AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N4008518R1613, NSWC BUILDING 3330S HVAC RENOVATION AT THE NAVAL SUPPORT ACTIVITY, CRANE, INDIANA

See follow ing pages for details.

PROPOSAL DUE DATE REMAINS 2:00 P.M. (EDT) ON 17 MAY 2018. ACKNOWLEDGE RECEIPT OF THIS AMENDMENT WITH YOUR

PROPOSAL.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1613

X 9B. DATED (SEE ITEM 11)

02-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriat ion date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not , is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-May-2018

CODE

NAVFAC MID ATLANTIC

PWD CRANE FEAD

300 HIGHWAY 361

NSA BLDG 2516

CRANE IN 47522

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Carrie L. Grimard, Contracting Officer 812-854-6641 carrie.grimard@navy.mil

N4008518R1613

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

SOLICITATION #N4008518R1613, NSWC BLDG 3330S HVAC RENOVATION AT THE NAVAL SUPPORT

ACTIVITY, CRANE, INDIANA

The following changes are made to the specifications and drawings:

1. Section 01 30 01.22 22, paragraph 1.4.3: Change the second sentence to read as follows: “A Certified Technology Specialist-Design (CTS-D) is not required for the design and preparation of the Audio Visual Package.

2. Section 01 30 01.22 22, paragraph 1.5.2: Delete the following sentence: “The ‘over-the-shoulder’ review meeting shall be held via teleconference or at NAVFAC located in Norfolk, VA” Replace with the following: “The over-the-shoulder meetings may be held either at NSA Crane or via conference call. If the meeting is held via conference call, submit the package electronically to the Government at least two days in advance.”

3. Remove Section 02 82 16.00 20 and replace with the revised, attached Section 02 82 16.00 20

4. Remove the following drawings:

AD100

A-100 A-110 A-200 A-401 A-502 I-100 M102A M102B M104A M-601 M-602

ED103

ED104

ED105

E-101 E-103 E-104 E-106

Replace with the revised, attached drawings:

AD100

A-100 A-110 A-200 A-401 A-502 I-100

N4008518R1613

M102A M102B M104A M-601 M-602

ED103

ED104

ED105

E-101 E-103 E-104 E-106

5. The attached questions and answers are incoporated.

(End of Summary of Changes)

QUESTIONS AND ANSWERS ‐ SOLICITATION N4008518R1613 NSWC BLDG 3330 HVAC RENOVATION AT NSA CRANE INDIANA

UPDATED: 09 MAY 2018 (AMENDMENT 0002)

PPI # Discipline Question Response

1 Fire Protection

The specification / drawing calls for electric smoke detectors above the chamber ceiling? Is there a cavity above the anechoic chamber with pre‐ action?

Yes, the space above the anechoic chamber has an existing preaction sprinkler system.

2 Fire Protection

If there are multiple ceiling levels in and above the anechoic chamber, what are the ceiling heights of each?

The anechoic chamber ceiling is approximatley 25 ft and the ceiling above the anechoic chamber is approximaltey 5 ft.

3 Fire Protection

The specification / drawing calls for electric smoke detectors located in the chamber. Typically an anechoic chamber is a radiation testing type chamber in which electric smoke detection does not operate properly potentially causing false alarms / discharges. Can you confirm the application of electric smoke detectors is correct inside the anechoic chamber?

The smoke detectors shown in the chamber are to be demolished

(F‐101 demo note 1). An air aspirated very early warning smoke detection system is to be provided in the chamber (F‐101 new work note 1), not electric smoke detectors.

4 Fire Protection

The specification / drawing calls out for two (2) control panels, one (1) for clean agent fire system, one (1) for pre‐action system. The clean agent and pre‐action can be monitored / controlled / released by a multiple zone single (one

(1)) control panel. Would this be acceptable or are two (2) control panels required?

Provide two releasing panels as shown on the drawings.

5 Fire Protection Where would the pre‐action valve be located?

The preaction valve is existing. It is located in the mechanical room (Room 105 per our existing floor plans).

6 Fire Protection

Is the demolition of the existing fire alarm system / devices under an alternate contractor scope of work?

The existing fire alarm system is not being demolished and is going to remain. Only demolish the devices noted in the demolition keynotes on F‐101.

7 Fire Protection

The specification / drawing calls for clean agent fire protection of the control room in conjunction with the anechoic chamber. Can you confirm the ceiling height in the anechoic chamber (60'‐0"?) and the control room (XX'‐XX")?

I don't have exact measurements and only have existing floor plans. As I recall, the anechoic chamber is about 25 ft and the control room is about 9 ft. This should be confirmed during the contractor's site visit.

8 Fire Protection

Is air sampling detection required in the control room or only photoelectric type electric smoke detectors?

Air aspirating smoke detection is required in the control room as well as the anechoic chamber.

9 Fire Protection

Can you confirm where pre‐action will be required? Anechoic chamber, above anechoic chamber, and control room?

See F‐101 General Note 1. The preaction sprinkler system is existing and will remain in the control room and above the anechoic chamber. The sprinklers will be removed from inside the anechoic chamber and not replaced.

10 Fire Protection

The specification / drawing calls for a manually operated 2nd supply of clean agent fire suppressant. The system can be configured as a main / reserve (two shot) system in which either supply of clean agent suppressant can be manually actuated by pull stations or mechanically. The main / reserve switch will select which cylinders are ready to be activated. Is this an acceptable configuration and / or the intent of the specification / drawing?

The intent is to have a primary clean agent system activated by the air aspirating smoke detection system and a reserve clean agent system activated manually. If the system can be configured as described in the RFI, that would also be acceptable.

11 Fire Protection

Will there be any flammable liquids or hazards housed / used in the anechoic chamber which would increase the required clean agent fire suppression system design concentration for fire protection?

There aare no flammable liquids or other hazardous substances housed/used in in the anechoic chamber.

12 Electrical

Is the anechoic chamber an electrically classified area? (i.e. Class 1 Div 1, Class

1 Div 2, etc.)

There is no electrical Classification to the chamber – standard electrical outlets, lights, etc.

13 Fire Protection

Is there any specific clean agent fire suppression agent or acceptable / allowable clean agent fire suppression agent to be provided? In previous systems at Crane FM200 clean agent fire suppression systems were applied.

Plans and specs were prepared with Novec1230 in mind due to the smaller amount of floor space needed for the cylinders, but we can't specify a specific clean agent. Any clean agent that meets the specs will be acceptable.

14 FF&E

When is it expected that the FF&E modification would be issued, so that it can be determined if the furniture will undergo a manufacturer's price increase?

FF&E modification will be awarded as a lump sum, 6‐9 months prior to BOD which is currenlty anticipated to be in the second quarter of FY18 or NLT 1/18/19.

15 FF&E

The RFP states that the Prime

Contractor should anticipate a deposit between 30 percent and 50 percent of the FF&E cost (estimated to be approximately $1.1 million). Can the

Contractor bill for this deposit at the time it is paid by the Contractor to the manufacturer's dealer? Also, can the Contractor bill for the balance due at the time it is paid by the

Contractor to the manufacturer's dealer?

Payments for FF&E will not be made until the FF&E is either on‐ site or is in the position of the prime contractor and stored in a secured/insured/approved facility.

16 FF&E

Please confirm all purchases for the project are tax‐exempt.

The contract contains clause 52.229‐3, Federal, State, and Local

Taxes which requires the contractor to include all applicable federal, state, and local taxes in their price. However, purchases for items for use by the Federal Government are tax exempt in accordance with Indiana Code 6‐2.5‐5‐24. See www.in.gov/dor for further information.

17 FF&E

The RFP states that "F&FE items are not considered construction and the prime contractor shall not be required to secure any additional bond for the award of the FF&E line item unless otherwise indicated in the contract. If any additional bond is required for the

FF&E line item it is to be included in the prime contractor's F&FE HAR." Please confirm that a bond for the FF&E is not required.

The prime contractor is not required to submit a bond to the

Government; however, prime contractor may chose to require subcontractors to provide bonding to the prime.

18 Seismic

International Building code: Most current projects fall under IBC 2012 or

IBC 2015.

This is indicated on S‐001, under "Project Notes", item #1. 2015

IBC is indicated.

19 Seismic

Seismic Design Category: A, B, C, D, E or

F? Likely a "D" for Southern Indiana.

This is also indicated on S‐001 under "Live Load Notes". This was calculated as "C" in accordance with the UFCs. This structure was on the low end of the design seismic accelerations that require consideration of design category "C".

20 Seismic

Component importance Factor: 1.0 or

1.5. Likely 1.5 if Department of Defense

project.

This is also indicated on S‐001 under "Live Load Notes". The importance category is 1.0. This a regular building (despite falling under DoD ownership), and it does not require consideration of risk category 4 (which has Ie = 1.5) as indicated in UFC 3‐301‐01, Table 2. It also does not fall under risk category 3 criteria in the same table. Risk category 2 is applicable to this structure.

21 Contract

See Attachment A, highlighted in yellow

– There is an inconsistency of completion days for the project. What is the total completion days requested for this project and is this the days of completion until the BOD date or the

CCD date?

BOD = 400 Days, CCD 430 Days (Block 11 on the SF 1442 and

Clause 52.211‐10 allow 15 days for performance to begin so in order to get a completiond date that is 430 days after award, the number of days to complete the project is 415 days so when we calculate the actual date we add the 415+15 to get a CCD of 430)

22 Contract

In one area of the solicitation it states that “the QC manager must report to an officer of the firm and not be subordinate to the Project

Superintendent or the Project

Manager”. On another page of solicitation it states that “ In addition to implementing and managing the QC program, the QC Manager may perform the duties of Project Superintendent”.

Also on attachment B it states that the

QC person can be the SSHO. Based on this information, it is our understanding that our project superintendent can also serve as the QC Manager and Site

Safety Officer onsite. Is this correct?

The QC manager must report to an officer of the firm and not be subordinate to the Project Superintendent or the Project

Manager. Either the QC Manager or Project Superintendent can also serve as the SSO.

23 Civil

Will there be a solid landfill provided for this project at NSA Crane?

Excess material and soil should be assumed to be disposed of off installation. Small amounts of soil may be disposed of on the installation pending availability and coordination with the

NAVFAC construction manager post award.

24 Demo

Does all demolished equipment/materials become property of the contractor?

All demolished equipment and materials become property of the contractor unless otherwise noted on the drawings or specs.

26 General

We are unable to attend the walk‐ through for the above mentioned project. My first question is, can we able to go forward and BID on this project still?

Yes, you may still submit a proposal even though you did not attend the site visit.

27 General

Secondly, Can you please provide us the walk thru SIGN UP sheet for contractors

& sub‐contractors.

A copy of the sign‐up sheet is provided with Amendment 0001

28 General

Is there any way that you can forward the Powerpoint presentation to me that was used in the pre‐proposal conference for subject solicitation?

A copy of the power point presentation is provided with

Amendment 0001

29 Fire Protection

Sheet F‐101 demolition note #2 indicates demo sprinklers in Anechoic chamber and general note #1 sprinkler above Anechoic chamber to remain.

Please confirm that there are sprinklers above and inside chamber. If so, is both above and inside chamber the same system?

Yes, there are sprinklers above and inside the anechoic chamber.

As per the drawings, the sprinklers inside the chamber are to be demolished and the sprinklers above the chamber are to remain.

30 General Will the areas we will be working in be occupied by employees or not?

The main project area, B3330S second floor will be vacated. The first floor, where there is limited work, will be occupied.

31 FF&E

What is the Navy’s intention regarding the timing of the Contractor Interior

Designer validation of all the FF&E requirements with the Activity?

Validation of the FF&E (face‐to‐face meeting with activity representative) should be part of the pre‐con meeting or immediately following. Construction duration is compressed so it will be important to start the FF&E process early.

32 FF&E

Confirm that a CTS‐D is required for the

AV design on this project. Is there AV

Equipment included in the project?

A CTS‐D is not required on this project. There is limited AV equipment on the project.

33 FF&E

Confirm if the over the shoulder meeting may be held at Norfolk, VA.

The over‐the‐shoulder meetings may be held either at NSA Crane or via conference call. If the meeting is held via conference call, submit the package electroincally to the Government at least two days in advance.

34 FF&E

How long will this project last? How much time is being allocated for the design if the Final FFE is due 9 months before BOD?

Final FF&E package will be due 6‐9 months prior to beneficial occupancy date. The FF&E process should begin immediately following contract award. The prime contractor should forward id credentials to NAVFAC ID for approval.

35 FF&E

How many BVDs should be anticipated for this project?

The government anticipates (1) BVD.

36 FF&E

“Upon completion of the FF&E installation, the Contractor shall provide professional Interior

Photography of the completed interior.” Will this be required?

Yes.

General

Specification Section 02 82 16.00 20

Asbestos is written for the

Commonwealth of Virginia. Should this be changed to reflect State of Indiana laws?

Yes. We do not expect to encounter asbestos and Specification

Section 02 82 16.00 20 is included in the event that unforeseen is encountered. The Specification has been updated and attached.

the motorized screen and projector listed on page E‐106, notes 5 & 6.

If they were suppose to be a part of the

FFE package, it does not show on the drawings or the specs Please advise.

Should be part of CLIN 0006 (A/V Package) in the supplmentary instructions to bidders

39 Arch

Should existing wall tile and board be removed in areas where new wall tile/board? is being installed? We did not see a note on this.

Existing wall board is to remain and new tile provided.

40 Arch

In the specifications it requires all wall covering to be removed and skim coated to a level 5 finish. Please provide locations of wall covering that is to be removed.

Asssume 2,500 s.f. of wallcovering is to be removed

HVAC REPLACEMENT B3330 1130910

SECTION 02 82 16.00 20 Page 1

SECTION 02 82 16.00 20

ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

08/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)

AIHA Z88.6 (2006) Respiratory Protection - Respirator

Use-Physical Qualifications for Personnel

AIHA Z9.2 (2006) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation

Systems

ASTM INTERNATIONAL (ASTM)

ASTM C732 (2006; R 2012) Aging Effects of Artificial

Weathering on Latex Sealants

ASTM D2794 (1993; R 2010) Resistance of Organic

Coatings to the Effects of Rapid

Deformation (Impact)

ASTM D522 (1993a; R 2008) Mandrel Bend Test of

Attached Organic Coatings

ASTM E119 (2012a) Standard Test Methods for Fire

Tests of Building Construction and

Materials

ASTM E1368 (2011) Visual Inspection of Asbestos

Abatement Projects

ASTM E1494 (2012) Encapsulants for Spray- or

Trowel-Applied Friable Asbestos-Containing

Building Materials

ASTM E736 (2000; R 2011) Cohesion/Adhesion of

Sprayed Fire-Resistive Materials Applied to Structural Members

ASTM E84 (2012b) Standard Test Method for Surface

Burning Characteristics of Building

Materials

ASTM E96/E96M (2010) Standard Test Methods for Water

Vapor Transmission of Materials

SECTION 02 82 16.00 20 Page 2

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 560/5-85-024 (1985) Guidance for Controlling

Asbestos-Containing Materials in Buildings

(Purple Book)

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926.103 Respiratory Protection

29 CFR 1926.1101 Asbestos

29 CFR 1926.200 Accident Prevention Signs and Tags

29 CFR 1926.51 Sanitation

29 CFR 1926.59 Hazard Communication

40 CFR 61-SUBPART A General Provisions

40 CFR 61-SUBPART M National Emission Standard for Asbestos

40 CFR 763 Asbestos

U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)

ND OPNAVINST 5100.23 (2005; Rev G) Navy Occupational Safety and

Health (NAVOSH) Program Manual

UNDERWRITERS LABORATORIES (UL)

UL 586 (2009) Standard for High-Efficiency

Particulate, Air Filter Units

1.2 DEFINITIONS

1.2.1 ACM

Asbestos Containing Materials.

1.2.2 Amended Water

Water containing a wetting agent or surfactant with a maximum surface tension of 0.00042 psi.

1.2.3 Area Sampling

Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.

1.2.4 Asbestos

The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and actinolite asbestos and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content of the material is determined to be at least one percent.

SECTION 02 82 16.00 20 Page 3

1.2.5 Asbestos Control Area

That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris.

1.2.6 Asbestos Fibers

Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and

Health (NIOSH) Method 7400.

1.2.7 Asbestos Permissible Exposure Limit

0.1 fibers per cubic centimeter of air as an 8-hour time weighted average measured in the breathing zone as defined by 29 CFR 1926.1101 or other

Federal legislation having legal jurisdiction for the protection of workers health.

1.2.8 Background

The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard abatement efforts. Background concentrations for other (contaminated) areas are measured in similar but asbestos free locations.

1.2.9 Contractor

The Contractor is that individual, or entity under contract to the Navy to perform the herein listed work.

1.2.10 Competent Person

A person meeting the requirements for competent person as specified in

29 CFR 1926.1101 including a person capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically trained in a training course which meet the criteria of EPA's Model Accreditation Plan (

40 CFR 763) for project designer or supervisor, or its equivalent. The competent person shall have a current State of Indiana asbestos contractors or supervisors license.

1.2.11 Encapsulation

The abatement of an asbestos hazard through the appropriate use of chemical encapsulants.

1.2.12 Encapsulants

Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with performance requirements as specified herein.

a. Removal Encapsulant (can be used as a wetting agent)

SECTION 02 82 16.00 20 Page 4

b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material)

c. Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating all asbestos fibers and preventing fiber release due to routine mechanical damage)

d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed).

1.2.13 Friable Asbestos Material

One percent asbestos containing material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry.

1.2.14 Glovebag Technique

Those asbestos removal and control techniques put forth in 29 CFR 1926.1101

Appendix G.

1.2.15 HEPA Filter Equipment

High efficiency particulate air (HEPA) filtered vacuum and/or exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters shall retain 99.97 percent of particles

0.3 microns or larger as indicated in UL 586.

1.2.16 Navy Consultant (NC)

That qualified person employed directly by the Government to monitor, sample, inspect the work or in some other way advise the Contracting

Officer. The NC is normally a private consultant, but can be an employee of the Government.

1.2.17 Negative Pressure Enclosure (NPE)

That engineering control technique described as a negative pressure enclosure in 29 CFR 1926.1101.

1.2.18 Nonfriable Asbestos Material

Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.

1.2.19 Personal Sampling

Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific employee, as performed in accordance with 29 CFR 1926.1101.

SECTION 02 82 16.00 20 Page 5

1.2.20 Private Qualified Person (PQP)

That qualified person hired by the Contractor to perform the herein listed tasks.

1.2.21 Qualified Person (QP)

A Registered Architect, Professional Engineer, Certified Industrial

Hygienist, consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate State

Model Accreditation Plan as described in 40 CFR 763 as a Building

Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project

Designer; and has successfully completed the National Institute of

Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating

Airborne Asbestos Dust" or equivalent. The QP must be qualified to perform visual inspections as indicated in ASTM E1368. The QP shall be appropriately licensed in the State of Indiana.

1.2.22 TEM

Refers to Transmission Electron Microscopy.

1.2.23 Time Weighted Average (TWA)

The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.

1.2.24 Wetting Agent

A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied. An equivalent wetting agent must have a surface tension of at most

0.00042 psi.

1.3 REQUIREMENTS

1.3.1 Description of Work

The work covered by this section includes the handling and control of asbestos containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos containing materials generated by the work. More specific operational procedures shall be outlined in the Asbestos Hazard Abatement Plan called for elsewhere in this specification. The asbestos work includes, but not limited to, the demolition and removal of asbestos containing roofing, floor tile and mastic, and other materials identified in the government furnished asbestos survey.

1.3.2 Medical Requirements

Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101.

SECTION 02 82 16.00 20 Page 6

1.3.2.1 Medical Examinations

Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1926.1101 or other pertinent State or local directives. This requirement must have been satisfied within the 12 months prior to the start of work on this contract. The same medical examination shall be given on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before or after the termination of employment in such occupation. Specifically identify x-ray films of asbestos workers to the consulting radiologist and mark medical record jackets with the word

"ASBESTOS."

1.3.2.2 Medical Records

Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of 30 years after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to:

The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician upon the request of the employee or former employee.

1.3.3 Employee Training

Submit certificates with the main abatement submittal, signed by each employee indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with

40 CFR 763; understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers;

understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 on an initial and annual basis. Certificates shall be organized by individual worker, not grouped by type of certification. Train all personnel involved in the asbestos control work in accordance with United

States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency

Response Act (AHERA) training criteria or State training criteria whichever is more stringent. The Contractor shall document the training by providing: dates of training, training entity, course outline, names of instructors, and qualifications of instructors upon request by the

Contracting Officer. Furnish each employee with respirator training and fit testing administered by the PQP as required by 29 CFR 1926.1101. Fully cover engineering and other hazard control techniques and procedures. All asbestos workers shall have a current State of Indiana asbestos worker's license.

1.3.4 Permits, Licenses, and Notifications

Obtain necessary permits and licenses in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities prior to the start of work. Notify the State's environmental protection agency and the Contracting Officer in writing 20 working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M. Notify the

Contracting Officer and other appropriate Government agencies in writing 20 working days prior to the start of asbestos work as indicated in applicable

SECTION 02 82 16.00 20 Page 7 laws, ordinances, criteria, rules, and regulations. Submit copies of all

Notifications to the Contracting Officer. Notify the local fire department

3 days prior to removing fire-proofing material from the building including notice that the material contains asbestos.

1.3.5 Environment, Safety and Health Compliance

In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of

Federal, State, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of 29 CFR 1926.1101, 40 CFR 61-SUBPART A, 40 CFR 61-SUBPART M, and ND OPNAVINST 5100.23. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Government shall apply. The following laws, ordinances, criteria, rules and regulations regarding removal, handling, storing, transporting and disposing of asbestos materials apply:

1.3.6 Respiratory Protection Program

Establish and implement a respirator program as required by AIHA Z88.6, 29 CFR 1926.1101, and 29 CFR 1926.103. Submit a written description of the program to the Contracting Officer. Submit a written program manual or operating procedure including methods of compliance with regulatory statutes.

1.3.6.1 Respirator Program Records

Submit records of the respirator program as required by AIHA Z88.6, 29 CFR 1926.103, and 29 CFR 1926.1101.

1.3.7 Asbestos Hazard Control Supervisor

The Contractor shall be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work.

1.3.8 Hazard Communication

Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Material Safety Data Sheets (MSDS) for all materials brought to the site.

1.3.9 Asbestos Hazard Abatement Plan

Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined space entry procedures and equipment and work procedures to be used in the removal and demolition of materials containing asbestos. The plan, not to be combined with other hazard abatement plans, shall be prepared, signed, and sealed by the PQP. Provide a Table of Contents for each abatement submittal, which shall follow the sequence of requirements in the contract. Such plan shall include but not be limited to the precise personal protective equipment to be used including, but not limited to, respiratory protection, type of whole-body

SECTION 02 82 16.00 20 Page 8 protection and, if reusable coveralls are to be employed decontamination methods (operations and quality control plan), the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, change rooms, removal method, interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan shall also include (both fire and medical emergency) response plans. The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. The Contractor, Asbestos

Hazard Control Supervisor, and PQP shall meet with the Contracting Officer prior to beginning work, to discuss in detail the Asbestos Hazard Abatement

Plan, including work procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification. Any changes required in the specification as a result of the plan shall be identified specifically in the plan to allow for free discussion and approval by the Contracting Officer prior to starting work.

1.3.10 Testing Laboratory

Submit the name, address, and telephone number of each testing laboratory selected for the sampling, analysis, and reporting of airborne concentrations of asbestos fibers along with evidence that each laboratory selected holds the appropriate State license and/or permits and certification that each laboratory is American Industrial Hygiene

Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis

Registry (AAR) and successful participation of the laboratory in the

Proficiency Analytical Testing (PAT) Program. Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National

Institute of Science and Technology (NIST) under National Voluntary

Laboratory Accreditation Program (NVLAP) for asbestos analysis. The testing laboratory firm shall be independent of the asbestos contractor and shall have no employee or employer relationship which could constitute a conflict of interest.

1.3.11 Landfill Approval

Submit written evidence that the landfill is for asbestos disposal. Within

3 working days after delivery, submit detailed delivery tickets, prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill. Submit a copy of the waste shipment records within 1 day of the shipment leaving the project site.

1.3.12 Medical Certification

Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in

29 CFR 1926.1101 and 29 CFR 1926.103 as prescribed by law. Submit certificates prior to the start of work but after the main abatement submittal.

SECTION 02 82 16.00 20 Page 9

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Local exhaust equipment; G

Vacuums; G

Respirators; G

Pressure differential automatic recording instrument; G

Amended water; G

Glovebags; G

Material Safety Data Sheets (MSDS) for all materials proposed for transport to the project site; G

Encapsulants; G

SD-06 Test Reports

Air sampling results; G

Pressure differential recordings for local exhaust system; G

Asbestos disposal quantity report; G

Encapsulation test patches; G

Clearance sampling; G

SD-07 Certificates

Asbestos hazard abatement plan; G

Testing laboratory; G

Private qualified person documentation; G

Contractor's license; G

Competent person documentation; G

Worker's license; G

Landfill approval; G

Employee training; G

Medical certification requirements; G

SECTION 02 82 16.00 20 Page 10

Waste shipment records and if applicable exemption report; G

Respiratory Protection Program; G

Delivery tickets; G

Vacuums; G

Water filtration equipment; G

Ventilation systems; G

Other equipment used to contain airborne asbestos fibers; G

Chemical encapsulants sealers;; G

Notifications

Show compliance with AIHA Z9.2 by providing manufacturers' certifications.

SD-11 Closeout Submittals

Notifications; G

Rental equipment; G

Respirator program records; G

Permits and licenses; G

Protective clothing decontamination quality control records; G

Protective clothing decontamination facility notification; G

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

Submit the name, address, and telephone number of the Private Qualified

Person (PQP) selected to prepare the Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer as described by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and

Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The PQP shall be appropriately licensed in the State of

Indiana. The PQP and the asbestos contractor shall not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP shall be a first tier subcontractor.

1.5.2 Competent Person Documentation

Submit training certification and a current State of Indiana Asbestos

SECTION 02 82 16.00 20 Page 11

Contractor's and Supervisor's License.

1.5.3 Worker's License

Submit documentation that requires all workers have a current State of

Indiana Asbestos Workers License.

1.5.4 Contractor's License

Contractor shall have current Indiana asbestos contractor's license. Submit a copy of the asbestos contractor's license issued by the State of Indiana.

1.5.5 Air Sampling Results

Complete fiber counting and provide results to the PQP for review within 16 hours of the "time off" of the sample pump. Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in excess of the acceptable limits. Submit sampling results to the Contracting Officer and the affected Contractor employees where required by law within 3 working days, signed by the testing laboratory employee performing air sampling, the employee that analyzed the sample, and the PQP. Notify the Contractor and the Contracting Officer immediately of any variance in the pressure differential which could cause adjacent unsealed areas to have asbestos fiber concentrations in excess of 0.01 fibers per cubic centimeter or background whichever is higher. In no circumstance shall levels exceed 0.1 fibers per cubic centimeter.

1.5.6 Pressure Differential Recordings for Local Exhaust System

Provide a local exhaust system that creates a negative pressure of at least

0.02 inches of water relative to the pressure external to the enclosure and operate it continuously, 24 hours a day, until the temporary enclosure of the asbestos control area is removed. Submit pressure differential recordings for each work day to the PQP for review and to the Contracting

Officer within 24 hours from the end of each work day.

1.5.7 Protective Clothing Decontamination Quality Control Records

Provide all records that document quality control for the decontamination of reusable outer protective clothing.

1.5.8 Protective Clothing Decontamination Facility Notification

Submit written evidence that persons who decontaminate, store, or transport asbestos contaminated clothing used in the performance of this contract were duly notified in accordance with 29 CFR 1926.1101.

1.6 EQUIPMENT

1.6.1 Rental Equipment

Provide a copy of the written notification to the rental company concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.

SECTION 02 82 16.00 20 Page 12

PART 2 PRODUCTS

2.1 ENCAPSULANTS

Shall conform to current USEPA requirements, shall contain no toxic or hazardous substances as defined in 29 CFR 1926.59, and shall conform to the following performance requirements.

2.1.1 Removal Encapsulants

Requirement Test Standard

Flame Spread - 25, Smoke Emission – 50

ASTM E84

Life Expectancy - 20 years

ASTM C732 Accelerated Aging Test

Permeability - Minimum 0.4 perms ASTM E96/E96M

Fire Resistance - Negligible effect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)

ASTM E119

Impact Resistance - Minimum 43 in/lb

ASTM D2794 Gardner Impact Test

Flexibility - no rupture or cracking ASTM D522 Mandrel Bend Test

2.1.3 Penetrating Encapsulant

Permeability - Minimum 0.4 perms

ASTM E96/E96M

on fire resistance rating over 3 hour test (Classified by UL for use over

Impact Resistance - Minimum 43 in/lb

ASTM D2794 Gardner Impact Test

Flexibility - no rupture or cracking ASTM D522 Mandrel Bend Test

2.1.4 Lock-down Encapsulant

SECTION 02 82 16.00 20 Page 13

Requirement

Test Standard

Permeability - Minimum 0.4 perms

ASTM E96/E96M

on fire resistance rating over 3 hour test (Classified by UL for use over

Bond Strength: 100 pounds of force/foot

ASTM E736

(Tests compatibility with cementitious and fibrous fireproofing)

PART 3 EXECUTION

3.1 EQUIPMENT

At all times, provide the Contracting Officer or the Contracting Officer's

Representative, with at least two complete sets of personal protective equipment including decontaminating reusable coveralls as required for entry to and inspection of the asbestos control area. Provide equivalent training to the Contracting Officer or a designated representative as provided to Contractor employees in the use of the required personal protective equipment. Provide manufacturer's certificate of compliance for all equipment used to contain airborne asbestos fibers.

3.1.1 Respirators

Select respirators from those approved by the National Institute for

Occupational Safety and Health (NIOSH), Department of Health and Human

Services.

3.1.1.1 Respirators for Handling Asbestos

Provide personnel engaged in pre-cleaning, cleanup, handling, encapsulation, removal and demolition of asbestos materials with respiratory protection as indicated in 29 CFR 1926.1101 and 29 CFR 1926.103.

3.1.2 Exterior Whole Body Protection

3.1.2.1 Outer Protective Clothing

Provide personnel exposed to asbestos with disposable "non-breathable," whole body outer protective clothing, head coverings, gloves, and foot coverings. Provide disposable plastic or rubber gloves to protect hands.

Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but shall not be used alone. Make sleeves secure at the wrists, make foot coverings secure at the ankles, and make clothing secure at the neck by the use of tape.

SECTION 02 82 16.00 20 Page 14

3.1.2.2 Work Clothing

Provide cloth work clothes for wear under the outer protective clothing and foot coverings and either dispose of or properly decontaminate them as recommended by the PQP after each use.

3.1.2.3 Personal Decontamination Unit

Provide a temporary, negative pressure unit with a separate decontamination locker room and clean locker room with a shower that complies with

29 CFR 1926.51(f)(4)(ii) through (V) in between for personnel required to wear whole body protective clothing. Provide two separate lockers for each asbestos worker, one in each locker room. Keep street clothing and street shoes in the clean locker. HEPA vacuum and remove asbestos contaminated disposable protective clothing while still wearing respirators at the boundary of the asbestos work area and seal in impermeable bags or containers for disposal. Do not wear work clothing between home and work.

Locate showers between the decontamination locker room and the clean locker room and require that all employees shower before changing into street clothes. Collect used shower water and filter with approved water filtration equipment to remove asbestos contamination. Dispose of filters and residue as asbestos waste. Discharge clean water to the sanitary system. Dispose of asbestos contaminated work clothing as asbestos contaminated waste. Decontamination units shall be physically attached to the asbestos control area. Build both a personnel decontamination unit and an equipment decontamination unit onto and integral with each asbestos control area.

3.1.2.4 Eye Protection

Provide goggles to personnel engaged in asbestos abatement operations when the use of a full face respirator is not required.

3.1.3 Warning Signs and Labels

Provide warning signs at all approaches to asbestos control areas. Locate signs at such a distance that personnel may read the sign and take the necessary protective steps required before entering the area. Provide labels and affix to all asbestos materials, scrap, waste, debris, and other products contaminated with asbestos.

3.1.3.1 Warning Sign

Legend

Notation

Danger one inch Sans Serif Gothic or Block

Asbestos one inch Sans Serif Gothic or Block

Cancer and Lung Disease Hazard

1/4 inch Sans Serif Gothic or Block

Authorized Personnel Only

Respirators and Protective Clothing are Required in this Area

SECTION 02 82 16.00 20 Page 15

Spacing between lines shall be at least equal to the height of the upper of any two lines.

3.1.3.2 Warning Labels

Provide labels conforming to 29 CFR 1926.1101 of sufficient size to be clearly legible, displaying the following legend:

DANGER

CONTAINS ASBESTOS FIBERS

AVOID CREATING DUST

CANCER AND LUNG DISEASE HAZARD

BREATHING ASBESTOS DUST MAY CAUSE SERIOUS BODILY HARM

3.1.4 Local Exhaust System

Provide a local exhaust system in the asbestos control area in accordance with AIHA Z9.2 and 29 CFR 1926.1101 that will provide at least four air changes per hour inside of the negative pressure enclosure. Local exhaust equipment shall be operated 24 hours per day, until the asbestos control area is removed and shall be leak proof to the filter and equipped with

HEPA filters. Maintain a minimum pressure differential in the control area of minus 0.02 inch of water column relative to adjacent, unsealed areas.

Provide continuous 24-hour per day monitoring of the pressure differential with a pressure differential automatic recording instrument. In no case shall the building ventilation system be used as the local exhaust system for the asbestos control area. Filters on exhaust equipment shall conform to AIHA Z9.2 and UL 586. The local exhaust system shall terminate out of doors and remote from any public access or ventilation system intakes.

3.1.5 Tools

Vacuums shall be leak proof to the filter and equipped with HEPA filters.

Filters on vacuums shall conform to AIHA Z9.2 and UL 586. Do not use power tools to remove asbestos containing materials unless the tool is equipped with effective, integral HEPA filtered exhaust ventilation systems. Remove all residual asbestos from reusable tools prior to storage or reuse.

3.1.6 Rental Equipment

If rental equipment is to be used, furnish written notification to the rental agency concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.

3.1.7 Glovebags

Submit written manufacturers proof that glovebags will not break down under expected temperatures and conditions.

SECTION 02 82 16.00 20 Page 16

3.2 WORK PROCEDURE

Perform asbestos related work in accordance with 29 CFR 1926.1101, 40 CFR 61-SUBPART M, and as specified herein. Use wet removal procedures, appropriate encapsulation procedures as listed in the asbestos hazard abatement plan, and negative pressure enclosure techniques. Personnel shall wear and utilize protective clothing and equipment as specified herein. Eating, smoking, drinking, chewing gum, tobacco, or applying cosmetics shall not be permitted in the asbestos work or control areas.

Personnel of other trades not engaged in the encapsulation removal and demolition of asbestos containing material shall not be exposed at any time to airborne concentrations of asbestos unless all the personnel protection and training provisions of this…