This notice provides details regarding a multiple award construction contract to be awarded by the Naval Facilities Engineering Command Mid-Atlantic. The contract will be a small business set-aside for indefinite delivery indefinite quantity design-build and design-bid-build construction projects primarily supporting installations in Virginia. Work will involve new construction, repair, alteration and renovation of facilities including administrative, industrial, maintenance, warehouses, hangars and other building types. Projects are estimated to range between $4 million to $15 million in value, with a total contract value not to exceed $249 million over five years. Five contracts will be awarded and offerors must submit a bid guarantee of at least 20% of the largest award amount up to $3 million. The request for proposals will be issued on May 22, 2018 under solicitation N4008518R1111. The initial task order involves foundation and crawl space repairs to the AEGIS Facility at Wallops Island, Virginia with a cost estimate of $1 million to $5 million.

Attachment,_Design_Revision_1.pdf

View the file

Other files

File Type Posted
N4008518R1111-0004.pdf PDF
N4008518R1111-0003.pdf PDF
AEGIS_V10_SITE_VISIT_LOG_Redacted.pdf PDF
Attachment_M_Photographs.pdf PDF
Attachment_L_SECNAV_5512-1_11787.pdf PDF
N4008518R1111-0002.pdf PDF
Attachment_K_Price_Proposal_Form.pdf PDF
N4008518R1111-0001.pdf PDF
N4008518R1111.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC

WORK ORDER NUMBER

1551139

DESIGN REVISION 1

AEGIS Facility (V-10) Foundation and Crawl Space Repairs

At Wallops Island, Virginia

CONTINUATION SHEET

SECTION 01 11 00 SUMMARY OF WORK

PART 1 GENERAL

1.5 LOCATION OF UNDERGROUND UTILITIES

Delete the following sentence “Contact local utility location service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on Monday or after a Holiday.”

Replace with the following sentence “Contact NASA through the Contracting Officer a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday, all utility marking must be performed by NASA locator.”

SECTION 01 14 00 Work RESTRICTIONS

PART 1 GENERAL

1.2.h SPECIAL SCHEDULING REQUIREMENTS

Delete the following sentence “Escorts are required for contractor’s personnel when entering AEGIS Facility V-10 above the crawl space.”

Add the following sentence “Government escorts are required for contractor’s personnel when entering AEGIS Facility V-10 above the crawl space.”

Add the following subsection to 1.2 Special Scheduling Requirments

1.2.l No photographs inside of Building V-10.

SECTION 01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT

CONTRACT MANAGEMENT SYSTEM

PART 1 GENERAL

1.4.3 Field Administration

1551139 AMENDMENT 003

Delete the following sentence “The tablet computer must have a web-browser, built-in camera, and cellular data connectivity.”

Add the following sentence “The tablet computer must have a web-browser, built-in camera, cellular data connectivity and data for project duration.”

SECTION 01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULE (NAS)

1.6.2.3.1 Work Breakdown Structure (WBS)

Delete part d. Commissioning & Testing in its entirety from the project specifications.

1.6.2.5.1 Cost Loading Activities

Delete the following sentence “The Value of commissioning, testing and closeout WBS section may not be less than 10 percent of the total costs for Procurement and Construction Activities.”

SECTION 01 45 00 QUALITY CONTROL

1.5.1.1 Duties

Delete the following sentence “Provide a QC Manager at the work site to implement and manage the QC Program and to serve as the Site Safety and Health Officer (SSHO) as detailed in Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS.”

Add the following sentence “Provide a QC Manager at the work site to implement and manage the QC program.”

SECTION 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROLS

PART 1 GENERAL

1.3.1.2.1 Erosion and Sediment Control

Add the following sentence “The land disturbance for the project does not exceed 10,000 square feet. If the Contactor disturbs more than 10,000 square feet of land, they must submit and obtain an approved erosion and sediment control plan by the Virginia Department of Environmental Quality.”

1.3.1.3 Virginia Stormwater Management

Delete the following “Where land disturbance is equal to or exceed one acre, prepare and submit a Stormwater Pollution Prevention Plan (SWPPP) and comply with requirements specified in the Virginia Stormwater Management Law and Regulations (Virginia Code: 9 VAC 25-870).”

Replace with the following “The land disturbance for the project does not exceed one acre. Prepare a Stormwater Pollution Prevention Plan (SWPPP) that includes Stormwater Pollution Prevention Plan (Dated March 2016) found in the SUPPLEMENTARY INFORMATION and comply with requirements specified in the Virginia Stormwater Management Law and Regulations (Virginia Code: 9 VAC 25-870).”

Add the following sentence “A modification to the existing VPDES is required for the stormwater outfall. NASA Wallops will permit the outfall with the Virginia Department of Environmental Quality. The Contractor must contact NASA Wallops through the Contracting Officer at the start of construction and coordinate with the permit resubmittal”

PART 1 GENERAL

1.3.1.3.1 Stormwater General Permit for Construction Activities Registration Statement

Add the following sentence “The land disturbance for the project does not exceed one acre. If the Contactor disturbs more than one acre of land, a General Permit must be submitted.”

- END OF PROPOSED AMENDMENT