Attachment_E_-_REV2_PRICE_PROPOSAL_FORM.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| 1700.1701.Elec._COMB.pdf | ||
| 1701.4393824-4393856.pdf | ||
| Attachment_E_-_REVISED_PRICE_PROPOSAL_FORM.docx | DOCX document | |
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| P199_Demo_Site_Visit_Sign_In_Sheet.pdf | ||
| Attachment_B_-_SECNAV_5512.pdf | ||
| Attachment_A_-_Pre-Proposal_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Attachment_C_-_Construction_Experience_Project_Data_Sheet.docx | DOCX document | |
| Solicitation_N4008519R9023.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE PROPOSAL FORM
1.1 CONTRACT LINE ITEMS
Provide the Contract Line Item Number (CLIN) lump sum price for the items below:
CLIN 0001 - BASE PRICE - Price includes the following:
CLIN 0001AA - Price for work associated with the demolition of BLDGs 130, 1701, 3984, 4434, 4435, 4553, 4858, 4232, 4233 and 4234 completed in accordance with the RFP, but not including the work indicated or specified to be provided under CLIN 0001AB, 0001AC, 0002AA, 0002AB and 0002AC.
CLIN 0001AB – Removal & Disposal of Light Ballast - Price includes the following:
Removal and disposal of light ballast in accordance with Specification Section 02 84 16.
Quantity: 5,000 units x $_______/100 units = $_____________________ CLIN 0001AC – Removal & Disposal of Misc Furnishings and Equipment - Price includes the following:
Removal and disposal of miscellaneous furnishings and equipment inside the buildings in accordance with the plans and specifications.
Quantity: 300 tons x $_______/10 tons = $_____________________
TOTAL PRICE FOR CLIN 0001: $_______________________
CLIN 0002 – OPTION 1, Optional Building Demolition – Price includes the following:
CLIN 0002AA - Price for work associated with the demolition of BLDGs 1700, 3985, 4437, 4438, 4439 and the electrical work associated with existing guard shack complete in accordance with drawings and specifications, but not including the work indicated or specified to be provided under CLIN 0001AA, 0001AB, 0001AC, 0002AB and 0002AC.
CLIN 0002AB – Removal & Disposal of Light Ballast - Price includes the following:
Removal and disposal of light ballast in accordance with Specification Section 02 84 16.
Quantity: 1,750 units x $_______/100 units = $____________________ CLIN 0002AC – Removal & Disposal of Misc Furnishings and Equipment - Price includes the following:
Removal and disposal of miscellaneous furnishings and equipment inside the buildings in accordance with the plans and specifications.
Quantity: 100 tons x $_______/10 tons = $____________________
TOTAL PRICE FOR CLIN 0002: $______________________
TOTAL PRICE FOR ALL CLINs 0001 THROUGH 0002: $______________________
1.2 CONTRACT LINE ITEM NOTES
a. Submit offers using this Price Proposal Form and these Contract Line Item Notes.
b. Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government’s best interest, the Government will evaluate offers for award purposes by adding the total price for the option(s) to the total price for CLIN 0002-0003. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).
c. A firm-fixed proposed price is required for all CLINs. No provision is made for economic price adjustment.
d. The Government reserves the unilateral right to award CLIN 0002 to the Contractor at the proposed price within 30 calendar days after the contract award. If Options are exercised, the contract completion date remains the same.
e. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
f. If CLIN 0002 and/or 0003 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
g. Should the actual quantity of any of these items required to complete the work vary from that listed, the unit price will be used to adjust the total contract price in accordance with the contract clause entitled FAR 52.211-18, Variation in Estimated Quantity.
-- End of Document --