneal interior panels on right side of schedule
P1479 Outdoor Infantry Immersion Trainer, Marine Corps Base, Camp Lejeune, NC
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
11/28/2018, resubmitted 1‐
25‐19 07 27 10.00 10
Are air barrier requirements required for the AAR trailer compound? The UFC 1‐201‐ 01, Non‐Permanent DOD Facilities in support of Military Operations, does not require it. Having to meet this specification for a building of this construction will be extremely cost prohibitive and is not industry standard. The manufacturers simply do not do this for these structures and will need to have a separate subcontractor come in and spray these walls before they are closed up. This will also require secondary air barrier work once the sections are being installed together onsite.
Air water barrier only recommendtion as long as UFC 1‐201‐01 non‐perm DOD facility offers an exception as stated in PPI question
11/28/2018, resubmitted 1‐
25‐19 23 08 00.00 22
Are Commissioning requirements required for the AAR trailer compound? The UFC 1‐201‐01, Non‐Permanent DOD Facilities in support of Military Operations, does not require it. At a minimum the specification should be tailored to address a modular building.
The AAR building is required to be tested and balanced which includes a two season performance test. CBHF
11/28/2018, resubmitted 1‐
25‐19 99‐S‐603 03 41 33
Drawing 99‐S‐603 where shown Sect #3 ‐ Typical Prestressed Slab Section – in relationship to prestressing, is post tensioning of the slabs the preferred and/or allowed method of reinforcement to conform to PCI Certification C1 – “Precast Concrete Products (No Prestressed Reinforcement) as stated in Specification Section 034133?
Post tensioning is allowed only if conforming to PCI Certification and used only in the shop. (Post Tensioning in the field is not allowed). MMSA
11/28/2018, resubmitted 1‐
25‐19 General
Can welded connections be used in lieu of bolted connections for Precast Members?
Bolted connection shall be used for precast member connections per the construction documents. LS3P
11/28/2018, resubmitted 1‐
25‐19 Several
There is conflicting information between the floor plan drawings and elevation drawings regarding door information; In bldg. 12 (room 104), bldg. 27 (rooms 101 and 104), bldg. 43 (room 104), and bldg. 44 (room 104). On the floor plan drawing, the door information given is DOOR NO 4 (door type C) but on the elevation drawings they are shown and labeled door type G. Please confirm what door type is to be used.
Assume door designation on elevation is correct
11/28/2018, resubmitted 1‐
25‐19
Amendment #4, RFI responses 50‐58
In response to RFI #50‐58 responses, the original RFI is not referring to the G key tag. It is referring to the opening/door schedule to the number 7 in the hexagon that then refers you to the door schedule that is on sheet 99‐A‐401, that then gives you a letter which is G that then refers you to a detail on sheet 99‐A‐403 to door type G Lattice door. The floor plan drawings and elevation drawings conflict with each other. The elevation calls for an opening while the floor plan drawings call for DOOR NO 7 which when you go to the door schedule (sheet 99‐A‐401) you get all the door and frame information that then refers you to sheet 99‐A‐403 which stated that DOOR NO 7 is a type G Lattice door. Please advise what door number on the door schedule is to be used in each of these drawings where there is conflict.
Bldg. 22 room 102, Bldg. 27 room 102, Bldg. 37 room 102, Bldg. 43 room 102, Bldg.
44 room 102, Bldg. 47 room 102, Bldg. 79 room 103, Bldg. 80 room 103, Bldg. 87 room 102.
Assume door designation on elevation is correct
P1479 Outdoor Infantry Immersion Trainer, Marine Corps Base, Camp Lejeune, NC
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
11/28/2018, resubmitted 1‐
25‐19
Amendment #4, RFI response 49
In response to RFI 49 it states to use type C doors for all interior doors that are missing door information (the hexagon with a number in it that refers you to the door schedule on sheet 99‐A‐401 that then refers you to sheet 99‐A‐403 for the door type and detail, as well as the frame type and detail). From sheet 99‐A‐403 the door details type C doors are overhead coiling door, and there are also two different sizes for type C doors DOOR NO 4 and DOOR NO 5 on the door schedule on sheet 99‐A‐401. The floor plan drawings are showing swinging doors not any overhead coiling doors, additionally there is not the allowable space in any of the floor plans with the missing hexagon with a number in it that refers you to the door schedule on sheet 99‐A‐401 that then refers you to sheet 99‐A‐403 for the door type and detail, as well as the frame type and detail to put in either size of the type C door (overhead coiling door) that is in the door schedule. Please confirm the DOOR NO of the door that you are referring to on the door schedule.
assume all interior doors get door symbol #2 per door schedule on 99‐ A401. This references elevation “B” door per 99‐A403 and corresponding frame details 24, 25/99‐A402. No overhead coiling door. Swing
11/28/2018, resubmitted 1‐
25‐19
Amendment #4, RFI response 48
In response to RFI 48, sheet 12‐A‐101 does call out door and frame types via the hexagon with a number in it that refers you to the door schedule on sheet 99‐A‐401 that then refers you to sheet 99‐A‐403 for the door type and detail, as well as the frame type and detail. The floor plan drawing and elevation drawings conflict with each other. Please confirm the door number to be used in room 102 or if it is an opening because sheet 12‐A‐101 calls for DOOR NO 7 that when you go to sheet 99‐ A‐401 says DOOR NO 7 is door type G and on sheet 99‐A‐403 door type G is a Lattice door, but on the elevation drawing it shows it as an opening.
assume door designation on elevations is correct
11/28/2018, resubmitted 1‐
25‐19 26 00 00 & 26 41 00 Can you please confirm that lightning protection nor building grounding is required at the village buildings; both shipping containers and precast structures alike.
Lightning Protection and additional grounding is not required at Village Buildings. CBHF
66 1/28/2019 Amendment 7 Amendment 7; The renderings issued depict metal and/or wood wall panels that are attached to the roof of the precast structures. This scope for these areas is not identified in the drawings. Please confirm that the drawings govern.
Building plans, elevations and their accompanying finish material/texture schedule govern
67 1/28/2019 Amendment 7 Amendment 7; The renderings issued depict rubble and tire piles, props and other scenic features that are not represented in the other bid documents, please confirm that these items are GFGI. Government to confirm
68 1/28/2019 Amendment 7 CLIN 0001AC ‐ Please confirm if galvanneal walls inside of the conex buildings are to be carried under this CLIN. These are assumed to be reconfigurable walls. Agree
69 1/28/2019 Amendment 7 CLIN 0001AD‐ Roof Coatings and Joint Sealants; Please clarify if all precast perimeter horizontal wall joint sealants on the roof and second floor are to be included in this CLIN or if this is just for the vertical wall sealants? All perimeter horizontal wall joints
P1479 Outdoor Infantry Immersion Trainer, Marine Corps Base, Camp Lejeune, NC
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
70 1/28/2019 AAR Building Set, A‐
The current design has the modules at 14’ wide or more. Will the user allow modules to be no more than 13’ 10” wide? Buildings over 13’ 10” will have very costly shipping constraints. Government to confirm
71 1/28/2019 AAR Building Set, A‐
A module mate line would fall on the right side hall way wall. Thus a structural column will need to be placed on the right side of the double door. Can the hallway be shifted to the left to accommodate a column?
We'll review if you can send preferred column and corridor shift dimensions needed
72 1/28/2019 AAR Building Set, A‐
On the ceiling plan ‐ the gypsum ceiling in the IT room is listed at 9’. This will be constrained by shipping height. Please advise if there is flexibility to this finished height?
All ceilings indicated 9'‐0" per A121, ceiling legend. Please send max ceiling restrictions
73 1/28/2019 AAR Building Set, S‐
203 & A‐151
On the roof plan – standing seam roof is called out. Standing seam roof typically requires a 2” per slope. This would make the units too tall to ship. Can EPDM .060 black be used? TPO? Maintain 1/4"/FT metal roof
74 1/28/2019 AAR Building Set, S‐
Is there a detail for the required floor assembly?
floor systems consist of metal stud framing with ¾” plywood sheathing designed by the modular building manufacturer with VCT covering
75 1/28/2019 AAR Building Set, M‐
The mounting locations of the heat pumps shown in the current design prevents the factory from being able to mount the units in the shop. Due to this the units must be mounted in the field which is a major cost driver. Would the government consider attic mounted mechanical equipment?
Locate heat pumps per plans
76 1/28/2019 Amendment 7 CLIN 00001AI ‐ It is assumed that this CLIN is to incorporate the entire modular building including its contents, foundations, site prep for the building, TAB, Cx and Air Barrier testing. If any of these assumptions are bad please correct. Agree
77 1/28/2019 Amendment 7
CLIN 00001AJ ‐ The painting scope is assumed to take into account total weathering look of all buildings to include precast structures, conex buildings, site amenities (telephone poles, electrical panels), gates/fence, graffiti panels, awnings, doors, shutters, wood and steel panel props with a 3 year warranty. It is also stated to paint both sides of all interior galvanneal panels. It is understood that to achieve the desired "weathered" look on top of the "scenic" appearance that 3‐4 coats in all of these areas is typical. If any of these assumptions are bad please correct. Agree
P1479 Outdoor Infantry Immersion Trainer, Marine Corps Base, Camp Lejeune, NC
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
78 2/1/2019 Amendment 7 We wish to learn if the roof tops of the buildings and containers must receive scenic painting and attachments as indicated on the renderings.
Village: No scenic painting/textures on concrete roofs, just the WP'ing coating system per earlier PPI response; AAR, other bldgs: no scenic painting textures on roof. Just roofing manuf's galvalume or equivalent finish. Air water barrier only recommended as long as UFC 1‐201‐01 non‐perm DOD facility offers an exception as state in PPI question
Infantry Immersion Training
TRAFFIC COATINGS 071800 - 1
SECTION 071800 - TRAFFIC COATINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes traffic coatings for the following applications:
1. Pedestrian traffic.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include installation instructions and details, material descriptions, dry or wet film thickness requirements, and finish.
B. Shop Drawings: For traffic coatings.
1. Include details for treating substrate joints and cracks, flashings, deck penetrations, and other termination conditions that are not included in manufacturer's product data.
C. Samples: For each exposed product and for each color and texture specified.
1.4 INFORMATIONAL SUBMITTALS
A. Product certificates.
B. Sample warranty.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.
1.6 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace traffic coating that fails in materials or workmanship within specified warranty period.
1. Warranty Period: Five years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Material Compatibility: Provide primers; base coat, intermediate coat, and topcoat; and accessory materials that are compatible with one another and with substrate under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.
TRAFFIC COATINGS 071800 - 2
2.2 TRAFFIC COATING
A. Traffic Coating: Manufacturer's standard, traffic-bearing, seamless, high-solids-content, cold liquid-applied, elastomeric, water-resistant membrane system with integral wearing surface for pedestrian traffic; according to ASTM C957/C957M.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Advanced Polymer Technology Corporation.
b. BASF Corporation.
c. Euclid Chemical Company (The); an RPM company.
d. Key Resin Company.
e. Pacific Polymers®; ITW Polymers Sealants North America.
f. Pecora Corporation.
g. Soprema, Inc.
h. Urethane Polymers International, Inc.
B. Primer: Liquid primer as recommended in writing for substrate and conditions by traffic-coating manufacturer.
C. Preparatory and Base Coats: Polyurethane or epoxy.
D. Intermediate Coat: Polyurethane or epoxy.
1. Aggregate Content: As recommended in writing by traffic-coating manufacturer for substrate and service conditions indicated.
E. Topcoat: Polyurethane.
1. Aggregate Content: As recommended in writing by traffic-coating manufacturer for substrate and service conditions indicated.
2. Color: As selected by Architect from manufacturer's full range.
F. Aggregate: Manufacturer's standard aggregate for each use indicated of particle sizes, shape, and minimum hardness recommended in writing by traffic-coating manufacturer.
2.3 ACCESSORY MATERIALS
A. Joint Sealants: ASTM C920.
B. Sheet Flashing: Nonstaining sheet material recommended in writing by traffic-coating manufacturer.
C. Adhesive: Contact adhesive recommended in writing by traffic-coating manufacturer.
D. Reinforcing Strip: Fiberglass mesh recommended in writing by traffic-coating manufacturer.
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean and prepare substrates according to ASTM C1127 and manufacturer's written instructions to produce clean, dust-free, dry substrate for traffic-coating application.
1. Application of coating indicates acceptance of surfaces and conditions.
TRAFFIC COATINGS 071800 - 3
B. Mask adjoining surfaces not receiving traffic coatings to prevent overspray, spillage, leaking, and migration of coatings. Prevent traffic-coating materials from entering deck substrate penetrations and clogging weep holes and drains.
C. Concrete Substrates: Mechanically abrade surface to a uniform profile acceptable to manufacturer, according to ASTM D4259. Do not acid etch.
1. Remove grease, oil, paints, and other penetrating contaminants from concrete.
2. Remove concrete fins, ridges, and other projections.
3. Remove laitance, glaze, efflorescence, curing compounds, concrete hardeners, form-release agents, and other incompatible materials that might affect coating adhesion.
4. Remove remaining loose material to provide a sound surface, and clean surfaces according to
ASTM D4258.
3.2 TERMINATIONS AND PENETRATIONS
A. Prepare vertical and horizontal surfaces at terminations and penetrations through traffic coatings and at expansion joints, drains, and sleeves according to ASTM C1127 and manufacturer's written instructions.
B. Provide sealant cants at penetrations and at reinforced and nonreinforced, deck-to-wall butt joints.
C. Terminate edges of deck-to-deck expansion joints with preparatory base-coat strip.
D. Install sheet flashings at deck-to-wall expansion and dynamic joints, and bond to deck and wall substrates according to manufacturer's written recommendations.
3.3 JOINT AND CRACK TREATMENT
A. Prepare, treat, rout, and fill joints and cracks in substrates according to ASTM C1127 and manufacturer's written recommendations. Before coating surfaces, remove dust and dirt from joints and cracks according to ASTM D4258.
1. Comply with recommendations in ASTM C1193 for joint-sealant installation.
B. Apply reinforcing strip in traffic-coating system where recommended in writing by traffic-coating manufacturer.
3.4 TRAFFIC-COATING APPLICATION
A. Apply traffic coating according to ASTM C1127 and manufacturer's written instructions.
B. Apply coats of specified compositions for each type of traffic coating at locations as indicated on
Drawings.
C. Apply traffic coatings to prepared wall terminations and vertical surfaces to height indicated; omit aggregate on vertical surfaces.
D. Cure traffic coatings.
3.5 PROTECTING AND CLEANING
A. Protect traffic coatings from damage and wear during remainder of construction period.
B. Clean spillage and soiling from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.
END OF SECTION 071800
| Amend 0008 |
| 190201 Outdoor IITS Prep PPI Response |
| 190123 PPI #111 - 071800 SF - TRAFFIC COATINGS |