N4008518R1111-0001.pdf
PDF 23 KB Posted
- Attached to
- NOTICE OF MACC IDIQ AWARD
- Solicitation number
- N4008518R1111
About this file
This document provides information regarding a multiple award construction contract notice of award from the Naval Facilities Engineering Command. The contract is a small business set-aside for general construction projects valued between $4 million and $15 million located primarily in the Hampton Roads area of Virginia. The total estimated value of all contracts awarded is $249 million over five years. The Naval Facilities Engineering Command intends to award up to five firm fixed price indefinite delivery indefinite quantity contracts resulting from this solicitation. The initial task order involves repair and replacement work valued between $1 million and $5 million at a facility on Wallops Island, Virginia. The response due date for proposal submission in response to solicitation number N4008518R1111 was June 26, 2018.
N4008518R1111-0001.pdf
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB) SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION PROJECTS FOR THE NAVAL FACILITIES ENGINEERING COMMENT, MID-ATLANTIC, PRIMARILY IN THE HAMPTON ROADS
AREA OF VIRGINIA
The proposal due date remains 26 June 2018, at 2:00pm local time.
See Continuation Sheet.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1111
X 9B. DATED (SEE ITEM 11)
22-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-May-2018
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R1111
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
The purpose of this amendment is to:
1. Correct Section 00100, Paragraph 1.3.3, change $4,000 to $4,000,000
2. PPIs 1 through 6.
3. Correct the proposal due date in SF1442 Block 13.A
1. Replace Section 00100, Paragraph 1.3.3 with:
“1.3.3 The completion date for the basic contract is one (1) year from the date of contract award with four (4) one-year option periods. The total five-year (base and four one-year options) estimated construction cost for all contracts is not to exceed $249,000,000.00 for the life of the contract. Projects for the MACC have an estimated construction cost between $4,000,000 and $15,000,000; however, smaller and larger dollar value projects may be considered at the discretion of the Contracting Officer. The Government guarantees an award amount of $5,000.00 to each successful offeror over the full term of the contract, including option years.”
2. Responses to PPIs 1 through 6.
PPI#
Reference Question
Government Response
Page/ Dwg
Section Paragraph
1 1 Block 13.A
The due date on the solicitation is June 21st; however NECO and the
General Requirements state the RFP is due June 26th. Please confirm the proposal due date.
See Amendment 0001
2 10 Design
Exp Please specify the minimum and maxium final design cost.
Bid per the RFP
3 SF 1442
The SF1442 states the bid due date to be 6/21/18. However in other places, i.e. NECO web page and page 58 of 59 of the solicitation the bid due date is stated to be 6/26/18.
Which is the correct date?
See Amendment 0001
Please confirm bid date. SF1442 states 6/21/2018, General
Requirements states 6/26/2018 See Amendment 0001
5 Page 9 00100 Experience
Construction Experience - Please confirm size of single completed construction projects are to be greater than 4 Mil. for relevant construction projects.
Bid per the RFP
N4008518R1111
6 Page 13 00100
SAFETY
Requirements Can Safety awards be included? Bid per the RFP
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 21-Jun-2018 02:00 PM to 26-Jun-2018 02:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .