This document provides notice of an award for an indefinite delivery indefinite quantity multiple award construction contract by the Department of the Navy Naval Facilities Engineering Command. The contract is a total small business set-aside for general building construction projects primarily in the Hampton Roads area of Virginia, with an estimated value of $249 million over five years. Up to five awardees will be selected to receive task orders for construction projects ranging from $4-15 million, including the initial $1-5 million seed project to repair structures and systems at the Aegis Facility V10 on Wallops Island, Virginia. Offerors must submit a bid guarantee of at least 20% of the largest task order amount up to $3 million with their proposals. The request for proposal was issued on May 22, 2018 under solicitation N4008518R1111, with proposals due by June 26, 2018.
N4008518R1111-0003.pdf
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB) SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION PROJECTS FOR THE NAVAL FACILITIES ENGINEERING COMMENT, MID-ATLANTIC, PRIMARILY IN THE HAMPTON ROADS
AREA OF VIRGINIA
The proposal due date remains 26 June 2018, at 2:00pm local time.
See Continuation Sheet.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1111
X 9B. DATED (SEE ITEM 11)
22-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jun-2018
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R1111
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
The purpose of this amendment is to:
1. Provide responses to PPIs
2. Provide “Attachment M Photographs”
3. Provide “Attachment, Design Revision 1”
4. Provide the Site Visit Log
PPI#
Reference Question
Government Response
Page/ Dwg
Section Paragraph
8 9 Factor 1 -
Experience
(1) Construction Experience
The minimum $4M project requirement seems unreasonable for a Small Business Set Aside procurement and will limit the level of competition as it will disqualify many Small Businesses in the area. Lowering this minimum requirement to $3M will ensure a higher level of competition.
Bid per the RFP
12 9 of 59 Factor 1 (i), (1)
Regarding Page 9 of 59 – Factor 1 – Experience, (1) Construction Experience, the requirement for “At least one (1) project must have a final construction cost of $10,000,000 or greater” is discriminatory against true Small Businesses that possess both the resources and capability to service the requirements contemplated for this solicitation. As a small business that has been regularly engaged in both IDIQ and MACC contracting for the government for the last ten years we can count on one hand the number of Small Business MACC Task Order awards that exceeded $10M. Awarded Task Orders exceeding $10M represent less than five percent of the total number of Task Orders awarded on the last three NAVFAC Hampton Roads Small Business MACCs. These high value projects are rare opportunities for small business and to exclude small businesses that cannot provide a project of a randomly chosen dollar value is discriminatory. It is important to note that there is no difference between the successful implementation of a $5M project and a $15M project, the specifications read the same, the risk management and construction management processes and staffing requirements are the same. The major difference between a $5M and $15M project is larger two and three dimensional unitary requirements and/or advanced technology requirements for the larger valued project.
A better gage of a Small Business contractors’ strength and capability would be by it’s bonding capacity, both single project and aggregate. This is a true measure of risk for the government that has been established by risk management professionals.
The $10M project restriction forces a Joint Venture relationship between the capable Small Business and a Large or other Small Business in order to compete for the MACC.
The structure of the Joint Venture inherently inhibits the ability of both entities to compete effectively as one for Task Orders in the size range contemplated for this solicitation. The result is a business arrangement that benefits no one including the government.
We are respectfully requesting reconsideration of the solicitation requirement for At least one
(1) project must have a final construction cost of $10,000,000 or greater. In order to provide equitable parameters for Factor 1 that will be inclusive for capable small business Offerors having the desire to compete for this solicitation, we suggest the following:
Substitute $5M or $7.5M (at the governments’ discretion) for the $10M requirement. With respect to bonding capacity, we suggest on page 7 of 59 – 4.2, (a), (1), (iii) delete $10,000,000 and the ability to bond multiple projects, Insert $15,000,000 and an aggregate bonding capacity of $60,000,000 or $20,000,000 and an aggregate bonding capacity of $80,000,000 (at the governments discretion).
These minor changes are consistent with NAVFAC MACC requirements in other Areas of Responsibility (AOR) and will broaden the field for competition without compromising the quality of the Small Business Offerors participating in the proposal process.
H101,C G101,C G301,S1 01,S102, S103, Civil and Structural drawing elevations seem to be cordinated from different benchmarks such as sea level vs. FFE. Please cordinate the civil and structural dicipline elevation points from the same benchmark to remove confusion on proposed FFE grades at each facility.
Bid per the RFP
14 10
Factor 1 – Experience
: (2) Design
Experience
We intend to use two design firms to create a turnkey team. One will act as architect/lead designer while the other will provide engineering for mechanical, electrical, and plumbing. Are we allowed three to five projects for each designer or is that a combined total for the design team?
Bid per the RFP
17 9 Factor 1 – Experience
For Factor 1, may we submit projects that are ‘substantially complete’ (70% or more)? We have a very relevant project that is 97% complete that we would like to include in our proposal.
Bid per the RFP
18 Site Visit
Since we are unable to see the crawl space at the site visit, will there be an additional site visit where we can access the space being renovated?
19 Site Visit
Since we are unable to see the crawl space at the site visit, will we receive additional photographs and measurements to help access the space and needs?
Bid per the RFP
20 Fire Will you be requiring a fire sprinkler system inside the crawl space? Bid per RFP
21 General Can one person serve the roll of Super/QC/SSHO?
See Amendment
22 General Does the gov't provide the escorts for work inside the building or is this the contractor's responsibility?
See Amendment
23 Concrete Are the aluminum termination bars continuous around the concrete footings and walls? Bid per RFP
24 Fire What type of pipe is the existing incoming fire service main? Bid per RFP
25 Fire What type of pipe connections does the existing fire service main have? Bid per RFP
26 General Does the gov't provide utility locating services for all excavation areas or is this the contractor's responsibility?
See Amendment
May we have a picture of the Fire piping Flange we are to connect too. Sheets FD101 and FX101 Note #1
See Amendment
H101,C G101,C G301,S1 01,S102, S103, Civil and Structural drawing elevations seem to be coordinated from different benchmarks such as sea level vs. FFE. Please coordinate the civil and structural discipline elevation points from the same benchmark to remove confusion on proposed FFE grades at each facility. Bid per RFP
29 7 015719 1.3
SD-1- Please provide what Regulatory Notifications are required for this project outside of expected Navy procedures such as Dig Permits, ect. Bid per RFP
30 2 015719.012
1.3.1.3
Since site disturbance is less then one acre with VADEQ permit already approved thru Navy efforts will an approved SWPPP Plan be required or does this area fall under the Chesapeake Bay Preservation Act?
See Amendment
31 2 015719.012
1.3.1.2.2
Will localized dewatering under the facility require any special procedures other then a filter bag? Has testing been performed on the existing soils to eliminate the suspension of hazardous materials present for soil removal and disposal if necessary? Bid per RFP
Have any required US Army Corps or other permits been secured by the Navy in advance of this project? CS101 shows a 10" force main discharging directly into a waterway. Previous projects of this nature usually require extensive permitting thru appropriate regulatory agencies. Additionally procurement of these permits can be lengthy in turn extending the total duration of the project 6-12
See Amendment months. Appendix A has documentation relation to projects considered from 2004 thru 2014 and do not seam to apply to V-10 which is dated 4/2/18.
33 3 024100 1.5
SD-01 Demolition Plan- Please confirm this plan will be required to comply with Section 23-1 of the EM385 which states "(2) Demolition/Renovation Plan. A demolition plan developed by a RPE (REGISTERED PROFESSIONAL ENGINEER) and shall be submitted to the GDA. Plan shall be based on the engineering, lead and asbestos surveys and shall intend for the safe dismantling and removal of all building components and debris. " Additionally please confirm this plan will be completed by a third party paid for by the prime contractor and not provided by the Navy's DOR. Bid per RFP
34 1 01 11 00 1.2.1 Confirm the area under the facility is classified as a permit required Confined Space. Bid per RFP
35 1 312319 1.1.1
Confirm the dewatering plan is primarily considered for the pump stations and is not intended for the crawl space which we were told during the site visit has pumps in place which can dewater that space. Bid per RFP
36 9 05719 1.4.2 Please provide a copy of the Environmental Management System. Bid per RFP
ED101-
The Electrical SOW is extensive and will require several coordinated outages, will temporary power be required during these outages? Bid per RFP
38 MD101
The Mechanical SOW is extensive, please confirm temporary facilities / restrooms are not required during this SOW. If they are please define an appropriate type, restroom trailer or Porto-o-potty. Bid per RFP
39 2
01 11 00
1.5
States to obtain digging permits and comply with “Installation requirements for locating and marking underground utilities”. With the excavation needed in the crawl space, and the limited vertical space, will this be a requirement? We have spoken to a third party locator and informed that they could not do utility locating in the crawl space. Bid per RFP
40 2 01 14 00 1.2 i
Refers to the use of an “exterior dewatering pump” for the in place dewatering pipe. Is there currently a pump in place for the contractor to use or does the contractor need to provide the pump? If there is not a pump in place, what are the procedures and requirements for the pump? What size of pump is needed? Is the pump to be Electric or Gas?
See Amendment
41 1 01 14 00 1.2 h Are escorts supplied by the facility and is there a cost to the contractor? What are the limitations for escorts?
See Amendment
42 3 01 14 00 1.4 . Are photographs permitted and will they be required from the contractor?
Bid per RFP
43 2 01 31 23.13
1.4.3
Please confirm that the Contractor is to provide a tablet computer with a CAC reader at the jobsite. If so, the requirement is also for cellular data connectivity. Is the connectivity at the cost and responsibility of the Contractor or the Government?
See Amendment
44 2 01 32 17.00
1.4
Please confirm that the schedule must be P6 and Cost Loaded. Bid per RFP
45 3 01 45 00.00
1.51.1
Paragraph 1.5.1.1 states the QCM is to serve as the SSHO and to perform the duties of the Superintendent. Please confirm one person is acceptable to perform all three positions.
See Amendment
46 10 Special
Instructions E
States to verify appropriate materials are installed at all penetrations that are existing. Is there a quantifiable amount of existing penetrations that will need to be filled with sealant? Bid per RFP
47 1 00 01 15 1.3 Will Appendix A be a part of the contract? Bid per RFP
48 1 01 14 00 1.2 Please confirm that KTRs should allow for 2 weeks of uncompensated government delay? Bid per RFP
49 6 01 32 17.00
1.6.2.5.1
The value of commissioning/testing/close out activities will not be less than 10 percent of the total costs for Procurement and Construction Activities. QUESTION - The actual value of commissioning/testing/close out activities will be far less than 10% of the contract value. Can the commissioning/testing/close out activities be cost loaded or otherwise scheduled at their respective actual costs plus markups?
See Amendment
51 3 01 45 35 1.3.14 What does this Paragraph mean? How does this paragraph effect KTR in terms of implementation and cost? Bid per RFP
52 01 50 00
Please confirm that the untitled plan attached at the end of this section is the proposed staging/laydown plan and that the fence shown crossing the exiting parking lot is by the KTR? Are there any gates required? Is the cost of the temporary Hcp. And CO parking stripping to be borne by the KTR. Bid per RFP
Is sand an acceptable fill for the west portion of the crawl space Bid per RFP
Is the finish floor of the East side of the building 2' lower or is the entire first floor at "8.96' " Bid per RFP
56 01 11 00 1.2.1 this para indicates the existing crawl space to be a "Permitted Confined Space" During the site visit we were only allowed to look down into the crawl space thru the floor hatch door at one small area of the crawl space. It was noted that just in that small space several various obstructions, i.e. unistrut, conduit, hangers, steel beams, ect with low clearances occupied the space. Since we were not allowed to enter the crawl space during the site visit and view the area in it's entirety, the development of pricing for what it will take to include in a plan and put it into action that will comply with all the "Permitted Confined Space" requirements is not possible. The pictures provided in the drawings are not adequate to make this determination either.
One example of the difficulty in determining requirements would be the type of retrieval system necessary in the event of a rescue considering all of the possible obstructions and or low clearances in place. Assuming that the govt from time to time has entered into this area, is there any existing retrieval system in place or what type of retrieval system has the govt implemented when they have had cause to enter into this space? Please advise. Bid per RFP
57 12 safety
Please confirm if there are any specific forms to be filled out for the EMR and DART rating . We did not see any attachments in the RFP for safety
Bid per RFP
58 N/A N/A Site Visit Will the government be releasing the site visit list by amendment?
See Amendment
Drawing
CG101
Due to the various methodologies of Elevation call-outs used in the Drawings provided, please confirm that a minimum of 18” and a maximum of 27” (+/-) of the existing grade in the crawlspace will be required to be removed to complete the stated Crawlspace Drainage Scope of Work. Additionally, will the material cut from the Drainage work (Plan West – Columns 1 – 6+) be able to be used to Fill on the opposite side of the building (Plan East – Columns 6+ – 11), if/as required?
Bid per RFP
(End of Summary of Changes)