P947_-_Price_Proposal_Form_Rev_C_(FINAL).pdf

PDF 67 KB Posted

Attached to
P947 Welding and Body Repair Shop Facility, Marine Corps Logistics Base, Albany, Georgia.
Solicitation number
N4008519R9000
Issued by

About this file

P947_-_Price_Proposal_Form_Rev_C_(FINAL).pdf

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WELDING AND BODY REPAIR SHOP FACILITY 19P0947

MARINE CORPS LOGISTICS BASE, ALBANY, GA WORK ORDER NO.: 1365028

Document 00 22 13.00 20 Page 1

1 PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 - BASE PRICE. Price includes the following:

CLIN 0001AA: P947, Base Price- Price for the entire work, complete to the 5-foot line outside of the building AND CLIN 0001AB: Price for the entire project Site Work, outside the facility’s 5-foot line, including the apron going out 30’ from the building, complete in accordance with the RFP.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN

0001AA and 0001 AB

0001AA Building $__________

0001 AB Site Work Including Apron $__________

CLIN 0002 Option Item No.1 Prices Includes the following: Providing all work in connection with four (4) additional bays for the building, complete in accordance with the RFP specifications.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0002

0002 Option 1 4 Additional Bays for Building, including additional Jib Cranes

CLIN 0003 Option Item No. 2 - Price includes the following: providing all work in connection with the additional concrete apron 35 feet to 50 feet surrounding the building, complete in accordance with the RFP specifications

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0003

0003 Option 2 Additional Concrete Apron 35 Feet to 50 feet $__________

Document 00 22 13.00 20 Page 2

CLIN 0004 Option Item No. 3 - Price includes the following: providing all work in connection with the additional concrete apron 35 feet to 50 feet surrounding the building, complete in accordance with the RFP specifications

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0004

0004 Option3 Additional Concrete Apron 35 Feet to 50 feet, associated with the Additional 4 bays in CLIN

CLIN 0005 Option Item No. 4 - Price includes the following: providing all work in connection with providing concrete apron 50 feet to 100 feet surrounding the building.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0005

0005 Option 4 Additional Concrete Apron 50 Feet to 100 feet $__________

CLIN 0006 Option Item No. 5 - Price includes the following: providing all work in connection with providing concrete apron 50 feet to 100 feet surrounding the building.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0006

0006 Option 5 Additional Concrete Apron 50 Feet to 100 feet associated with the Additional 4 bays in CLIN

CLIN 0007 Option Item No. 6 - Price includes the following: providing all work in connection with providing interior improvements by providing Interior CMU wall along long shop area axis.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0007

0007 Option 6 Interior CMU Wall along shop area axis $__________

Document 00 22 13.00 20 Page 3

CLIN 0008 Option Item No. 7 - Price includes the following: providing all work in connection with providing interior improvements by providing Interior CMU wall along long shop area axis.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0008

0008 Option 7 Interior CMU Wall along shop area axis associated with the Additional 4 bays in CLIN

CLIN 0009 Option Item No. 8 - Price includes the following: Providing all work in connection with providing Smoking Area.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0009

0009 Option 8 Providing Smoking Area. $__________

CLIN 0010 Option Item No. 9 - Price includes the following: providing all work in connection with Landscaping

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0010

0010 Option 9 Landscaping $__________

CLIN 0011 Option Item No. 10 - Price includes the following: providing all work in connection with Landscaping

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0011

0011 Option 10 Demountable Partitions $__________

CLIN 0012 Option Item No. 11 - Price includes the following: providing all work in connection with Heavy Duty Shelving.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0012

0012 Option 11 Heavy Duty Shelving $__________

Document 00 22 13.00 20 Page 4

CLIN 0013 Option Item No. 12 - Price includes the following: providing all work in connection with Selective Demolition and restoration of Building 2215.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN 0013

0013 Option 12 Selective demolition and restoration of Building 2215

CLIN 00014 Planned Modification Item 1: FF&E

CLIN ITEM GOVERNMENT FF&E

ESTIMATE

HAR

(NTE 5%)

HAR AMOUNT

(GOVT FF&E

ESTIMATE x HAR%)

TOTAL FF&E ESTIMATED

AMOUNT FOR CLIN 0014

(GOVT FF&E ESTIMATE + HAR

AMOUNT)

0014 FF&E $496,692.17 _____% $______ $________

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Items 0001A and

0001B.

b. The Government reserves the unilateral right to award CLIN 0002, 0003, 0004, 0005, 0006, 0007 0008, 0009, 0010, 0011 , 0012 and 0013 to the Contractor at the proposed price within 120 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN

0008, CLIN 0009, CLIN 0010, CLIN 0011, CLIN 0012 and CLIN 0013. No provision is made for economic price adjustment. If Options are exercised, the contract completion date remains unchanged.

c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001.

In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).

d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

e. If CLIN 0002 - 0013 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

Document 00 22 13.00 20 Page 5

1.3 PLANNED MODIFICATION BID NOTES

These notes apply to Planned Modification CLINs.

a. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E Estimate is only an estimated amount.

b. If awarded, line items will be funded separately after completion of

FF&E design package review by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in Section 01 30 01.00 20 DESIGN PROCUREMENT AND INSTALLATION

OF FURNITURE, FIXTURES, AND EQUIPMENT.

c. Bonding is not required for the design, procurement and installation of

FF&E.

d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E. The proposed HAR is a fixed rate.

e. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.

f. If awarded, the FF&E modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E package was submitted within the approved schedule deadlines and sufficient lead time for the FF&E is not available and the Government's award of the modification is in the last six months of the contract.

2 PART 2 PRODUCTS

Not used.

Document 00 22 13.00 20 Page 6

3 PART 3 EXECUTION

Not used.

-- End of Document --